Dokumen tersebut membahas tentang konservasi sumber daya air untuk meningkatkan daya dukung daerah aliran sungai di Kalimantan. Dibahas mengenai kondisi daerah aliran sungai, lahan kritis, dan indeks kualitas lingkungan hidup di berbagai provinsi Kalimantan. Termasuk pula analisis kondisi daerah aliran sungai Barito di Kalimantan Tengah dan Selatan.
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
Gondang dam is one of 49 dams built until 2019. Gondang dam was planned for completion by the end of 2017. It is expected to irrigate the fields in Sragen and Karanganyar with the total area of 4630 hectares and to fulfill the raw water needs of 0.2 m3/s. This research aimed to examine the inflow characteristic, water availability, and simulation model of reservoir operation in order to obtain optimal release target showing a percentage of irrigated area and its reliability. The inflow characteristic was analyzed using Mock model. The inflow data was generated over 20 years using Thomas-Fiering seasonal model. The generated data can be used for the simulation of reservoir operation determined using Standard Operating Rule method. The whole analysis was performed by Microsoft Excel software. The research result showed that inflow from Melikan watershed has an average value of 1.37 m3/s. The analysis of water availability showed that the average monthly water balance for multipurpose scenario has -5.16 MCM deficit and 1.225 MCM surplus in term of no release for raw water need. The simulation model of reservoir operation yielding an average percentage of irrigated area 100%, 90%, and 80% has respectively 26.83%, 63.83%, and 86.63% level of reliability. For fulfilling 100% irrigated area, the level of reliability obtained from simulation was 72.25%. Due to the simulation result in the case of no release for raw water, the percentage of irrigated area relatively increased 40.28%, 72.95%, and 94.27%, respectively, while the percentage of 100% irrigated area reliability gained an average of 76.5%. Thus in order to obtain 100% of reliability, it needs more water supply.
Dokumen tersebut membahas tentang potensi dan pengelolaan sumber daya air tanah di beberapa lokasi di Bangka Belitung. Terdapat informasi mengenai litologi, kedalaman, debit, dan parameter kualitas air tanah dari sumur-sumur bor di hotel-hotel, perkebunan kelapa sawit, dan pabrik. Dokumen juga memberikan rekomendasi untuk menjaga keberlanjutan pengambilan air tanah di daerah-daerah tersebut.
Dokumen tersebut membahas tentang konservasi sumber daya air untuk meningkatkan daya dukung daerah aliran sungai di Kalimantan. Dibahas mengenai kondisi daerah aliran sungai, lahan kritis, dan indeks kualitas lingkungan hidup di berbagai provinsi Kalimantan. Termasuk pula analisis kondisi daerah aliran sungai Barito di Kalimantan Tengah dan Selatan.
Thesis Presentation: A Study of Water Utilization Potential and Capacity in C...Vempi Satriya
Gondang dam is one of 49 dams built until 2019. Gondang dam was planned for completion by the end of 2017. It is expected to irrigate the fields in Sragen and Karanganyar with the total area of 4630 hectares and to fulfill the raw water needs of 0.2 m3/s. This research aimed to examine the inflow characteristic, water availability, and simulation model of reservoir operation in order to obtain optimal release target showing a percentage of irrigated area and its reliability. The inflow characteristic was analyzed using Mock model. The inflow data was generated over 20 years using Thomas-Fiering seasonal model. The generated data can be used for the simulation of reservoir operation determined using Standard Operating Rule method. The whole analysis was performed by Microsoft Excel software. The research result showed that inflow from Melikan watershed has an average value of 1.37 m3/s. The analysis of water availability showed that the average monthly water balance for multipurpose scenario has -5.16 MCM deficit and 1.225 MCM surplus in term of no release for raw water need. The simulation model of reservoir operation yielding an average percentage of irrigated area 100%, 90%, and 80% has respectively 26.83%, 63.83%, and 86.63% level of reliability. For fulfilling 100% irrigated area, the level of reliability obtained from simulation was 72.25%. Due to the simulation result in the case of no release for raw water, the percentage of irrigated area relatively increased 40.28%, 72.95%, and 94.27%, respectively, while the percentage of 100% irrigated area reliability gained an average of 76.5%. Thus in order to obtain 100% of reliability, it needs more water supply.
