ETM 4th Project Meeting

          Plovdiv - Bulgaria
            6th – 7th October 2011

         Every Trainee Matters
      Leonardo Da Vinci – Partnership

                 Raftopoulos Dimitris
                 Strategic Leadership
Contents



    Mentored Learning
    Role of the Mentor in e-learning
    Mentor responsibilities
    Design & Implementation
    Training Program
    Delivering Mentored Learning




6-7.10.2011         Every Trainee Matters | 2010-1-ROI-LE004-0677111
“TRAIN THE TRAINER”

   MENTORED LEARNING


6-7.10.2011      Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentored Learning


    Mentored Learning is
         Focused Learning
         One on one mentoring
         Flexible scheduling
         Integrated delivery


    Mentored learning classroom: is a learning environment that
    incorporates tools, technologies and a Mentor in the learning
    process
    Comprehensive training environment incorporating a hybrid of:
         Traditional classroom instruction
         Hands on lab exercises
         One on one mentoring
         E-learning
         Reading
         Video based instruction
6-7.10.2011               Every Trainee Matters | 2010-1-ROI-LE004-0677111
Role of the mentor in e-learning (1/2)


    Assists the trainees to understand their role and the model of e-
    learning
         Explains & controls their obligation for participating to the educational e-course
         The educational e-course describes:
           • The educational material
           • The study schedule
           • The communication pattern
           • The certification


    Assists the trainees to study and understand the educational
    material
         The trainer is the representative of the training organisation
         Assists the trainees to make a time schedule
         Discuss with the trainees in issues presented regarding the study
         Assists the trainees to understand the educational means to be used
         Creates a community of learning
         Converts the training material from static to dynamic


6-7.10.2011                 Every Trainee Matters | 2010-1-ROI-LE004-0677111
Role of the mentor in e-learning (2/2)


    Provides advice to the trainees on training issues
       The trainer interferes either personally or to the whole group
       so as to:
              •   Explain the training material
              •   Resolve questions
              •   Suggest additional educational resources
              •   Suggest ideas for new or additional exercises


                                      Communicates-encourages the trainees
                                      and organises the communication pattern
                                      amongst them




6-7.10.2011                   Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Responsibilities (1/2)


    Overall responsibility for learners in the Mentored Learning
    Classroom
    Providing regular reviews to the learner, depending on the needs
    of that learner
    Monitor learners progress toward defined milestones and ultimate
    goal
    Progress reports to sales/learner to keep learners on track and
    note issues early
    Counseling learner on issues: late, sleeping, surfing internet,
    missing milestones
    Processes – Schedule and conduct audits and orientations,
    develops learning plans
    Planning – Daily classroom setup
    Executing – Assessments, breakout sessions, hands on-labs, MTM
    evaluations
    Monitoring – Learner progress toward defined goals
6-7.10.2011          Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Responsibilities (2/2)


    Mentoring – MBWA: Mentor By Walking Around, hourly interaction
    with learners
    Deliver breakout sessions and hands-on labs for topic knowledge
    and exam preparation
    Reporting – Forwards assessment and progress results to learners
    and sales
    Communicating – Sales, learner, accounting, other mentors
    Managing Information – learner files, updates and attendance
    Managing Time – Mentors should be out of the room less then 20
    % of the time
    Provide outside study materials and additional reading
    suggestions to the learners in areas of weakness
    Certification - Mentors must hold the MCT status and should
    maintain certifications in the courses being delivered in the
    Mentored Learning Classroom (MLC)

6-7.10.2011          Every Trainee Matters | 2010-1-ROI-LE004-0677111
“Train the Trainer”

   DESIGN &
   IMPLEMENTATION

6-7.10.2011         Every Trainee Matters | 2010-1-ROI-LE004-0677111
Training Course
                         (breakdown)


    Methodology
    User Administration
    Courses Administration
    Platform Administration
    Scenario of Use (live Practice of Trainees in Platform)




6-7.10.2011          Every Trainee Matters | 2010-1-ROI-LE004-0677111
Methodology (3 hours)


    Technologies used for the implementation of e-learning:
         Asynchronous learning platform
         Synchronous learning platform
         technical details, how to facilitate them educationally
         how to make the most out of the training tools

