SlideShare a Scribd company logo
ANALISA STANDAR NASIONAL INDONESIA ( SNI )
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012
NAMA PAKET PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II
LOKASI KEC. BURAU
ITEM PEMBAYARAN NO. : PERKIRAAN VOL. PEK. : 0,00
JENIS PEKERJAAN : Pasang Bekisting Plat Untuk lantai TOTAL HARGA (Rp.) : 0,00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0,00
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja Hari 0,3200 50.000,00 16.000,00
2. Tukang Hari 0,3300 75.000,00 24.750,00
3. Kepala Tukang Hari 0,0330 83.300,00 2.748,90
4. Mandor Hari 0,0060 83.300,00 499,80
43.998,70
B. BAHAN
1. Kayu Papan Bekisting M3 0,040 2.100.000,00 84.000,00
2. Kayu Balok Bekisting M3 0,015 2.100.000,00 31.500,00
3. Paku Biasa Kg 0,400 25.000,00 10.000,00
4. Minyak bekisting Ltr 0,200 20.000,00 4.000,00
5. Plywood tebal 9mm Lbr 0,350 172.500,00 60.375,00
6. Dolken Kayu E 8-10cm / 4m Btg 6,000 13.000,00 78.000,00
267.875,00
C. PERALATAN
0,00
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 311.873,70
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
JUMLAH HARGA PERALATAN
NAMA KEGIATAN : DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012
PEKERJAAN : PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II
LOKASI : KEC. BURAU
VOLUME : 950 M
I PEK. PENDAHULUAN Rp. 13.900.000,00
II PEK. SALURAN TYPE I (STA 0+000 - STA 0+430) Rp. 506.978.077,08
III PEK. SALURAN TYPE II (STA 0+438 - STA 0+950) Rp. 520.014.050,32
IV PEK. BANGUNAN BAGI (STA 0+430) Rp. 61.905.537,48
V PEK. BANGUNAN PENERJUN (STA 0+600) Rp. 18.440.268,39
VI PEK. REHABILITASI BENDUNG SINGGENI II Rp. 53.000.000,00
A REAL COST Rp. 1.174.237.933,27
B PAJAK PERTAMBAHAN NILAI (PPN) 10% Rp. 117.423.793,33
C JUMLAH (A + B) Rp. 1.291.661.726,60
D DIBULATKAN Rp. 1.291.660.000,00
Pejabat Pembuat Komitmen
Dinas Pekerjaan Umum
Kab. Luwu Timur
IDIYANA SARTIAN UMAR, ST
NIP. 19830512 200902 2 008
Terbilang :
SATU MILYAR DUA RATUS SEMBILAN PULUH SATU JUTA ENAM RATUS ENAM PULUH RIBU
RUPIAH
BILL OF QUANTITY
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
NO URAIAN PEKERJAAN TOTAL HARGA
Plt. Kepala Dinas Pekerjaan Umum
Kab. Luwu Timur
HIRFAN, ST. MT
NIP. 19710311 199702 1 001
Mengetahui ;
