SlideShare a Scribd company logo
1 of 3
LO 1. Determine criteria for testing components.
LO 2. Plan an approach for component testing
Criteria Assessment Contents Conditions Methodologies Assessment
Methods
1. Various testing methods are
Identified based on types of
electronic components
2. Characteristics and
appropriateness of testing
methods to be used during
development and on completion
is determined
3. Testing methods are
considered/selected in relation to
appropriate testing strategy
4. Plan for testing components is
developed at specified points
during development and on
completion
5. 5 Required test & measuring
instruments and tools are
prepared and checked in
accordance with established
procedures
6. Records system is established
to document testing results,
including problems and faults
Testing criteria may
include:
2.1. controls
2.2.effectiveness
2.3. efficiency
2.4. bug detection
2.5. functionality,
including flow
2.6. interoperability
2.7. performance
2.8. reliability
2.9. operating
parameters
Testing methods may
include:
3.1. automated
3.2. debugging
3.3. inspection
3.4. platform testing
3.5. prototyping
Testing method and
strategy may be
determined by:
5.1. Passive testing
5.2. Dynamic testing
5.3. In-circuit testing
Test and measuring
instruments may include:
6.1. Variable DC power
supply
6.2. Digital VOM
6.3. analog VOM
Tools may
include:.
set of pliers
set of
screw
drivers, set
of
wrenches
Hand drills,
Hack saw
set of files
tin snip,
hammer
Film
viewing,
individualize
d learning,
direct
student
laboratory
experience,
On the Job
Training,
Project
method
Practical
Demonstra
tion w/ oral
questioning
, Interview,
Portfolio
Assessment Criteria Contents Conditions Methodologie
s
Assessment
Methods
1. Work instructionare obtainedand
clarifiedbasedonjoborderor client
requirements.
2. Responsible personisconsultedfor
effectiveandproperwork
coordination
3. Data sheet/applicationnotesare
obtainedandinterpretedbasedon
manufacture’sspecifications
4. Testingcriteriaare definedtoensure
that componentsmeettechnical and
qualityrequirements
5. Documentandcommunicate testing
criteriato relevantpersonnel.
Determine criteria
for testing
electronics
components.
Planand
approach for
component
testing
Testcomponents
Evaluate the
testingprocess
The trainees
must have the
ff:
Setof fliers
Setof screw
drivers
Setof wrenches
Hand drills,hack
saw,set of files,
tinsnip,
hammer
Filmviewing,
individualized
learning,
directstudent
laboratory
experience,
On the Job
Training,
Project
method
Observation,
demonstratio
n withoral
questioning,
writtentest
Assessment Criteria Contents Methodologie
s
Assessment
Methods
1. Work instructionare obtainedand
clarifiedbaPsedonjoborderorclient
requirements.
2. Responsible personisconsultedfor
effectiveandproperwork
coordination
3. Data sheet/applicationnotesare
obtainedandinterpretedbasedon
manufacture’sspecifications
4. Testingcriteriaare definedtoensure
that componentsmeettechnical and
qualityrequirements
5. Documentandcommunicate testing
criteriato relevantpersonnel.
Determine criteria
for testing
electronics
components.
Planand
approach for
component
testing
Testcomponents
Evaluate the
testingprocess
Filmviewing,
individualized
learning,
directstudent
laboratory
experience,
On the Job
Training,
Project
method
Observation,
demonstratio
n withoral
questioning,
writtentest
6.4. dual trace triggered
oscilloscope
6.5. function generator
LO 3. Test components
Criteria Assessment Contents Conditions Methodologies Assessment
Methods
1. Testing methods are applied
to ensure that products meet
creative, production and
technical requirements
2. Problems and faults
detected by testing are
recorded and
remedial steps taken in
records
system is documented
3. Problems and faults
detected during testing are
resolved in
accordance with agreed
project
or industry practice
4. Evaluate final products
against the previously
determined criteria
5. Testing process is
documented and
summarized evaluation
report is submitted to
relevant personnel
6. Testing process is
documented and
summarized evaluation
report is submitted to
relevant personnel Evaluate
the testing process
Testing methods may
include:
3.1. automated
3.2. debugging
3.3. inspection
3.4. platform testing
3.5. prototyping
The
following
resources
must be
provided:
Working
area/bench,
Electronic
components,
Testing
instruments
and
equipment,
Assessment
rating sheet,
Reporting
forms
Filmviewing,
individualized
learning,
direct
student
laboratory
experience,
On the Job
Training,
Project
method
Practical
Demonstration
w/ oral
questioning,
Interview,
Portfolio
LO 4. Evaluate the testingprocess
Criteria Assessment Contents Conditions Methodologies Assessment
Methods
1.1 Testingmethodsthatwere
successful andthose thatledto
difficultiesare identifiedbasedon
industry standards
1.2 Testingprocessandrecords
systemare evaluatedbasedon
standardprocedures
Testing methods may
include:
3.1. automated
3.2. debugging
3.3. inspection
3.4. platform testing
3.5. prototyping
Testing method and
The following
resources
must be
provided:
Working
area/bench,
Electronic
components,
Filmviewing,
individualized
learning,
direct
student
laboratory
experience,
Practical
Demonstration
w/ oral
questioning,
Interview,
Portfolio
Unit of Competency: INSTALL AND CONFIGURE COMPUTER SYSTEM
Modules Title: INSTALL AND CONFIGURING COMPUTER SYSTEM
Module Descriptor: This unit covers the outcomes required in installing and
configuring desktop and workstation computer systems. It
consists of competencies to assemble computer
hardware, install operating system and drivers for
peripherals/devices, and install application software as
well as to conduct testing and documentation.
Nominal Duration: 60 hours
Summary of Learning Outcomes:
LO1. Assemble computer hardware
1.3 Testresults/findingsare
documentedforsubsequent
componentstesting.
strategy may be
determined by:
5.1. Passive testing
5.2. Dynamic testing
5.3. In-circuit testing
Test and measuring
instruments may
include:
6.1. Variable DC power
supply
6.2. Digital VOM
6.3. analog VOM
6.4. dual trace
triggered oscilloscope
6.5. function generator
Testing
instruments
and
equipment,
Assessment
rating sheet,
Reporting
forms
On the Job
Training,
Project
method