    Distance learning – “Theory & Practice”

    The educational course which he/she is called to implement
         Pedagogical theories, self-learning, cooperative learning
         Synchronous, asynchronous, blended learning

    Discussion coordination among the members of the learning e-
    community
         Special characteristics of written & oral communication

    Assessment procedures – certification of the trainees (specificities
    of certification)


6-7.10.2011               Every Trainee Matters | 2010-1-ROI-LE004-0677111
The mentors must be capable


    Learning a new class
         Prepare to learn
         Learn the material
         Plan the presentation
         Overcome obstacles
         Resolve product questions


                                   Developing a teaching outline
                                                  Determine the topic order
                                                          Introduce a topic
                                                          Build an exercise
                                                           Design a review
                                                                Add closing
                                                               Add opening



6-7.10.2011              Every Trainee Matters | 2010-1-ROI-LE004-0677111
The mentors must be capable


    Putting a class together
         Finalize the outline
         Develop teaching notes
         Design all board work
         Create auxiliary material
         Practice teaching the class


                                    Making a good class Excellent
                                Convert the lecture into a group activity
                                         Foster a learning environment
                                           Manage challenging trainees
                                                   Prepare for problems
                                                    Evaluate the results




6-7.10.2011               Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentors must be trained on


    Asynchronous learning platform: Software with a set of
    “tools” that a trainer must know how to use during training
         (e.g.: using the platform, creating courses, creating learning activities,
         managing users – learners, etc)


    Synchronous learning platform: How to operate, Technical
    details, how to valorise it during the educational process
         (e.g.: collaborative learning, chat, transfer of learning objects of any
         format to the learners, etc)

    A Trainer must be trained on:
         The design & development processes of learning material (printed & electronic
         format)
         The implementation process of synchronous, asynchronous & blended learning
         The user characteristics that will participate in a learning program
         How to manage a training program
         How to certify the participants

6-7.10.2011                Every Trainee Matters | 2010-1-ROI-LE004-0677111
Users Administration (45’-50’)


    Browse List of Users
          Add New (Part 1)
          Edit
          Show User Profile
          Delete User
          Search Filters
    Bulk User Actions (Delete, Download, etc)
    Add New User (Part 2)
    Upload Users
    Create/Edit Custom User Profile fields
    Define Roles
    Assign System Roles
    User Policies


6-7.10.2011              Every Trainee Matters | 2010-1-ROI-LE004-0677111
Courses Administration (45’-60’)


    Add/Edit a Course
    Enrolments
    Manage Activities
    Manage Blocks (Add/Edit Sticky Blocks)
    Calendar (Add/Edit Events)
    Assign Roles in a Course
    View Grades
    Create/Manage Groups
    View/Edit Reports
    View/Manage Course’s Files
    Add a Resource
    Add an Activity (SCORM, Survey, Certificate)
    Edit “Topic Outlines”
6-7.10.2011          Every Trainee Matters | 2010-1-ROI-LE004-0677111
Platform Administration & Scenario


Platform Administration (15’–20’)
  Site Policies (Setting for Platform’s security)
  Calendar (Preferences, Settings)
  Front Page
     –    Settings
     –    Site files
    Cleanup (Inactive Users, etc.)

Scenario of Use (45’–60’)
  Full Practice on the previous issues live on the platform
  Questions




6-7.10.2011            Every Trainee Matters | 2010-1-ROI-LE004-0677111
Training Program

   “TRAIN THE TRAINER”


6-7.10.2011       Every Trainee Matters | 2010-1-ROI-LE004-0677111
Testing the Knowledge


     Phase 1 - Audit Mentor
          Step   1:   Meeting
          Step   2:   Overview
          Step   3:   Learn
          Step   4:   Discovery
          Step   5:   Final Hand off


     Phase 2 - The Needs Assessment
          Step 1: Feedback
          Step 2: Needs Assessment
          Step 3: Close/Advance




6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Audit (1/3)


    Step 1: Meeting
    Trainee will meet with the Mentor for an Audit Demo on the actual
    Training Model. Trainee will experience a:
          Pre-assessment
          Learn
              Reading assignment (10 pages 10’)
              Lecture through Video Stream (15’)
              Review /lab through hands on exercise (15’)
          Post-assessment
          Meet with Responsible person for Needs Assessment

