The document describes the installation of RAI Products' "Pro-Seal 6006" loop sealant at the intersection of SR 138 and Oakley Industrial Boulevard on June 23, 2005. Representatives from GDOT and RAI observed the installation of the sealant on the loop in the Oakley Industrial Boulevard turn lane. The installation is documented over 15 pages.
This document summarizes the features and benefits of the Gore Excluder AAA Endoprosthesis. It has over 15 years of experience with over 190,000 devices distributed, proven durability backed by clinical and commercial data, and allows for more opportunities to optimize the infrarenal seal with an intuitive repositionable delivery system. Users can learn more at the provided website.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Blvd, and on US 29/SR 14/Roosevelt Highway near John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 near mile post 10 north of Lumpkin, Georgia on December 16, 2008. Photos were taken of Site 5, which used a QPL-49 permanent soil reinforcing mat on SR 27 to address erosion problems.
This document summarizes the features and benefits of the Gore Excluder AAA Endoprosthesis. It has over 15 years of experience with over 190,000 devices distributed, proven durability backed by clinical and commercial data, and allows for more opportunities to optimize the infrarenal seal with an intuitive repositionable delivery system. Users can learn more at the provided website.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Blvd, and on US 29/SR 14/Roosevelt Highway near John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 near mile post 10 north of Lumpkin, Georgia on December 16, 2008. Photos were taken of Site 5, which used a QPL-49 permanent soil reinforcing mat on SR 27 to address erosion problems.
Brennan A. Roney and Pam King from GDOT reviewed permanent soil reinforcement mats and erosion problems on SR 27 at mile post 13 on December 16, 2008. Photos were taken of QPL-49 permanent soil reinforcing mats installed on SR 27 at site 6.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Boulevard, and on US 29/SR 14/Roosevelt Highway southwest of John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
El águila vive hasta 70 años, pero a los 40 años debe tomar una difícil decisión ya que sus garras y pico se han debilitado y no puede cazar. Sus opciones son morir o someterse a un proceso de renovación de 150 días, durante el cual se encierra en una montaña, arranca su pico desgastado y renueva sus plumas y garras, lo que le dará 30 años más de vida. De forma similar, en nuestra vida a veces debemos alejarnos para un proceso de renovación que nos permita desprendernos del pasado y aprovechar
The primary avenues for product approval with the Georgia Department of Transportation (GDOT) are the GDOT Qualified Products Lists (QPL) and the GDOT New Product Evaluation process. The QPL identifies products that have proven to meet GDOT specifications, while the New Product Evaluation process assesses new products for potential use. Other approval options include the National Transportation Product Evaluation Program (NTPEP) and the AASHTO Product Evaluation List (APEL), as well as GDOT task forces for specialized product categories.
Gdot new product evaluation presentation quarterly meeting 090313 acec meetingBrennanRoney
The document discusses Georgia Department of Transportation's (GDOT) New Product Evaluation process. It provides guidelines for submitting new products to GDOT for evaluation and potential approval. The New Product Evaluation Committee evaluates products quarterly and determines if they will be accepted, require further testing, or be rejected. The process involves submitting an application and fee, committee review, conducting field or lab tests if needed, and determining final classification status. Examples of recently evaluated new products are also provided.
Npe 1306 2 seal for life llc poly ken ve h-pile ft.pptBrennanRoney
On March 21, 2014, Seal for Life Industries LLC's "Polyken VE" product was installed on the Candy Lane bridge in Cobb County for a field test. Representatives from Seal for Life LLC and the Georgia Department of Transportation were present to observe the installation. The document provides details of the installation but no other context or outcomes.
The document describes a field test review conducted by Cobb County DOT on March 7, 2007 of the rust prevention product "Rust Grip" manufactured by Superior Products International. Several structures coated with Rust Grip were inspected, including a salt spreader hopper, two bridges coated in 2003 and 2006, and a parkway coated in 2002.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 near mile post 10 south of Lumpkin, Georgia on December 16, 2008. Photos were taken of Site 5 where a permanent soil reinforcing mat on the qualified products list was being used to address erosion problems on Route 27.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 at milepost 13 on December 16, 2008. Photos were taken of Site 6, which used a QPL-49 permanent soil reinforcing mat on SR 27 to address erosion problems.
The document summarizes a field test review conducted by Cobb County DOT on March 7, 2007. It describes applying Superior Products International's "Rust Grip" coating to salt spreaders and bridges. Rust Grip and a green top coat paint were applied to the Candy Lane Road Bridge on July 24, 2006, the Macedonia Road Bridge on May 9, 2003, and Stout Parkway on June 21, 2002, and all were reviewed on March 7, 2007.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at Oakley Industrial Boulevard, SR 138, and US 29/SR 14/Roosevelt Highway. The sealant had been installed by the GDOT Office of Transportation Data in March 2002 and was inspected over 24 pages.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
Npe Field Test Review 092206 Intersection RaiBrennanRoney
The field test review took place on September 22, 2006 and evaluated NPE 0410-2 RAI 2 part loop sealant applied on SR 138 at Oakley Industrial Blvd in Union City, Georgia. In attendance from GDOT were Brennan A. Roney and Brad Young.
