Radio and TV Talk Shows
• Presented by
Harmain Akhter(499)
Asma Maqsood(510)
Tayyaba Yousaf(485)
• Presented to
Mam Sana Fatima
What is talk shows
• “Talk Show” is basically the word of American &
Australian English. In British English it is know
by “Chat Show”.
• “A television or radio show in which various
topics are discussed to inform or educate the
listens.”
History
• The talk show is one of the most popular types
of TV programs.
• This type of show has a long history which goes
back to the time that every home got a television
in the 1950’s.
• Basically, the talk show has been evolved from a
radio station to a television as a TV talk show.
Categories According to the
timing
Day Talk show:
• Day time is a time which mostly targets the
house wives.
• There are also many types of shows in that time.
Like Morning shows, Cooking shows, TV
Magazine show.
• i.e Geo Shaan Say, Utho Jago Pakistan,
Subha Sawery Maya Kay Sath Subh
Categories According to the
timing
Afternoon Talk show:
• This is the time when there is less viewership of
TV channels In this time.
• TV Channels mostly on air the repeated telecast
of live shows of the last day.
• i.e. Repeated Telecast of the Capital Talk on
Geo News.
Classification According to
the Timming
Evening talk show:
• This is basically the time when most of the
People are free from their work places.
• Thus, there is more viewership at this time so
the most important or top rated shows of any TV
channel on air their programs at evening time.
• i.e. aj kamran khan ka sath, mazakraat, off the
record.
Classification According to
the Medium
Radio
• 1905 H.A
EUSSENDEN
• 1908 Le de Forest
• 1915 David sarnoff
• 1922 1st concert
and
BBC established
Television
• 1906 Le De forest
• 1940 Peter Gold Mark
• 1948 cable TV
• 1992 plasma TV
• 2010 3-D TV
First talk show
Radio
• Steve Allen
Television
• Joe Franklin
Radio talks
Radio talks
• “Talk radio is a radio format containing
discussion about topical issues and consisting
entirely or almost entirely of original spoken
word content rather than outside music”
Types of radio talks
• Hot Talk
• Liberal talk radio
• Sports talk
Television talk show
Timeline
• On television, the earliest such program was Meet the Press, which
first aired in 1947.
• The original host, Martha Rountree, was also the only woman in the
program's history to moderate discussion as politicians and other
public leaders made appearances.
• In 1952, the Today show made its first appearance on NBC with
host Dave Garroway, Soon other networks followed with similar
programs.
• A variety of daytime talk shows have covered a number of issues
with very distinct methods of delivery.
Types of TV talk shows
• News talk shows
• Sports talk shows
• Entertainment talk
shows
Top Rated TV Talk Shows
Capital Talk Hosted by Hamid Mir.
It is broadcast four days a week (Monday to Thursday) in the
timing of 8:05pm. Launched in 2002.
Kal Tak
Is a political talk show. Aired from Express News. Hosted by a well
known anchor and columnist Javed Chaudhry.
Off the record
Aired on ary news. His program is known because of his bold
steps and unbiased approach.
Hasb-e-Haal
Hasb-e-Haal is a political comedy show Airs on Dunya TV at 11:05
pm from Thursday to Sunday.
Khabarnaak
Geo News TV Program Pakistani Comedy television show. Airs on
11:05pm on Fridays, Saturdays and Sundays.
Flaws in TV
Talk Shows
• Political Talk
Shows
• Create Negativity
• Anti Government
Talks Shows
Impact of talk shows
• Popular
• Rise to awareness
• Changing the political scenario
• Affiliation and biasness
• Logic and facts & figures
• Information on various aspects
• Background of the story
• Opinion makers.
• Source of social change
Stages of Production
• Pre-production
• Production
• Post-production
• Distribution and duplication
Pre-production
Radio
• Motive of the program (why
this program?)
• Research of Target Audience
• Content of the program
• Selection of Format
Television
• Idea formation
• Research
• Script
• Budget
• Production modle
• Resource planning
• Program approval
• Approval for program
Pre-production
Radio
• Duration of the Program
• Time of Broadcast
• Frequency of the
Program
Television
• Facility request and check
• Permits and clearence
• Selection of characters
• Set arrangement
• Costume designer
• Make-up artist
• Equipments
• Location
• Schedual
Production
Radio
• Euipments arrangements
• Sound equipments
• Crew / staff
• Communication
• Schedual
Television
• Set designing
• Euipments arrangements
• Sound equipments
• Crew / staff
• Communication
• Schedual
• Line producer
• Monitor working of staff
• Scenes
Post-production
Radio
• To arrange recorded
material into a more
logical sequence
• To remove the
uninteresting. Repetitive
or technically acceptable
portion.