Dokumen tersebut membahas tentang potensi dan pengelolaan sumber daya air tanah di beberapa lokasi di Bangka Belitung. Terdapat informasi mengenai litologi, kedalaman, debit, dan parameter kualitas air tanah dari sumur-sumur bor di hotel-hotel, perkebunan kelapa sawit, dan pabrik. Dokumen juga memberikan rekomendasi untuk menjaga keberlanjutan pengambilan air tanah di daerah-daerah tersebut.
Kuliah 3-1303 2023 Proses SIDLACOM Bendungan Cipanas R1.pptxNadnosWolfrider
Dokumen tersebut merupakan laporan proses pembangunan Bendungan Cipanas di Kabupaten Sumedang dan Indramayu, Jawa Barat. Bendungan ini bertujuan untuk memenuhi kebutuhan air irigasi dan air baku serta mengendalikan banjir. Pembangunan bendungan telah dimulai sejak tahun 1979 dan saat ini sedang dalam tahap konstruksi paket 3 yang meliputi pembangunan bendungan utama, pelimpah, dan fasilitas penduk
Dokumen tersebut merangkum hasil survei dan analisis hidrologi untuk merencanakan rehabilitasi jaringan irigasi Bendung Tritis. Terdapat identifikasi kerusakan, analisis debit banjir rancangan, dan rencana rehabilitasi yang meliputi perbaikan saluran dan bangunan.
Dokumen tersebut berisi informasi mengenai skematik sistem penyediaan air bersih di beberapa wilayah di Provinsi Banten. Terdapat informasi sumber air, reservoir, pipa distribusi, debit air, dan wilayah pelayanan.
Dipresentasikan dalam acara Webinar Nasional “Kajian Kubah Gambut dan Penerapan Metode Paludikultur dalam Rehabilitasi dan Restorasi Lahan Gambut”, 22 Desember 2020.
Jatigede Regional Water Supply System.pptxarci155munas
Pembangunan Instalasi Pengolahan Air (IPA) direncanakan dalam 2 alternatif, yaitu:
Alternatif 1, Pembangunan 1 tahap 3500 l/detik
Alternatif 2, Pembangunan 2 tahap, yaitu
Tahap I, 1500 l/detik
Tahap II, 2000 l/detik
Laporan ini membahas rencana pembangunan jalan aspal di Desa Sei Sumba untuk meningkatkan aksesibilitas menuju rumah sakit. Termasuk rencana pelaksanaan, sumber daya, dan anggaran proyek.
1. Gambaran umum Kecamatan Ciseeng dan potensi wilayahnya seperti pertanian, perikanan dan demografi
2. Kondisi dan permasalahan di bidang pendidikan, kesehatan, infrastruktur dan perekonomian masyarakat pedesaan
3. Sejarah nama "Ciseeng" dan profil kecamatan
More Related Content
Similar to REHABILITASI RUJAB BENDUNGAN LEUWIKERIS LAPORAN KULIAH LAPANGAN.pptx
Kuliah 3-1303 2023 Proses SIDLACOM Bendungan Cipanas R1.pptxNadnosWolfrider
Dokumen tersebut merupakan laporan proses pembangunan Bendungan Cipanas di Kabupaten Sumedang dan Indramayu, Jawa Barat. Bendungan ini bertujuan untuk memenuhi kebutuhan air irigasi dan air baku serta mengendalikan banjir. Pembangunan bendungan telah dimulai sejak tahun 1979 dan saat ini sedang dalam tahap konstruksi paket 3 yang meliputi pembangunan bendungan utama, pelimpah, dan fasilitas penduk
Dokumen tersebut merangkum hasil survei dan analisis hidrologi untuk merencanakan rehabilitasi jaringan irigasi Bendung Tritis. Terdapat identifikasi kerusakan, analisis debit banjir rancangan, dan rencana rehabilitasi yang meliputi perbaikan saluran dan bangunan.
Dokumen tersebut berisi informasi mengenai skematik sistem penyediaan air bersih di beberapa wilayah di Provinsi Banten. Terdapat informasi sumber air, reservoir, pipa distribusi, debit air, dan wilayah pelayanan.
Dipresentasikan dalam acara Webinar Nasional “Kajian Kubah Gambut dan Penerapan Metode Paludikultur dalam Rehabilitasi dan Restorasi Lahan Gambut”, 22 Desember 2020.
