3. Project Organization Chart
For STM
Mechanical : Air Condition and Sanitary Work
Revise : 4 ,June, 2013
Document Section! Engineer Section!
Purchase! Site Admin! EE Engineering!
ME
Engineering!Auto Cad! Safety Doc.!
Store! House Keeper! ME , EE! Safety Site! Foreman! Foreman!
PCMC Director!
Mr. Phichet Wangveera!
Tel : 08-4666-9963!
!
QC.!
Project Co.!Document Engineering!
Document Manager! Project Manager!
Site Manager!
4. Project
Manager
• Name
:
Mr.
Dusitsan
K.
• Work
Experience
PCMC
Engineering
Co.,
Ltd
5. Site
Manager
• Name
:
Mr.
Tawatchai
S.
• Work
Experience
– Toshiba
Consumer
Product
(
Thailand
)
Co.,
Ltd
• ConstrucNon
Manager
PCMC
Engineering
Co.,
Ltd
6. Current
Project
Show
Case
• Project
Name
:
FaxLite
Green
Data
Center
• Owner
:
AIS
• Main-‐Contractor
:
Schneider
• Project
Valve
:
76
Mil
Baht
• Scope
of
Work
:
Mechanical,
Sanitary,
Fire
ProtecNon
PCMC
Engineering
Co.,
Ltd
7. FXL
:
Scope
of
Work
• Mechanical
Work
– Water
Cooled
Chiller
500
Ton
x
3
Units
– Cooling
Tower
x
3
Units
– Chilled
&
Condenser
Water
Pump
– Piping
,
InsulaNon
Work
– AHU,
FCU
,
and
CRAC
– DucNng
and
InsulaNon
Work
– Electrical
Work
– ME
BMS
Control
Work
PCMC
Engineering
Co.,
Ltd
8. FXL
:
Scope
of
Work
• Sanitary
– Cold
Water
Work
– Waste
and
Rain
Water
Work
– Piping
Work
• Fire
ProtecNon
Work
– Sprinkler
Work
– Pre-‐AcNon
Work
PCMC
Engineering
Co.,
Ltd
9. FXL
:
Single
Line
Diagram
PCMC
Engineering
Co.,
Ltd