    Step 2: Overview
          Classroom setup
          Video Content

    Step 3: The trainee experiences Mentored Learning
              Pre-Assessment
              Learn (Lecture)
              Reinforce
              Apply (Lab exercise using VPC display)
              Post-Assessment

6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Audit (2/3)


    Step 4: Discovery
          Uncover trainee’s overall training goals and objectives
          Use these details to develop a personalized learning plan
          Include milestones and host a meeting each milestone to check
          progress
          Continue until trainee achieves their goal
    Step 5: Final hand–off
          Private Meeting with Mentor on discovery


    Activity 2 | 15’
          Role Play
          Audit—Overview
              Classroom set up
              Video Content
          Role play in teams of 3: Education Counselor, Prospect, Evaluator




6-7.10.2011                 Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Audit (3/3)


    Activity 3 | 20’
          Role Play
          Audit - Trainee Experiences Mentored Learning
          Audit - Discovery & Turnover
              Pre Assessment
              Learn (Lecture)
              Reinforce
              Apply (Lab exercise using VPC display)
              Post Assessment


          Role play in teams of 3: Education Counselor, Prospect, Evaluator




6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Delivering Mentored Learning

   INSTRUCTOR TRAINING


6-7.10.2011        Every Trainee Matters | 2010-1-ROI-LE004-0677111
Agenda


    Delivering Mentored Learning
          Mentor Characteristics
          Planning Phase
          Execution Phase
              Orientation
              Monitoring
              Reporting
              Communicating
              Managing:
               • Information
               • Time
               • Resources
              Troubleshooting




                                                     Mentored Learning Instructor
                                                             Tools and Resources
    Next Steps
          Exam
          Audit

6-7.10.2011                 Every Trainee Matters | 2010-1-ROI-LE004-0677111
With the completion of this session…


    The Trainer will:
          Know what Mentored Learning is and its value
          Know how Mentored Learning is introduced
          Know the role of the Mentored Learning Instructor or Mentor during
          Pre Delivery and Delivery Phase
              Mentor Characteristics
              Pre-Delivery Mentored Learning Audit
              Daily delivery and Execution of Mentoring
              Tracking and Reporting trainee progress




 Be prepared to complete the Instructor Process Certification Exam




6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Planning Phase


    Planning Phase is consisted by:


              Classroom Layout
                                                           Session Logistics
      Vendor Logistics


  Trainee Mentored                                                  Classroom Hours
  Learning Folders

                                                        Mentored Learning
                                                        Manager




6-7.10.2011            Every Trainee Matters | 2010-1-ROI-LE004-0677111
The Mentor is also responsible for…


    Processes – Schedule and conduct audits
    Planning – Daily classroom setup
    Executing – Assessments, breakout sessions
    Monitoring – Trainee progress toward defined goals
    Reporting – Forwards assessment and progress results to trainees
    and sales
    Communicating – Sales, trainee, accounting, other Mentors
    Managing Resources – Server, images, hardware
    Managing Information – Trainee files, updates and attendance
    Managing Time – Mentors should be out of the room less then 20
    % of the time
         20% may consist of computer setup, research, breakout sessions




6-7.10.2011                Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentored Learning Floor Plan


                                                               Server
                                                                Rack




                                                                        One-Way Glass
                                                                        One-Way Glass




                                                                                                                Glass
                                              M
                                              e
                                              en
                                                 tor
                                                  or
                                                  s
                                                                                           Demo/Closing
                                                                                         Mentor Orientation &
                                                                                          Break-Out Room

                                                                                             Whiteboard




                                                                                                                        Hallway
                                                     Sign-In Table
                                                                                             Whiteboard

                                                                                           Demo/Closing
                                                                                         Mentor Orientation &
                                                                                          Break-Out Room




                                                                         One-Way Glass




                                                                                                                Glass
                                                                                                                Glass
                                    Hallway




6-7.10.2011        Every Trainee Matters | 2010-1-ROI-LE004-0677111
The Mentored Learning Environment




6-7.10.2011           Every Trainee Matters | 2010-1-ROI-LE004-0677111
The Mentor’s Schedule