Jatigede Regional Water Supply System.pptxarci155munas
Pembangunan Instalasi Pengolahan Air (IPA) direncanakan dalam 2 alternatif, yaitu:
Alternatif 1, Pembangunan 1 tahap 3500 l/detik
Alternatif 2, Pembangunan 2 tahap, yaitu
Tahap I, 1500 l/detik
Tahap II, 2000 l/detik
Laporan ini membahas rencana pembangunan jalan aspal di Desa Sei Sumba untuk meningkatkan aksesibilitas menuju rumah sakit. Termasuk rencana pelaksanaan, sumber daya, dan anggaran proyek.
1. Gambaran umum Kecamatan Ciseeng dan potensi wilayahnya seperti pertanian, perikanan dan demografi
2. Kondisi dan permasalahan di bidang pendidikan, kesehatan, infrastruktur dan perekonomian masyarakat pedesaan
3. Sejarah nama "Ciseeng" dan profil kecamatan
Similar to REHABILITASI RUJAB BENDUNGAN LEUWIKERIS LAPORAN KULIAH LAPANGAN.pptx (20)
1. KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
SATUAN KERJA BALAI BESAR WILAYAH SUNGAI CITANDUY
Jalan Prof Dr. H. Sutami No 1 Banjar Telepon 0265 741051 Banjar
Banjar, April 2019
BENDUNGAN
LEUWIKERIS
2. LATAR BELAKANG
Wilayah Sungai Citanduy dengan luas 447.285,93 km 2 memiliki ketersediaan
air sebesar 5,04 Milyar m3/tahun atau setara dengan debit sebesar 159,95
m3/detik.
Kebutuhan air untuk irigasi, RKI, dan kebutuhan lainnya dengan total 77,568
m3/detik. Kebutuhan air ini tidak sepenuhnya terpenuhi bila ditinjau per DAS.
Hasil analisis neraca air per DAS tahun 2011 memperlihatkan bahwa dari
sejumlah kebutuhan air sebesar 77,568 m3/detik saat ini hanya terpenuhi
61,056 m3/detik.
Kekurangan air terjadi di bulan Juni sampai dengan Oktober, yang berdampak
pada pola tanam irigasi. Disamping permasalahan tersebut pada saat musim
penghujan juga masih sering terjadi banjir dibeberapa tempat seperti
Sidareja, Wanareja, lakbok, Cibeureum dll.
Untuk mengatasi hal tersebut perlu dikembangkan pengelolaan sumber air di
wilayah sungai Citanduy melalui optimalisasi pemanfaatan air antara lain
salah satunya dengan membangun Bendungan Leuwikeris
3. MAKSUD dan TUJUAN.
Maksud dibangunnya bendungan Leuwikeris adalah untuk lebih
mengoptimalkan pemanfaatan ketersediaan air sebesar 5,04 Milyar m3/tahun
Tujuan :
1. Mengairi daerah irigasi seluas 19.733 ha.
2. Menyediakan air baku di sekitar kota Banjar, kabupaten Tasikmalaya,
kabupaten Ciamis sebesar 845 liter/detik.
3. Mereduksi banjir periode 25 tahun sebesar 11,7 % dari 509,7 m3/detik
menjadi 450,02 m3/detik.
