Where ethics,
integrity,
compliance &
audit
intersect
John J. Hall, CPA
September 12, 2024
Download your CPE certificate immediately
upon meeting the requirements.
Ask content questions
anytime
Get help with technical
Issues
Thank you for joining us
2
Earn CPE by meeting all the requirements as
listed in the Earn CPE widget.
The webinar will be available for on-demand viewing
approximately 24 hours after the event
Introduction John J. Hall, CPA
President | Hall Consulting, Inc.
• 45 years as an auditor, speaker, skills trainer,
consultant and business owner
• Specialty is effective Business Risk Management
and Response (including Fraud Risk Management)
Contact: www.johnhallspeaker.com/contact/
Website: www.JohnHallSpeaker.com
Direct phone (U.S.): 312-560-9931
3
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
4
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
5
6
Personal
Individual’s basic notion of right and wrong
Organizational
Consciously defined by organizations to promote
consistent integrity in the members
Ethics – Two Categories
Where ethics, integrity, compliance & audit intersect
7
Personal
Individual’s basic notion of right and wrong
Organizational
Consciously defined by organizations to promote
consistent integrity in the members
Ethics – Two Categories
Where ethics, integrity, compliance & audit intersect
8
In Theory…
Good Ethics
is
Good Business
Where ethics, integrity, compliance & audit intersect
ETHICS
A philosophical discipline that
describes and directs moral conduct
Where ethics, integrity, compliance & audit intersect
9
ETHICS
A philosophical discipline that
describes and directs moral conduct
The Foundation
Where ethics, integrity, compliance & audit intersect
10
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTENTIONS
The Foundation
Where ethics, integrity, compliance & audit intersect
11
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
INTENTIONS
Where ethics, integrity, compliance & audit intersect
12
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
INTENTIONS
ACTIONS
Where ethics, integrity, compliance & audit intersect
13
Ethics / Integrity
Disconnect
Risk
THE Core Issue
Where ethics, integrity, compliance & audit intersect
14
Why do intelligent people stare
right into the face of ethics –
and then do
the wrong thing anyway?
I Keep Wondering…
Where ethics, integrity, compliance & audit intersect
15
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
INTENTIONS
ACTIONS
RATIONALIZATION
Where ethics, integrity, compliance & audit intersect
16
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
COMPLIANCE
A legal discipline that describes rules by which we
determine whether or not actions are acceptable
INTENTIONS
ACTIONS
Where ethics, integrity, compliance & audit intersect
17
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
COMPLIANCE
A legal discipline that describes rules by which we
determine whether or not actions are acceptable
INTENTIONS
ACTIONS
VERIFICATION
Where ethics, integrity, compliance & audit intersect
18
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
COMPLIANCE
A legal discipline that describes rules by which we
determine whether or not actions are acceptable
INTENTIONS
ACTIONS
VERIFICATION
Our Role????
Where ethics, integrity, compliance & audit intersect
19
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
COMPLIANCE
A legal discipline that describes rules by which we
determine whether or not actions are acceptable
INTENTIONS
ACTIONS
Something is Missing
VERIFICATION
Where ethics, integrity, compliance & audit intersect
20
ETHICS
A philosophical discipline that
describes and directs moral conduct
INTEGRITY
Consistent and uncompromising adherence
to strong moral and ethical principles and values
COMPLIANCE
A legal discipline that describes rules by which we
determine whether or not actions are acceptable
INTENTIONS
ACTIONS
VERIFICATION
ACCOUNTABILITY
Where ethics, integrity, compliance & audit intersect
21
22
What happens if a leg is broken or missing?
Where ethics, integrity, compliance & audit intersect
What happens if a leg is broken or missing?
What if two legs…
Where ethics, integrity, compliance & audit intersect
23
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
30
A few ethics
concerns
✓ Shading the truth – ignoring the truth
Where ethics, integrity, compliance & audit intersect
31
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
Where ethics, integrity, compliance & audit intersect
32
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
✓ Back-room shadow deals
Where ethics, integrity, compliance & audit intersect
33
Shadow Deals
Undisclosed non-transparent relationship that has a real or
apparent impact on what others perceive.
Shadow deals create the risk that judgement or actions regarding a
primary interest will be unduly influenced by a secondary interest.