Malili, . 2012
Penawar,
CV. / PT. ............................................
( ............................................. )
Direktur/Direktris
NAMA KEGIATAN : DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012
PEKERJAAN : PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II 430
LOKASI : KEC. BURAU 620
VOLUME : 950 M
HARGA SAT. JML.HARGA
(RP) (RP)
(03) (04) (05) (06)
PEK. PENDAHULUAN
1 Papan Proyek 1,000 LS 400.000,00 400.000,00
2 Pengukuran & Pematokan + Pembersihan Lokasi 1,000 LS 2.500.000,00 2.500.000,00
3 Direksi Keet 1,000 LS 1.500.000,00 1.500.000,00
4 Mobilisasi Dan Demobilisasi 1,000 LS 7.000.000,00 7.000.000,00
5 Administrasi + Dokumentasi + Back Up Data 1,000 LS 2.500.000,00 2.500.000,00
13.900.000,00
PEK. SALURAN TYPE I (STA 0+000 - STA 0+430)
1 Galian Biasa (Menggunakan Excavator) 164,653 M
3
25.513,80 4.200.921,39
2 Urugan Kembali Bekas Galian 164,653 M
3
11.182,70 1.841.263,98
3 Pasangan Batu Kali 1 : 4 627,800 M3
704.105,50 442.037.432,90
4 Plesteran 1 : 3 344,000 M
2
35.764,10 12.302.850,40
5 Plesteran Voeg 1 : 2 1.032,000 M
2
22.853,90 23.585.224,80
6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 34,400 M
3
668.906,50 23.010.383,60
430,000 506.978.077,08
PEK. SALURAN TYPE II (STA 0+438 - STA 0+950)
1 Galian Tanah Biasa 138,289 M
3
23.332,00 3.226.562,68
2 Urugan Kembali Bekas Galian 138,289 M
3
11.182,70 1.546.446,19
3 Pasangan Batu Kali 1 : 4 646,400 M
3
704.105,50 455.133.795,20
4 Plesteran 1 : 3 404,000 M
2
35.764,10 14.448.696,40
5 Plesteran Voeg 1 : 2 1.111,000 M2
22.853,90 25.390.682,90
6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 30,300 M3
668.906,50 20.267.866,95
620,000 520.014.050,32
PEK. BANGUNAN BAGI (STA 0+430)
1 Galian Tanah Biasa 29,250 M
3
23.332,00 682.461,00
2 Urugan Kembali Bekas Galian 29,250 M
3
11.182,70 327.093,98
3 Pasangan Batu Kali 1 : 4 19,370 M3
704.105,50 13.638.523,54
4 Plesteran 1 : 3 18,000 M
2
35.764,10 643.753,80
5 Plesteran Voeg 1 : 2 9,000 M
2
22.853,90 205.685,10
6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 14,200 M3
668.906,50 9.498.472,30
7 Beton Bertulang 1 : 2 : 3 0,143 M
3
875.836,50 125.069,45
8 Pembesian Plat 17,040 Kg 14.923,30 254.293,03
9 Bekisting 1,700 M2
311.873,70 530.185,29
10 Pengadaan & Pemasangan Pintu Air, B. 100 Cm 1,000 Ls 20.000.000,00 20.000.000,00
11 Pengadaan & Pemasangan Pintu Air, B. 80 Cm 1,000 Ls 16.000.000,00 16.000.000,00
620,000 61.905.537,48
II
(02)
I
III
IV
BILL OF QUANTITY
VOLUMEURAIAN PEKERJAAN SATUANNO
(01)
PEK. BANGUNAN PENERJUN (STA 0+600)
1 Galian Tanah Biasa 11,934 M3
23.332,00 278.444,09
2 Urugan Kembali Bekas Galian 11,934 M
3
11.182,70 133.454,34
3 Pasangan Batu Kali 1 : 4 22,620 M3
704.105,50 15.926.866,41
4 Plesteran 1 : 3 14,400 M2
35.764,10 515.003,04
5 Plesteran Voeg 1 : 2 7,200 M
2
22.853,90 164.548,08
6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 0,435 M
3
668.906,50 290.974,33
7 Beton Bertulang 1 : 2 : 3 0,143 M
3
875.836,50 125.069,45
8 Pembesian Plat 17,040 Kg 14.923,30 254.293,03
9 Bekisting 2,410 M
2
311.873,70 751.615,62
620,000 18.440.268,39