4. Dapat menghasilkan daya listrik sebesar 20 megawatt
5. Meningkatkan potensi pariwisata.
LOKASI PEKERJAAN
Bendungan dibangun di sungai Citanduy di desa Ancol kecamatan cimaragas
dan desa handap herang di kecamatan cijeunjing kabupaten Ciamis dan
kecamatan cineam kabupaten Tasikmalaya
4. INFORMASI UMUM
NAMA PROYEK : PEMBANGUNAN BENDUNGAN LEUWIKERIS KAB. CIAMIS DAN KAB. TASIKMALAYA
LOKASI : Desa Ancol Kecamatan Cineam Kabupaten Tasikmalaya, Desa Handapherang Kab. Ciamis
PENGGUNA JASA : BALAI BESAR WILAYAH SUNGAI CITANDUY SNVT PEMBANGUNAN
BENDUNGAN BBWS CITANDUY
PELAKSANA KEGIATAN
KONSTRUKSI : PAKET I : PT. Pembangunan Perumahan – PT. Bahagia Bangun Nusa KSO
PAKET II : PT. Waskita Karya – PT.Adhi Karya KSO
PAKET III : PT. Hutama Karya
SUPERVISI : KSO PT. Virama Karya (Persero) KSO PT. Caturbina Guna Persada
SUMBER DANA : APBN
TAHUN ANGGARAN : 2016– 2021
NILAI KONTRAK :
KONSTRUKSI : Paket I Rp. 867.069.000.000,- (Included PPN)
Paket II Rp. 642.332.000.000,- (Included PPN)
paket III Rp. 385.467.000.000,- (Included PPN)
SUPERVISI : Rp. 47.343.000.000,- (Included PPN)
TANGGAL KONTRAK : 23 Nopember 2016
TANGGAL SPMK : 23 Nopember 2016
LAMA MASA PELAKSANAAN : PAKET I : 1.560 Hari Kalender
PAKET II : 1.560 Hari Kalender
PAKET III : 540 Hari Kalender
SUPERVISI : 1.506 Hari Kalender
MULAI KONTRAK : PAKET I, PAKET II, PAKET III, SUPERVISI : 23 NOPEMBER 2016
AKHIR KONTRAK : PAKET I : 02 Maret 2021
PAKET II : 02 Maret 2021
PAKET III : 17 MEI 2018
SUPERVISI : 02 Maret 2021
MASA PEMELIHARAAN : 365 Hari Kalender
5. DATA PROYEK
Nama Bendungan : Bendungan Leuwikeris
Lokasi : Kabupaten Ciamis/Tasikmalaya
LOKASI PEKERJAAN
Lokasi pekerjaan Bendungan Leuwikeris di sungai
Citanduy Hulu di Kapung Panaekan, Desa Ancol,
Kecamatan Cineam, Kabupaten Tasikmalaya Provinsi
Jawa Barat.
Wilayah Administrasi
Kiri Aliran Sungai : Kampung Cibatok, Desa
Ciharalang, Kecamatan
Cijeungjing, Kabupaten
Ciamis, Provinsi Jawa Barat
Kanan Aliran Sungai : Kampung Panaekan, Desa
Ancol, Kecamatan Cineam,
Kabupaten Tasikmalaya,
Provinsi Jawa Barat
Koordinat : Pada 117 5’0” BT dan 10
45’ 0” LS
Lokasi Bendungan
Leuwikeris
6. Kab. Ciamis &
Kab. Tasikmalaya
Prov. Jawa Barat
LOKASI BENDUNGAN LEUWIKERIS
7. PETA WILAYAH GENANGAN BENDUNGAN LEUWIKERIS
AREA GENANGAN & SABUK HIJAU
Luas Area Genangan : 494,29 Ha
Luas Sabuk Hijau : 31,00 Ha +
525,29 Ha
As Bendungan
Leuwikeris
8. BORROW AREA ANCOL
Jenis Material = Lempung Lanauan
Luas = 10 Ha
Volume = 500.000 m3
Tataguna Lahan = Kebun Campuran
Jarak dari DAM Site = 0,50 Km arah barat daya
PETA WILAYAH GENANGAN BENDUNGAN LEUWIKERIS
Bendungan Leuwikeris
QUARRY G. PANGAJAR
Luas = 150 Ha
Volume = 8 Juta m3
Peruntukan = - Inti Lempung
- Rockfill
- Filter
- Transisi
Kepemilikan = Kebun Campuran
Jarak dari DAM Site = 18.0 Km arah barat daya
9.
10. DATA TEKNIS
WADUK
Luas daerah pengaliran sungai : 646,00 km2
Luas genangan pada kondisi HWL (FWL PMF) : 242,90 Ha
Debit sungai rata - rata tahunan : 49,52 m3/det
Curah hujan rata - rata tahunan : 2987,00 mm
Debit banjir maksimum boleh jadi (QPMFin) : 4767,40 m3/det
Debit banjir 1.000 tahun (Q1.000in) : 1066,90 m3/det
Debit banjir 100 tahun (Q100in) : 600,30 m3/det
Muka air banjir PMF (HWL) : 156,48 m
Muka air banjir 1.000 tahun : 153,19 m
Muka air banjir 100 tahun : 152,19 m
Muka air normal maksimal (NWL) : 150,00 m
Tampungan bruto (dengan sedimen) : 81,44 juta m3
Tampungan efektif : 45,35 juta m3
Tampungan mati pada elevasi + 133,00 m (dengan sedimen) : 36,09 juta m3
Usia guna waduk : 50 tahun
Retensi Banjir : 18,48 %
11. 1 KM
2 KM
4 KM
12 KM
BORROW AREA A
BORROW AREA B
BORROW AREA D
BORROW AREA C
QUARRY
PANGAJAR
MATERIAL KONSTRUKSI
Peta Lokasi Material Konstruksi
12. Borrow Area yang Dipakai BA - A
1.250.000 m3
150.000 m3
650.000 m3
600.000 m3
14. TATA LETAK BENDUNGAN LEUWIKERIS
Bendungan Utama
Bangunan
Fasilitas Outlet Pengelak &
Pengambilan
Pelimpah samping overflow (100m)
Inlet Pengelak
Inlet Pengambilan
Power House
Pelimpah pintu sorong (2x10m)
DESAIN
15. 175.337
BM01
90.381
BM.3
CP01
95.0 m
90.0 m
80.0 m
85
.0
m
90.0 m
16
0.