    Mentored Learning training is scheduled in 3.5 hour
    sessions or time blocks

    Three (3) daily sessions are typically held: morning,
    afternoon or evening

    Each session is booked on a seat availability basis:
          Morning Sessions:             08:30   am   –   12:00   pm
          Afternoon Sessions:           01:00   pm   –   04:30   pm
          Evening Sessions:             05:30   pm   –   09:00   pm
          Saturday:                     08:30   am   –   12:00   pm (if applicable)




6-7.10.2011              Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentored Learning Classroom Hours

    Days         8:30 am – 12:00 pm            1:00 pm – 4:30 pm           5:30 pm – 9:00 pm

Monday               Mentor Specialty:             Mentor Specialty:           Mentor Specialty:
                 Networking & Applications     Networking & Applications   Networking & Applications

Tuesday
                     Mentor Specialty:
                                                   Mentor Specialty:             Mentor Specialty:
                 Programming, Databases &
                                               Networking & Applications           Networking
                       Applications


Wednesday
                     Mentor Specialty:
                                                   Mentor Specialty:             Mentor Specialty:
                 Programming, Databases &
                                               Networking & Applications           Networking
                       Applications


Thursday             Mentor Specialty:
                 Programming, Databases &          Mentor Specialty:             Mentor Specialty:
                       Applications            Networking & Applications           Networking


Friday
                     Mentor Specialty:             Mentor Specialty:
                                                                                     CLOSED
                 Networking & Applications     Networking & Applications


Saturday             Mentor Specialty:
                 Programming, Databases &              CLOSED                        CLOSED
                       Applications




6-7.10.2011                   Every Trainee Matters | 2010-1-ROI-LE004-0677111
The Mentored Learning
                      Trainee Learning File


    Mentored Learning trainee File for each trainee is created
    during the Orientation process (hardcopies)

    The Mentored Learning trainee File is referenced and used
    throughout the trainee’s training

    The Mentored Learning trainee File documents all:
          Pre and post test results
          Future sessions (trainee’s commitment)
          Attendance
          Class completions
          and other critical notes




6-7.10.2011              Every Trainee Matters | 2010-1-ROI-LE004-0677111
Execution Phase


    Execution:
          trainee Setup
          Orientation
    Monitoring
    Reporting
    Communicating
    Managing:
          Information
          Time
          Resources
    Troubleshooting




6-7.10.2011               Every Trainee Matters | 2010-1-ROI-LE004-0677111
Trainee Setup Process


    Step 1
          Create the trainee Account in Active Directory (Mentored Learning
          classroom only)
          Create the trainee Workstation
              Login
              Lab Images are pushed from main server to trainee machine



    Step 2
          Create the trainee Account for the Video Provider
          Create a learning plan with milestones and a final goal date:

 Monitor frequently to ensure milestones are being met and
  customer is satisfied




6-7.10.2011                 Every Trainee Matters | 2010-1-ROI-LE004-0677111
Trainee Orientation Process


    The first day includes discussion of:
          trainee goals, expectations
          Timeline completion
          Availability
          “House Rules”
          “How to” i.e. Learning Port
          Scheduling Future Sessions
          Cancellation Policy


    Trainee Mentored Learning File
          Standard training agreements & sales orders
          Course Mapping Form
          House Rules
          Mentored Learning Checklist
          Trainee Tracking Sheet with Milestones & Goal Date

          Pretest–Trainee Assessments
          FAQs




6-7.10.2011                    Every Trainee Matters | 2010-1-ROI-LE004-0677111
The Mentored Learning
                         Counseling Session


    Types of Mentor Counseling Sessions
          Slow or Speedy trainee
          Low Test Scores
          Resistant trainee


    The trainee Write-up

    Orientation - Day of 1st Session

    Activity 1 | 45’
          Role Play / Walk Through
              Trainee Folder, Rules, Checklist
              Locate the Step by Step checklist in your workbook
              Review the Step and Demo activities
              Walk through the process with as both trainee/Mentor




