The document describes typical construction equipment used for different activities at substation and transmission line projects. It lists equipment such as bulldozers, excavators, cranes, trucks, pavers and other machinery. For each piece of equipment it provides the use, approximate quantity needed, expected duration on site in days, and average hours of use per day. The activities covered include site development, below and above grade construction, foundation installation, pole erection, conductor stringing and testing/commissioning work.
Trucking Calculator work sheet
To calculate the time, materials, machinery and costs.
A) the amount of material that you need to place on a road for road construction or for road re-surfacing.
B) to calculate the type and size of loading equipment required
C) to calculate the type and size of hauling trucks.
D) to calculate the travel times involved
E) To calculate time needs for a) grader, compactor and water truck(wetting down the road surface for optimum compaction),
F) to calculate the job time duration and Job COST
f
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...JMDSAE
By Dimitrios Savvidis
The talk will be covering :
Latest developments on CO2 legislation in Europe
Overview of GHG emissions in the transport sector in Europe
New simulation tool – VECTO
Future steps
From Upstream to Downstream: Opportunities and Challenges for RailPLG Consulting
With unprecedented highs in crude, NGL, and natural gas production, the US is leveraging abundant and low-cost hydrocarbons to become one of the largest energy and chemicals suppliers to the world. PLG Consulting’s CEO Graham Brisben details why this is happening and what it means for rail shipments and car demand in sand, refined products, chemicals, and other commodities. Download this free presentation given at the Rail Equipment Finance Conference 2019. In it, you’ll discover:
- What’s expected for frac sand rail shipments in 2019
- How small cube hoppers are affecting cars in storage
- The biggest stories that represent potential new rail volumes/tank car demand
- The forecast for shale-driven industrial investment
Larry Hernandez with Caltrans provides the department's perspective on in-place recycling in a presentation delivered during the CalAPA Spring Asphalt Pavement Conference March 7-8, 2024 in Ontario, Calif.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
Trucking Calculator work sheet
To calculate the time, materials, machinery and costs.
A) the amount of material that you need to place on a road for road construction or for road re-surfacing.
B) to calculate the type and size of loading equipment required
C) to calculate the type and size of hauling trucks.
D) to calculate the travel times involved
E) To calculate time needs for a) grader, compactor and water truck(wetting down the road surface for optimum compaction),
F) to calculate the job time duration and Job COST
f
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...JMDSAE
By Dimitrios Savvidis
The talk will be covering :
Latest developments on CO2 legislation in Europe
Overview of GHG emissions in the transport sector in Europe
New simulation tool – VECTO
Future steps
From Upstream to Downstream: Opportunities and Challenges for RailPLG Consulting
With unprecedented highs in crude, NGL, and natural gas production, the US is leveraging abundant and low-cost hydrocarbons to become one of the largest energy and chemicals suppliers to the world. PLG Consulting’s CEO Graham Brisben details why this is happening and what it means for rail shipments and car demand in sand, refined products, chemicals, and other commodities. Download this free presentation given at the Rail Equipment Finance Conference 2019. In it, you’ll discover:
- What’s expected for frac sand rail shipments in 2019
- How small cube hoppers are affecting cars in storage
- The biggest stories that represent potential new rail volumes/tank car demand
- The forecast for shale-driven industrial investment
Larry Hernandez with Caltrans provides the department's perspective on in-place recycling in a presentation delivered during the CalAPA Spring Asphalt Pavement Conference March 7-8, 2024 in Ontario, Calif.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