0
m
1
5
5
.0
m
16
5.
0
m
170.0
m
165.0 m
100.0
m
95.0 m
90.0 m
8
5
.0
m
190.0
m
75
.0
m
110.0 m
105.0 m
100.0
m
80.0 m
75.0 m
1
5
5
.0
m
90.0 m 80.0 m
85
.0
m
75
.0
m
100.0 m
100
.0
m
160
.0
180.
0
m
180.0
m
175.0
m
180.0 m
17
0.0 m
1
6
0
.0
m
165.0
m
1
7
5
.0
m
155.0
m
16
0.
0
m
16
5.0
m
95
.0
m
85.0 m
85.0 m
17
0.0 m
18
0.0 m
95.0 m
90.0 m
16
0.0 m
105.0 m
110.0 m
115.0
m
120.0
m
125.0
m
130.0
m
16
5.0 m
17
5.0 m
125.0
m
1
2
0
.0
m
115.0
m
11
0.
0
m
10
5.
0
m
9
0
.0
m
8
5
.0
m
95
.0
m
10
0.
0
m
8
0
.0
m
16
5.
0
m
16
5.0 m
1
7
0
.0
m
17
5.
0
m
180.0 m
16
0.0 m
165.0
m
17
0.0 m
175.0
m
18
0.
0
m
P.2
P.3
P.5
P.6
P.8
P.9
P.10
P.11
P.12
P.13
P.14
P.15
P.16
P.17
P.18
P.21
P.22
P.23
P.24
P.26
P.27
0+250
0+200
0+150
0+100
0+50
0+50
BM-03
212.194,240
NO.
X
9.185.627.825
Y
Z + 90,381
BM-01
212.464,756
NO.
X
9.185.674,638
Y
Z + 175,337
TDN 22
213.526,000
NO.
X
9.185.510,000
Y
Z + 86,744
P.7
TEROWONGAN
PENGELAK2
TEROWONGAN
PENGELAK1
B
ro
nj
on
g
(2
m
x1
.
SAWAH
SAWAH
P.1
Terowongan Pengelak (2 buah)
DENAH TEROWONGAN PENGELAK
POTONGAN MEMANJANG TEROWONGAN PENGELAK 1
POTONGAN MEMANJANG TEROWONGAN PENGELAK 2
16. TEROWONGAN PENGELAK (DIVERSION TUNNEL)
Lokasi : Bukit Tumpuan Kiri
Tipe : Lingkaran
Panjang Terowongan I : 1030,47 m
Panjang Terowongan II : 1016,64 m
Diameter : 2 x 6,25 m
Kemiringan : 0,00485
Elevasi inlet terowongan I dan II : + 86,00 m
Elevasi Outlet Terowongan I : + 81,03 m
Elevasi Outlet Terowongan II : + 81,10 m
Debit rencana (Q25)out : 607,33 m3/det
Tipe Pintu pengelak : pintu sorong tegak (plat baja)
Ruang pintu pengelak : bentuk persegi struktur beton
Ukuran pintu pengelak : 6.95 m x 6.95 m (2 buah)
17. POTONGAN MEMANJANG BENDUNGAN
BENDUNGAN UTAMA
17
Hm 0
Hm 2
Hm 3
Hm 4
Hm 5
Hm 6 Hm 1
P.17
P.16
P.15
P.14
P.13
P.12
P.11
P.10
P.9
P.8
P.7
P.6
P.5
P.4
P.3
P.2
P.1
NOMOR PROFIL
JARAK PROFIL/PARTIAL DISTANCE
PATOK HEKTOMETER
ELEVASI TANAH ASLI
P.0
P.0
POTONGAN MELINTANG BENDUNGAN P.6 (STA 0+125)
3
3
1
3
Datum Elev = 20 m
ELEVASI (m)
JARAK (m)
4
4
18. BENDUNGAN
Tipe bendungan : zonal dengan inti
Lempung, urugan batu
Tinggi maksimal di atas dasar galian : 83,50 m
Elevasi puncak + Chammber : + 159,00m
Panjang puncak : 388,00m
Lebar puncak : 14,50 m
Kemiringan lereng hulu : 1:3,00