The document describes the installation of RAI Products' "Pro-Seal 6006" loop sealant at the intersection of SR 138 and Oakley Industrial Boulevard on June 23, 2005. Representatives from GDOT and RAI observed the installation of the sealant on the loop in the Oakley Industrial Boulevard turn lane. The installation is documented over 15 pages.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Boulevard, and on US 29/SR 14/Roosevelt Highway southwest of John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
2009 0612 Npe 0801 1 Cera Tech Redi Max And Qpl 27 Products SubmittalsBrennanRoney
The document summarizes a review of field tests of various CeraTech products conducted by GDOT on June 12, 2009. The tests included Redi-Max for slab replacement, Pavemend SLQ, TR, and 15.0, and DOTLine installed in February 2008 along State Route 404 near mile post 44. Photos document the conditions of the various products at the time of the June 2009 review, including locations of the Redi-Max replacement and other products.
Brennan A. Roney and Pam King from GDOT reviewed permanent soil reinforcement mats and erosion problems on SR 27 at mile post 13 on December 16, 2008. Photos were taken of QPL-49 permanent soil reinforcing mats installed on SR 27 at site 6.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Boulevard, and on US 29/SR 14/Roosevelt Highway southwest of John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
El águila vive hasta 70 años, pero a los 40 años debe tomar una difícil decisión ya que sus garras y pico se han debilitado y no puede cazar. Sus opciones son morir o someterse a un proceso de renovación de 150 días, durante el cual se encierra en una montaña, arranca su pico desgastado y renueva sus plumas y garras, lo que le dará 30 años más de vida. De forma similar, en nuestra vida a veces debemos alejarnos para un proceso de renovación que nos permita desprendernos del pasado y aprovechar
The primary avenues for product approval with the Georgia Department of Transportation (GDOT) are the GDOT Qualified Products Lists (QPL) and the GDOT New Product Evaluation process. The QPL identifies products that have proven to meet GDOT specifications, while the New Product Evaluation process assesses new products for potential use. Other approval options include the National Transportation Product Evaluation Program (NTPEP) and the AASHTO Product Evaluation List (APEL), as well as GDOT task forces for specialized product categories.
Gdot new product evaluation presentation quarterly meeting 090313 acec meetingBrennanRoney
The document discusses Georgia Department of Transportation's (GDOT) New Product Evaluation process. It provides guidelines for submitting new products to GDOT for evaluation and potential approval. The New Product Evaluation Committee evaluates products quarterly and determines if they will be accepted, require further testing, or be rejected. The process involves submitting an application and fee, committee review, conducting field or lab tests if needed, and determining final classification status. Examples of recently evaluated new products are also provided.
Npe 1306 2 seal for life llc poly ken ve h-pile ft.pptBrennanRoney
On March 21, 2014, Seal for Life Industries LLC's "Polyken VE" product was installed on the Candy Lane bridge in Cobb County for a field test. Representatives from Seal for Life LLC and the Georgia Department of Transportation were present to observe the installation. The document provides details of the installation but no other context or outcomes.
The document describes a field test review conducted by Cobb County DOT on March 7, 2007 of the rust prevention product "Rust Grip" manufactured by Superior Products International. Several structures coated with Rust Grip were inspected, including a salt spreader hopper, two bridges coated in 2003 and 2006, and a parkway coated in 2002.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 near mile post 10 south of Lumpkin, Georgia on December 16, 2008. Photos were taken of Site 5 where a permanent soil reinforcing mat on the qualified products list was being used to address erosion problems on Route 27.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 at milepost 13 on December 16, 2008. Photos were taken of Site 6, which used a QPL-49 permanent soil reinforcing mat on SR 27 to address erosion problems.
The document summarizes a field test review conducted by Cobb County DOT on March 7, 2007. It describes applying Superior Products International's "Rust Grip" coating to salt spreaders and bridges. Rust Grip and a green top coat paint were applied to the Candy Lane Road Bridge on July 24, 2006, the Macedonia Road Bridge on May 9, 2003, and Stout Parkway on June 21, 2002, and all were reviewed on March 7, 2007.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at Oakley Industrial Boulevard, SR 138, and US 29/SR 14/Roosevelt Highway. The sealant had been installed by the GDOT Office of Transportation Data in March 2002 and was inspected over 24 pages.
