This document provides instructions on configuring master data and performing calibration processes in SAP S/4HANA. It covers creating equipment, task lists, maintenance plans, and calibration orders. It also describes updating equipment status when calibration is overdue using background jobs run through transaction codes. The overall goal is to maintain instrument accuracy through proper calibration order management and equipment status tracking.
maintenance planning and shedding in (SAP PM EAM )Goolla Dwarakesh
To create a maintenance strategy for a vehicle at 40,000km and 80,000km intervals. The strategy involves:
1. Defining maintenance packages using code IP11 and saving them
2. Creating measuring points for equipment using code IK01 and assigning them to the strategy
3. Developing a general task list using code IA05 per the strategy
4. Building a maintenance plan using code IP01 and assigning the tasks, equipment, and schedule parameters
5. Scheduling the plan for execution using code IP10 and recording counter readings using code IK11 to generate measurement documents.
New Holland D150B Crawler Dozer Service Repair Manual.pdfufsekmdmmdd
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text instructions.
New Holland D150B Crawler Dozer Service Repair Manual.pdffusekdmdmded
This document provides instructions for removing the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Fasteners securing the engine hood and mounts are also removed to allow lifting out the engine. Safety precautions are noted such as ensuring the engine is cold before draining coolant.
New Holland D150B Crawler Dozer Service Repair Manual.pdffujskemdidk8u1
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text.
New Holland D150B Crawler Dozer Service Repair Manual.pdffujsekmdijdjd3e
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text.
New holland d150 b crawler dozer service repair manualjjdjfkkskemme
This service manual provides maintenance and repair instructions for a D150B crawler dozer with a Tier 3 engine. It contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. The manual is intended for use by qualified dealership technicians and contains safety warnings. It uses a coding system to classify information by machine components, functions, and technical data types to help technicians find the specific information needed to resolve customer issues.
New holland d150 b crawler dozer service repair manualfjjskkefksme
This service manual provides maintenance and repair instructions for a D150B crawler dozer with the following specifications:
- Model: D150B XLT with cab, Tier 3 engine, power angle tilt blade, made in Brazil
- Engine: F4HE9684U*J101
- Edition: 3rd edition, English, June 2018
The manual contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. Each section provides detailed information, specifications, and repair procedures for the relevant components and systems.
New holland d150 b crawler dozer service repair manualfjskekfseik
This service manual provides maintenance and repair instructions for a D150B crawler dozer with a Tier 3 engine. It contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. The manual is intended for qualified service technicians and contains technical specifications, diagrams, troubleshooting information, and repair procedures for the systems of the dozer.
maintenance planning and shedding in (SAP PM EAM )Goolla Dwarakesh
To create a maintenance strategy for a vehicle at 40,000km and 80,000km intervals. The strategy involves:
1. Defining maintenance packages using code IP11 and saving them
2. Creating measuring points for equipment using code IK01 and assigning them to the strategy
3. Developing a general task list using code IA05 per the strategy
4. Building a maintenance plan using code IP01 and assigning the tasks, equipment, and schedule parameters
5. Scheduling the plan for execution using code IP10 and recording counter readings using code IK11 to generate measurement documents.
New Holland D150B Crawler Dozer Service Repair Manual.pdfufsekmdmmdd
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text instructions.
New Holland D150B Crawler Dozer Service Repair Manual.pdffusekdmdmded
This document provides instructions for removing the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Fasteners securing the engine hood and mounts are also removed to allow lifting out the engine. Safety precautions are noted such as ensuring the engine is cold before draining coolant.
New Holland D150B Crawler Dozer Service Repair Manual.pdffujskemdidk8u1
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text.
New Holland D150B Crawler Dozer Service Repair Manual.pdffujsekmdijdjd3e
This document provides instructions to remove the engine from a D150B XLT crawler dozer. The steps include draining fluids, disconnecting wiring harnesses and hoses connected to components like the air filter, radiator, fuel lines, starter motor and alternator. Mounting bolts securing the engine hood and components like the fan and radiator are also removed to separate the engine from the machine. Safety precautions are outlined and illustrations supplement the text.
New holland d150 b crawler dozer service repair manualjjdjfkkskemme
This service manual provides maintenance and repair instructions for a D150B crawler dozer with a Tier 3 engine. It contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. The manual is intended for use by qualified dealership technicians and contains safety warnings. It uses a coding system to classify information by machine components, functions, and technical data types to help technicians find the specific information needed to resolve customer issues.
