Precision Engineered Spacer System


1
Why the change?
• 2016 Building Regulation require “Zero Carbon”
  That means a deeper construction roof and wall cavity..
  Or - thicker / more dense / more expensive insulation!

                                                    £ more expensive




                                                                       2
Our engineered solution




                          3
Why the change?
• Why the need to change the current offer?

• 60% of our roof systems supplied are 0.18 U Value or lower (2011-2012)




                                                                           4
Why the change?
• All single support spacer systems suffer from lateral sway




                                                               5
Why the change?
• All rely on installer skill to ensure correct installation




                                                               6
Why the change?
• Roof Systems now have additional requirement to support PV panels.

• Giving an increased roof mass above the spacer system




                                                                       7
just compare the physics..
                             8
just compare the physics..
                             9
just compare the physics..
                             10
Quattro




          11
Quattro




          12
Quattro




          13
Quattro




          14
Quattro




          15
Quattro




          16
Quattro




          17
Quattro




          18
Quattro




          19
Quattro




          just compare the physics..
                                       20
Metal Building Solutions




     Precision Engineered Spacer Bar System
21

Quattro Engineered Spacer Bar System