More Related Content

What's hot (19)

Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Law down1 6
Law down1 6Law down1 6
Law down1 6
 
Iso 9000 2000 Internal Audits
Iso 9000 2000 Internal AuditsIso 9000 2000 Internal Audits
Iso 9000 2000 Internal Audits
 
QMS Implementation Presentation
QMS Implementation Presentation QMS Implementation Presentation
QMS Implementation Presentation
 
Test construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erpTest construction (for content staff) eg feb08 erp
Test construction (for content staff) eg feb08 erp
 
Phase 1 Compliance
Phase 1 CompliancePhase 1 Compliance
Phase 1 Compliance
 
ISO / IEC 17025
ISO / IEC 17025ISO / IEC 17025
ISO / IEC 17025
 
Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...
 
Auditing and inspection
Auditing and inspectionAuditing and inspection
Auditing and inspection
 
Iso 17025
Iso 17025Iso 17025
Iso 17025
 
Marking report
Marking reportMarking report
Marking report
 
Implementation of ISO 17025 -summary
Implementation of ISO 17025 -summaryImplementation of ISO 17025 -summary
Implementation of ISO 17025 -summary
 
Ilac g24 edition 2007 (e)
Ilac g24 edition 2007 (e)Ilac g24 edition 2007 (e)
Ilac g24 edition 2007 (e)
 
Pharmaceutical Auditing and Inspections Professor Peivand Pirouzi 2010
Pharmaceutical Auditing and Inspections   Professor Peivand Pirouzi 2010Pharmaceutical Auditing and Inspections   Professor Peivand Pirouzi 2010
Pharmaceutical Auditing and Inspections Professor Peivand Pirouzi 2010
 
daada Quality control
daada Quality controldaada Quality control
daada Quality control
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
vender certification.ppsx
vender certification.ppsxvender certification.ppsx
vender certification.ppsx
 
quality assurance audits
quality assurance audits quality assurance audits
quality assurance audits
 
Audit vs inspection
Audit vs inspectionAudit vs inspection
Audit vs inspection
 

Similar to Tesda css correction

Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing ProcessH2Kinfosys
 
Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshsshaikbab
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxPriyaFulpagare1
 
R!!! ria-gui-test plan 1.0
R!!! ria-gui-test plan 1.0R!!! ria-gui-test plan 1.0
R!!! ria-gui-test plan 1.0hanumanthunembi
 