New holland d150 b crawler dozer service repair manualfjjskkefksme
This service manual provides maintenance and repair instructions for a D150B crawler dozer with the following specifications:
- Model: D150B XLT with cab, Tier 3 engine, power angle tilt blade, made in Brazil
- Engine: F4HE9684U*J101
- Edition: 3rd edition, English, June 2018
The manual contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. Each section provides detailed information, specifications, and repair procedures for the relevant components and systems.
New holland d150 b crawler dozer service repair manualfjskekfseik
This service manual provides maintenance and repair instructions for a D150B crawler dozer with a Tier 3 engine. It contains sections covering the engine, rear axle, hydrostatic drive, brakes, hydraulic systems, tracks and suspension, cab climate control, electrical systems, dozer blade, tools, and cab/bodywork. The manual is intended for qualified service technicians and contains technical specifications, diagrams, troubleshooting information, and repair procedures for the systems of the dozer.
This document outlines the calibration process for test equipment in SAP PM, including:
1. Creating master inspection characteristics, equipment tasks lists, and maintenance plans for scheduling calibration work.
2. Generating calibration orders, carrying out tasks, and recording calibration results.
3. Making a usage decision based on the results to determine if equipment passes calibration or needs to be deactivated.
The process integrates test equipment management from the SAP Quality Management module with maintenance order processing in PM.
POStar can turn a smartphone/tablet into a flexible, easy-to-use mobile POS!
POStar provide a simple, flexible, easy-to-use POS app.
It can turn your smartphone and tablet into a mobile POS system!
No more complicated setup procedures!
No more heavy and expensive terminal devices!
Take orders anywhere even without an internet connection.
GooglePlay search "POStar"
Tata Consultancy Services has proposed installing devices for the Himachal Pradesh State Electricity Board. The 8-step process for device installation includes entering the installation number, move-in date, and device serial number in transaction code EG31. It also involves calculating periodic consumption, entering meter rent results, initial reading and notes, releasing the MR data without correction, and checking the successful installation in transaction code ES32. The proposal provides an overview and instructions for installing the devices.
This document provides a summary of AT commands for Multi-Tech wireless modem products. It describes general AT command behaviors and syntax, as well as commands for manufacturer identification, model identification, software version, serial number, SIM functions, character sets, capabilities, power off, phone functionality levels, and phone activity status. The document contains 18 chapters that cover call control, network service, security, phonebook, SMS, supplementary services, data, fax, SIM toolkit, GPRS, and other AT commands.
ITSCNC offer Fadal Siemens Control Touch Probe Manual that includes installation and setup guide information. If you have any query email us at parts@itscnc.com.
This document provides instructions for setting up and using a Direct/Residual Shear Apparatus machine. The summary includes:
1) The machine arrives ready for use with calibrated instrumentation already installed and assigned to inputs. Users should verify the calibration and ensure instruments are plugged into the correct channels.
2) The initial setup involves configuring date/time, display brightness, and preference settings like units of measurement and automatically updating the system.
3) Detailed instructions are provided for sample preparation, consolidation, performing tests, and calibrating the instrumentation if needed.
Case 1650 l crawler dozer service repair manualfjjskefkskem
This service manual provides maintenance and repair information for the 1650L crawler dozer. It includes sections on the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork and decals. The manual is intended for qualified dealership personnel and contains warnings about performing repairs without proper training or tools.
1. A client is an independent business unit within an SAP system that contains client-dependent and client-independent data.
2. Client-dependent data such as customizing, application, and user data can only be viewed from the client it belongs to, while client-independent data like programs and repository objects are available throughout the system.
3. To copy data to a new client, it must first be defined and then filled with data through a local or remote copy from an existing client.
Case 1150 l crawler dozer service repair manualfjjsekfksem
This document is a service manual for a 1150L XLT crawler dozer made in Brazil. It contains sections on the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, and bodywork. Each section contains technical data, functional descriptions, diagnostics, and service procedures for the components of that system. The manual provides information to qualified service personnel to maintain and repair the dozer.
New Holland D140B Crawler Dozer Service Repair Manual.pdffujsekmdijdjd3e
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdfzpdj618286
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, platform, cab, bodywork, and decals. Each section provides information, specifications, diagrams, and procedures for servicing and repairing the various components and systems of the dozer.
New Holland D140B Crawler Dozer Service Repair Manual.pdfufsekmdmmdd
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdffujskemdidk8u1
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdffusekdmdmded
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdff8uusejkddm7u
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork, and decals. The manual provides maintenance and repair instructions for technicians, with references to component locations by section number for finding specific technical information to resolve issues on the machine.