Kemiringan lereng hilir : 1:2,50
Volume timbunan (termasuk cofferdam) : 4.582juta m3
19. 0+250
0+200
0+150
0+100
0+50
0+50
P.2 P.3 P.5 P.6 P.8 P.9 P.10 P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18
P.21 P.22
P.23
P.24
P.26 P.27
X 9.185.674,638
Y
Z
+
175,337
SAW
AH
P.1 P.7
DENAH PELIMPAH
Pelimpah Samping (Ogee 85 m)
Pelimpah Samping (Pintu Sorong 2 x 10 m)
20. 0+250
0+200
0+150
0+100
0+50
0+50
P.2 P.3 P.5 P.6 P.8 P.9 P.10 P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18
P.21 P.22
P.23
P.24
P.26 P.27
X 9.185.674,638
Y
Z
+
175,337
SAW
AH
P.1 P.7
DENAH PELIMPAH
Pelimpah Samping (Pintu Sorong 2 x 10 m)
Ruang Olak
Elevasi dasar titik hulu : +131,00 m
Elevasi dasar titik hilir : +129,00 m
Lebar Saluran udik : 40,00 m
Lebar Saluran hilir : 50,00 m
Lebar Saluran Peluncur : 35,00 m
Stilling Basin
Elevasi Ruang Olak : + 71,00 m
Lebar Ruang Olak : 35,00 m
Panjang Ruang Olak : 60,00 m
Tipe Ruang Olak : USBR II
21. Potongan Memanjang Pelimpah
P.0 P.1 P.2 P.3 P.4 P.5 P.6 P.7 P.8 P.9 P.10 P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18 P.19 P.20 P.21 P.22 P.23 P.24 P.27
P.26
P.25 P.28
POTONGAN MEMANJANG PELIMPAH
Ir. Maryono Bony Dipl.HE
B AGIA N GA MB AR :
28 MARET 2014
P ROPINS I :
P EKERJ AAN :
TANGGAL
K AB UP ATEN
NO.K ONTRAK
MODEL TEST DAN SERTIFIKASI
11/PP -K ST/P &P -B BWSCIT/III/2014
:
POTONGAN MEMANJANG PELIMPAH
BENDUNGAN LEUWI KERIS
NO.RE GISTER :
NO.LE MBAR :
PT.
ADITYA
JAWA BARAT
CIAMIS
0-00-01-32
Di Periksa
Di Setujui
Mengetahui
Ketua Tim
Direktur
Direksi
PPK Perencanaan dan Program
Kabid Program & PerencanaanUmum
Budi Anton Mulyono,ST
Rahman Khamal,BE
Marwansyah,ST.M.Eng.
Sigit Irawan,ST.MT
02/41
LEMBAR : 035
BENDUNGAN LEUWI KERIS
DETAIL .1
DETAIL .2
DETAIL .3
2
1
22. POTONGAN MELINTANG PELIMPAH
LEMBAR: 036
P.1
PROPINSI :
T ANGGAL
KABUPAT EN
NO.KONTRAK
BENDUNGAN LEUWIKERIS
NO.REGIST ER
NO.LEMBAR
ADITYA
J AWA BARAT
CIA MIS
0-00-01-033
Di Peri ksa
Di Setujui
Ketua Tim
Di rektur
Direksi
PPK Perencanaan danProgram
Kabi d Program & PerencanaanUmum
03/43
P.2
M ODEL T EST DAN SERTIFIKASI
M engetahui
BENDUNGAN LEUWI KERIS
Ir. M aryono BonyDipl.HE
Sigit Irawan,ST.MT
Budi Anton Mulyono, ST
07/PP-KST /P&P-BBWSCIT /VI/2015
Riswanto Rosi , ST ., M PSDA
BENDUNGAN LEUWI KERIS
DETAIL B
DETAIL A.