Television
• Editing
• Digital video effects
• Musical elements
• Cut
• Time
• Recheck list
Post-production
Radio
• To compress the material in
time.
• For creative effect to produce
new juxtaposition of speech,
music. sound and even
silence.
Television
• Meeting with colleagues
• Synchronization
• Promos
• Teasers
• Publicity
Duplication and Distribution
Radio
• Include only process of
distribution.
• Mostly include on air
shows.
Television
• Once a final copy of the
show is ready, it must be
duplicated or copied so
the staff can send it to
stations or affiliates.
Equipment's
Equipment's
Radio
• Mixer
• Speakers
• Cable
• Audio playback
component
Television
• Tripod for each camera
• A video switcher that can
handle every single video
source you have (or computer
system)
• Multiple microphones
• An audio switcher that can
handle every audio source you
have (or computer system)
• Multi camera
Equipment's
Radio
• Transmitter
• Receiver
• Antenna
• Transmission lines
• Audio process
Television
• Multiple TV Monitors, minimum
of one per video source
• Video tape/DVD decks
• CD/audio tape players
• Cables and connectors to
piece it all together
• Lights
• Set furniture- usually
something homey. Avoid
detailed patterns. Go for solid
colors that blend.
Types of radio production
• Audio Production: It is an audio producer creates jingles,
sweepers, promos and station imaging. The role involves scripting audio,
creating audio and inventing new creative ways to get a message across in
a limited amount of time.
• Show Production: Radio show producers work closely
with the presenter of a radio show to come up with interesting
content including researching topics, features, call in ideas and
looking after the live show by watching song timings, choosing
callers to put on air and keeping the presenter on topic
Conclusion
Talk shows are the beauty of democracy. Public opinion must be
involved in talk shows like kamran shahid and Asma sherazi. Planted
talk shows must be banned by the Govt. Media organizations like
PEMRA should have check and balance on the talk shows and anchors
should also be accountable to the law More over the contribution of the
Talk shows on many important issues cannot be ignored. But some talk
shows themselves are becoming "mafias" although it’s a hard word to
use, but it’s the reality.
radio TV talk show slideshare
radio TV talk show slideshare

radio TV talk show slideshare

  • 2.
    Radio and TVTalk Shows • Presented by Harmain Akhter(499) Asma Maqsood(510) Tayyaba Yousaf(485) • Presented to Mam Sana Fatima
  • 3.
    What is talkshows • “Talk Show” is basically the word of American & Australian English. In British English it is know by “Chat Show”. • “A television or radio show in which various topics are discussed to inform or educate the listens.”
  • 4.
    History • The talkshow is one of the most popular types of TV programs. • This type of show has a long history which goes back to the time that every home got a television in the 1950’s. • Basically, the talk show has been evolved from a radio station to a television as a TV talk show.
  • 5.
    Categories According tothe timing Day Talk show: • Day time is a time which mostly targets the house wives. • There are also many types of shows in that time. Like Morning shows, Cooking shows, TV Magazine show. • i.e Geo Shaan Say, Utho Jago Pakistan, Subha Sawery Maya Kay Sath Subh
  • 6.
    Categories According tothe timing Afternoon Talk show: • This is the time when there is less viewership of TV channels In this time. • TV Channels mostly on air the repeated telecast of live shows of the last day. • i.e. Repeated Telecast of the Capital Talk on Geo News.
  • 7.
    Classification According to theTimming Evening talk show: • This is basically the time when most of the People are free from their work places. • Thus, there is more viewership at this time so the most important or top rated shows of any TV channel on air their programs at evening time. • i.e. aj kamran khan ka sath, mazakraat, off the record.
  • 8.
    Classification According to theMedium Radio • 1905 H.A EUSSENDEN • 1908 Le de Forest • 1915 David sarnoff • 1922 1st concert and BBC established Television • 1906 Le De forest • 1940 Peter Gold Mark • 1948 cable TV • 1992 plasma TV • 2010 3-D TV
  • 9.
    First talk show Radio •Steve Allen Television • Joe Franklin
  • 10.
  • 11.
    Radio talks • “Talkradio is a radio format containing discussion about topical issues and consisting entirely or almost entirely of original spoken word content rather than outside music”
  • 12.
    Types of radiotalks • Hot Talk • Liberal talk radio • Sports talk
  • 13.
  • 14.