New holland d140 b crawler dozer service repair manualujjfdjkjskkmdm
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, platform, cab, bodywork, and decals. Each section provides technical information, specifications, diagrams, and procedures for servicing and repairing the various components and systems of the dozer.
New holland d140 b crawler dozer service repair manualuudfjjjskkemmd
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork, and decals. Each section provides information on maintenance, repair, and specifications for the various components and systems of the dozer.
New holland d140 b crawler dozer service repair manualfujsjefkksekmme
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must be disconnected from the hydro pumps before the engine can be lifted and removed from the machine.
Case 821 e zbar sugar wheel loader service repair manualfusjefjskefkksem
This document provides a service manual for the 821E Wheel Loader. It contains information on the engine, transmission, front and rear axle systems, brakes, hydraulic systems, steering, wheels, cab climate control, electrical systems, and platform/cab/bodywork. The manual is intended to be used by qualified dealership personnel for repair and maintenance work using the provided instructions and special tools. Unauthorized repairs without following procedures may void warranties.
OpenMetadata Community Meeting - 5th June 2024OpenMetadata
The OpenMetadata Community Meeting was held on June 5th, 2024. In this meeting, we discussed about the data quality capabilities that are integrated with the Incident Manager, providing a complete solution to handle your data observability needs. Watch the end-to-end demo of the data quality features.
* How to run your own data quality framework
* What is the performance impact of running data quality frameworks
* How to run the test cases in your own ETL pipelines
* How the Incident Manager is integrated
* Get notified with alerts when test cases fail
Watch the meeting recording here - https://www.youtube.com/watch?v=UbNOje0kf6E
This document outlines the calibration process for test equipment in SAP PM, including:
1. Creating master inspection characteristics, equipment tasks lists, and maintenance plans for scheduling calibration work.
2. Generating calibration orders, carrying out tasks, and recording calibration results.
3. Making a usage decision based on the results to determine if equipment passes calibration or needs to be deactivated.
The process integrates test equipment management from the SAP Quality Management module with maintenance order processing in PM.
POStar can turn a smartphone/tablet into a flexible, easy-to-use mobile POS!
POStar provide a simple, flexible, easy-to-use POS app.
It can turn your smartphone and tablet into a mobile POS system!
No more complicated setup procedures!
No more heavy and expensive terminal devices!
Take orders anywhere even without an internet connection.
GooglePlay search "POStar"
Tata Consultancy Services has proposed installing devices for the Himachal Pradesh State Electricity Board. The 8-step process for device installation includes entering the installation number, move-in date, and device serial number in transaction code EG31. It also involves calculating periodic consumption, entering meter rent results, initial reading and notes, releasing the MR data without correction, and checking the successful installation in transaction code ES32. The proposal provides an overview and instructions for installing the devices.
This document provides a summary of AT commands for Multi-Tech wireless modem products. It describes general AT command behaviors and syntax, as well as commands for manufacturer identification, model identification, software version, serial number, SIM functions, character sets, capabilities, power off, phone functionality levels, and phone activity status. The document contains 18 chapters that cover call control, network service, security, phonebook, SMS, supplementary services, data, fax, SIM toolkit, GPRS, and other AT commands.
ITSCNC offer Fadal Siemens Control Touch Probe Manual that includes installation and setup guide information. If you have any query email us at parts@itscnc.com.
This document provides instructions for setting up and using a Direct/Residual Shear Apparatus machine. The summary includes:
1) The machine arrives ready for use with calibrated instrumentation already installed and assigned to inputs. Users should verify the calibration and ensure instruments are plugged into the correct channels.
2) The initial setup involves configuring date/time, display brightness, and preference settings like units of measurement and automatically updating the system.
3) Detailed instructions are provided for sample preparation, consolidation, performing tests, and calibrating the instrumentation if needed.
Case 1650 l crawler dozer service repair manualfjjskefkskem
This service manual provides maintenance and repair information for the 1650L crawler dozer. It includes sections on the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork and decals. The manual is intended for qualified dealership personnel and contains warnings about performing repairs without proper training or tools.
1. A client is an independent business unit within an SAP system that contains client-dependent and client-independent data.
2. Client-dependent data such as customizing, application, and user data can only be viewed from the client it belongs to, while client-independent data like programs and repository objects are available throughout the system.
3. To copy data to a new client, it must first be defined and then filled with data through a local or remote copy from an existing client.
Case 1150 l crawler dozer service repair manualfjjsekfksem
This document is a service manual for a 1150L XLT crawler dozer made in Brazil. It contains sections on the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, and bodywork. Each section contains technical data, functional descriptions, diagnostics, and service procedures for the components of that system. The manual provides information to qualified service personnel to maintain and repair the dozer.