6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Execution Phase



    Deliver Assessments to trainees

    Deliver Breakout Sessions as Needed

    Provide Outside Reading Suggestions

    Provide Regular Reviews to trainee

    Provide Capstone Assignments as Needed




6-7.10.2011         Every Trainee Matters | 2010-1-ROI-LE004-0677111
Daily Monitoring


    Trainee Progress toward defined Goals
    Hold trainees accountable
    Attendance
    Behavior and body language
    MBWA: Mentor by Walking Around

    Orientation
          Activity 2 | 45’
          Role Play
              Counseling Session
              - Slow or Speedy trainee
              - Low Test Scores
              - Resistant trainee
              - Trainee Write-up
              Review the talking points of each scenario Roll play in teams of two: Mentor/trainee
              Role Play having each taking on the role of the Mentor/trainee




6-7.10.2011                  Every Trainee Matters | 2010-1-ROI-LE004-0677111
Daily Reporting



    Daily Reporting




     Assessment Results          Ongoing Progress                   Evaluations Through
     to Sales/trainees           Results                            MTM




6-7.10.2011               Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Management Activities



       Mentor Management Activities




     Resources                Information                        Time




6-7.10.2011            Every Trainee Matters | 2010-1-ROI-LE004-0677111
Managing Information



       Managing Information




     Trainee Folders            Logons                             Vendor updates




6-7.10.2011              Every Trainee Matters | 2010-1-ROI-LE004-0677111
Managing Resources


    Servers

    Workstations

    Images

    Credentials
          MCT, Cisco


    Skills
          Gaps
          No SME




6-7.10.2011             Every Trainee Matters | 2010-1-ROI-LE004-0677111
Managing Time



      Minimum Out-of-Room Activities




     Audits                  Meetings                           Breakouts




6-7.10.2011           Every Trainee Matters | 2010-1-ROI-LE004-0677111
Mentor Troubleshooting


       Problem trainees

                                                          Wrong Modality




   Handling Monday
   Mornings

                                                          More than 1 question
                                                          at a time




6-7.10.2011          Every Trainee Matters | 2010-1-ROI-LE004-0677111
Supporting Material for Trainers


    Mentored Learning Reference Tools: DVD
          Orientation Packet with Checklist
              Trainee Information Profile
              Mentored Learning Classroom Policy and Procedures
              Test Past Guarantee
              Mentored Learning Information Sheet
          Trainee Setup guide
          Mentored Learning Daily Survey
          Trainee Tracking Form
          Mentor Exam
          Audit Video
          Mentored Learning Manager Online Sessions




6-7.10.2011                 Every Trainee Matters | 2010-1-ROI-LE004-0677111
6-7.10.2011   Every Trainee Matters | 2010-1-ROI-LE004-0677111