Where ethics, integrity, compliance & audit intersect
34
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
✓ Back-room shadow deals
✓ Leadership integrity erosion
Where ethics, integrity, compliance & audit intersect
35
Plus Nissan, Mitsubishi, Fiat Chrysler…
Where ethics, integrity, compliance & audit intersect
36
And now Cummins…
Where ethics, integrity, compliance & audit intersect
37
And now Cummins…
Where ethics, integrity, compliance & audit intersect
38
And now Cummins…
Where ethics, integrity, compliance & audit intersect
39
And their customers…
Where ethics, integrity, compliance & audit intersect
40
And their customers…
Where ethics, integrity, compliance & audit intersect
41
Boeing 737 MAX
Where ethics, integrity, compliance & audit intersect
42
Alaska Airlines 737 MAX
Where ethics, integrity, compliance & audit intersect
43
Where ethics, integrity, compliance & audit intersect
44
Where ethics, integrity, compliance & audit intersect
45
Where ethics, integrity, compliance & audit intersect
46
Where ethics, integrity, compliance & audit intersect
47
Saturday,
May 17, 2024
Where ethics, integrity, compliance & audit intersect
48
Where ethics, integrity, compliance & audit intersect
49
Why do intelligent people stare
right into the face of ethics –
and then do
the wrong thing anyway?
Again - I Keep Wondering…
Where ethics, integrity, compliance & audit intersect
50
Manipulation of
Non-Financial Results
The Slippery Slope
Where ethics, integrity, compliance & audit intersect
51
Non-financial
results
✓ Environmental impact
Where ethics, integrity, compliance & audit intersect
52
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
Where ethics, integrity, compliance & audit intersect
53
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
✓ Safety of self-driving vehicles
Where ethics, integrity, compliance & audit intersect
54
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
✓ Safety of self-driving vehicles
✓ Harassment and discrimination
Where ethics, integrity, compliance & audit intersect
55
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
✓ Safety of self-driving vehicles
✓ Harassment and discrimination
✓ Misuse of technology
Where ethics, integrity, compliance & audit intersect
56
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
✓ Safety of self-driving vehicles
✓ Harassment and discrimination
✓ Misuse of technology
✓ Personal and data privacy
Where ethics, integrity, compliance & audit intersect
57
Non-financial
results
✓ Environmental impact
✓ Customer trends and volumes
✓ Safety of self-driving vehicles
✓ Harassment and discrimination
✓ Misuse of technology
✓ Personal and data privacy
✓ ESG compliance reporting
Where ethics, integrity, compliance & audit intersect
58
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
✓ Back-room shadow deals
✓ Leadership integrity erosion
✓ International conflict +/- domestic conflict
Where ethics, integrity, compliance & audit intersect
60
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
✓ Back-room shadow deals
✓ Leadership integrity erosion
✓ International conflict +/- domestic conflict
✓ AI-based decisions & deception
Where ethics, integrity, compliance & audit intersect
61
Artificial Intelligence & Algorithms
Where ethics, integrity, compliance & audit intersect
62
Where ethics, integrity, compliance & audit intersect
63
FUNDAMENTAL QUESTION
But is there
anything really new
to discuss?
Where ethics, integrity, compliance & audit intersect
64
A few ethics
concerns
✓ Shading the truth – ignoring the truth
✓ Rationalization of pretty much everything
✓ Back-room shadow deals
✓ Leadership integrity erosion
✓ International conflict +/- domestic conflict
✓ AI-based decisions & deception
✓ Growing uncertainty and anxiety
Where ethics, integrity, compliance & audit intersect
65
Uncertainty
causes
anxiety
Where ethics, integrity, compliance & audit intersect
66
Where ethics, integrity, compliance & audit intersect
67
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
68
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
75
Hey, Let’s Jump Off the Cliff
Where ethics, integrity, compliance & audit intersect
76
Creeping
Normalcy
BEWARE
Where ethics, integrity, compliance & audit intersect
77
The Slippery Slope
Unethical
(Dishonest)
Ethical
(Honest)
Where ethics, integrity, compliance & audit intersect
78
Well…
It Depends
The Slippery Slope
Unethical
(Dishonest)
Ethical
(Honest)
Where ethics, integrity, compliance & audit intersect
79
Well…
It Depends
The Slippery Slope
Unethical
(Dishonest)
Ethical
(Honest)
Where ethics, integrity, compliance & audit intersect
80
Well…
It Depends
The Slippery Slope
Unethical
(Dishonest)
Ethical
(Honest)
Where ethics, integrity, compliance & audit intersect
81
Ethical
(Honest)
Unethical
(Dishonest)
The Slippery Slope
Where ethics, integrity, compliance & audit intersect
82
✓ Governance
✓ Policies
✓ Internal Controls
✓ Tone ‘In The Middle'
✓ Micro Culture
✓ Audit
Ethical
(Honest)
Unethical
(Dishonest)
The Slippery Slope
Where ethics, integrity, compliance & audit intersect
83
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
84
A Risky Topic?