S KALA 1 : 100
23. POTONGAN MELINTANG PELIMPAH PADA SALURAN PELUNCUR
LEMBAR :
B AGIA N GA MB AR :
P ROPINS I :
P EKERJ AAN :
TANGGAL
K AB UP ATEN
NO.K ONTRAK
BENDUNGAN LEUWI KERIS
NO.RE GISTER
NO.LE MBAR
ADITYA
JAWA BARAT
CIAMIS
0-00-01-042
DiP eriksa
DiS etujui
K etua Tim
Direktur
Direksi
P PK P erencanaan dan Program
K abid P rogram & P erencanaan Umum
12/41
P.18
P.19
045
Mengetahui
Ir. Maryono B ony Dipl.HE
S igit Irawan,ST.MT
B udi Anton Muly ono,ST
17 Apri l 2015 07/PP -K ST/P &P -B BWSCIT/VI/2015
Ris wanto Rosi, ST.,MPSDA
BENDUNGAN LEUWI KERIS
DETAIL A.
SKALA 1 : 20
SKALA 1 : 100
24. POTONGAN MELINTANG PELIMPAH PADA RUANG OLAK
LEMBAR :
P. 27
BAGIAN GAMBAR :
PROPINSI :
PEKERJAAN :
T ANGGAL
KABUPAT EN
NO.KONTRAK
BENDUNGAN LEUWIKERIS
NO.REGIST ER
NO.LEMBAR
ADITYA
J AWA BARAT
CIA MIS
0-00-01-046
DiP eriksa
DiS etujui
K etua Tim
Direktur
Direksi
P PK P erencanaan dan Program
Kabi d Program & PerencanaanUmum
16/41
P. 26
049
Mengetahui
Ir. Maryono B ony Dipl.HE
S igit Irawan,ST.MT
B udi Anton Muly ono,ST
07/PP-KST /P&P-BBWSCIT /VI/2015
Ris wanto Rosi, ST.,MPSDA
B ENDUNGAN LEUWI KERIS
S KA LA 1 :20
DETAIL A.
S KALA 1 : 100
25. BANGUNAN PELIMPAH
Lokasi : bukit tumpuan kiri
Tipe :Pelimpah Samping tipe ogee (Tanpa Pintu) Dan
Pelimpah Pintu Sorong
Lebar Bersih Pelimpah : 85m Pelimpah Samping (Tanpa Pintu) dan 2 x
10 m Pelimpah Pintu Sorong tegak
a) PELIMPAH DENGAN PINTU SORONG
Tipe Pintu : Pintu Sorong Tegak
Debit rencana PMFout : 4348,09 m3/det
Debit rencana Q1000out : 992,99 m3/det
Debit rencana 100out : 553,48 m3/det
Jumlah Pintu : 2 buah
Ukuran pintu : 10 m x 10 m
Lebar bersih mercu pelimpah berpintu : 2 x 10,00 m
Elevasi mercu dasar pintu : +140,00 m
Elevasi apron : +138,00 m
26. b) PELIMPAH SAMPING
Tipe : Pelimpah Samping Type Ogee
(Tanpa Pintu)
Debit Banjir PMFOut dikurangi Qpintu : 3225,39 m3/det
Debit Banjir Q1000 Out Tahunan : 967,57 m3/det
Debit Banjir Q100 Out Tahunan : 543,21 m3/det
Lebar Mercu Pelimpah : 85,00 m
Elevasi Mercu Pelimpah : +150,00 m
Elevasi Muka Air Banjir : +156,48 m
Elevasi Apron : +148,00 m
27. 175.337
BM01
90.381
BM.3
CP01
95.0 m
90.0 m
80.0 m
85
.0
m
90.0 m
16
0.
0
m
1
5
5
.0
m
16
5.
0
m
170.0
m
165.0 m
100.0
m
95.0 m
90.0 m
8
5
.0
m
190.0
m
185.0 m
180.0
m
195.0 m
75
.0
m
110.0 m
105.0 m
100.0
m
80.0 m
75.0 m
1
5
5
.0
m
90.0 m 80.0 m
85
.0
m
100.0 m
100
.0
m
160
.0
m
180.
0
m
180.0
m
175.0
m
180.0 m
17
0.0 m
1
6
0
.0
m
165.0
m
1
7
5
.0
m
155.0
m
16
0.
