Cembre copper butt and through splices are suitable for jointing low voltage stranded copper conductors up to 1000v. Cembre L-M copper splices are annealed and electrolytically tin plated featuring an internal taper at both ends of the splice to ease the introduction of the copper conductor prior to crimping.
Cembre copper butt and through splices are suitable for jointing low voltage stranded copper conductors up to 1000v. Cembre L-M copper splices are annealed and electrolytically tin plated featuring an internal taper at both ends of the splice to ease the introduction of the copper conductor prior to crimping.
Isolation Procedures for Safe Working on Electrical Systems and Equipment by the JIB | solation Procedures for Safe Working on Electrical Systems and Equipment
This chart shows the safe isolation procedure that you should use when working on electrical systems and equipment.
You'll receive a printed copy of this from your Training Provider, but it's also here as a handy reference to keep electronically.
THE RULES OF SAFE ISOLATION ARE:
Obtain permission to start work (a Permit may be required in some situations)
Identify the source(s) of supply using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Isolate the supply(s)
Secure the isolation
Prove the system/equipment is DEAD using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Put up warning signs to tell other people that the electrical installation has been isolated
Once the system/equipment is proved DEAD, work can begin
Uploaded by THORNE & DERRICK LV HV Jointing, Earthing, Substation & Electrical Eqpt | Explosive Atmosphere Experts & ATEX IECEx.
THORNE & DERRICK based in the UK are international distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment.
Since 1985, T&D have established an international reputation based on SERVICE | INTEGRITY | TRUST.
Contact us for 3M, ABB, Alroc, AN Wallis, CATU, Cembre, Centriforce, CMP, CSD, Elastimold, Ellis Patents, Emtelle, Euromold, Filoform , Furse, Lucy Electric & Zodion, Nexans, Pfisterer, Polypipe, Prysmian, Roxtec, Sicame, WT Henley.
Isolation Procedures for Safe Working on Electrical Systems and Equipment by the JIB | solation Procedures for Safe Working on Electrical Systems and Equipment
This chart shows the safe isolation procedure that you should use when working on electrical systems and equipment.
You'll receive a printed copy of this from your Training Provider, but it's also here as a handy reference to keep electronically.
THE RULES OF SAFE ISOLATION ARE:
Obtain permission to start work (a Permit may be required in some situations)
Identify the source(s) of supply using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Isolate the supply(s)
Secure the isolation
Prove the system/equipment is DEAD using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Put up warning signs to tell other people that the electrical installation has been isolated
Once the system/equipment is proved DEAD, work can begin
Uploaded by THORNE & DERRICK LV HV Jointing, Earthing, Substation & Electrical Eqpt | Explosive Atmosphere Experts & ATEX IECEx.
THORNE & DERRICK based in the UK are international distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment.
Since 1985, T&D have established an international reputation based on SERVICE | INTEGRITY | TRUST.
Contact us for 3M, ABB, Alroc, AN Wallis, CATU, Cembre, Centriforce, CMP, CSD, Elastimold, Ellis Patents, Emtelle, Euromold, Filoform , Furse, Lucy Electric & Zodion, Nexans, Pfisterer, Polypipe, Prysmian, Roxtec, Sicame, WT Henley.