Potential Career & Personal Risk
Where ethics, integrity, compliance & audit intersect
85
What’s
our role?
THE BIG QUESTION
Where ethics, integrity, compliance & audit intersect
86
What’s
your role?
THE LARGER QUESTION
Where ethics, integrity, compliance & audit intersect
87
Out on a Limb???
Where ethics, integrity, compliance & audit intersect
88
Potential
roles
1. Deterrence
Where ethics, integrity, compliance & audit intersect
89
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
Where ethics, integrity, compliance & audit intersect
90
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
Where ethics, integrity, compliance & audit intersect
91
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
• Include ethics issues in project planning
92 Where ethics, integrity, compliance & audit intersect
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
• Include ethics issues in project planning
• Critical thinking & skepticism
93 Where ethics, integrity, compliance & audit intersect
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
• Include ethics issues in project planning
• Critical thinking & skepticism
• Be visible and vocal
94 Where ethics, integrity, compliance & audit intersect
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
• Include ethics issues in project planning
• Critical thinking & skepticism
• Be visible and vocal
• Tell success stories
95 Where ethics, integrity, compliance & audit intersect
Monitoring,
analysis &
verification
suggestions
• Include ethics issues in risk analysis
• Include ethics issues in project planning
• Critical thinking & skepticism
• Be visible and vocal
• Tell success stories
• Recruit heroes
Where ethics, integrity, compliance & audit intersect
96
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
Where ethics, integrity, compliance & audit intersect
97
98
Audit Interviews
Where ethics, integrity, compliance & audit intersect
Ask About Problems
Where ethics, integrity, compliance & audit intersect
99
Good questions “Have you seen anything that made you
uncomfortable?”
100 Where ethics, integrity, compliance & audit intersect
Good questions “Have you seen anything that made you
uncomfortable?”
“Have you been asked to sign or approve
anything that you weren’t confident was
correct?”
101 Where ethics, integrity, compliance & audit intersect
Good questions “Have you seen anything that made you
uncomfortable?”
“Have you been asked to sign or approve
anything that you weren’t confident was
correct?”
“Is anyone breaking the rules?”
102 Where ethics, integrity, compliance & audit intersect
Good questions “Have you seen anything that made you
uncomfortable?”
“Have you been asked to sign or approve
anything that you weren’t confident was
correct?”
“Is anyone breaking the rules?”
=====
“Tell me what happened.”
103 Where ethics, integrity, compliance & audit intersect
Good questions “Have you seen anything that made you
uncomfortable?”
“Have you been asked to sign or approve
anything that you weren’t confident was
correct?”
“Is anyone breaking the rules?”
=====
“Tell me what happened.”
=====
“How could we prove that?”
104 Where ethics, integrity, compliance & audit intersect
Good questions “Have you seen anything that made you
uncomfortable?”
“Have you been asked to sign or approve
anything that you weren’t confident was
correct?”
“Is anyone breaking the rules?”
=====
“Tell me what happened.”
=====
“How could we prove that?”
105 Where ethics, integrity, compliance & audit intersect
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
4. Radar / early warning system
Where ethics, integrity, compliance & audit intersect
107
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
4. Radar / early warning system
5. Stop sign
Where ethics, integrity, compliance & audit intersect
108
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
4. Radar / early warning system
5. Stop sign
6. Conscience
Where ethics, integrity, compliance & audit intersect
109
How does a person
systematically analyze situations
to make clear and correct
ethical decisions?
- page 2
Where ethics, integrity, compliance & audit intersect
110
How does a person
systematically analyze situations
to make clear and correct
ethical decisions?
