This document provides pile details for a hotel tower project, including:
- The toe level is at -33.00m and the pile elevation for P1 is at +0.175m.
- The top of raft and pile elevations for P2 to P4 is shown.
- The toe level is at -39.00m and the pile cut off levels are shown at -4.425m, -1.925m, and -2.325m.
- Project details like the date, drawing number, scale, job number, client and other parties are listed.
This document appears to be an architectural drawing for a proposed hospitality development project in Erbil, Iraq. It includes a keyplan layout showing multiple building blocks, building identifiers, scales, revision details, consultant names, and the client and project name. It also notes some structural details for hotel towers within the development.
The document provides information on the methodology of construction works summarized in a power point presentation. It discusses specifications for various construction items from two volumes of CPWD Specifications published by CPWD. The power point presentations are useful for students, engineers, and construction departments to understand specifications, standards, and methodology for different construction materials and works. It then provides details on pile work, including terminology, driven cast-in-situ reinforced cement concrete piles, jetting, reinforcement, and concrete.
Bolivia driven vibrated piles k. rainer masssarschcfpbolivia
This document discusses vibrated and driven piles, including different types of piles and methods of installation. It describes how vibrated pile driving works, noting that vibratory hammers can efficiently install piles through frequency control. Modern monitoring systems allow optimization of vibrator parameters like frequency to maximize penetration rates while minimizing ground vibrations.
This document provides pile details for a hotel tower project, including:
- The toe level is at -33.00m and the pile elevation for P1 is at +0.175m.
- The top of raft and pile elevations for P2 to P4 is shown.
- The toe level is at -39.00m and the pile cut off levels are shown at -4.425m, -1.925m, and -2.325m.
- Project details like the date, drawing number, scale, job number, client and other parties are listed.
This document appears to be an architectural drawing for a proposed hospitality development project in Erbil, Iraq. It includes a keyplan layout showing multiple building blocks, building identifiers, scales, revision details, consultant names, and the client and project name. It also notes some structural details for hotel towers within the development.
The document provides information on the methodology of construction works summarized in a power point presentation. It discusses specifications for various construction items from two volumes of CPWD Specifications published by CPWD. The power point presentations are useful for students, engineers, and construction departments to understand specifications, standards, and methodology for different construction materials and works. It then provides details on pile work, including terminology, driven cast-in-situ reinforced cement concrete piles, jetting, reinforcement, and concrete.
Bolivia driven vibrated piles k. rainer masssarschcfpbolivia
This document discusses vibrated and driven piles, including different types of piles and methods of installation. It describes how vibrated pile driving works, noting that vibratory hammers can efficiently install piles through frequency control. Modern monitoring systems allow optimization of vibrator parameters like frequency to maximize penetration rates while minimizing ground vibrations.