ATTACHMENT 3-B: TYPICAL CONSTRUCTION EQUIPMENT BY ACTIVITY
Site
Development

Activity

San Diego Gas & Electric Company
East County Substation Project

ECO Substation

Project
Component

2

Construct,
maintain, and
upgrade roads

Road grader

3
2
Scraper

3

Grade pads and
access roads

Bulldozer

2

Compactor
Loader
Backhoe
Rock truck
Rock crusher
Water truck

5

1

Maintain and
refuel equipment

Maintenance
truck

30

2
3
2
1
1
3

5

10

Transport and
support
construction
personnel

Approximate
Quantity

¾-ton or 1-ton
pickup truck

Use

Equipment

Approximate
Number of
People

ATTACHMENT 3-B: TYPICAL CONSTRUCTION EQUIPMENT BY ACTIVITY

Load dump trucks
and stockpile

Suppress dust

Crush rock

Move rock

3

1

1

2

2

Grade pads and
access roads

Excavate

3

Grade pads and
access roads

200

36

36

100

100

100

100

100

100

130

130

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-1

6

6

6

5

6

8

8

6

8

2

2

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
Activity

Site
Development
(continued)

Below Grade
Construction

30

5

3

1

8

30

2

20

Concrete truck

¾-ton or 1-ton
pickup truck

Asphalt Haul
Trucks

Vibrating roller

Asphalt
emulsion truck

Asphalt paver

Water truck

Concrete truck

Haul truck

Maintain and
refuel equipment

Pour concrete

Transport and
support
construction
personnel

Transport asphalt

Compact soil and
asphalt

Pave access roads

Pave access roads

Transport water

Place concrete

Transport Class II
import material

2

1

10

10

5

3

1

2

30

2

20

Approximate
Quantity

80

40

150

75

150

20

20

20

20

100

25

50

Approximate
Duration On
Site
(8-hour days)

6

6

2

3

2

6

6

6

6

2

3

10

Average
Duration of
Use
(hours per
day)

Use

10

Maintenance
truck

Drill pier
foundations

3

Equipment

1

Drill rig

Excavate pad
foundations

Approximate
Number of
People

6

Backhoe

San Diego Gas & Electric Company
East County Substation Project

3

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

ECO Substation
(continued)

August 2009
3-B-2
Above Grade
Construction
(continued)

Below Grade
Construction
(continued)

Activity

San Diego Gas & Electric Company
East County Substation Project

ECO Substation
(continued)

Project
Component

2

10

Compact soil
Transport and
support
construction
personnel

Compactor handheld
¾-ton or 1-ton
pickup truck

2

20

5
2

Set steel and
install equipment
Place material and
set steel

Bucket
truck/manlift
Crane

15
6

1

Maintain and
refuel equipment

Maintenance
truck

1

1

Suppress dust

Water truck

1

2

Duct bank and
conduit
installation

Backhoe

6

2

Install grounding

2

Trencher

6

4

Approximate
Quantity

6

Place material and
set steel

Light duty
crane

4

Use

Move rebar,
equipment,
masonry, and
other materials

Equipment

Fork lift/skid
steer

Approximate
Number of
People

100

100

150

150

80

150

60

60

60

75

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-3

4

6

2

2

6

6

7

7

4

6

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
6

Bucket truck

Forklift

Boom Truck

Place material and
set steel

Set steel and
install equipment

Unload and move
material

Place material and
set steel

4

2

2

2

2

Approximate
Quantity

40

40

20

20

100

100

Approximate
Duration On
Site
(8-hour days)

4

2

2

7

7

6

6

Average
Duration of
Use
(hours per
day)

Use

2

Crane

Transport and
support
construction
personnel

2

30

24

Equipment

4

¾-ton or 1-ton
pickup truck

Transport and
support
construction
personnel

2

5

5

Activity

Above Grade
Construction
(continued)

2

Heavy Van

Outdoor check out
of equipment

1

5

Approximate
Number of
People

Communication
Equipment
Installation

8

Manlift

Extract and
remove oil

1

2

2

Diesel
generator
(500 kW)

Extract and
remove oil

Testing and
Commissioning

1

Crane

San Diego Gas & Electric Company
East County Substation Project

3

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

ECO Substation
(continued)