- page 2
Degrees of Separation
Where ethics, integrity, compliance & audit intersect
111
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
4. Radar / early warning system
5. Stop sign
6. Conscience
7. Advisor
Where ethics, integrity, compliance & audit intersect
112
Potential
roles
1. Deterrence
2. Monitoring, analysis & verification
3. Field reality examiner / auditor
4. Radar / early warning system
5. Stop sign
6. Conscience
7. Advisor
8. Preacher Teacher
Where ethics, integrity, compliance & audit intersect
113
Preacher Teacher
Where ethics, integrity, compliance & audit intersect
114
Ask About Solutions
Where ethics, integrity, compliance & audit intersect
115
Employee
ethics training
scenarios
W W Y D N
(What Would You Do Next?)
Where ethics, integrity, compliance & audit intersect
116
Tell Them Solutions?????
Where ethics, integrity, compliance & audit intersect
117
“What if we…”
Pivot to Solutions
Where ethics, integrity, compliance & audit intersect
118
“What if we…”
Pivot to Solutions
Where ethics, integrity, compliance & audit intersect
119
1. Starting Point
2. So…Where are We Now
3. Let’s Play Better, Worse or the Same
4. The Slippery Slope of Integrity Erosion
5. So…Where Does That Leave Us?
6. Your Questions
Agenda
Where ethics, integrity, compliance & audit intersect
120
Visit www.TeamMateSolutions.com
for the latest in Internal Audit thought leadership and more.
See more webinars from TeamMate at tm.wolterskluwer.com/webinars
Your questions, comments, feedback,
well-reasoned and/or emotional arguments,
confessions or anything else?
www.JohnHallSpeaker.com/contact/
121
Visit www.TeamMateSolutions.com
for the latest in Internal Audit thought leadership and more.
See more webinars from TeamMate at tm.wolterskluwer.com/webinars
Thank you!
122

whereethicsintegritycomplianceauditintersect1725903142333 (1).pdf

  • 1.
  • 2.
    Download your CPEcertificate immediately upon meeting the requirements. Ask content questions anytime Get help with technical Issues Thank you for joining us 2 Earn CPE by meeting all the requirements as listed in the Earn CPE widget. The webinar will be available for on-demand viewing approximately 24 hours after the event
  • 3.
    Introduction John J.Hall, CPA President | Hall Consulting, Inc. • 45 years as an auditor, speaker, skills trainer, consultant and business owner • Specialty is effective Business Risk Management and Response (including Fraud Risk Management) Contact: www.johnhallspeaker.com/contact/ Website: www.JohnHallSpeaker.com Direct phone (U.S.): 312-560-9931 3
  • 4.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 4
  • 5.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 5
  • 6.
    6 Personal Individual’s basic notionof right and wrong Organizational Consciously defined by organizations to promote consistent integrity in the members Ethics – Two Categories Where ethics, integrity, compliance & audit intersect
  • 7.
    7 Personal Individual’s basic notionof right and wrong Organizational Consciously defined by organizations to promote consistent integrity in the members Ethics – Two Categories Where ethics, integrity, compliance & audit intersect
  • 8.
    8 In Theory… Good Ethics is GoodBusiness Where ethics, integrity, compliance & audit intersect
  • 9.
    ETHICS A philosophical disciplinethat describes and directs moral conduct Where ethics, integrity, compliance & audit intersect 9
  • 10.
    ETHICS A philosophical disciplinethat describes and directs moral conduct The Foundation Where ethics, integrity, compliance & audit intersect 10
  • 11.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTENTIONS The Foundation Where ethics, integrity, compliance & audit intersect 11
  • 12.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values INTENTIONS Where ethics, integrity, compliance & audit intersect 12
  • 13.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values INTENTIONS ACTIONS Where ethics, integrity, compliance & audit intersect 13
  • 14.
    Ethics / Integrity Disconnect Risk THECore Issue Where ethics, integrity, compliance & audit intersect 14
  • 15.