    Timeline • On television,the earliest such program was Meet the Press, which first aired in 1947. • The original host, Martha Rountree, was also the only woman in the program's history to moderate discussion as politicians and other public leaders made appearances. • In 1952, the Today show made its first appearance on NBC with host Dave Garroway, Soon other networks followed with similar programs. • A variety of daytime talk shows have covered a number of issues with very distinct methods of delivery.
  • 15.
    Types of TVtalk shows • News talk shows • Sports talk shows • Entertainment talk shows
  • 16.
    Top Rated TVTalk Shows
  • 17.
    Capital Talk Hostedby Hamid Mir. It is broadcast four days a week (Monday to Thursday) in the timing of 8:05pm. Launched in 2002.
  • 18.
    Kal Tak Is apolitical talk show. Aired from Express News. Hosted by a well known anchor and columnist Javed Chaudhry.
  • 19.
    Off the record Airedon ary news. His program is known because of his bold steps and unbiased approach.
  • 20.
    Hasb-e-Haal Hasb-e-Haal is apolitical comedy show Airs on Dunya TV at 11:05 pm from Thursday to Sunday.
  • 21.
    Khabarnaak Geo News TVProgram Pakistani Comedy television show. Airs on 11:05pm on Fridays, Saturdays and Sundays.
  • 22.
    Flaws in TV TalkShows • Political Talk Shows • Create Negativity • Anti Government Talks Shows
  • 23.
    Impact of talkshows • Popular • Rise to awareness • Changing the political scenario • Affiliation and biasness • Logic and facts & figures • Information on various aspects • Background of the story • Opinion makers. • Source of social change
  • 24.
    Stages of Production •Pre-production • Production • Post-production • Distribution and duplication
  • 25.
    Pre-production Radio • Motive ofthe program (why this program?) • Research of Target Audience • Content of the program • Selection of Format Television • Idea formation • Research • Script • Budget • Production modle • Resource planning • Program approval • Approval for program
  • 26.
    Pre-production Radio • Duration ofthe Program • Time of Broadcast • Frequency of the Program Television • Facility request and check • Permits and clearence • Selection of characters • Set arrangement • Costume designer • Make-up artist • Equipments • Location • Schedual
  • 27.
    Production Radio • Euipments arrangements •Sound equipments • Crew / staff • Communication • Schedual Television • Set designing • Euipments arrangements • Sound equipments • Crew / staff • Communication • Schedual • Line producer • Monitor working of staff • Scenes
  • 28.
    Post-production Radio • To arrangerecorded material into a more logical sequence • To remove the uninteresting. Repetitive or technically acceptable portion. Television • Editing • Digital video effects • Musical elements • Cut • Time • Recheck list
  • 29.
    Post-production Radio • To compressthe material in time. • For creative effect to produce new juxtaposition of speech, music. sound and even silence. Television • Meeting with colleagues • Synchronization • Promos • Teasers • Publicity
  • 30.
    Duplication and Distribution Radio •Include only process of distribution. • Mostly include on air shows. Television • Once a final copy of the show is ready, it must be duplicated or copied so the staff can send it to stations or affiliates.
  • 31.
  • 32.
    Equipment's Radio • Mixer • Speakers •Cable • Audio playback component Television • Tripod for each camera • A video switcher that can handle every single video source you have (or computer system) • Multiple microphones • An audio switcher that can handle every audio source you have (or computer system) • Multi camera
  • 33.
    Equipment's Radio • Transmitter • Receiver •Antenna • Transmission lines • Audio process Television • Multiple TV Monitors, minimum of one per video source • Video tape/DVD decks • CD/audio tape players • Cables and connectors to piece it all together • Lights • Set furniture- usually something homey. Avoid detailed patterns. Go for solid colors that blend.
  • 34.
    Types of radioproduction • Audio Production: It is an audio producer creates jingles, sweepers, promos and station imaging. The role involves scripting audio, creating audio and inventing new creative ways to get a message across in a limited amount of time. • Show Production: Radio show producers work closely with the presenter of a radio show to come up with interesting content including researching topics, features, call in ideas and looking after the live show by watching song timings, choosing callers to put on air and keeping the presenter on topic
  • 35.
    Conclusion Talk shows arethe beauty of democracy. Public opinion must be involved in talk shows like kamran shahid and Asma sherazi. Planted talk shows must be banned by the Govt. Media organizations like PEMRA should have check and balance on the talk shows and anchors should also be accountable to the law More over the contribution of the Talk shows on many important issues cannot be ignored. But some talk shows themselves are becoming "mafias" although it’s a hard word to use, but it’s the reality.