August 2009
3-B-4
Tower
Installation and
Conductor
Stringing

Install
Foundations

Access Roads

General
Construction

Activity

San Diego Gas & Electric Company
East County Substation Project

SWPL Loop-In

Project
Component

Backhoe

Drill rig

2
2

Conductor
Installation
Conductor
Installation

Puller and
tensioner
Reel trailer

4
4

4

Tower Erection
and Conductor
Installation

2

Tower Erection

Bucket truck

4

2

1

Foundation
Construction
Foundation
Construction

3

Pour Concrete

1

1

2

Approximate
Quantity

12

Large crane

2

2

Concrete truck

3

Equipment access

Maintain and
refuel equipment

Maintenance
truck

1
Bulldozer

Transport
construction
personnel

¾-ton or 1-ton
pickup truck

4

1

Use

Equipment

Approximate
Number of
People

20

20

30

10

10

10

10

10

40

60

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-5

8

8

8

6

6

6

3

4

2

2

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
Activity

General
Construction

12

2

3

3

2

Shop van

Aerial lift truck

Mechanic truck

Rigging truck

2-ton flatbed
truck or flatbed
boom truck

Helicopter

Load and unload
materials

Store tools

Access poles,
string conductor,
and other uses

Service and repair
equipment

Haul tools and
equipment

Haul and unload
materials

Transport and
install structures
and conductor

2

2

2

3

2

3

2

1

Approximate
Quantity

80

60

40

90

60

60

60

60

60

Approximate
Duration On
Site
(8-hour days)

4

4

5

4

5

4

4

4

4

Average
Duration of
Use
(hours per
day)

Use

2

Small mobile
crane (12 tons)

Haul structures
and equipment

4

Equipment

4

Semi tractortrailer

Operate air tools

Approximate
Number of
People

2

Air
compressors

5

4

60

Dump truck

San Diego Gas & Electric Company
East County Substation Project

6

6

Haul excavated
materials and
import backfill

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

138 kV
Transmission
Line

August 2009
3-B-6
Pole Foundation
Installation

Access Roads

General
Construction
(continued)

Activity

San Diego Gas & Electric Company
East County Substation Project

138 kV
Transmission
Line (continued)

Project
Component

1

2

Approximate
Quantity

1

1

4
2

2

Grade access
roads and pole
sites
Construct,
maintain, and
upgrade roads

Pour concrete
Excavate holes for
foundation and
pole installation
Compact soil
around structure
foundations

Bulldozer
Front-end
loader
Road grader
Compactor
Concrete truck
Drill rig with
augers
Air tampers

1

1

1
1
4
2

2

1

1

Break up rock and
excavate

Blasting rig

2

Suppress dust and
fire

Water truck

Transport
construction
personnel

¾-ton or 1-ton
pickup truck

3
1

Use

Equipment

Approximate
Number of
People

1

Construct,
maintain, and
upgrade roads
Construct access
roads

60

40

50

80

80

80

80

30

80

90

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-7

4

5

4

5

5

5

5

3

5

4

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
Activity

Pole Installation

Conductor
Stringing and
Sagging

Site
Development

10

2

5

10

2

1

2

Maintenance
truck

¾-ton or 1-ton
pickup truck

Splice trailer

Conductor reel
trailer

Puller and
tensioner

Take-up trailer

Backhoe

Large mobile
crane (75 tons)

Grade pad, access
road, clear and
grub

Maintain and
refuel equipment

Transport and
support
construction
personnel

Store splicing
supplies

Transport cable
reels and feed
cables into conduit

Pull conductor and
wire

Install conductor

Excavate trenches

Erect structures

2

1

1

5

2

2

2

2

1

1

Approximate
Quantity

50

20

50

65

65

40

40

40

40

3

20

Approximate
Duration On
Site
(8-hour days)

4

6

6

2

2

4

4

4

4

5

4

Average
Duration of
Use
(hours per
day)

Use

1

Bulldozer

Grade pad and
access road

2

Equipment

2

Scraper

Compact soil and
asphalt

Approximate
Number of
People

2

Compactor

San Diego Gas & Electric Company
East County Substation Project

2

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

138 kV
Transmission
Line (continued)

Boulevard
Substation

August 2009
3-B-8
Site
Development
(continued)