    Why do intelligentpeople stare right into the face of ethics – and then do the wrong thing anyway? I Keep Wondering… Where ethics, integrity, compliance & audit intersect 15
  • 16.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values INTENTIONS ACTIONS RATIONALIZATION Where ethics, integrity, compliance & audit intersect 16
  • 17.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values COMPLIANCE A legal discipline that describes rules by which we determine whether or not actions are acceptable INTENTIONS ACTIONS Where ethics, integrity, compliance & audit intersect 17
  • 18.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values COMPLIANCE A legal discipline that describes rules by which we determine whether or not actions are acceptable INTENTIONS ACTIONS VERIFICATION Where ethics, integrity, compliance & audit intersect 18
  • 19.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values COMPLIANCE A legal discipline that describes rules by which we determine whether or not actions are acceptable INTENTIONS ACTIONS VERIFICATION Our Role???? Where ethics, integrity, compliance & audit intersect 19
  • 20.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values COMPLIANCE A legal discipline that describes rules by which we determine whether or not actions are acceptable INTENTIONS ACTIONS Something is Missing VERIFICATION Where ethics, integrity, compliance & audit intersect 20
  • 21.
    ETHICS A philosophical disciplinethat describes and directs moral conduct INTEGRITY Consistent and uncompromising adherence to strong moral and ethical principles and values COMPLIANCE A legal discipline that describes rules by which we determine whether or not actions are acceptable INTENTIONS ACTIONS VERIFICATION ACCOUNTABILITY Where ethics, integrity, compliance & audit intersect 21
  • 22.
    22 What happens ifa leg is broken or missing? Where ethics, integrity, compliance & audit intersect
  • 23.
    What happens ifa leg is broken or missing? What if two legs… Where ethics, integrity, compliance & audit intersect 23
  • 24.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 30
  • 25.
    A few ethics concerns ✓Shading the truth – ignoring the truth Where ethics, integrity, compliance & audit intersect 31
  • 26.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything Where ethics, integrity, compliance & audit intersect 32
  • 27.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything ✓ Back-room shadow deals Where ethics, integrity, compliance & audit intersect 33
  • 28.
    Shadow Deals Undisclosed non-transparentrelationship that has a real or apparent impact on what others perceive. Shadow deals create the risk that judgement or actions regarding a primary interest will be unduly influenced by a secondary interest. Where ethics, integrity, compliance & audit intersect 34
  • 29.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything ✓ Back-room shadow deals ✓ Leadership integrity erosion Where ethics, integrity, compliance & audit intersect 35
  • 30.
    Plus Nissan, Mitsubishi,Fiat Chrysler… Where ethics, integrity, compliance & audit intersect 36
  • 31.
    And now Cummins… Whereethics, integrity, compliance & audit intersect 37
  • 32.
    And now Cummins… Whereethics, integrity, compliance & audit intersect 38
  • 33.
    And now Cummins… Whereethics, integrity, compliance & audit intersect 39
  • 34.
    And their customers… Whereethics, integrity, compliance & audit intersect 40
  • 35.
    And their customers… Whereethics, integrity, compliance & audit intersect 41
  • 36.
    Boeing 737 MAX Whereethics, integrity, compliance & audit intersect 42
  • 37.
    Alaska Airlines 737MAX Where ethics, integrity, compliance & audit intersect 43
  • 38.
    Where ethics, integrity,compliance & audit intersect 44
  • 39.
    Where ethics, integrity,compliance & audit intersect 45
  • 40.
    Where ethics, integrity,compliance & audit intersect 46
  • 41.
    Where ethics, integrity,compliance & audit intersect 47
  • 42.
    Saturday, May 17, 2024 Whereethics, integrity, compliance & audit intersect 48
  • 43.
    Where ethics, integrity,compliance & audit intersect 49
  • 44.
    Why do intelligentpeople stare right into the face of ethics – and then do the wrong thing anyway? Again - I Keep Wondering… Where ethics, integrity, compliance & audit intersect 50
  • 45.
    Manipulation of Non-Financial Results TheSlippery Slope Where ethics, integrity, compliance & audit intersect 51
  • 46.
    Non-financial results ✓ Environmental impact Whereethics, integrity, compliance & audit intersect 52
  • 47.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes Where ethics, integrity, compliance & audit intersect 53
  • 48.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes ✓ Safety of self-driving vehicles Where ethics, integrity, compliance & audit intersect 54
  • 49.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes ✓ Safety of self-driving vehicles ✓ Harassment and discrimination Where ethics, integrity, compliance & audit intersect 55
  • 50.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes ✓ Safety of self-driving vehicles ✓ Harassment and discrimination ✓ Misuse of technology Where ethics, integrity, compliance & audit intersect 56
  • 51.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes ✓ Safety of self-driving vehicles ✓ Harassment and discrimination ✓ Misuse of technology ✓ Personal and data privacy Where ethics, integrity, compliance & audit intersect 57
  • 52.