PEK. REHABILITASI BENDUNG SINGGENI II
1 Catsdam 1,000 Ls 5.000.000,00 5.000.000,00
2 Pembongkaran / Rehab. Lantai Intake & Sayap Bendung 1,000 Ls 18.000.000,00 18.000.000,00
3 Pengadaan dan Pemasangan Pintu Air 1,000 Ls 30.000.000,00 30.000.000,00
235,000 53.000.000,00
VI
V

More Related Content

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
Marius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
Expeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
Pixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
marketingartwork
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Revisi rab singgeni ii

  • 1. ANALISA STANDAR NASIONAL INDONESIA ( SNI ) PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012 NAMA PAKET PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II LOKASI KEC. BURAU ITEM PEMBAYARAN NO. : PERKIRAAN VOL. PEK. : 0,00 JENIS PEKERJAAN : Pasang Bekisting Plat Untuk lantai TOTAL HARGA (Rp.) : 0,00 SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0,00 PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA (Rp.) (Rp.) A. TENAGA 1. Pekerja Hari 0,3200 50.000,00 16.000,00 2. Tukang Hari 0,3300 75.000,00 24.750,00 3. Kepala Tukang Hari 0,0330 83.300,00 2.748,90 4. Mandor Hari 0,0060 83.300,00 499,80 43.998,70 B. BAHAN 1. Kayu Papan Bekisting M3 0,040 2.100.000,00 84.000,00 2. Kayu Balok Bekisting M3 0,015 2.100.000,00 31.500,00 3. Paku Biasa Kg 0,400 25.000,00 10.000,00 4. Minyak bekisting Ltr 0,200 20.000,00 4.000,00 5. Plywood tebal 9mm Lbr 0,350 172.500,00 60.375,00 6. Dolken Kayu E 8-10cm / 4m Btg 6,000 13.000,00 78.000,00 267.875,00 C. PERALATAN 0,00 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 311.873,70 JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN JUMLAH HARGA PERALATAN
  • 2. NAMA KEGIATAN : DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012 PEKERJAAN : PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II LOKASI : KEC. BURAU VOLUME : 950 M I PEK. PENDAHULUAN Rp. 13.900.000,00 II PEK. SALURAN TYPE I (STA 0+000 - STA 0+430) Rp. 506.978.077,08 III PEK. SALURAN TYPE II (STA 0+438 - STA 0+950) Rp. 520.014.050,32 IV PEK. BANGUNAN BAGI (STA 0+430) Rp. 61.905.537,48 V PEK. BANGUNAN PENERJUN (STA 0+600) Rp. 18.440.268,39 VI PEK. REHABILITASI BENDUNG SINGGENI II Rp. 53.000.000,00 A REAL COST Rp. 1.174.237.933,27 B PAJAK PERTAMBAHAN NILAI (PPN) 10% Rp. 117.423.793,33 C JUMLAH (A + B) Rp. 1.291.661.726,60 D DIBULATKAN Rp. 1.291.660.000,00 Pejabat Pembuat Komitmen Dinas Pekerjaan Umum Kab. Luwu Timur IDIYANA SARTIAN UMAR, ST NIP. 19830512 200902 2 008 Terbilang : SATU MILYAR DUA RATUS SEMBILAN PULUH SATU JUTA ENAM RATUS ENAM PULUH RIBU RUPIAH BILL OF QUANTITY REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) NO URAIAN PEKERJAAN TOTAL HARGA Plt. Kepala Dinas Pekerjaan Umum Kab. Luwu Timur HIRFAN, ST. MT NIP. 19710311 199702 1 001 Mengetahui ; Malili, . 2012 Penawar, CV. / PT. ............................................ ( ............................................. ) Direktur/Direktris
