The document presents 34 photos documenting the construction progress of various zones in Lakeview City Phase 2 between May 16-22, 2017. The photos show work ongoing in residential blocks EL1-EL6, CL2.1-CL5.2, the swimming pool, water retention pond, viewing plaza, walkways around the pond, viewing deck, and entrance gate.