River of Live
Community Church
Sept 29th, 2013
AGM Presentation
Project: Sanctuary, Administration,& Children’s Centre
Phase: Schematic Design
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
InteriorViews……...
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
InteriorViews……...
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
InteriorViews……...
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
InteriorViews……...
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
BalconyStairs……...
Ian Moxon
Architect
Project: Sanctuary
Phase: Schematic Design Status: Client Review
ExteriorViews……...
ADMINISTRATION
CLASSROOM
ADDITION
North of Sanctuary
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
AdminMainFloor
Area of Main Floor Addition = 6700 SF
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
MainFloor……...
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
MainFloor……...
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
MainFloor……..ISO
Ian Moxon
Architect
Project: Second Floor Classrooms
Phase: Schematic Design Status: Client Review
SecondFloor……...
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
SecondFloor……...
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
SecondFloor……...
Ian Moxon
Architect
Project: Sanctuary and Administration
Phase: Schematic Design Status: Client Review
BalconySection....
Ian Moxon
Architect
Project: Sanctuary and Administration
Phase: Schematic Design Status: Client Review
Balcony…….……...
Ian Moxon
Architect
Project: Second Floor Classroom
Phase: Schematic Design Status: Client Review
InteriorViews……...
Ian Moxon
Architect
Project: Administration
Phase: Schematic Design Status: Client Review
ExteriorViews……...
Ian Moxon
Architect
Project: Sanctuary and Administration (Phase One)
Phase: Schematic Design Status: Client Review
ExteriorViews……...
CHILDREN’S
CENTRE/FOYER
Existing Outdoor Play Area
Ian Moxon
Architect
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
MainFloor……...
Ian Moxon
Architect
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
SecondFloor……...
Ian Moxon
Architect
InteriorViews……...
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
Play Center Equipment Ideas
Play Centre Equipment Ideas
Ian Moxon
Architect
InteriorViews……...
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
Ian Moxon
Architect
ExteriorViews……...
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
Ian Moxon
Architect
ExteriorViews……...
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
Ian Moxon
Architect
ExteriorViews……...
Project: Children’s Addition
Phase: Schematic Design Status: Client Review
Building and
Borrowing Costs
Project Component Cost
Estimate
Project Components Estimate
Professional Fees 400,000.00
Sanctuary 1,256,000.00
Administration 1,906,000.00
Children’s Centre/Foyer 2,516.000.00
Paving, Landscaping, Gym 306,000.00
Total Project Estimate 6,384,000.00
Annual Operating Costs 30,000.00
Sample Borrowing Costs
Principle Amount Monthly Payment
Increase
Monthly
Operating
Increase
Total Additional
Required
4 Million 21,697.00 2900.00 24,597.00
3 Million 14,981.00 2900.00 17,881.00
2.5 Million 9,983.00 2,900.00 12,883.00
Interest Rate – 5.21 %
5 Year Term
20 Year Amortization
Our Current Mortgage Payment is 6400.00 per month
Plus our annual payment of $20,000 = $8067.00 per month
Moving Towards a Tithe
ROL is excitedly preparing for a harvest in Lethbridge! We believe that God is
asking us to dream, and expect growth in our church. In order to move forward
with this dream we will need to increase our monthly budget, which requires an
increase of giving from the congregation. In the next weeks we ask that
everyone in our church pray about how they can help, whether it be starting to
tithe, or adding an offering specifically for the building project. We will use next
months to gauge the level of financial support for this project before coming
back to the congregation with a plan to proceed with construction.
As a congregation, we also agreed to amended the 2013/2014 budget to spend
the $70,000 needed to finalize design and engineering for the project. ROL is
committed to only proceed with these costs as the giving increases in our
congregation. Currently the average giving per month is around
$93,000. According to 2011 average income/household statistics in Alberta if all
200 households in our membership tithed the average giving per month would
increase by about $40,000, which would be more than enough to cover the
payments for the project. If each person in our church were to increase their
giving $5 per week (Family of 5 - $115 per month) then our giving would
increase by about $15,000 per month which would cover the cost of borrowing
$3M.
As you can see, this dream easily becomes possible if we join together as a
family to increase our storehouse. Please pray about your role in the harvest!
Complete Detailed Design
October – December
(pretender construction estimate)
PROJECT DESIGN COST FOR REMINDER OF 2013
Building Appraisal 7,500.00
Site Survey 4,200.00
Developed Design Process 47,800.00
Geotechnical Investigation 8,000.00
Pre-tender Construction Estimate 2,500.00
Total 70,000.00
ROL Building Concepts

ROL Building Concepts

Editor's Notes

  • #2 Gary and Ian to present first section
  • #3 Small gathering area with viewing for wheelchairs
  • #4 From Stage
  • #5 From NW cornerOption for natural light to platformSlightly lower platform height
  • #6 From SW corner
  • #7 Stair access in both corners
  • #8 Higher quality finishesLarge glazed curtain wall to large meeting room
  • #10 Consolidated admin areaDirect access to exterior form 18 AveCreating large foyer area and more access to sanctuary
  • #11 Dedicated counselling room
  • #12 Baptismal change facilities
  • #22 Current needs in preschool areaDream of a play centre for Sunday and weekday community use.
  • #32 Lawrence to explain
  • #33 We have some preliminary cost estimates for this project. Professional building estimator came in to give us a per square foot cost to buildWe have added number for:FurnitureSoundLightingPaving the Parking lotLandscapingOperating Costs – utilities, insurance, janitorial
  • #34 This is just a sampleWe currently pay 6400.00/month plus yearly payment of 20,000 = $8067These figures show the addition amounts we need per month, borrowing and operating the new space.
  • #36 We would like to move forward on this project. The next step is to complete our detailed design of the project – this is not building – just drawing, site survey’s, appraisals. (we wanted Don to bring one of his diggers and park it on the lawn)We need 15 – 20,000 per month over the next 3 months to move this forward. We would like to proceed as you catch the vision and begin to give towards that vision.Result of this would be a pre-tender construction estimate – much better number before we decide to go ahead.All of this work needs to be done – even if we decide to slow things down