1. Curriculum vitae
Name : hazem salah abdel aziz
date of birth : 24 - jun -1977
Nationalty : egyptian
Marital status : married
Address : egypt – gizaa – al haram
Phone number : 002-011-58583434
e.mail : HAZEMDRILLER@OUTLOOK.COM
education : Bachelors of commerce 1996
languages : arabic & english
work history :
2013 – 2015 rig manager SUP @ sinopec drilling saudi
2012 – 2013 night toolpusher @ ades drilling egypt
2010 – 2012 driller @ nabors drilling saudi
2009 – 2010 assistant driller @ nabors drilling. kuwait
2008 – 2009 assistant driller @ santa fe drilling. kuwait
2005 – 2008 derrick man @ santa fe drilling. kuwait
2001 – 2005 floor man @ santa fe drilling. kuwait
1998 – 2000 roustabout @ global santa fe drilling. egypt
1996 – 1998 painter @ santa fe drilling. egypt
Courses & certificates .
2. General safety ( updc ) drilling co.
Fire fighting ( updc ) drilling co.
H2s traning ( updc ) drilling co.
IOASH cours ( updc ) drillilg co.
Manlifting traning ( santa fe drilling co )
Safety focus team ( global santa fe drilling )
Confined space entry ( global santa fe drilling )
Fall prevention & protection ( global santa fe drilling )
First aid ( nabors drilling
international )
Rig pass ( nabors drilling
international )
Well cap ( driller & supervisore level ) randy smith 5 time
Stuck pipe randy smith
Bosiet offshore rig traning
Experience with rig and tools .
Experience in kick
Qualified to treat with ( mago breake )
Experience using tds nov . & canrig tds cams / system
Experience in supervision drilling crew
Qualified to treat with all sheets
3. Qualified to treat with blow out condition
Experience in condition and stuck
Experience in working direction
National varco tds 11 & 4
Canrig topdrive 750 & 500 ton
Drilling rig 2000 hp / 3000 HP jack up rig
Work over rig 1500 hp jack up rig
I have 5 years experience
work with cyber chair : NABORS DRILLING SAUDI& KUWAIT
ADES
OFFSHORE DRILLING
conventional rigs : SANTA FE DRILLING
experience with Canrig Topdrive tec.
MI Swaco rigwhatch data screen
NOV Rigwatch data screen
and also manual handle break
iron roughneck tm20 and st80 ( nov )
Total time working in drilling rig opration 18 years
Supervising and coordinating activities of workers
engaged in drilling activities
Ensuring strict health and safety standards are followed by all
staff
4. Directing workers to erect, dismantle and move drilling rigs
and drilling crews in setting up and operating power units, draw
works and other drilling equipment
Planning delivery of drilling tools, fuel, water and other
supplies for use at drill site
Ordering various types of drilling bits to be used, according to
type of strata encountered
Directs workers in mixing drilling mud and circulating mud in
borehole, and in use of special drilling mud to prevent blowouts
from gas pressure
Ordering installation of control head (valve device) to control
flow of oil
Supervising operations at wells to maintain and regulate flow
of oil
Mentoring junior staff
Help OIM & BE with the planning and supervision of rig moves.
Keep equipment and systems operational by setting priorities
for equipment repairs.