Activity

San Diego Gas & Electric Company
East County Substation Project

Boulevard
Substation
(continued)

Project
Component

Approximate
Quantity

1
1

Pave access roads
Pave access roads
Compact soil and
asphalt

Excavator
Rock crusher
Water truck
Haul truck
Haul truck
Concrete truck
Water truck
Asphalt paver
Asphalt
emulsion truck
Vibrating roller

1
1
8
8
4
15
4
1
1

Transport water

1

15

4

8

Import Class II
material
Place concrete

8

1

1

1

Export material

Suppress dust

Crush rock

Grade pad

1

1

Excavate trenches

Backhoe

Load dump trucks
and stockpile

2

2

Use

Loader

Equipment

2

Approximate
Number of
People

25

5

5

25

7

7

40

65

20

30

30

40

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-9

4

6

6

2

3

10

10

5

6

4

6

8

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
Activity

Site
Development
(continued)

Below Grade
Construction
2

1

1

30

12

7

Walk-behind
trencher

Skid steer
loader

Backhoe (with
drill
attachment)

Maintenance
truck

Concrete truck

¾-ton or 1-ton
pickup truck

Asphalt haul
trucks

Suppress dust

Excavate trenches

Transport soil

Drill/excavate pier
foundations

Maintain and
refuel equipment

Place concrete

Transport and
support
construction
personnel

Transport asphalt

2

1

1

2

1

1

1

3

7

Approximate
Quantity

30

72

72

72

72

72

72

30

72

5

Approximate
Duration On
Site
(8-hour days)

4

4

2

4

6

4

2

8

2

6

Average
Duration of
Use
(hours per
day)

Use

1

Water truck

Compact soil

2

Equipment

1

Compactor handheld

Export material

Approximate
Number of
People

2

Haul truck

San Diego Gas & Electric Company
East County Substation Project

60

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

Boulevard
Substation
(continued)

August 2009
3-B-10
Above Grade
Construction

Activity

San Diego Gas & Electric Company
East County Substation Project

Boulevard
Substation
(continued)

Project
Component

1
2
1
2

Maintain and
refuel equipment
Install/test
batteries and
breakers
Support steel
construction work

Maintenance
truck
Heavy van
Boom truck

6

1
6
1

1

4

2
1

Support bus and
disconnect
construction
Support steel and
equipment
construction
Transport tools for
breaker and
transformer
installation and
construction
Support the steel
and transformer
installation
Support 138 kV
GCB Installation

Manlift
All-terrain
extendable
forklift
Crew assist
vehicle

Two-man
bucket truck
Bucket truck

4

1

6

4
1

8

Transport and
support
construction
personnel

Approximate
Quantity

¾-ton or 1-ton
pickup truck

Use

Equipment

Approximate
Number of
People

20

95

62

125

125

125

40

25

50

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-11

4

4

2

6

6

6

2

2

3

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
Activity

Above Grade
Construction
(continued)

Testing and
Commissioning

Existing
Substation
Demolition

5

3

3

2

1

1

Roller
compactor

Haul truck

Backhoe with
breaker
attachment

Heavy van

¾-ton or 1-ton
pickup truck

Diesel
generator (500
kW)

Small crane

Remove the
transformer

Compact backfill

Remove concrete
from site

Break and remove
concrete
foundations and
backfill

Test relays and
RTU

Transport and
support
construction
personnel

Distribute oil

Install
transformers

1

1

1

5

1

2

1

1

1

Approximate
Quantity

3

4

1

1

2

5

75

20

6

6

Approximate
Duration On
Site
(8-hour days)

3

3

6

4

3

6

2

2

24

6

Average
Duration of
Use
(hours per
day)

Use

1

Crane

Remove debris

2

Equipment

2

Haul truck

Extract and
remove oil

Approximate
Number of
People

1

Oil truck/pump

San Diego Gas & Electric Company
East County Substation Project

2

Attachment 3-B: Typical Construction Equipment by Activity

Project
Component

Boulevard
Substation
(continued)

August 2009
3-B-12
Tower and
Building
Installation

Site
Development
and Foundations
Installation

Existing
Substation
Demolition
(continued)

Activity

San Diego Gas & Electric Company
East County Substation Project

White Star
Communication
Facility

Boulevard
Substation
(continued)