Npe Field Test Review 092206 Intersection Rai Traffic DataBrennanRoney
The document discusses a field test review from September 22, 2006 of a loop sealant and traffic data unit installation that was 1.5 years old on US 29/SR 14/Roosevelt Highway. The review was conducted by Brennan A. Roney and Brad Young of the Georgia Department of Transportation.
Npe Field Test Review 092206 Intersection RaiBrennanRoney
The field test review took place on September 22, 2006 and evaluated NPE 0410-2 RAI 2 part loop sealant applied on SR 138 at Oakley Industrial Blvd in Union City, Georgia. In attendance from GDOT were Brennan A. Roney and Brad Young.
The document describes the installation of RAI Products' "Pro-Seal 6006" loop sealant at the intersection of SR 138 and Oakley Industrial Boulevard on June 23, 2005. Representatives from GDOT and RAI observed the installation of the sealant on the loop in the Oakley Industrial Boulevard turn lane. The installation is documented over 15 pages.
The document describes inspections of the installation and performance of RAI Products' "Pro-Seal 6006" loop sealant at several intersections and highways in Georgia. The inspections were conducted by GDOT employee Brennan Roney on January 19, 2006 and included sites at the intersection of SR 138 and Oakley Industrial Boulevard, and on US 29/SR 14/Roosevelt Highway southwest of John Rivers Road. The reports covered 24 pages and found that the loop sealant had been installed correctly and was performing as intended.
2009 0612 Npe 0801 1 Cera Tech Redi Max And Qpl 27 Products SubmittalsBrennanRoney
The document summarizes a review of field tests of various CeraTech products conducted by GDOT on June 12, 2009. The tests included Redi-Max for slab replacement, Pavemend SLQ, TR, and 15.0, and DOTLine installed in February 2008 along State Route 404 near mile post 44. Photos document the conditions of the various products at the time of the June 2009 review, including locations of the Redi-Max replacement and other products.
A site visit was conducted on December 16, 2008 to review permanent soil reinforcement mats and erosion problems on State Route 27 near Cussetta, Georgia. Photos were taken by Brennan A. Roney of the Georgia Department of Transportation at Site 7, where SR 27 turns south of Cussetta. The site visit was also attended by Pam King of GDOT to examine a QPL-49 permanent soil reinforcing mat that had been installed on SR 27.
Brennan A. Roney and Pam King from the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27 south of State Route 39 on December 16, 2008. Photos were taken of Site 4, which showed the shoulder, ditch, and slope area and included a permanent soil reinforcing mat that was placed on State Route 27 to address erosion problems.
Brennan A. Roney and Pam King of the Georgia Department of Transportation reviewed permanent soil reinforcement mats and erosion issues on State Route 27. They inspected a site south of milepost 18, where there was a curve in the road, with erosion problems affecting the southbound shoulder, ditch, slope, median, and northbound shoulder, ditch, and slope. Photos were taken on December 16, 2008 to document the inspection of a permanent soil reinforcing mat installed on SR 27 at this location.
Brennan A. Roney and Pam King of GDOT reviewed permanent soil reinforcement mats and erosion issues on SR 27 near mile post 22 on December 16, 2008. Photos were taken of site 2, which was south of mile post 22 at a driveway turnaround on the right southbound shoulder, showing the ditch, slope, and a QPL-49 permanent soil reinforcing mat that had been installed on SR 27 to address erosion problems.
Brennan A. Roney and Pam King from GDOT reviewed a site on SR 27 north of Mile Post 22 to inspect permanent soil reinforcement mats and erosion issues. At the site, an old green mat was visible in the ditch bottom with no erosion, and the slope had red clay with sparse vegetation. Brennan A. Roney and Pam King from GDOT were present on December 16, 2008 to inspect a QPL-49 Permanent Soil Reinforcing Mat on SR 27 at this site.
1. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 1
2. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 2
3. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 3
4. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 4
5. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 5
6. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 6
7. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 7
8. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 8
9. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 9
10. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 10
11. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 11
12. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 12
13. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 13
14. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 14
15. RAI Products’ “Pro-Seal 6006” Installation at Intersection of S.R.138 & Oakley Industrial Blvd. -- Loop Sealant Installed On Loop on Oakley Industrial Boulevard Turn Lane -- People Present: GDOT, Brennan Roney; GDOT, Ernie Cochran; GDOT-OTD, Troy Blount; RAI, John Rosenblatt June 23, 2005 Page 15
16. RAI Products’ “Pro-Seal 6006” Installed March 2002 by the Office of Transportation Data Office, GDOT -- Loop Sealant Installed On Loop on US 29|SR 14|Roosevelt Hwy going southwest just pass John Rivers Rd -- People Present: GDOT, Brennan Roney June 23, 2005 Page 16