Afghanistan has five main river basins and 35 sub-river basins that were created according to water law and management. The river basins include the Amu, Helmand, Harirod, Kabul, and North basins. The Ministry of Energy and Water operates 183 hydro-meteorological stations across the basins, with plans to install 36 more. Sixteen of the stations are located at Afghanistan's borders to monitor shared rivers with neighboring countries. Afghanistan works to cooperatively manage its water resources with neighboring countries through agreements and institutions like a transboundary water unit.
SWaRMA_IRBM_Module8_#1, Knowledge management and communication, Laurie et alICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#6, Godavari visit to observe IWRM technologies, Samden ...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#5, Sediment management at Afghanistan, Abdul A. ZazayICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#4, Sediment management including landslide and river ban...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#3, Groundwater and springshed management, Madhav Dhakal ...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#2, Improved watershed management, Sanjeev Bhuchar and Ho...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#1, GLOF Risk Reduction, Finu Shrestha et al ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module8_#1, Knowledge management and communication, Laurie et alICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#6, Godavari visit to observe IWRM technologies, Samden ...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#5, Sediment management at Afghanistan, Abdul A. ZazayICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#4, Sediment management including landslide and river ban...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#3, Groundwater and springshed management, Madhav Dhakal ...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#2, Improved watershed management, Sanjeev Bhuchar and Ho...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module6_#1, GLOF Risk Reduction, Finu Shrestha et al ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWARMA_IRBM_Module5_#4, Why riparian countries should cooperate in transbound...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#3, Transboundary cooperation in HKH basins:overview of i...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#2, Key principles of international water law, Ram Babu D...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#1, Water diplomacy and regional cooperation, Anjal Praka...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module3_#1, Gendered vulnerabilities and the socioeconomic driver...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#8, Scenario planning in IRBM, Shahriar WahidICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#6, Flood management in Nepal, Dilip GautamICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#5, Role of hydrometeorological monitoring for IRBM in Ne...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#4, Water ecosystem interaction, Susan CuddyICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et alICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#1, Tools and approaches for understanding biophysical dr...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#7, Conceptualizing the impact of climate change in the r...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#6, Climate change impact on hydrological regime using DP...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#2, River basin management: approach and challenges, Phil...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#3, Upstream-Downstream linkages and Multi-scale IRBM, Sa...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion “Competition and Regulation in Professions and Occupations” held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the author’s consent.
SWARMA_IRBM_Module5_#4, Why riparian countries should cooperate in transbound...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#3, Transboundary cooperation in HKH basins:overview of i...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#2, Key principles of international water law, Ram Babu D...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module5_#1, Water diplomacy and regional cooperation, Anjal Praka...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module3_#1, Gendered vulnerabilities and the socioeconomic driver...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#8, Scenario planning in IRBM, Shahriar WahidICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#6, Flood management in Nepal, Dilip GautamICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#5, Role of hydrometeorological monitoring for IRBM in Ne...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#4, Water ecosystem interaction, Susan CuddyICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et alICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module2_#1, Tools and approaches for understanding biophysical dr...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#7, Conceptualizing the impact of climate change in the r...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#6, Climate change impact on hydrological regime using DP...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#4, IRBM implementation in nepal challenges and opportuni...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#2, River basin management: approach and challenges, Phil...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
SWaRMA_IRBM_Module1_#3, Upstream-Downstream linkages and Multi-scale IRBM, Sa...ICIMOD
This presentation is the part of 12-day (28 January–8 February 2019) training workshop on “Multi-scale Integrated River Basin Management (IRBM) from the Hindu Kush Himalayan Perspective” organized by the Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative of the International Centre for Integrated Mountain Development (ICIMOD), and targeted at participants from Afghanistan.
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion “Competition and Regulation in Professions and Occupations” held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the author’s consent.
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Orkestra
UIIN Conference, Madrid, 27-29 May 2024
James Wilson, Orkestra and Deusto Business School
Emily Wise, Lund University
Madeline Smith, The Glasgow School of Art
Acorn Recovery: Restore IT infra within minutesIP ServerOne
Introducing Acorn Recovery as a Service, a simple, fast, and secure managed disaster recovery (DRaaS) by IP ServerOne. A DR solution that helps restore your IT infra within minutes.
0x01 - Newton's Third Law: Static vs. Dynamic AbusersOWASP Beja
f you offer a service on the web, odds are that someone will abuse it. Be it an API, a SaaS, a PaaS, or even a static website, someone somewhere will try to figure out a way to use it to their own needs. In this talk we'll compare measures that are effective against static attackers and how to battle a dynamic attacker who adapts to your counter-measures.
About the Speaker
===============
Diogo Sousa, Engineering Manager @ Canonical
An opinionated individual with an interest in cryptography and its intersection with secure software development.
Have you ever wondered how search works while visiting an e-commerce site, internal website, or searching through other types of online resources? Look no further than this informative session on the ways that taxonomies help end-users navigate the internet! Hear from taxonomists and other information professionals who have first-hand experience creating and working with taxonomies that aid in navigation, search, and discovery across a range of disciplines.
2. Contents
River basins of Afghanistan(MEW)
Sub river basins of Afghanistan(MEW)
Hydro meteorological stations
Trans boundary stations
Regional cooperation
2
3. 3
River basins in Afghanistan
Afghanistan has five
main river basins and
35 sub river basins .
River basins created
according water law
and water resource
management.
4. 4
Sub river basins in Afghanistan
Afghanistan has Four open
River basins and one river
basin is close which is
confined to the country
Amo river basin
Helmand river basin
Hariroad river basin
Kabul river basin
North river basin
Open
Close
5. 5
Automatic hydro meteorological stations
Ministry of Energy and water has 183 hydro meteorological stations in five river basins
in different provinces .
Also has plan to installation of 36 new stations in these river basins.
6. 6
👉
Trans boundary stations in Afghanistan
Between 183
hydrometeor logical
station Just 16 stations
are trans boundary
stations and that
stations installed in
Kabul river basin, Amo
river basin ,Helmand
river basin and Harirud-
Murghab river basin.
7. 7
Regional cooperation
Afghanistan country doesn’t have any problem with its neighbors
countries .
Just it has problem with Iran country and also Afghanistan country has
a treaty between two countries (Iran and Afghanistan) .
8. 8
We have trans boundary unit inside of MEW, it established on 2015 and worked
independently, but now in 2018 joined with directory of water law
Implementation of Helmand treaty through to two issues:
o Installation of Dehrawood hydrological station.
o Completion of Kamal Khan dam.
Regional cooperation enhanced with the neighbouring countries for the effective
utilization of Trans boundary water based on the mutual benefits.
Continue…