Project
Component

Approximate
Quantity

Support substation
demolition

Backhoe

Crane

10

3

Concrete truck

2

1

¾-ton or 1-ton
pickup truck

10

Drill rig

5

Transport and
support
construction
personnel

3

1

Suppress dust

Water truck

1

Transport material

1

2

Use

Forklift

Manlift

Equipment

1

4

Approximate
Number of
People

10

1

Install
communication
tower and
prefabricated
building

Excavate pad
foundation
Place concrete

1

Drill pier
foundation

2

2

2

2

15

24

24

24

Approximate
Duration On
Site
(8-hour days)

August 2009
3-B-13

6

6

6

6

2

2

6

8

Average
Duration of
Use
(hours per
day)

Attachment 3-B: Typical Construction Equipment by Activity
 

More Related Content

Similar to typical construction equipment

Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
IRJET Journal
 
Trucking calculator work sheet v11
Trucking calculator work sheet v11Trucking calculator work sheet v11
Trucking calculator work sheet v11
Eric Lestock Kay
 
TM 5-272
TM 5-272TM 5-272
TM 5-272
blancaisabelcig
 
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
JMDSAE
 
Elizabeth River Ferry
Elizabeth River FerryElizabeth River Ferry
Elizabeth River Ferry
Ralph Duncan, P.E.
 
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docxENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
YASHU40
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportUGPTI
 
Signal Int. Current Marketing Brochure
Signal Int. Current Marketing BrochureSignal Int. Current Marketing Brochure
Signal Int. Current Marketing BrochureRobatSignal
 
HUB:BLE-2 06 Day 2 Plenary
HUB:BLE-2 06  Day 2 PlenaryHUB:BLE-2 06  Day 2 Plenary
HUB:BLE-2 06 Day 2 Plenary
Space IDEAS Hub
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port LandsideAnthony Jones
 
From Upstream to Downstream: Opportunities and Challenges for Rail
From Upstream to Downstream: Opportunities and Challenges for RailFrom Upstream to Downstream: Opportunities and Challenges for Rail
From Upstream to Downstream: Opportunities and Challenges for Rail
PLG Consulting
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
California Asphalt Pavement Association
 
Peculiarities of transportation by the Mississippi river
Peculiarities of transportation by the Mississippi riverPeculiarities of transportation by the Mississippi river
Peculiarities of transportation by the Mississippi river
Eugene Tkachenko
 

Similar to typical construction equipment (16)

AWMA PHA 3
AWMA PHA 3AWMA PHA 3
AWMA PHA 3
 
AF Resume Feb 2015
AF Resume Feb 2015AF Resume Feb 2015
AF Resume Feb 2015
 
Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
Rehabilitation Study of NH34 Kabrai to Maudaha through the 35.00 Km Section L...
 
Trucking calculator work sheet v11
Trucking calculator work sheet v11Trucking calculator work sheet v11
Trucking calculator work sheet v11
 
TM 5-272
TM 5-272TM 5-272
TM 5-272
 
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
Future of Heavy Duty Vehicles CO2 Emissions Legislation and Fuel Consumption ...
 
Elizabeth River Ferry
Elizabeth River FerryElizabeth River Ferry
Elizabeth River Ferry
 
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docxENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
Signal Int. Current Marketing Brochure
Signal Int. Current Marketing BrochureSignal Int. Current Marketing Brochure
Signal Int. Current Marketing Brochure
 
HUB:BLE-2 06 Day 2 Plenary
HUB:BLE-2 06  Day 2 PlenaryHUB:BLE-2 06  Day 2 Plenary
HUB:BLE-2 06 Day 2 Plenary
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
 
From Upstream to Downstream: Opportunities and Challenges for Rail
From Upstream to Downstream: Opportunities and Challenges for RailFrom Upstream to Downstream: Opportunities and Challenges for Rail
From Upstream to Downstream: Opportunities and Challenges for Rail
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
 
Peculiarities of transportation by the Mississippi river
Peculiarities of transportation by the Mississippi riverPeculiarities of transportation by the Mississippi river
Peculiarities of transportation by the Mississippi river
 
Intermodal
IntermodalIntermodal
Intermodal
 

Recently uploaded

Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 

Recently uploaded (20)

Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 

typical construction equipment

  • 1. ATTACHMENT 3-B: TYPICAL CONSTRUCTION EQUIPMENT BY ACTIVITY
  • 2.
  • 3. Site Development Activity San Diego Gas & Electric Company East County Substation Project ECO Substation Project Component 2 Construct, maintain, and upgrade roads Road grader 3 2 Scraper 3 Grade pads and access roads Bulldozer 2 Compactor Loader Backhoe Rock truck Rock crusher Water truck 5 1 Maintain and refuel equipment Maintenance truck 30 2 3 2 1 1 3 5 10 Transport and support construction personnel Approximate Quantity ¾-ton or 1-ton pickup truck Use Equipment Approximate Number of People ATTACHMENT 3-B: TYPICAL CONSTRUCTION EQUIPMENT BY ACTIVITY Load dump trucks and stockpile Suppress dust Crush rock Move rock 3 1 1 2 2 Grade pads and access roads Excavate 3 Grade pads and access roads 200 36 36 100 100 100 100 100 100 130 130 Approximate Duration On Site (8-hour days) August 2009 3-B-1 6 6 6 5 6 8 8 6 8 2 2 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 4. Activity Site Development (continued) Below Grade Construction 30 5 3 1 8 30 2 20 Concrete truck ¾-ton or 1-ton pickup truck Asphalt Haul Trucks Vibrating roller Asphalt emulsion truck Asphalt paver Water truck Concrete truck Haul truck Maintain and refuel equipment Pour concrete Transport and support construction personnel Transport asphalt Compact soil and asphalt Pave access roads Pave access roads Transport water Place concrete Transport Class II import material 2 1 10 10 5 3 1 2 30 2 20 Approximate Quantity 80 40 150 75 150 20 20 20 20 100 25 50 Approximate Duration On Site (8-hour days) 6 6 2 3 2 6 6 6 6 2 3 10 Average Duration of Use (hours per day) Use 10 Maintenance truck Drill pier foundations 3 Equipment 1 Drill rig Excavate pad foundations Approximate Number of People 6 Backhoe San Diego Gas & Electric Company East County Substation Project 3 Attachment 3-B: Typical Construction Equipment by Activity Project Component ECO Substation (continued) August 2009 3-B-2
  • 5. Above Grade Construction (continued) Below Grade Construction (continued) Activity San Diego Gas & Electric Company East County Substation Project ECO Substation (continued) Project Component 2 10 Compact soil Transport and support construction personnel Compactor handheld ¾-ton or 1-ton pickup truck 2 20 5 2 Set steel and install equipment Place material and set steel Bucket truck/manlift Crane 15 6 1 Maintain and refuel equipment Maintenance truck 1 1 Suppress dust Water truck 1 2 Duct bank and conduit installation Backhoe 6 2 Install grounding 2 Trencher 6 4 Approximate Quantity 6 Place material and set steel Light duty crane 4 Use Move rebar, equipment, masonry, and other materials Equipment Fork lift/skid steer Approximate Number of People 100 100 150 150 80 150 60 60 60 75 Approximate Duration On Site (8-hour days) August 2009 3-B-3 4 6 2 2 6 6 7 7 4 6 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 6. 6 Bucket truck Forklift Boom Truck Place material and set steel Set steel and install equipment Unload and move material Place material and set steel 4 2 2 2 2 Approximate Quantity 40 40 20 20 100 100 Approximate Duration On Site (8-hour days) 4 2 2 7 7 6 6 Average Duration of Use (hours per day) Use 2 Crane Transport and support construction personnel 2 30 24 Equipment 4 ¾-ton or 1-ton pickup truck Transport and support construction personnel 2 5 5 Activity Above Grade Construction (continued) 2 Heavy Van Outdoor check out of equipment 1 5 Approximate Number of People Communication Equipment Installation 8 Manlift Extract and remove oil 1 2 2 Diesel generator (500 kW) Extract and remove oil Testing and Commissioning 1 Crane San Diego Gas & Electric Company East County Substation Project 3 Attachment 3-B: Typical Construction Equipment by Activity Project Component ECO Substation (continued) August 2009 3-B-4