New Holland D140B Crawler Dozer Service Repair Manual.pdffujsekmdijdjd3e
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdfzpdj618286
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, platform, cab, bodywork, and decals. Each section provides information, specifications, diagrams, and procedures for servicing and repairing the various components and systems of the dozer.
New Holland D140B Crawler Dozer Service Repair Manual.pdfufsekmdmmdd
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdffujskemdidk8u1
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdffusekdmdmded
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must then be disconnected from the hydro pumps before lifting the engine from the machine.
New Holland D140B Crawler Dozer Service Repair Manual.pdff8uusejkddm7u
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork, and decals. The manual provides maintenance and repair instructions for technicians, with references to component locations by section number for finding specific technical information to resolve issues on the machine.
New holland d140 b crawler dozer service repair manualujjfdjkjskkmdm
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, platform, cab, bodywork, and decals. Each section provides technical information, specifications, diagrams, and procedures for servicing and repairing the various components and systems of the dozer.
New holland d140 b crawler dozer service repair manualuudfjjjskkemmd
This document is a service manual for a D140B Crawler Dozer with part number 47998871. It contains sections covering the engine, rear axle system, hydrostatic drive, brakes and controls, hydraulic systems, tracks and track suspension, cab climate control, electrical systems, dozer blade and arm, tools, and the platform, cab, bodywork, and decals. Each section provides information on maintenance, repair, and specifications for the various components and systems of the dozer.
New holland d140 b crawler dozer service repair manualfujsjefkksekmme
The document provides instructions for removing the engine from a D140B crawler dozer. Key steps include removing the radiator, intake air cooler, engine hood, wiring harnesses, fuel lines, and mounting bolts. The drive shaft must be disconnected from the hydro pumps before the engine can be lifted and removed from the machine.
Case 821 e zbar sugar wheel loader service repair manualfusjefjskefkksem
This document provides a service manual for the 821E Wheel Loader. It contains information on the engine, transmission, front and rear axle systems, brakes, hydraulic systems, steering, wheels, cab climate control, electrical systems, and platform/cab/bodywork. The manual is intended to be used by qualified dealership personnel for repair and maintenance work using the provided instructions and special tools. Unauthorized repairs without following procedures may void warranties.
OpenMetadata Community Meeting - 5th June 2024OpenMetadata
The OpenMetadata Community Meeting was held on June 5th, 2024. In this meeting, we discussed about the data quality capabilities that are integrated with the Incident Manager, providing a complete solution to handle your data observability needs. Watch the end-to-end demo of the data quality features.
* How to run your own data quality framework
* What is the performance impact of running data quality frameworks
* How to run the test cases in your own ETL pipelines
* How the Incident Manager is integrated
* Get notified with alerts when test cases fail
Watch the meeting recording here - https://www.youtube.com/watch?v=UbNOje0kf6E
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...XfilesPro
Wondering how X-Sign gained popularity in a quick time span? This eSign functionality of XfilesPro DocuPrime has many advancements to offer for Salesforce users. Explore them now!
Hand Rolled Applicative User ValidationCode KataPhilip Schwarz
Could you use a simple piece of Scala validation code (granted, a very simplistic one too!) that you can rewrite, now and again, to refresh your basic understanding of Applicative operators <*>, <*, *>?
The goal is not to write perfect code showcasing validation, but rather, to provide a small, rough-and ready exercise to reinforce your muscle-memory.
Despite its grandiose-sounding title, this deck consists of just three slides showing the Scala 3 code to be rewritten whenever the details of the operators begin to fade away.
The code is my rough and ready translation of a Haskell user-validation program found in a book called Finding Success (and Failure) in Haskell - Fall in love with applicative functors.
What is Master Data Management by PiLog Groupaymanquadri279
PiLog Group's Master Data Record Manager (MDRM) is a sophisticated enterprise solution designed to ensure data accuracy, consistency, and governance across various business functions. MDRM integrates advanced data management technologies to cleanse, classify, and standardize master data, thereby enhancing data quality and operational efficiency.
UI5con 2024 - Keynote: Latest News about UI5 and it’s EcosystemPeter Muessig
Learn about the latest innovations in and around OpenUI5/SAPUI5: UI5 Tooling, UI5 linter, UI5 Web Components, Web Components Integration, UI5 2.x, UI5 GenAI.