An introduction to the cryptocurrency investment platform Binance Savings.Any kyc Account
Learn how to use Binance Savings to expand your bitcoin holdings. Discover how to maximize your earnings on one of the most reliable cryptocurrency exchange platforms, as well as how to earn interest on your cryptocurrency holdings and the various savings choices available.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
3. Site
Development
Activity
San Diego Gas & Electric Company
East County Substation Project
ECO Substation
Project
Component
2
Construct,
maintain, and
upgrade roads
Road grader
3
2
Scraper
3
Grade pads and
access roads
Bulldozer
2
Compactor
Loader
Backhoe
Rock truck
Rock crusher
Water truck
5
1
Maintain and
refuel equipment
Maintenance
truck
30
2
3
2
1
1
3
5
10
Transport and
support
construction
personnel
Approximate
Quantity
¾-ton or 1-ton
pickup truck
Use
Equipment
Approximate
Number of
People
ATTACHMENT 3-B: TYPICAL CONSTRUCTION EQUIPMENT BY ACTIVITY
Load dump trucks
and stockpile
Suppress dust
Crush rock
Move rock
3
1
1
2
2
Grade pads and
access roads
Excavate
3
Grade pads and
access roads
200
36
36
100
100
100
100
100
100
130
130
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-1
6
6
6
5
6
8
8
6
8
2
2
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
4. Activity
Site
Development
(continued)
Below Grade
Construction
30
5
3
1
8
30
2
20
Concrete truck
¾-ton or 1-ton
pickup truck
Asphalt Haul
Trucks
Vibrating roller
Asphalt
emulsion truck
Asphalt paver
Water truck
Concrete truck
Haul truck
Maintain and
refuel equipment
Pour concrete
Transport and
support
construction
personnel
Transport asphalt
Compact soil and
asphalt
Pave access roads
Pave access roads
Transport water
Place concrete
Transport Class II
import material
2
1
10
10
5
3
1
2
30
2
20
Approximate
Quantity
80
40
150
75
150
20
20
20
20
100
25
50
Approximate
Duration On
Site
(8-hour days)
6
6
2
3
2
6
6
6
6
2
3
10
Average
Duration of
Use
(hours per
day)
Use
10
Maintenance
truck
Drill pier
foundations
3
Equipment
1
Drill rig
Excavate pad
foundations
Approximate
Number of
People
6
Backhoe
San Diego Gas & Electric Company
East County Substation Project
3
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
ECO Substation
(continued)
August 2009
3-B-2
5. Above Grade
Construction
(continued)
Below Grade
Construction
(continued)
Activity
San Diego Gas & Electric Company
East County Substation Project
ECO Substation
(continued)
Project
Component
2
10
Compact soil
Transport and
support
construction
personnel
Compactor handheld
¾-ton or 1-ton
pickup truck
2
20
5
2
Set steel and
install equipment
Place material and
set steel
Bucket
truck/manlift
Crane
15
6
1
Maintain and
refuel equipment
Maintenance
truck
1
1
Suppress dust
Water truck
1
2
Duct bank and
conduit
installation
Backhoe
6
2
Install grounding
2
Trencher
6
4
Approximate
Quantity
6
Place material and
set steel
Light duty
crane
4
Use
Move rebar,
equipment,
masonry, and
other materials
Equipment
Fork lift/skid
steer
Approximate
Number of
People
100
100
150
150
80
150
60
60
60
75
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-3
4
6
2
2
6
6
7
7
4
6
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
6. 6
Bucket truck
Forklift
Boom Truck
Place material and
set steel
Set steel and
install equipment
Unload and move
material
Place material and
set steel
4
2
2
2
2
Approximate
Quantity
40
40
20
20
100
100
Approximate
Duration On
Site
(8-hour days)
4
2
2
7
7
6
6
Average
Duration of
Use
(hours per
day)
Use
2
Crane
Transport and
support
construction
personnel
2
30
24
Equipment
4
¾-ton or 1-ton
pickup truck
Transport and
support
construction
personnel
2
5
5
Activity
Above Grade
Construction
(continued)
2
Heavy Van
Outdoor check out
of equipment
1
5
Approximate
Number of
People
Communication
Equipment
Installation
8
Manlift
Extract and
remove oil
1
2
2
Diesel
generator
(500 kW)
Extract and
remove oil
Testing and
Commissioning
1
Crane
San Diego Gas & Electric Company
East County Substation Project
3
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