  • 3. NAMA KEGIATAN : DETAIL ENGINEERING DESIGN (DED) TAHUN ANGGARAN 2012 PEKERJAAN : PEMBANGUNAN LINING SALURAN INDUK DI SINGGENI II 430 LOKASI : KEC. BURAU 620 VOLUME : 950 M HARGA SAT. JML.HARGA (RP) (RP) (03) (04) (05) (06) PEK. PENDAHULUAN 1 Papan Proyek 1,000 LS 400.000,00 400.000,00 2 Pengukuran & Pematokan + Pembersihan Lokasi 1,000 LS 2.500.000,00 2.500.000,00 3 Direksi Keet 1,000 LS 1.500.000,00 1.500.000,00 4 Mobilisasi Dan Demobilisasi 1,000 LS 7.000.000,00 7.000.000,00 5 Administrasi + Dokumentasi + Back Up Data 1,000 LS 2.500.000,00 2.500.000,00 13.900.000,00 PEK. SALURAN TYPE I (STA 0+000 - STA 0+430) 1 Galian Biasa (Menggunakan Excavator) 164,653 M 3 25.513,80 4.200.921,39 2 Urugan Kembali Bekas Galian 164,653 M 3 11.182,70 1.841.263,98 3 Pasangan Batu Kali 1 : 4 627,800 M3 704.105,50 442.037.432,90 4 Plesteran 1 : 3 344,000 M 2 35.764,10 12.302.850,40 5 Plesteran Voeg 1 : 2 1.032,000 M 2 22.853,90 23.585.224,80 6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 34,400 M 3 668.906,50 23.010.383,60 430,000 506.978.077,08 PEK. SALURAN TYPE II (STA 0+438 - STA 0+950) 1 Galian Tanah Biasa 138,289 M 3 23.332,00 3.226.562,68 2 Urugan Kembali Bekas Galian 138,289 M 3 11.182,70 1.546.446,19 3 Pasangan Batu Kali 1 : 4 646,400 M 3 704.105,50 455.133.795,20 4 Plesteran 1 : 3 404,000 M 2 35.764,10 14.448.696,40 5 Plesteran Voeg 1 : 2 1.111,000 M2 22.853,90 25.390.682,90 6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 30,300 M3 668.906,50 20.267.866,95 620,000 520.014.050,32 PEK. BANGUNAN BAGI (STA 0+430) 1 Galian Tanah Biasa 29,250 M 3 23.332,00 682.461,00 2 Urugan Kembali Bekas Galian 29,250 M 3 11.182,70 327.093,98 3 Pasangan Batu Kali 1 : 4 19,370 M3 704.105,50 13.638.523,54 4 Plesteran 1 : 3 18,000 M 2 35.764,10 643.753,80 5 Plesteran Voeg 1 : 2 9,000 M 2 22.853,90 205.685,10 6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 14,200 M3 668.906,50 9.498.472,30 7 Beton Bertulang 1 : 2 : 3 0,143 M 3 875.836,50 125.069,45 8 Pembesian Plat 17,040 Kg 14.923,30 254.293,03 9 Bekisting 1,700 M2 311.873,70 530.185,29 10 Pengadaan & Pemasangan Pintu Air, B. 100 Cm 1,000 Ls 20.000.000,00 20.000.000,00 11 Pengadaan & Pemasangan Pintu Air, B. 80 Cm 1,000 Ls 16.000.000,00 16.000.000,00 620,000 61.905.537,48 II (02) I III IV BILL OF QUANTITY VOLUMEURAIAN PEKERJAAN SATUANNO (01)
  • 4. PEK. BANGUNAN PENERJUN (STA 0+600) 1 Galian Tanah Biasa 11,934 M3 23.332,00 278.444,09 2 Urugan Kembali Bekas Galian 11,934 M 3 11.182,70 133.454,34 3 Pasangan Batu Kali 1 : 4 22,620 M3 704.105,50 15.926.866,41 4 Plesteran 1 : 3 14,400 M2 35.764,10 515.003,04 5 Plesteran Voeg 1 : 2 7,200 M 2 22.853,90 164.548,08 6 Rabat Beton 1 : 3 : 5 (T. 5 cm) 0,435 M 3 668.906,50 290.974,33 7 Beton Bertulang 1 : 2 : 3 0,143 M 3 875.836,50 125.069,45 8 Pembesian Plat 17,040 Kg 14.923,30 254.293,03 9 Bekisting 2,410 M 2 311.873,70 751.615,62 620,000 18.440.268,39 PEK. REHABILITASI BENDUNG SINGGENI II 1 Catsdam 1,000 Ls 5.000.000,00 5.000.000,00 2 Pembongkaran / Rehab. Lantai Intake & Sayap Bendung 1,000 Ls 18.000.000,00 18.000.000,00 3 Pengadaan dan Pemasangan Pintu Air 1,000 Ls 30.000.000,00 30.000.000,00 235,000 53.000.000,00 VI V