Recording:
https://www.youtube.com/live/MSdGLG2zLy8?si=INxBHTqkwHhxV5Ta&t=0
A Study of Variable-Role-based Feature Enrichment in Neural Models of CodeAftab Hussain
Understanding variable roles in code has been found to be helpful by students
in learning programming -- could variable roles help deep neural models in
performing coding tasks? We do an exploratory study.
- These are slides of the talk given at InteNSE'23: The 1st International Workshop on Interpretability and Robustness in Neural Software Engineering, co-located with the 45th International Conference on Software Engineering, ICSE 2023, Melbourne Australia
Introducing Crescat - Event Management Software for Venues, Festivals and Eve...Crescat
Crescat is industry-trusted event management software, built by event professionals for event professionals. Founded in 2017, we have three key products tailored for the live event industry.
Crescat Event for concert promoters and event agencies. Crescat Venue for music venues, conference centers, wedding venues, concert halls and more. And Crescat Festival for festivals, conferences and complex events.
With a wide range of popular features such as event scheduling, shift management, volunteer and crew coordination, artist booking and much more, Crescat is designed for customisation and ease-of-use.
Over 125,000 events have been planned in Crescat and with hundreds of customers of all shapes and sizes, from boutique event agencies through to international concert promoters, Crescat is rigged for success. What's more, we highly value feedback from our users and we are constantly improving our software with updates, new features and improvements.
If you plan events, run a venue or produce festivals and you're looking for ways to make your life easier, then we have a solution for you. Try our software for free or schedule a no-obligation demo with one of our product specialists today at crescat.io
Flutter is a popular open source, cross-platform framework developed by Google. In this webinar we'll explore Flutter and its architecture, delve into the Flutter Embedder and Flutter’s Dart language, discover how to leverage Flutter for embedded device development, learn about Automotive Grade Linux (AGL) and its consortium and understand the rationale behind AGL's choice of Flutter for next-gen IVI systems. Don’t miss this opportunity to discover whether Flutter is right for your project.
WWDC 2024 Keynote Review: For CocoaCoders AustinPatrick Weigel
Overview of WWDC 2024 Keynote Address.
Covers: Apple Intelligence, iOS18, macOS Sequoia, iPadOS, watchOS, visionOS, and Apple TV+.
Understandable dialogue on Apple TV+
On-device app controlling AI.
Access to ChatGPT with a guest appearance by Chief Data Thief Sam Altman!
App Locking! iPhone Mirroring! And a Calculator!!
Graspan: A Big Data System for Big Code AnalysisAftab Hussain
We built a disk-based parallel graph system, Graspan, that uses a novel edge-pair centric computation model to compute dynamic transitive closures on very large program graphs.
We implement context-sensitive pointer/alias and dataflow analyses on Graspan. An evaluation of these analyses on large codebases such as Linux shows that their Graspan implementations scale to millions of lines of code and are much simpler than their original implementations.
These analyses were used to augment the existing checkers; these augmented checkers found 132 new NULL pointer bugs and 1308 unnecessary NULL tests in Linux 4.4.0-rc5, PostgreSQL 8.3.9, and Apache httpd 2.2.18.
- Accepted in ASPLOS ‘17, Xi’an, China.
- Featured in the tutorial, Systemized Program Analyses: A Big Data Perspective on Static Analysis Scalability, ASPLOS ‘17.
- Invited for presentation at SoCal PLS ‘16.
- Invited for poster presentation at PLDI SRC ‘16.
SMS API Integration in Saudi Arabia| Best SMS API ServiceYara Milbes
Discover the benefits and implementation of SMS API integration in the UAE and Middle East. This comprehensive guide covers the importance of SMS messaging APIs, the advantages of bulk SMS APIs, and real-world case studies. Learn how CEQUENS, a leader in communication solutions, can help your business enhance customer engagement and streamline operations with innovative CPaaS, reliable SMS APIs, and omnichannel solutions, including WhatsApp Business. Perfect for businesses seeking to optimize their communication strategies in the digital age.
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian CompaniesQuickdice ERP
Explore the seamless transition to e-invoicing with this comprehensive guide tailored for Saudi Arabian businesses. Navigate the process effortlessly with step-by-step instructions designed to streamline implementation and enhance efficiency.
Microservice Teams - How the cloud changes the way we workSven Peters
A lot of technical challenges and complexity come with building a cloud-native and distributed architecture. The way we develop backend software has fundamentally changed in the last ten years. Managing a microservices architecture demands a lot of us to ensure observability and operational resiliency. But did you also change the way you run your development teams?
Sven will talk about Atlassian’s journey from a monolith to a multi-tenanted architecture and how it affected the way the engineering teams work. You will learn how we shifted to service ownership, moved to more autonomous teams (and its challenges), and established platform and enablement teams.