''Train the trainer'' presentation

  • 1.
    ETM 4th ProjectMeeting Plovdiv - Bulgaria 6th – 7th October 2011 Every Trainee Matters Leonardo Da Vinci – Partnership Raftopoulos Dimitris Strategic Leadership
  • 2.
    Contents Mentored Learning Role of the Mentor in e-learning Mentor responsibilities Design & Implementation Training Program Delivering Mentored Learning 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 3.
    “TRAIN THE TRAINER” MENTORED LEARNING 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 4.
    Mentored Learning Mentored Learning is Focused Learning One on one mentoring Flexible scheduling Integrated delivery Mentored learning classroom: is a learning environment that incorporates tools, technologies and a Mentor in the learning process Comprehensive training environment incorporating a hybrid of: Traditional classroom instruction Hands on lab exercises One on one mentoring E-learning Reading Video based instruction 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 5.
    Role of thementor in e-learning (1/2) Assists the trainees to understand their role and the model of e- learning Explains & controls their obligation for participating to the educational e-course The educational e-course describes: • The educational material • The study schedule • The communication pattern • The certification Assists the trainees to study and understand the educational material The trainer is the representative of the training organisation Assists the trainees to make a time schedule Discuss with the trainees in issues presented regarding the study Assists the trainees to understand the educational means to be used Creates a community of learning Converts the training material from static to dynamic 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 6.
    Role of thementor in e-learning (2/2) Provides advice to the trainees on training issues The trainer interferes either personally or to the whole group so as to: • Explain the training material • Resolve questions • Suggest additional educational resources • Suggest ideas for new or additional exercises Communicates-encourages the trainees and organises the communication pattern amongst them 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 7.
    Mentor Responsibilities (1/2) Overall responsibility for learners in the Mentored Learning Classroom Providing regular reviews to the learner, depending on the needs of that learner Monitor learners progress toward defined milestones and ultimate goal Progress reports to sales/learner to keep learners on track and note issues early Counseling learner on issues: late, sleeping, surfing internet, missing milestones Processes – Schedule and conduct audits and orientations, develops learning plans Planning – Daily classroom setup Executing – Assessments, breakout sessions, hands on-labs, MTM evaluations Monitoring – Learner progress toward defined goals 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 8.
    Mentor Responsibilities (2/2) Mentoring – MBWA: Mentor By Walking Around, hourly interaction with learners Deliver breakout sessions and hands-on labs for topic knowledge and exam preparation Reporting – Forwards assessment and progress results to learners and sales Communicating – Sales, learner, accounting, other mentors Managing Information – learner files, updates and attendance Managing Time – Mentors should be out of the room less then 20 % of the time Provide outside study materials and additional reading suggestions to the learners in areas of weakness Certification - Mentors must hold the MCT status and should maintain certifications in the courses being delivered in the Mentored Learning Classroom (MLC) 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 9.
    “Train the Trainer” DESIGN & IMPLEMENTATION 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 10.
    Training Course (breakdown) Methodology User Administration Courses Administration Platform Administration Scenario of Use (live Practice of Trainees in Platform) 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 11.
    Methodology (3 hours) Technologies used for the implementation of e-learning: Asynchronous learning platform Synchronous learning platform technical details, how to facilitate them educationally how to make the most out of the training tools Distance learning – “Theory & Practice” The educational course which he/she is called to implement Pedagogical theories, self-learning, cooperative learning Synchronous, asynchronous, blended learning Discussion coordination among the members of the learning e- community Special characteristics of written & oral communication Assessment procedures – certification of the trainees (specificities of certification) 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 12.
    The mentors mustbe capable Learning a new class Prepare to learn Learn the material Plan the presentation Overcome obstacles Resolve product questions Developing a teaching outline Determine the topic order Introduce a topic Build an exercise Design a review Add closing Add opening 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 13.
    The mentors mustbe capable Putting a class together Finalize the outline Develop teaching notes Design all board work Create auxiliary material Practice teaching the class Making a good class Excellent Convert the lecture into a group activity Foster a learning environment Manage challenging trainees Prepare for problems Evaluate the results 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 14.