ECO Substation
(continued)
August 2009
3-B-4
7. Tower
Installation and
Conductor
Stringing
Install
Foundations
Access Roads
General
Construction
Activity
San Diego Gas & Electric Company
East County Substation Project
SWPL Loop-In
Project
Component
Backhoe
Drill rig
2
2
Conductor
Installation
Conductor
Installation
Puller and
tensioner
Reel trailer
4
4
4
Tower Erection
and Conductor
Installation
2
Tower Erection
Bucket truck
4
2
1
Foundation
Construction
Foundation
Construction
3
Pour Concrete
1
1
2
Approximate
Quantity
12
Large crane
2
2
Concrete truck
3
Equipment access
Maintain and
refuel equipment
Maintenance
truck
1
Bulldozer
Transport
construction
personnel
¾-ton or 1-ton
pickup truck
4
1
Use
Equipment
Approximate
Number of
People
20
20
30
10
10
10
10
10
40
60
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-5
8
8
8
6
6
6
3
4
2
2
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
8. Activity
General
Construction
12
2
3
3
2
Shop van
Aerial lift truck
Mechanic truck
Rigging truck
2-ton flatbed
truck or flatbed
boom truck
Helicopter
Load and unload
materials
Store tools
Access poles,
string conductor,
and other uses
Service and repair
equipment
Haul tools and
equipment
Haul and unload
materials
Transport and
install structures
and conductor
2
2
2
3
2
3
2
1
Approximate
Quantity
80
60
40
90
60
60
60
60
60
Approximate
Duration On
Site
(8-hour days)
4
4
5
4
5
4
4
4
4
Average
Duration of
Use
(hours per
day)
Use
2
Small mobile
crane (12 tons)
Haul structures
and equipment
4
Equipment
4
Semi tractortrailer
Operate air tools
Approximate
Number of
People
2
Air
compressors
5
4
60
Dump truck
San Diego Gas & Electric Company
East County Substation Project
6
6
Haul excavated
materials and
import backfill
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
138 kV
Transmission
Line
August 2009
3-B-6
9. Pole Foundation
Installation
Access Roads
General
Construction
(continued)
Activity
San Diego Gas & Electric Company
East County Substation Project
138 kV
Transmission
Line (continued)
Project
Component
1
2
Approximate
Quantity
1
1
4
2
2
Grade access
roads and pole
sites
Construct,
maintain, and
upgrade roads
Pour concrete
Excavate holes for
foundation and
pole installation
Compact soil
around structure
foundations
Bulldozer
Front-end
loader
Road grader
Compactor
Concrete truck
Drill rig with
augers
Air tampers
1
1
1
1
4
2
2
1
1
Break up rock and
excavate
Blasting rig
2
Suppress dust and
fire
Water truck
Transport
construction
personnel
¾-ton or 1-ton
pickup truck
3
1
Use
Equipment
Approximate
Number of
People
1
Construct,
maintain, and
upgrade roads
Construct access
roads
60
40
50
80
80
80
80
30
80
90
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-7
4
5
4
5
5
5
5
3
5
4
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
10. Activity
Pole Installation
Conductor
Stringing and
Sagging
Site
Development
10
2
5
10
2
1
2
Maintenance
truck
¾-ton or 1-ton
pickup truck
Splice trailer
Conductor reel
trailer
Puller and
tensioner
Take-up trailer
Backhoe
Large mobile
crane (75 tons)
Grade pad, access
road, clear and
grub
Maintain and
refuel equipment
Transport and
support
construction
personnel
Store splicing
supplies
Transport cable
reels and feed
cables into conduit
Pull conductor and
wire
Install conductor
Excavate trenches
Erect structures
2
1
1
5
2
2
2
2
1
1
Approximate
Quantity
50
20
50
65
65
40
40
40
40
3
20
Approximate
Duration On
Site
(8-hour days)
4
6
6
2
2
4
4
4
4
5
4
Average
Duration of
Use
(hours per
day)
Use
1
Bulldozer
Grade pad and
access road
2
Equipment
2
Scraper
Compact soil and
asphalt
Approximate
Number of
People
2
Compactor
San Diego Gas & Electric Company
East County Substation Project
2
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
138 kV
Transmission
Line (continued)
Boulevard
Substation
August 2009
3-B-8
11. Site
Development
(continued)
Activity
San Diego Gas & Electric Company
East County Substation Project
Boulevard
Substation
(continued)
Project
Component
Approximate
Quantity
1
1
Pave access roads
Pave access roads
Compact soil and
asphalt
Excavator
Rock crusher
Water truck
Haul truck
Haul truck
Concrete truck
Water truck
Asphalt paver