2. TASL - TCS Confidential
2
Agenda
Introduction on Calibration
Master Data Configuration for Calibration
Calibration Order Confirmation (IW41)
Complete Calibration Order (IW32)
Change Equipment Status (IE02)
3. TASL - TCS Confidential
3
Introduction on Calibration
Instrument calibration is one of the primary processes used to maintain instrument
accuracy. Calibration is the process of configuring an instrument to provide a result
for a sample within an acceptable range. Eliminating or minimizing factors that
cause inaccurate measurements is a fundamental aspect of instrumentation design.
4. TASL - TCS Confidential
4
Master Data Configuration for Calibration
Step 1 : To Create
equipment master, use
T-Code: IE01
1.Enter Valid On
2.Select Equipment
Category as “Q” for
Quality and Press
“Enter”.
1
2
5. TASL - TCS Confidential
5
Master Data Configuration for Calibration…
Step 2 : The next screen
appears, Input the details,
1.Description of Equipment.
2.Select object type as “ACLVE”
and scroll down.
1
2
6. TASL - TCS Confidential
6
Master Data Configuration for Calibration…
Step 3 : The Location tab
appears, Input the details,
1.Select the Calibration Location
as “CAL”
2.Enter Plant Section.
3.Enter work centre.
4.ENter ABC Indicator indicating
the criticality of Equipment.
1
2
3
4
7. TASL - TCS Confidential
7
Master Data Configuration for Calibration…
Step 4 : The Organization tab
appears, Input the details,
A.Enter cost centre.
Resposibilites
1.Enter Plant Section.
2.Enter Planner Group.
3.Enter Main work centre.
4.Enter Catalog Profile.
A
1
2
3
4
8. TASL - TCS Confidential
8
Master Data Configuration for Calibration…
Step 5 : The PRT tab appears,
Input the details,
1.Select PRT usage as “009” as All
task list types.
2.Input start and End Reference
for setup and execution. Click on
save.
1
2
9. TASL - TCS Confidential
9
Master Data Configuration for Calibration…
Step 6 : The Equipment is saved.
10. TASL - TCS Confidential
10
Master Data Configuration for Calibration…
Step 1 : To Change equipment
master, use T-Code: IE02
Enter Equipment Number and
Press “ENTER”
11. TASL - TCS Confidential
11
Master Data Configuration for Calibration…
Step 2 : Takes to the change
screen mode,
After making changes, click on
“SAVE”. The changes will be
saved.
12. TASL - TCS Confidential
12
Master Data Configuration for Calibration…
Step 1 : To Display equipment
master, use T-Code: IE03
Enter Equipment Number and
Press “ENTER”
13. TASL - TCS Confidential
13
Master Data Configuration for Calibration…
Step 2 : Takes to the display
screen mode,
The general tab screen is
displayed.
14. TASL - TCS Confidential
14
Master Data Configuration for Calibration…
Location and Organization View.
15. TASL - TCS Confidential
15
Master Data Configuration for Calibration…
After making changes, click on “SAVE”. The changes will be saved.
16. TASL - TCS Confidential
16
Master Data Configuration for Calibration…
Step 1 : To Create equipment
tasklist, use T-Code: IA01
Enter Equipment Number and
Press “ENTER”
17. TASL - TCS Confidential
17
Master Data Configuration for Calibration…
Step 2 : In the next screen,
Equipment Tasklist:Header
General view,
1.Enter Work Centre.
2.Select Usage as “Plant
Maintenance”.
3.Select Planner Group as “QLT”
4.Select Overall status as
“Released (General).
1
2
3
4
18. TASL - TCS Confidential
18
Master Data Configuration for Calibration …
Step 3 : In the next screen the
Equipment tasklist is saved.
19. TASL - TCS Confidential
19
Master Data Configuration for Calibration…
Step 1 : To Change equipment
tasklist, use T-Code: IA02
Enter the Equipment Number.
Enter Key Date and Press
“Enter”.
20. TASL - TCS Confidential
20
Master Data Configuration for Calibration…
Step 2 : The next screen shows the Operation View.
Click on “Task List” from the Header of the More Option.
21. TASL - TCS Confidential
21
Master Data Configuration for Calibration…
Step 2 : The next screen shows the Tasklist View.
This shows the tasklist of the Equipment and Usage status.
22. TASL - TCS Confidential
22
Master Data Configuration for Calibration…
Step 3 : The next screen shows
the Header View.
This confirms the Usage,Planner
group and Overall status.