    Mentors must betrained on Asynchronous learning platform: Software with a set of “tools” that a trainer must know how to use during training (e.g.: using the platform, creating courses, creating learning activities, managing users – learners, etc) Synchronous learning platform: How to operate, Technical details, how to valorise it during the educational process (e.g.: collaborative learning, chat, transfer of learning objects of any format to the learners, etc) A Trainer must be trained on: The design & development processes of learning material (printed & electronic format) The implementation process of synchronous, asynchronous & blended learning The user characteristics that will participate in a learning program How to manage a training program How to certify the participants 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 15.
    Users Administration (45’-50’) Browse List of Users Add New (Part 1) Edit Show User Profile Delete User Search Filters Bulk User Actions (Delete, Download, etc) Add New User (Part 2) Upload Users Create/Edit Custom User Profile fields Define Roles Assign System Roles User Policies 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 16.
    Courses Administration (45’-60’) Add/Edit a Course Enrolments Manage Activities Manage Blocks (Add/Edit Sticky Blocks) Calendar (Add/Edit Events) Assign Roles in a Course View Grades Create/Manage Groups View/Edit Reports View/Manage Course’s Files Add a Resource Add an Activity (SCORM, Survey, Certificate) Edit “Topic Outlines” 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 17.
    Platform Administration &Scenario Platform Administration (15’–20’) Site Policies (Setting for Platform’s security) Calendar (Preferences, Settings) Front Page – Settings – Site files Cleanup (Inactive Users, etc.) Scenario of Use (45’–60’) Full Practice on the previous issues live on the platform Questions 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 18.
    Training Program “TRAIN THE TRAINER” 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 19.
    Testing the Knowledge Phase 1 - Audit Mentor Step 1: Meeting Step 2: Overview Step 3: Learn Step 4: Discovery Step 5: Final Hand off Phase 2 - The Needs Assessment Step 1: Feedback Step 2: Needs Assessment Step 3: Close/Advance 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 20.
    Mentor Audit (1/3) Step 1: Meeting Trainee will meet with the Mentor for an Audit Demo on the actual Training Model. Trainee will experience a: Pre-assessment Learn Reading assignment (10 pages 10’) Lecture through Video Stream (15’) Review /lab through hands on exercise (15’) Post-assessment Meet with Responsible person for Needs Assessment Step 2: Overview Classroom setup Video Content Step 3: The trainee experiences Mentored Learning Pre-Assessment Learn (Lecture) Reinforce Apply (Lab exercise using VPC display) Post-Assessment 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 21.
    Mentor Audit (2/3) Step 4: Discovery Uncover trainee’s overall training goals and objectives Use these details to develop a personalized learning plan Include milestones and host a meeting each milestone to check progress Continue until trainee achieves their goal Step 5: Final hand–off Private Meeting with Mentor on discovery Activity 2 | 15’ Role Play Audit—Overview Classroom set up Video Content Role play in teams of 3: Education Counselor, Prospect, Evaluator 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 22.
    Mentor Audit (3/3) Activity 3 | 20’ Role Play Audit - Trainee Experiences Mentored Learning Audit - Discovery & Turnover Pre Assessment Learn (Lecture) Reinforce Apply (Lab exercise using VPC display) Post Assessment Role play in teams of 3: Education Counselor, Prospect, Evaluator 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 23.
    Delivering Mentored Learning INSTRUCTOR TRAINING 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 24.
    Agenda Delivering Mentored Learning Mentor Characteristics Planning Phase Execution Phase Orientation Monitoring Reporting Communicating Managing: • Information • Time • Resources Troubleshooting Mentored Learning Instructor Tools and Resources Next Steps Exam Audit 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 25.
    With the completionof this session… The Trainer will: Know what Mentored Learning is and its value Know how Mentored Learning is introduced Know the role of the Mentored Learning Instructor or Mentor during Pre Delivery and Delivery Phase Mentor Characteristics Pre-Delivery Mentored Learning Audit Daily delivery and Execution of Mentoring Tracking and Reporting trainee progress  Be prepared to complete the Instructor Process Certification Exam 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 26.
    Planning Phase Planning Phase is consisted by: Classroom Layout Session Logistics Vendor Logistics Trainee Mentored Classroom Hours Learning Folders Mentored Learning Manager 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 27.
    The Mentor isalso responsible for… Processes – Schedule and conduct audits Planning – Daily classroom setup Executing – Assessments, breakout sessions Monitoring – Trainee progress toward defined goals Reporting – Forwards assessment and progress results to trainees and sales Communicating – Sales, trainee, accounting, other Mentors Managing Resources – Server, images, hardware Managing Information – Trainee files, updates and attendance Managing Time – Mentors should be out of the room less then 20 % of the time 20% may consist of computer setup, research, breakout sessions 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 28.
    Mentored Learning FloorPlan Server Rack One-Way Glass One-Way Glass Glass M e en tor or s Demo/Closing Mentor Orientation & Break-Out Room Whiteboard Hallway Sign-In Table Whiteboard Demo/Closing Mentor Orientation & Break-Out Room One-Way Glass Glass Glass Hallway 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 29.
