The document summarizes a project to replace an old power generator at an electricity power plant in The Hague, Netherlands. A new 27MW generator from Brush/HMA required redesigning the old foundation. Laser scanning and 3D modeling were used to precisely measure and design concrete consoles to support the 50 ton generator in the same location as the old one. The consoles were installed, grouted in place, and the generator was successfully installed within the precision tolerances required.