SlideShare a Scribd company logo
1 of 86
‫الرحيم‬ ‫الرحمن‬ ‫هللا‬ ‫بسم‬
PROPOSAL
PEMBANGUNAN & PENGEMBANGAN
PONDOK PESANTREN AL-FATAH
SULTAN MUKSIN SYAH - BACAN
Dusun Moifi – Desa Panamboang
Kec.Bacan Selatan – Kab.Halmahera Selatan
Maluku Utara Kode Pos 97791
Hp. 0821 1445 0443 / 0813 5343 6754
Proposal Pembangunan dan Pengembangan Page | 1
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PENDAHULUAN
Alhamdulilah, segala puji bagi Allah Subhanahu Wa Ta’ala, shalawat dan salam semoga Allah
curahkan kepada junjungan Nabi Muhammad Shallallahu ‘Alaihi Wasallam, para shahabat dan para
pengikutnya yang setia sampai hari kiamat. Aamin yaa Rabbal ‘alamiin.
Pondok Pesantren Shuffah Hizbullah Al-Fatah Sultan Muksin Syah, yang berlokasi di Dusun
Moifi, Desa Panamboang, Kec.Bacan Selatan, Kab.Halmahera Selatan, Propinsi Maluku Utara sedang
membangun dan mengembangkan Pusat Pendidikan terpadu dan Kegiatan Pembinaan Ummat
melewati Majlis Ta’lim dan Da’wah Islam yang representative untuk melayani aktifitas santri dan
masyarakat Islam sekitarnya serta kaum muslimin pada umumnya.
Salah satu sarana dan prasarana yang sangat vital sebagai tempat ibadah, dan member
bimbingan para santri dan umat menjadi muslim yang bertaqwa dan berakhlaq mulia adalah
Gedung Masjid, Gedung Lokal Madrasah, dan Gedung Asrama. Namun dengan semakin
meningkatnya perkembangan dan kegiatan pendidikan dari tingkat TK/TPA, SD sampai SMA yang
dipercayakan pada Pondok Pesantren Al-Fatah, masjid yang ada saat ini (dibangun sejak tahun
1981) sudah tidak mampu menampung jama’ah dan tidak lagi memadai.
Guna memenuhi keperluan tersebut, dengan mengharap ridlo dan pertolongan Allah
Subhanahu Wa Ta’ala, kami berniat untuk melakukan pembangunan dan pengembangan Pondok
Pesantren Shuffah Hizbullah Al-Fatah Sultan Muksin Syah Bacan (Al-Fatah Bacan) yang berada di
Dusun Moifi, Desa Panamboang, Kecamtan Bacan Selatan, Kabupaten Halmahera Selatan, Maluku
Utara, Kode Pos 97791.
Dengan recana pembangunan dan pengembangan lokasi Pondok Pesantren diatas, sebagai
salah satu pusat kegiatan pendidikan keagamaan baik formal, non formal, diharapkan segera
terealisasi dan berfungsi sebagai sarana kegiatan keagamaan shalat berjama’ah lima waktu dan
tempat pendidikan serta kegiatan social keagamaan masyarakat dapat tertampung dan berjalan
lebih baik. Dalam hal ini tidak mungkin dapat kami lakukan sendiri kecuali dengan uluran dan
bantuan dana dari Bapak-Bapak, Ibu-Ibu, Saudara kaum muslimin yang dimuliakan Allah.
Kepada Allah jua kami berharap semoga Allah senantiasa melimpahkan curahan rahmat dan kasih
sayang-Nya, sehingga Bapak-Bapak, Ibu-Ibu dan Saudara-Saudara diberi kelapangan rizqi dan
kemudahan-kemudahan untuk dapat turut serta beramal jariyah membangun dan mengembangkan
Pondok Pesantren Al-Fatah Sultan Muksin Syah di Bacan. Aamiin yaa Rabbal ‘alamiin.
LANDASAN
Firman Allah Subhanahu Wa Ta’ala :
“Hanya yang memakmurkan masjid-masjid Allah, ialah orang-orang yang beriman kepada Allah dan
hari akhir serta tetap mendirikan shalat, mengeluarkan zakat dan tidak takut melainkan kepada
Allah. Lantaran itu mudah-mudahan mereka menjadi orang-orang yang mendapat petunjuk.” (QS.
At-Taubah : 18)
Proposal Pembangunan dan Pengembangan Page | 2
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
“Siapakah yang mau memberi pinjaman kepada Allah, pinjaman yang baik (menafkahkan hartanya
di jalan Allah), maka Allah akan melipatgandakan pem-bayaran kepadanya dengan lipat ganda yang
banyak. Dan Allah menyempitkan dan melapangkan (rizqi) dan kepada-Nya lah kamu dikembalikan.”
(QS. Al-Baqarah : 245)
“Wahai orang-orang yang beriman, belanjakanlah (di jalan Allah) sebagian dari rizki yang telah kami
berikan kepadamu sebelum dating hari yang pada hari itu tidak ada lagi jual beli dan tidak ada lagi
persahabatan yang akrab dan tidak ada lagi syafa’at. Dan orang-orang kafir itulah yang zalim.” (QS.
Al-Baqarah : 254)
Sabda Rasulullah Shallallahu ‘Alaihi Wasallam : “Barang siapa yang mendirikan masjid karena Allah,
maka Allah akan membangunkannya rumah di surga”. (HR. Muslim dari Usman bin Affan).