Test Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdfTest Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdfnandanbh86
 
test-plan-template-05.pdf
test-plan-template-05.pdftest-plan-template-05.pdf
test-plan-template-05.pdfgintpt
 
ISO 29119 and Software Testing - now what??
ISO 29119 and Software Testing - now what??ISO 29119 and Software Testing - now what??
ISO 29119 and Software Testing - now what??Fáber D. Giraldo
 
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxLecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxSirRafiLectures
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answersMaria FutureThoughts
 
Verification and Validation
Verification and ValidationVerification and Validation
Verification and ValidationMusTufa Nullwala
 
1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptxgianggiang114
 
Test Management.pptx
Test Management.pptxTest Management.pptx
Test Management.pptxMAshok10
 
chapter-no-4-test-management fudhg ddh j
chapter-no-4-test-management fudhg ddh jchapter-no-4-test-management fudhg ddh j
chapter-no-4-test-management fudhg ddh jAmitDeshai
 
Test planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningTest planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningpushpait
 

Similar to Tesda css correction (20)

Introduction to CMMI-DEV v1.3 - Day 3
Introduction to CMMI-DEV v1.3  - Day 3Introduction to CMMI-DEV v1.3  - Day 3
Introduction to CMMI-DEV v1.3 - Day 3
 
Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing Process
 
Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshs
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
 
R!!! ria-gui-test plan 1.0
R!!! ria-gui-test plan 1.0R!!! ria-gui-test plan 1.0
R!!! ria-gui-test plan 1.0
 
Test Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdfTest Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdf
 
Qa documentation pp
Qa documentation ppQa documentation pp
Qa documentation pp
 
Quality assurance (qa) online training
Quality assurance (qa) online trainingQuality assurance (qa) online training
Quality assurance (qa) online training
 
test-plan-template-05.pdf
test-plan-template-05.pdftest-plan-template-05.pdf
test-plan-template-05.pdf
 
ISO 29119 and Software Testing - now what??
ISO 29119 and Software Testing - now what??ISO 29119 and Software Testing - now what??
ISO 29119 and Software Testing - now what??
 
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptxLecture 08 (SQE, Testing, PM, RM, ME).pptx
Lecture 08 (SQE, Testing, PM, RM, ME).pptx
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers
 
Verification and Validation
Verification and ValidationVerification and Validation
Verification and Validation
 
1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx
 
Face.ppt
Face.pptFace.ppt
Face.ppt
 
ISTQB Test Process
ISTQB Test ProcessISTQB Test Process
ISTQB Test Process
 
Test Management.pptx
Test Management.pptxTest Management.pptx
Test Management.pptx
 
TMMi Implementation Guideline
TMMi Implementation GuidelineTMMi Implementation Guideline
TMMi Implementation Guideline
 
chapter-no-4-test-management fudhg ddh j
chapter-no-4-test-management fudhg ddh jchapter-no-4-test-management fudhg ddh j
chapter-no-4-test-management fudhg ddh j
 
Test planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningTest planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planning
 

Recently uploaded

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 

Recently uploaded (20)

