1. Integrated Framing Assemblies (IFAs)
and Commercial ICF Construction
• Contact: David Morris - General Manager
dmorris@stalaframing.com Direct : 502-779-2127
2. Stala® -- Presentation Objectives
1. Review challenges of forming, bracing and finishing ICF openings with
conventional bucks. Requires additional materials and is labor intensive.
2. Learn about time & money saving features offered by pre-engineered Integrated
Framing Assemblies (IFAs) – by Stala®
3. Cost analysis of conventional ICF openings vs. Stala®
3. STALA® Integrated Framing Assemblies (IFAs)
“Pre-Engineered ICF Openings”
Q: How did we get into ICF Construction???
A: Demand by project owners, architects and ICF
champions for commercial-grade ICF openings.
Photo and Net Zero School Design By: Sherman, Carter, Barnhart
Owner: Warren County Schools – Alliance to Save Energy Award Winner
4. Making the Pieces Fit:
challenges of conventional “bucks” on large ICF projects
5. STALA® - Integrated Framing Assemblies:
The “A-Ha!” Moment
The Atlas Companies formulated a innovative design to
have the Stala Frame link and align the ICF Wall –
Creating STALA