23. TASL - TCS Confidential
23
Master Data Configuration for Calibration…
Step 1 : To Display equipment
tasklist, use T-Code: IA03
Enter the Equipment Number
and Press “Enter”.
24. TASL - TCS Confidential
24
Master Data Configuration for Calibration…
Step 2 : To Display equipment tasklist, use T-Code: IA03
It displays the Header and Operation view of the Equipment Tasklists.
25. TASL - TCS Confidential
25
Master Data Configuration for Calibration…
Step 1 : To Create equipment tasklist, use T-Code: IA02
The Operation view is displayed.
26. TASL - TCS Confidential
26
Master Data Configuration for Calibration…
Step 1 : To Create maintenance
plan, use T-Code: IP01
Select the Maintenance Plant
Category as “Quality Calib Order”
and Press “Enter”.
27. TASL - TCS Confidential
27
Master Data Configuration for Calibration…
Step 2 : To Create maintenance
plan, use T-Code: IP01
Input the maintenance plan
name and Scroll down
28. TASL - TCS Confidential
28
Master Data Configuration for Calibration…
Step 3 : To Create maintenance
plan, use T-Code: IP01
1.Enter the Planning Plant.
2.Select the Order Type as
“ZCAL” for Quality Confirmation
Order.
3.Enter Main Work Centre.
4.Select Main Planner Group.
1
2
3
4
29. TASL - TCS Confidential
29
Master Data Configuration for Calibration…
Step 4 : To Create maintenance plan, use T-Code: IP01
Select the Cycle Start date and click on continue.The maintenance plan is created.
1
2
30. TASL - TCS Confidential
30
Master Data Configuration for Calibration…
Step 1 : To Change maintenance
plan, use T-Code: IP02
Enter the maintenance plan
number and Press “Enter”.
31. TASL - TCS Confidential
31
Master Data Configuration for Calibration…
Step 2 : To Change maintenance
plan, use T-Code: IP02
The Item Location tab and
input for list of location items
are confirmed. Like Main
Plant,Location,Plant
Section,Work centre, and ABC
Indicator.
32. TASL - TCS Confidential
32
Master Data Configuration for Calibration…
Step 3 : To Change maintenance
plan, use T-Code: IP02
The maintenance plan is saved
successfully.
33. TASL - TCS Confidential
33
Master Data Configuration for Calibration…
Step 1 : To Display maintenance
plan, use T-Code: IP03
Enter the maintenance plan
number and Press “Enter”.
34. TASL - TCS Confidential
34
Master Data Configuration for Calibration…
Step 2 : To Display maintenance
plan, use T-Code: IP03
The Changes are updated and
displayed.
35. TASL - TCS Confidential
35
Master Data Configuration for Calibration…
Step 1 : To Schedule
maintenance plan, use T-Code:
IP10
Enter the Maintenance plan
and press “Enter”.
36. TASL - TCS Confidential
36
Master Data Configuration for Calibration…
Step 2 : To Schedule
maintenance plan, use T-Code:
IP10
Give the planning schedule and
start scheduling date.
37. TASL - TCS Confidential
37
Master Data Configuration for Calibration…
Step 3 : To Schedule
maintenance plan, use T-Code:
IP10
Click on line item and then click
on .Start
1
2
38. TASL - TCS Confidential
38
Master Data Configuration for Calibration…
Step 4 : To Schedule maintenance plan, use T-Code: IP10
1.Enter the Date
2. Click on Continue. The next screen shows the schedule calls.
1
2
39. TASL - TCS Confidential
39
Master Data Configuration for Calibration…
Step 5 : To Schedule
maintenance plan, use T-Code:
IP10
The schedule calls are listed.
40. TASL - TCS Confidential
40
Master Data Configuration for Calibration…
Step 1 : To display Schedule maintenance plan, use T-Code: IP24
Verify that Calibration Plan is Scheduled & Calibration Order is created as per
Schedule
41. TASL - TCS Confidential
41
Master Data Configuration for Calibration…
Step 1 : To create calibration
order, use T-Code: IW31
Enter the Order type as “ZCAL”.
Then Press “Enter”.
42. TASL - TCS Confidential
42
Master Data Configuration for Calibration…
Step 2 : To create calibration
order, use T-Code: IW31
Input the Person responsible
and dates.
43. TASL - TCS Confidential
43
Master Data Configuration for Calibration…
Step 3 : To create calibration
order, use T-Code: IW31
Input the Control key as
“QM01” Plant maintenance
44. TASL - TCS Confidential
44
Master Data Configuration for Calibration…
Step 1 : To create calibration
order, use T-Code: IW31
Now the Calibration order is saved.