  • 7. Tower Installation and Conductor Stringing Install Foundations Access Roads General Construction Activity San Diego Gas & Electric Company East County Substation Project SWPL Loop-In Project Component Backhoe Drill rig 2 2 Conductor Installation Conductor Installation Puller and tensioner Reel trailer 4 4 4 Tower Erection and Conductor Installation 2 Tower Erection Bucket truck 4 2 1 Foundation Construction Foundation Construction 3 Pour Concrete 1 1 2 Approximate Quantity 12 Large crane 2 2 Concrete truck 3 Equipment access Maintain and refuel equipment Maintenance truck 1 Bulldozer Transport construction personnel ¾-ton or 1-ton pickup truck 4 1 Use Equipment Approximate Number of People 20 20 30 10 10 10 10 10 40 60 Approximate Duration On Site (8-hour days) August 2009 3-B-5 8 8 8 6 6 6 3 4 2 2 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 8. Activity General Construction 12 2 3 3 2 Shop van Aerial lift truck Mechanic truck Rigging truck 2-ton flatbed truck or flatbed boom truck Helicopter Load and unload materials Store tools Access poles, string conductor, and other uses Service and repair equipment Haul tools and equipment Haul and unload materials Transport and install structures and conductor 2 2 2 3 2 3 2 1 Approximate Quantity 80 60 40 90 60 60 60 60 60 Approximate Duration On Site (8-hour days) 4 4 5 4 5 4 4 4 4 Average Duration of Use (hours per day) Use 2 Small mobile crane (12 tons) Haul structures and equipment 4 Equipment 4 Semi tractortrailer Operate air tools Approximate Number of People 2 Air compressors 5 4 60 Dump truck San Diego Gas & Electric Company East County Substation Project 6 6 Haul excavated materials and import backfill Attachment 3-B: Typical Construction Equipment by Activity Project Component 138 kV Transmission Line August 2009 3-B-6
  • 9. Pole Foundation Installation Access Roads General Construction (continued) Activity San Diego Gas & Electric Company East County Substation Project 138 kV Transmission Line (continued) Project Component 1 2 Approximate Quantity 1 1 4 2 2 Grade access roads and pole sites Construct, maintain, and upgrade roads Pour concrete Excavate holes for foundation and pole installation Compact soil around structure foundations Bulldozer Front-end loader Road grader Compactor Concrete truck Drill rig with augers Air tampers 1 1 1 1 4 2 2 1 1 Break up rock and excavate Blasting rig 2 Suppress dust and fire Water truck Transport construction personnel ¾-ton or 1-ton pickup truck 3 1 Use Equipment Approximate Number of People 1 Construct, maintain, and upgrade roads Construct access roads 60 40 50 80 80 80 80 30 80 90 Approximate Duration On Site (8-hour days) August 2009 3-B-7 4 5 4 5 5 5 5 3 5 4 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 10. Activity Pole Installation Conductor Stringing and Sagging Site Development 10 2 5 10 2 1 2 Maintenance truck ¾-ton or 1-ton pickup truck Splice trailer Conductor reel trailer Puller and tensioner Take-up trailer Backhoe Large mobile crane (75 tons) Grade pad, access road, clear and grub Maintain and refuel equipment Transport and support construction personnel Store splicing supplies Transport cable reels and feed cables into conduit Pull conductor and wire Install conductor Excavate trenches Erect structures 2 1 1 5 2 2 2 2 1 1 Approximate Quantity 50 20 50 65 65 40 40 40 40 3 20 Approximate Duration On Site (8-hour days) 4 6 6 2 2 4 4 4 4 5 4 Average Duration of Use (hours per day) Use 1 Bulldozer Grade pad and access road 2 Equipment 2 Scraper Compact soil and asphalt Approximate Number of People 2 Compactor San Diego Gas & Electric Company East County Substation Project 2 Attachment 3-B: Typical Construction Equipment by Activity Project Component 138 kV Transmission Line (continued) Boulevard Substation August 2009 3-B-8
