:E-mail peter.sam2013@hotmail.com :Phone 01020380085
:Address 50 Hassan ma'moun st.beside .Ahly club Nasr City,
cairo, Egypt
MCV Mercedes benz July 2014 — Present
BS in Mechatronics & Robotic engineer September 2008 — June 2013
DEVELOPMENT COURCES JULY 2013 — DECEMBER 2013
Peter Samir maher
Farag
Objective
To secure a responsible and challenging position with a progressive establishment where my skills and knowledge can be
gainfully utilized, with a good prospect for learning, future advancement and career development into Mechatronics &
Robotic filed specially design.
Work experience
mechanical maintenance engineer
Responsibilities
Organizing routine servicing schedules
Fitting new parts and Carrying out quality inspections
Keeping production managers informed of progress and Organizing teams to make sure 24-hour cover is available
Achievements
Invented flow detector device for peroxide material for fiber factory (MCV)
Manufactured feeder machine for steel eccentric press for machinery factory (MCV)
Manufactured rupes control units for painting factory (MCV)
Design and manufactured bus carriage for painting factory (MCV)
Eslsca certificate Skills:
Time management
Presentation skills
Business writing
Supply chain management
Finance for non- financial
Education
Egyptian Russian University
Obtained the bachelor degree with GPA 3.63 very good
Graduation project : excellent (Design and manufacture solar tracking system)
MCV ACADEMY (Mercedes Benz)
Technical courses about maintain Mercedes Benz trucks and buses
Peter Samir maher Farag 1
Accomplishment
Successfully completion an academic year 2011/2012 at Izhevsk State Technical University - Russia
with excellent grade
Qualifications & Internships
Professional welding training at MCV welding training center (2014)
Plc s7 -200 Siemens training at jelecom (2013)
Embedded c arduino training at jelecom (2013)
Manufacturing training at bummash enterprise at Russia (2012)
Hydraulic and pneumatic training at Festo (2011)
Maintenance training at Atlas Egypt for trading (2010)
Computer skills
Solid Works 2011 (advanced level)
Auto Cad 2011 (advanced level)
MS-project
MS-office (word,excel,powerpoint )
SAP programe
Language skills
Arabic : mother tunge
English : fluent
Russian : fair
Interests
Music, Reading, Swimming
References
upon your request .
Peter Samir maher Farag 2

recently cv

  • 1.
    :E-mail peter.sam2013@hotmail.com :Phone01020380085 :Address 50 Hassan ma'moun st.beside .Ahly club Nasr City, cairo, Egypt MCV Mercedes benz July 2014 — Present BS in Mechatronics & Robotic engineer September 2008 — June 2013 DEVELOPMENT COURCES JULY 2013 — DECEMBER 2013 Peter Samir maher Farag Objective To secure a responsible and challenging position with a progressive establishment where my skills and knowledge can be gainfully utilized, with a good prospect for learning, future advancement and career development into Mechatronics & Robotic filed specially design. Work experience mechanical maintenance engineer Responsibilities Organizing routine servicing schedules Fitting new parts and Carrying out quality inspections Keeping production managers informed of progress and Organizing teams to make sure 24-hour cover is available Achievements Invented flow detector device for peroxide material for fiber factory (MCV) Manufactured feeder machine for steel eccentric press for machinery factory (MCV) Manufactured rupes control units for painting factory (MCV) Design and manufactured bus carriage for painting factory (MCV) Eslsca certificate Skills: Time management Presentation skills Business writing Supply chain management Finance for non- financial Education Egyptian Russian University Obtained the bachelor degree with GPA 3.63 very good Graduation project : excellent (Design and manufacture solar tracking system) MCV ACADEMY (Mercedes Benz) Technical courses about maintain Mercedes Benz trucks and buses Peter Samir maher Farag 1
  • 2.
    Accomplishment Successfully completion anacademic year 2011/2012 at Izhevsk State Technical University - Russia with excellent grade Qualifications & Internships Professional welding training at MCV welding training center (2014) Plc s7 -200 Siemens training at jelecom (2013) Embedded c arduino training at jelecom (2013) Manufacturing training at bummash enterprise at Russia (2012) Hydraulic and pneumatic training at Festo (2011) Maintenance training at Atlas Egypt for trading (2010) Computer skills Solid Works 2011 (advanced level) Auto Cad 2011 (advanced level) MS-project MS-office (word,excel,powerpoint ) SAP programe Language skills Arabic : mother tunge English : fluent Russian : fair Interests Music, Reading, Swimming References upon your request . Peter Samir maher Farag 2