45. TASL - TCS Confidential
45
Master Data Configuration for Calibration…
Step 1 : To change calibration
order, use T-Code: IW32
Enter the Calibration order and
Press “Enter”.
46. TASL - TCS Confidential
46
Master Data Configuration for Calibration…
Step 2 : To change calibration
order, use T-Code: IW32
The change screen appears and
after making changing , the
screen can be closed.
47. TASL - TCS Confidential
47
Master Data Configuration for Calibration…
Step 1 : To Display calibration
order, use T-Code: IW33
Enter the Calibration order and
Press “Enter”.
48. TASL - TCS Confidential
48
Master Data Configuration for Calibration…
Step 2 : To Display calibration
order, use T-Code: IW33
Changes made during the IW32
can be displayed here for
confirming.
49. TASL - TCS Confidential
49
Master Data Configuration for Calibration…
Step 1 : To update status of Equipment , use T-Code: ZQM_EQUINACT
Auto update the Equipment Status as Inactive when Calibration is Overdue . Enter the plant
and key date.
Then From header program>Execute in Background.
1
2
3
50. TASL - TCS Confidential
50
Master Data Configuration for Calibration…
Step 2 : To update status of Equipment ,
use T-Code: ZQM_EQUIINACT
The background job is scheduled
successfully.
51. TASL - TCS Confidential
51
Master Data Configuration for Calibration…
Step 1 : To perform
job selection. , use T-
Code: SM37.
Input job name &
user name and
Execute to Verify
that Job has finished
successfully.
.
52. TASL - TCS Confidential
52
Master Data Configuration for Calibration…
Step 2 : To perform job selection. , use T-Code: SM37.
Select the Job & select Spool to
53. TASL - TCS Confidential
53
Master Data Configuration for Calibration…
Step 3 : To perform job selection. , use T-Code: SM37.
The spool log is displayed. Now Verify that log displayed as Equipment is Inactivated
54. TASL - TCS Confidential
54
Master Data Configuration for Calibration…
Step 1 : To Display calibration
order, use T-Code: IE03
The Equipment is shown as inactive.
55. TASL - TCS Confidential
55
Calibration Order Confirmation (IW41)
Step 1 : To Calibration Order
Confirmation, use T-Code: IW41
Enter Calibration Order & Operation
and Press Enter >
56. TASL - TCS Confidential
56
Calibration Order Confirmation (IW41)...
Step 2 : To Calibration Order
Confirmation, use T-Code: IW41
Input the Actual Work Hours, Work
Start & Work Finish Date,
Confirmation Text and then Save
after the Confirmation.
57. TASL - TCS Confidential
57
Calibration Order Confirmation (IW41)...
Step 3 : To Calibration Order
Confirmation, use T-Code: IW41
Calibration Order has been
confirmed. 1
2
58. TASL - TCS Confidential
58
Complete Calibration Order (IW32)
Step 1 : To Complete Calibration Order, use T-Code: IW32
1.Enter Calibration Order > Press Enter > Verify that Order is in CNF status.
2.Select 'Complete (technically)' Flag
1
2
59. TASL - TCS Confidential
59
Complete Calibration Order (IW32)...
Step 2 : To Complete Calibration Order, use T-Code: IW32
3. pop-up will appear > review the Completion Date & Time > Select Continue.
3
60. TASL - TCS Confidential
60
Complete Calibration Order (IW32)...
Step 3 : To Complete Calibration Order, use T-Code: IW32
The Order is Saved Successfully.
61. TASL - TCS Confidential
61
Complete Calibration Order (IW32)...
Step 1 : To Display Calibration
Order, use T-Code: IW33
Input Calibration Order > Press
Enter > Verify that Order is in TECO
status.
62. TASL - TCS Confidential
62
Set Equipment Status as Available (IE02)
Step 1 : To Set Equipment Status
as Available , use T-Code: IE02
After entering Input as Equipment
and Pressing Enter; the change
screen appears.
63. TASL - TCS Confidential
63
Set Equipment Status as Available (IE02)...
Step 2 : To Set Equipment Status as
Available , use T-Code: IE02
Navigate from SAP Menu as,
Equipment > Functions > Active-
Inactive > Activate.
64. TASL - TCS Confidential
64
Set Equipment Status as Available (IE02)...
Step 3 : To Set Equipment Status as Available , use T-Code: IE02
Verify that Equipment is in AVLB status only & INAC Status has been removed for the
Equipment.
Save the Equipment"