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 

Tesda css correction

  • 1. LO 1. Determine criteria for testing components. LO 2. Plan an approach for component testing Criteria Assessment Contents Conditions Methodologies Assessment Methods 1. Various testing methods are Identified based on types of electronic components 2. Characteristics and appropriateness of testing methods to be used during development and on completion is determined 3. Testing methods are considered/selected in relation to appropriate testing strategy 4. Plan for testing components is developed at specified points during development and on completion 5. 5 Required test & measuring instruments and tools are prepared and checked in accordance with established procedures 6. Records system is established to document testing results, including problems and faults Testing criteria may include: 2.1. controls 2.2.effectiveness 2.3. efficiency 2.4. bug detection 2.5. functionality, including flow 2.6. interoperability 2.7. performance 2.8. reliability 2.9. operating parameters Testing methods may include: 3.1. automated 3.2. debugging 3.3. inspection 3.4. platform testing 3.5. prototyping Testing method and strategy may be determined by: 5.1. Passive testing 5.2. Dynamic testing 5.3. In-circuit testing Test and measuring instruments may include: 6.1. Variable DC power supply 6.2. Digital VOM 6.3. analog VOM Tools may include:. set of pliers set of screw drivers, set of wrenches Hand drills, Hack saw set of files tin snip, hammer Film viewing, individualize d learning, direct student laboratory experience, On the Job Training, Project method Practical Demonstra tion w/ oral questioning , Interview, Portfolio Assessment Criteria Contents Conditions Methodologie s Assessment Methods 1. Work instructionare obtainedand clarifiedbasedonjoborderor client requirements. 2. Responsible personisconsultedfor effectiveandproperwork coordination 3. Data sheet/applicationnotesare obtainedandinterpretedbasedon manufacture’sspecifications 4. Testingcriteriaare definedtoensure that componentsmeettechnical and qualityrequirements 5. Documentandcommunicate testing criteriato relevantpersonnel. Determine criteria for testing electronics components. Planand approach for component testing Testcomponents Evaluate the testingprocess The trainees must have the ff: Setof fliers Setof screw drivers Setof wrenches Hand drills,hack saw,set of files, tinsnip, hammer Filmviewing, individualized learning, directstudent laboratory experience, On the Job Training, Project method Observation, demonstratio n withoral questioning, writtentest Assessment Criteria Contents Methodologie s Assessment Methods 1. Work instructionare obtainedand clarifiedbaPsedonjoborderorclient requirements. 2. Responsible personisconsultedfor effectiveandproperwork coordination 3. Data sheet/applicationnotesare obtainedandinterpretedbasedon manufacture’sspecifications 4. Testingcriteriaare definedtoensure that componentsmeettechnical and qualityrequirements 5. Documentandcommunicate testing criteriato relevantpersonnel. Determine criteria for testing electronics components. Planand approach for component testing Testcomponents Evaluate the testingprocess Filmviewing, individualized learning, directstudent laboratory experience, On the Job Training, Project method Observation, demonstratio n withoral questioning, writtentest
  • 2. 6.4. dual trace triggered oscilloscope 6.5. function generator LO 3. Test components Criteria Assessment Contents Conditions Methodologies Assessment Methods 1. Testing methods are applied to ensure that products meet creative, production and technical requirements 2. Problems and faults detected by testing are recorded and remedial steps taken in records system is documented 3. Problems and faults detected during testing are resolved in accordance with agreed project or industry practice 4. Evaluate final products against the previously determined criteria 5. Testing process is documented and summarized evaluation report is submitted to relevant personnel 6. Testing process is documented and summarized evaluation report is submitted to relevant personnel Evaluate the testing process Testing methods may include: 3.1. automated 3.2. debugging 3.3. inspection 3.4. platform testing 3.5. prototyping The following resources must be provided: Working area/bench, Electronic components, Testing instruments and equipment, Assessment rating sheet, Reporting forms Filmviewing, individualized learning, direct student laboratory experience, On the Job Training, Project method Practical Demonstration w/ oral questioning, Interview, Portfolio LO 4. Evaluate the testingprocess Criteria Assessment Contents Conditions Methodologies Assessment Methods 1.1 Testingmethodsthatwere successful andthose thatledto difficultiesare identifiedbasedon industry standards 1.2 Testingprocessandrecords systemare evaluatedbasedon standardprocedures Testing methods may include: 3.1. automated 3.2. debugging 3.3. inspection 3.4. platform testing 3.5. prototyping Testing method and The following resources must be provided: Working area/bench, Electronic components, Filmviewing, individualized learning, direct student laboratory experience, Practical Demonstration w/ oral questioning, Interview, Portfolio
  • 3. Unit of Competency: INSTALL AND CONFIGURE COMPUTER SYSTEM Modules Title: INSTALL AND CONFIGURING COMPUTER SYSTEM Module Descriptor: This unit covers the outcomes required in installing and configuring desktop and workstation computer systems. It consists of competencies to assemble computer hardware, install operating system and drivers for peripherals/devices, and install application software as well as to conduct testing and documentation. Nominal Duration: 60 hours Summary of Learning Outcomes: LO1. Assemble computer hardware 1.3 Testresults/findingsare documentedforsubsequent componentstesting. strategy may be determined by: 5.1. Passive testing 5.2. Dynamic testing 5.3. In-circuit testing Test and measuring instruments may include: 6.1. Variable DC power supply 6.2. Digital VOM 6.3. analog VOM 6.4. dual trace triggered oscilloscope 6.5. function generator Testing instruments and equipment, Assessment rating sheet, Reporting forms On the Job Training, Project method