  • 11. Site Development (continued) Activity San Diego Gas & Electric Company East County Substation Project Boulevard Substation (continued) Project Component Approximate Quantity 1 1 Pave access roads Pave access roads Compact soil and asphalt Excavator Rock crusher Water truck Haul truck Haul truck Concrete truck Water truck Asphalt paver Asphalt emulsion truck Vibrating roller 1 1 8 8 4 15 4 1 1 Transport water 1 15 4 8 Import Class II material Place concrete 8 1 1 1 Export material Suppress dust Crush rock Grade pad 1 1 Excavate trenches Backhoe Load dump trucks and stockpile 2 2 Use Loader Equipment 2 Approximate Number of People 25 5 5 25 7 7 40 65 20 30 30 40 Approximate Duration On Site (8-hour days) August 2009 3-B-9 4 6 6 2 3 10 10 5 6 4 6 8 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 12. Activity Site Development (continued) Below Grade Construction 2 1 1 30 12 7 Walk-behind trencher Skid steer loader Backhoe (with drill attachment) Maintenance truck Concrete truck ¾-ton or 1-ton pickup truck Asphalt haul trucks Suppress dust Excavate trenches Transport soil Drill/excavate pier foundations Maintain and refuel equipment Place concrete Transport and support construction personnel Transport asphalt 2 1 1 2 1 1 1 3 7 Approximate Quantity 30 72 72 72 72 72 72 30 72 5 Approximate Duration On Site (8-hour days) 4 4 2 4 6 4 2 8 2 6 Average Duration of Use (hours per day) Use 1 Water truck Compact soil 2 Equipment 1 Compactor handheld Export material Approximate Number of People 2 Haul truck San Diego Gas & Electric Company East County Substation Project 60 Attachment 3-B: Typical Construction Equipment by Activity Project Component Boulevard Substation (continued) August 2009 3-B-10
  • 13. Above Grade Construction Activity San Diego Gas & Electric Company East County Substation Project Boulevard Substation (continued) Project Component 1 2 1 2 Maintain and refuel equipment Install/test batteries and breakers Support steel construction work Maintenance truck Heavy van Boom truck 6 1 6 1 1 4 2 1 Support bus and disconnect construction Support steel and equipment construction Transport tools for breaker and transformer installation and construction Support the steel and transformer installation Support 138 kV GCB Installation Manlift All-terrain extendable forklift Crew assist vehicle Two-man bucket truck Bucket truck 4 1 6 4 1 8 Transport and support construction personnel Approximate Quantity ¾-ton or 1-ton pickup truck Use Equipment Approximate Number of People 20 95 62 125 125 125 40 25 50 Approximate Duration On Site (8-hour days) August 2009 3-B-11 4 4 2 6 6 6 2 2 3 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity
  • 14. Activity Above Grade Construction (continued) Testing and Commissioning Existing Substation Demolition 5 3 3 2 1 1 Roller compactor Haul truck Backhoe with breaker attachment Heavy van ¾-ton or 1-ton pickup truck Diesel generator (500 kW) Small crane Remove the transformer Compact backfill Remove concrete from site Break and remove concrete foundations and backfill Test relays and RTU Transport and support construction personnel Distribute oil Install transformers 1 1 1 5 1 2 1 1 1 Approximate Quantity 3 4 1 1 2 5 75 20 6 6 Approximate Duration On Site (8-hour days) 3 3 6 4 3 6 2 2 24 6 Average Duration of Use (hours per day) Use 1 Crane Remove debris 2 Equipment 2 Haul truck Extract and remove oil Approximate Number of People 1 Oil truck/pump San Diego Gas & Electric Company East County Substation Project 2 Attachment 3-B: Typical Construction Equipment by Activity Project Component Boulevard Substation (continued) August 2009 3-B-12
  • 15. Tower and Building Installation Site Development and Foundations Installation Existing Substation Demolition (continued) Activity San Diego Gas & Electric Company East County Substation Project White Star Communication Facility Boulevard Substation (continued) Project Component Approximate Quantity Support substation demolition Backhoe Crane 10 3 Concrete truck 2 1 ¾-ton or 1-ton pickup truck 10 Drill rig 5 Transport and support construction personnel 3 1 Suppress dust Water truck 1 Transport material 1 2 Use Forklift Manlift Equipment 1 4 Approximate Number of People 10 1 Install communication tower and prefabricated building Excavate pad foundation Place concrete 1 Drill pier foundation 2 2 2 2 15 24 24 24 Approximate Duration On Site (8-hour days) August 2009 3-B-13 6 6 6 6 2 2 6 8 Average Duration of Use (hours per day) Attachment 3-B: Typical Construction Equipment by Activity