    The Mentored LearningEnvironment 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 30.
    The Mentor’s Schedule Mentored Learning training is scheduled in 3.5 hour sessions or time blocks Three (3) daily sessions are typically held: morning, afternoon or evening Each session is booked on a seat availability basis: Morning Sessions: 08:30 am – 12:00 pm Afternoon Sessions: 01:00 pm – 04:30 pm Evening Sessions: 05:30 pm – 09:00 pm Saturday: 08:30 am – 12:00 pm (if applicable) 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 31.
    Mentored Learning ClassroomHours Days 8:30 am – 12:00 pm 1:00 pm – 4:30 pm 5:30 pm – 9:00 pm Monday Mentor Specialty: Mentor Specialty: Mentor Specialty: Networking & Applications Networking & Applications Networking & Applications Tuesday Mentor Specialty: Mentor Specialty: Mentor Specialty: Programming, Databases & Networking & Applications Networking Applications Wednesday Mentor Specialty: Mentor Specialty: Mentor Specialty: Programming, Databases & Networking & Applications Networking Applications Thursday Mentor Specialty: Programming, Databases & Mentor Specialty: Mentor Specialty: Applications Networking & Applications Networking Friday Mentor Specialty: Mentor Specialty: CLOSED Networking & Applications Networking & Applications Saturday Mentor Specialty: Programming, Databases & CLOSED CLOSED Applications 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 32.
    The Mentored Learning Trainee Learning File Mentored Learning trainee File for each trainee is created during the Orientation process (hardcopies) The Mentored Learning trainee File is referenced and used throughout the trainee’s training The Mentored Learning trainee File documents all: Pre and post test results Future sessions (trainee’s commitment) Attendance Class completions and other critical notes 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 33.
    Execution Phase Execution: trainee Setup Orientation Monitoring Reporting Communicating Managing: Information Time Resources Troubleshooting 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 34.
    Trainee Setup Process Step 1 Create the trainee Account in Active Directory (Mentored Learning classroom only) Create the trainee Workstation Login Lab Images are pushed from main server to trainee machine Step 2 Create the trainee Account for the Video Provider Create a learning plan with milestones and a final goal date:  Monitor frequently to ensure milestones are being met and customer is satisfied 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 35.
    Trainee Orientation Process The first day includes discussion of: trainee goals, expectations Timeline completion Availability “House Rules” “How to” i.e. Learning Port Scheduling Future Sessions Cancellation Policy Trainee Mentored Learning File Standard training agreements & sales orders Course Mapping Form House Rules Mentored Learning Checklist Trainee Tracking Sheet with Milestones & Goal Date Pretest–Trainee Assessments FAQs 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 36.
    The Mentored Learning Counseling Session Types of Mentor Counseling Sessions Slow or Speedy trainee Low Test Scores Resistant trainee The trainee Write-up Orientation - Day of 1st Session Activity 1 | 45’ Role Play / Walk Through Trainee Folder, Rules, Checklist Locate the Step by Step checklist in your workbook Review the Step and Demo activities Walk through the process with as both trainee/Mentor 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 37.
    Execution Phase Deliver Assessments to trainees Deliver Breakout Sessions as Needed Provide Outside Reading Suggestions Provide Regular Reviews to trainee Provide Capstone Assignments as Needed 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 38.
    Daily Monitoring Trainee Progress toward defined Goals Hold trainees accountable Attendance Behavior and body language MBWA: Mentor by Walking Around Orientation Activity 2 | 45’ Role Play Counseling Session - Slow or Speedy trainee - Low Test Scores - Resistant trainee - Trainee Write-up Review the talking points of each scenario Roll play in teams of two: Mentor/trainee Role Play having each taking on the role of the Mentor/trainee 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 39.
    Daily Reporting Daily Reporting Assessment Results Ongoing Progress Evaluations Through to Sales/trainees Results MTM 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 40.
    Mentor Management Activities Mentor Management Activities Resources Information Time 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 41.
    Managing Information Managing Information Trainee Folders Logons Vendor updates 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 42.
    Managing Resources Servers Workstations Images Credentials MCT, Cisco Skills Gaps No SME 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 43.
    Managing Time Minimum Out-of-Room Activities Audits Meetings Breakouts 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 44.
    Mentor Troubleshooting Problem trainees Wrong Modality Handling Monday Mornings More than 1 question at a time 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 45.
    Supporting Material forTrainers Mentored Learning Reference Tools: DVD Orientation Packet with Checklist Trainee Information Profile Mentored Learning Classroom Policy and Procedures Test Past Guarantee Mentored Learning Information Sheet Trainee Setup guide Mentored Learning Daily Survey Trainee Tracking Form Mentor Exam Audit Video Mentored Learning Manager Online Sessions 6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111
  • 46.
    6-7.10.2011 Every Trainee Matters | 2010-1-ROI-LE004-0677111