    Non-financial results ✓ Environmental impact ✓Customer trends and volumes ✓ Safety of self-driving vehicles ✓ Harassment and discrimination ✓ Misuse of technology ✓ Personal and data privacy ✓ ESG compliance reporting Where ethics, integrity, compliance & audit intersect 58
  • 53.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything ✓ Back-room shadow deals ✓ Leadership integrity erosion ✓ International conflict +/- domestic conflict Where ethics, integrity, compliance & audit intersect 60
  • 54.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything ✓ Back-room shadow deals ✓ Leadership integrity erosion ✓ International conflict +/- domestic conflict ✓ AI-based decisions & deception Where ethics, integrity, compliance & audit intersect 61
  • 55.
    Artificial Intelligence &Algorithms Where ethics, integrity, compliance & audit intersect 62
  • 56.
    Where ethics, integrity,compliance & audit intersect 63
  • 57.
    FUNDAMENTAL QUESTION But isthere anything really new to discuss? Where ethics, integrity, compliance & audit intersect 64
  • 58.
    A few ethics concerns ✓Shading the truth – ignoring the truth ✓ Rationalization of pretty much everything ✓ Back-room shadow deals ✓ Leadership integrity erosion ✓ International conflict +/- domestic conflict ✓ AI-based decisions & deception ✓ Growing uncertainty and anxiety Where ethics, integrity, compliance & audit intersect 65
  • 59.
  • 60.
    Where ethics, integrity,compliance & audit intersect 67
  • 61.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 68
  • 62.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 75
  • 63.
    Hey, Let’s JumpOff the Cliff Where ethics, integrity, compliance & audit intersect 76
  • 64.
  • 65.
    The Slippery Slope Unethical (Dishonest) Ethical (Honest) Whereethics, integrity, compliance & audit intersect 78
  • 66.
    Well… It Depends The SlipperySlope Unethical (Dishonest) Ethical (Honest) Where ethics, integrity, compliance & audit intersect 79
  • 67.
    Well… It Depends The SlipperySlope Unethical (Dishonest) Ethical (Honest) Where ethics, integrity, compliance & audit intersect 80
  • 68.
    Well… It Depends The SlipperySlope Unethical (Dishonest) Ethical (Honest) Where ethics, integrity, compliance & audit intersect 81
  • 69.
    Ethical (Honest) Unethical (Dishonest) The Slippery Slope Whereethics, integrity, compliance & audit intersect 82
  • 70.
    ✓ Governance ✓ Policies ✓Internal Controls ✓ Tone ‘In The Middle' ✓ Micro Culture ✓ Audit Ethical (Honest) Unethical (Dishonest) The Slippery Slope Where ethics, integrity, compliance & audit intersect 83
  • 71.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 84
  • 72.
    A Risky Topic? PotentialCareer & Personal Risk Where ethics, integrity, compliance & audit intersect 85
  • 73.
    What’s our role? THE BIGQUESTION Where ethics, integrity, compliance & audit intersect 86
  • 74.
    What’s your role? THE LARGERQUESTION Where ethics, integrity, compliance & audit intersect 87
  • 75.
    Out on aLimb??? Where ethics, integrity, compliance & audit intersect 88
  • 76.
    Potential roles 1. Deterrence Where ethics,integrity, compliance & audit intersect 89
  • 77.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification Where ethics, integrity, compliance & audit intersect 90
  • 78.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis Where ethics, integrity, compliance & audit intersect 91
  • 79.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis • Include ethics issues in project planning 92 Where ethics, integrity, compliance & audit intersect
  • 80.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis • Include ethics issues in project planning • Critical thinking & skepticism 93 Where ethics, integrity, compliance & audit intersect
  • 81.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis • Include ethics issues in project planning • Critical thinking & skepticism • Be visible and vocal 94 Where ethics, integrity, compliance & audit intersect
  • 82.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis • Include ethics issues in project planning • Critical thinking & skepticism • Be visible and vocal • Tell success stories 95 Where ethics, integrity, compliance & audit intersect
  • 83.
    Monitoring, analysis & verification suggestions • Includeethics issues in risk analysis • Include ethics issues in project planning • Critical thinking & skepticism • Be visible and vocal • Tell success stories • Recruit heroes Where ethics, integrity, compliance & audit intersect 96
  • 84.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor Where ethics, integrity, compliance & audit intersect 97
  • 85.