Asphalt
emulsion truck
Vibrating roller
1
1
8
8
4
15
4
1
1
Transport water
1
15
4
8
Import Class II
material
Place concrete
8
1
1
1
Export material
Suppress dust
Crush rock
Grade pad
1
1
Excavate trenches
Backhoe
Load dump trucks
and stockpile
2
2
Use
Loader
Equipment
2
Approximate
Number of
People
25
5
5
25
7
7
40
65
20
30
30
40
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-9
4
6
6
2
3
10
10
5
6
4
6
8
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
12. Activity
Site
Development
(continued)
Below Grade
Construction
2
1
1
30
12
7
Walk-behind
trencher
Skid steer
loader
Backhoe (with
drill
attachment)
Maintenance
truck
Concrete truck
¾-ton or 1-ton
pickup truck
Asphalt haul
trucks
Suppress dust
Excavate trenches
Transport soil
Drill/excavate pier
foundations
Maintain and
refuel equipment
Place concrete
Transport and
support
construction
personnel
Transport asphalt
2
1
1
2
1
1
1
3
7
Approximate
Quantity
30
72
72
72
72
72
72
30
72
5
Approximate
Duration On
Site
(8-hour days)
4
4
2
4
6
4
2
8
2
6
Average
Duration of
Use
(hours per
day)
Use
1
Water truck
Compact soil
2
Equipment
1
Compactor handheld
Export material
Approximate
Number of
People
2
Haul truck
San Diego Gas & Electric Company
East County Substation Project
60
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
Boulevard
Substation
(continued)
August 2009
3-B-10
13. Above Grade
Construction
Activity
San Diego Gas & Electric Company
East County Substation Project
Boulevard
Substation
(continued)
Project
Component
1
2
1
2
Maintain and
refuel equipment
Install/test
batteries and
breakers
Support steel
construction work
Maintenance
truck
Heavy van
Boom truck
6
1
6
1
1
4
2
1
Support bus and
disconnect
construction
Support steel and
equipment
construction
Transport tools for
breaker and
transformer
installation and
construction
Support the steel
and transformer
installation
Support 138 kV
GCB Installation
Manlift
All-terrain
extendable
forklift
Crew assist
vehicle
Two-man
bucket truck
Bucket truck
4
1
6
4
1
8
Transport and
support
construction
personnel
Approximate
Quantity
¾-ton or 1-ton
pickup truck
Use
Equipment
Approximate
Number of
People
20
95
62
125
125
125
40
25
50
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-11
4
4
2
6
6
6
2
2
3
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity
14. Activity
Above Grade
Construction
(continued)
Testing and
Commissioning
Existing
Substation
Demolition
5
3
3
2
1
1
Roller
compactor
Haul truck
Backhoe with
breaker
attachment
Heavy van
¾-ton or 1-ton
pickup truck
Diesel
generator (500
kW)
Small crane
Remove the
transformer
Compact backfill
Remove concrete
from site
Break and remove
concrete
foundations and
backfill
Test relays and
RTU
Transport and
support
construction
personnel
Distribute oil
Install
transformers
1
1
1
5
1
2
1
1
1
Approximate
Quantity
3
4
1
1
2
5
75
20
6
6
Approximate
Duration On
Site
(8-hour days)
3
3
6
4
3
6
2
2
24
6
Average
Duration of
Use
(hours per
day)
Use
1
Crane
Remove debris
2
Equipment
2
Haul truck
Extract and
remove oil
Approximate
Number of
People
1
Oil truck/pump
San Diego Gas & Electric Company
East County Substation Project
2
Attachment 3-B: Typical Construction Equipment by Activity
Project
Component
Boulevard
Substation
(continued)
August 2009
3-B-12
15. Tower and
Building
Installation
Site
Development
and Foundations
Installation
Existing
Substation
Demolition
(continued)
Activity
San Diego Gas & Electric Company
East County Substation Project
White Star
Communication
Facility
Boulevard
Substation
(continued)
Project
Component
Approximate
Quantity
Support substation
demolition
Backhoe
Crane
10
3
Concrete truck
2
1
¾-ton or 1-ton
pickup truck
10
Drill rig
5
Transport and
support
construction
personnel
3
1
Suppress dust
Water truck
1
Transport material
1
2
Use
Forklift
Manlift
Equipment
1
4
Approximate
Number of
People
10
1
Install
communication
tower and
prefabricated
building
Excavate pad
foundation
Place concrete
1
Drill pier
foundation
2
2
2
2
15
24
24
24
Approximate
Duration On
Site
(8-hour days)
August 2009
3-B-13
6
6
6
6
2
2
6
8
Average
Duration of
Use
(hours per
day)
Attachment 3-B: Typical Construction Equipment by Activity