0
m
16
5.0
m
95
.0
m
85.0 m
85.
0
m
85.0 m
17
0.0 m
18
0.0 m
95.0 m
90.0 m
16
0.0 m
105.0 m
110.0 m
115.0
m
120.0
m
125.0
m
130.0
m
16
5.0 m
17
5.0 m
125.0
m
1
2
0
.0
m
115.0
m
11
0.
0
m
10
5.
0
m
9
0
.0
m
8
5
.0
m
95
.0
m
10
0.
0
m
8
0
.0
m
16
5.
0
m
16
5.0 m
1
7
0
.0
m
17
5.
0
m
180.0 m
16
0.0 m
165.0
m
17
0.0 m
175.0
m
18
0.
0
m
P.2
P.3
P.5
P.6
P.8
P.9
P.10
P.11
P.12
P.13
P.14
P.15
P.16
P.17
P.18
P.21
P.22
P.23
P.24
P.26
P.27
0+250
0+200
0+150
0+100
0+50
0+50
BM-03
212.194,240
NO.
X
9.185.627.825
Y
Z + 90,381
BM-01
212.464,756
NO.
X
9.185.674,638
Y
Z + 175,337
T
213
NO.
X
9.18
Y
Z + 86
P.7
TEROWONGAN
PENGELAK2
TEROWONGAN
PENGELAK1
B
ro
nj
on
g
(2
m
x1
.5
m
x0
.5
m
)
SAWAH
SAWAH
P.1
DENAH BANGUNAN PENGAMBILAN
Bangunan Pengambilan (Terowongan Pengelak 1)
Potongan Memanjang Bangunan Pengambilan
28. BANGUNAN PENGAMBILAN
Lokasi : Bukit tumpuan kiri
Tipe intake : Menara
Debit maksimum untuk PLTA (RWL 141,00 m) : 57,38 m3/det
Debit maksimum untuk irigasi (RWL 137,00 m) : 46,60 m3/det
Trash rack : 1 buah
Ruang pintu intake : Bentuk persegi dengan struktur beton
Elevasi dasar intake : + 133,00 m
Dimensi intake : 3,00 m x 3,00 m
Pintu intake : Pintu sorong tegak (Plat Baja)
Ukuran pintu intake : 3,00 m x 2,70 m
Panjang Saluran Hantar : 60 m
Tipe waterway :Lingkaran
Panjang waterway : 540,00 m
Diameter waterway : 6,25 m
Panjang Penstock : 1062,00 m
Diameter Pipa Baja : 2,00 m
Tipe katub pengamanan saluran Irigasi : katub kupu – kupu (F = 2,10 m x 1,95m)
Tipe katub kendali irigasi :Kerucut Tetap (FixedCone)/ (Howell – Bungervalve)
29. INSTALASI PEMBANGKIT TENAGA LISTRIK
Lokasi : Bukit tumpuan kiri hilir +75.00 m
Jenis gedung pembangkit : indoor
Ukuran gedung : Tinggi maksimum diatas pondasi 27.00 m,
panjang 30.00 m, lebar 25.00m
Kapasitas terpasang : 4 unit x 7.5 MW
Turbin
Elevasi pusat distributor : + 75 m
Tipe turbin : Francis
Jumlah : 4 unit
Tinggi rencana (design head) : 75.00 m
Tinggi maksimum : +150.00 m
Tinggi minimum : +141.00 m
Keluaran turbin : 4 unit x 7.5 MW
Kecepatan spesifik : 587 rpm
Kecepatan putar : 490 rpm
Tipe pengatur : Mekanikal Governor
Katub pengaman turbin : Generator
Elevas deck : + 77,00 m
Tipe : Vertikal Shaft
Kecepatan : 490 rpm
Kapasitas : 10 MW
Frekuensi : 50 hertz
Transformer : Tiga fase, 12,5 MVA, 50 hertz Switchyard
Lokasi : Bukit tumpuan kiri hilir
34. Realisasi penggalian terowongan.
Terowongan 1
Inlet : 10 Oktober 2017 Breaktrough 26 Oktober 2018 Outlet : 25 Juli 2017
( 16 Bulan )
Terowongan 2
Inlet : 9 September 2017 Breaktrough 17 Agustus 2018 Outlet : 8 Juli 2017
( 13 bulan )
Penyempurnaan pekerjaan dilaksanakan sampai dengan bulan Desember 2018 ( PHO paket 3 )