    98 Audit Interviews Where ethics,integrity, compliance & audit intersect
  • 86.
    Ask About Problems Whereethics, integrity, compliance & audit intersect 99
  • 87.
    Good questions “Haveyou seen anything that made you uncomfortable?” 100 Where ethics, integrity, compliance & audit intersect
  • 88.
    Good questions “Haveyou seen anything that made you uncomfortable?” “Have you been asked to sign or approve anything that you weren’t confident was correct?” 101 Where ethics, integrity, compliance & audit intersect
  • 89.
    Good questions “Haveyou seen anything that made you uncomfortable?” “Have you been asked to sign or approve anything that you weren’t confident was correct?” “Is anyone breaking the rules?” 102 Where ethics, integrity, compliance & audit intersect
  • 90.
    Good questions “Haveyou seen anything that made you uncomfortable?” “Have you been asked to sign or approve anything that you weren’t confident was correct?” “Is anyone breaking the rules?” ===== “Tell me what happened.” 103 Where ethics, integrity, compliance & audit intersect
  • 91.
    Good questions “Haveyou seen anything that made you uncomfortable?” “Have you been asked to sign or approve anything that you weren’t confident was correct?” “Is anyone breaking the rules?” ===== “Tell me what happened.” ===== “How could we prove that?” 104 Where ethics, integrity, compliance & audit intersect
  • 92.
    Good questions “Haveyou seen anything that made you uncomfortable?” “Have you been asked to sign or approve anything that you weren’t confident was correct?” “Is anyone breaking the rules?” ===== “Tell me what happened.” ===== “How could we prove that?” 105 Where ethics, integrity, compliance & audit intersect
  • 93.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor 4. Radar / early warning system Where ethics, integrity, compliance & audit intersect 107
  • 94.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor 4. Radar / early warning system 5. Stop sign Where ethics, integrity, compliance & audit intersect 108
  • 95.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor 4. Radar / early warning system 5. Stop sign 6. Conscience Where ethics, integrity, compliance & audit intersect 109
  • 96.
    How does aperson systematically analyze situations to make clear and correct ethical decisions? - page 2 Where ethics, integrity, compliance & audit intersect 110
  • 97.
    How does aperson systematically analyze situations to make clear and correct ethical decisions? - page 2 Degrees of Separation Where ethics, integrity, compliance & audit intersect 111
  • 98.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor 4. Radar / early warning system 5. Stop sign 6. Conscience 7. Advisor Where ethics, integrity, compliance & audit intersect 112
  • 99.
    Potential roles 1. Deterrence 2. Monitoring,analysis & verification 3. Field reality examiner / auditor 4. Radar / early warning system 5. Stop sign 6. Conscience 7. Advisor 8. Preacher Teacher Where ethics, integrity, compliance & audit intersect 113
  • 100.
    Preacher Teacher Where ethics,integrity, compliance & audit intersect 114
  • 101.
    Ask About Solutions Whereethics, integrity, compliance & audit intersect 115
  • 102.
    Employee ethics training scenarios W WY D N (What Would You Do Next?) Where ethics, integrity, compliance & audit intersect 116
  • 103.
    Tell Them Solutions????? Whereethics, integrity, compliance & audit intersect 117
  • 104.
    “What if we…” Pivotto Solutions Where ethics, integrity, compliance & audit intersect 118
  • 105.
    “What if we…” Pivotto Solutions Where ethics, integrity, compliance & audit intersect 119
  • 106.
    1. Starting Point 2.So…Where are We Now 3. Let’s Play Better, Worse or the Same 4. The Slippery Slope of Integrity Erosion 5. So…Where Does That Leave Us? 6. Your Questions Agenda Where ethics, integrity, compliance & audit intersect 120
  • 107.
    Visit www.TeamMateSolutions.com for thelatest in Internal Audit thought leadership and more. See more webinars from TeamMate at tm.wolterskluwer.com/webinars Your questions, comments, feedback, well-reasoned and/or emotional arguments, confessions or anything else? www.JohnHallSpeaker.com/contact/ 121
  • 108.
    Visit www.TeamMateSolutions.com for thelatest in Internal Audit thought leadership and more. See more webinars from TeamMate at tm.wolterskluwer.com/webinars Thank you! 122