LOKASI
Dusun Moifi – Desa Panamboang Kec.Bacan Selatan – Kab.Halmahera Selatan Maluku Utara Kode
Pos 97791
TAHAP PEMBANGUNAN
Tahap Pertama :
Pembangunan Masjid dengan luas 30 m x 30 m, dibangun 2 (dua) lantai. Lantai 1 seluas 676 m2 dan
lantai 2 seluas 676 m2 (plus pelataran)
Tahap Kedua :
Pengembangan Pondok Pesantren, masyarakat dan muslimin. Perlengkapan dan Fasilitas
Pendukung aktifitas Masjid.
RENCANA BIAYA
1. Tanah bersertifikat wakaf seluas 400 m x 250 m = 100.000 m2, berbentuk tanah kebun atau
10 Ha dan masih keadaan semak belukar atau hutan dengan biaya pemeliharaan lahan
perbulan Rp. 5.000.000,- ( Lima juta Rupiah )
2. Anggaran Biaya renovasi mess semi permanent 6m x 4m Rp. 30.000.000 (Tiga puluh juta
rupiah )
Rekapitulasi Biaya
3. Tahap kedua : pengembangan Pondok Pesantren yang meliputi beberapa bangunan
permament, diantaranya :
1) Bangunan Gedung Sekolah SMP dan SMA PUTRA seluas 60 m x 20 m = 1200 m2 x 2
Proposal Pembangunan dan Pengembangan Page | 3
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Lantai = 2.400 m2
2) Bangunan Gedung Sekolah SMP dan SMA PUTRI seluas 60 m x 20 m = 1200 m2 x 2 Lantai
= 2.400 m2
3) Bangunan Gedung Sekolah Dasar PUTRA Al-Fatah seluas 55 m x 10 m = 550 m2 x 2 Lantai
= 1.100 m2
4) Bangunan Gedung Sekolah Dasar PUTRI Al-Fatah seluas 55 m x 10 m = 550 m2 x 2 Lantai
= 1.100 m2
5) Bangunan Gedung Serba Guna / Auditorium Al-Fatah seluas 50 m x 33 m =1.650 m2 x 2
Lantai = 3.300 m2. Plus Ruang Genset dan Diesel seluas 26 m x 10 m = 260 m2. = 3.560 m2
6) Bangunan Gedung Kantin Putra Al-Fatah seluas 36 m x 24 m = 864 m2 x 2 Lantai = 1.728
m2
7) Bangunan Gedung Kantin Putri Al-Fatah seluas 36 m x 24 m = 864 m2 x 2 Lantai = 1.728
m2
Dengan Total Anggaran Tahap pertama dan tahap kedua sejumlah Rp. 3.767.250.000,- (tiga
milyar tujuh ratus enam puluh tujuh juta dua ratus lima puluh rupiah)
SUMBER DANA
1) Berupa uang atau bahan bangunan atau kedua-duanya
2) Donatur tetap
3) Instansi/ organisasi, perusahaan yang tidak mengikat
4) Masyarakat Muslimin secara umum
5) Usaha lain yang halal dan tidak mengikat
CARA MENYUMBANG
Untuk sumbangan berupa barang ataupun uang yang ingin diserahkan dapat langsung ke alamat
kami :
PANITIA PEMBANGUNAN & PENGEMBANGAN
PONDOK PESANTREN SHUFFAH
AL FATAH SULTAN MUKSIN SYAH BACAN
Dusun Moifi – Desa Panamboang
Kec.Bacan Selatan – Kab.Halmahera Selatan
Kode Pos 97791
PH / HP. +62 821 1445 0443. +62 813 5343 6754
Proposal Pembangunan dan Pengembangan Page | 4
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Atau melalui transfer ke rekening :
1. Rekening No. 5220.01.036608.53.6 BRI Unit Bacan Ternate a.n Yayasan Al Fatah Bacan
2. Rekening No. xxxx.xx.xxxx. BSM Unit Bacan Ternate a.n Panitia Pembangunan
dan Pengembangan Pon-Pes Shuffah Al-fatah Sultan
Muksin Syah Bacan
SUSUNAN PANITIA
Penasihat : Drs. KH. Yakhsyallah Manshur, M.Ag.
: Sultan Bacan
Pembina : Aziz Aly Hp. 0821 2682 9872
: Dr. Arif Rahman Fitriyanto Hp. 0812 8005 1732
Pengasuh : M. Buchari E. Zabir Syah Hp. 0812 8496 9686
Ketua Panitia : M. Babullah Zabir Syah Hp. 0853 4583 4910
Wakil Ketua : Muhammad Arsyad Ridho Hp. 0812 1481 3171
Sekretaris : Taslim Yamin, Amd, Kep. Hp. 0821 9080 7069
: Hanifah Muslimah, Amd, Keb. Hp. 0813 2262 4013
Bendahara : Saepudin Ace Hp. 0823 4820 3759
: Firman Mustaqim Hp. 0821 2617 4712
TIM PENGGALANGAN DANA
1. H. Shafril Lubis
2. H. Nurdin
3. H. Mad Idris
4. H. Asep Rahman
5. H. Bustami Utje
6. H. Sakuri, SH
7. H. Sahlan Damiri
8. H. Wawan Ruswandi
9. Arif Rahman Fitrianto, MA
10. M. Anshorullah
11. Ir. Sulis Diantoro
PENUTUP
Karena Allah dan mengharap Ridho-nya semata-mata, kami mengetuk hati para dermawan
Muslimin untuk turut serta membantu dan meraih Anugrah ALLAH dalam pembiayaan
Pembangunan dan Pengembangan Pondok Pesantren Al Fatah Sultan Muksin Syah Bacan ini. Atas
kemurahan hati para dermawan semoga mendapat balasan pahala yang berlipat ganda disisi_nya.
Amin yaa Robbal ‘alamin. Terima Kasih dan Jazakumullah Khairon.
Proposal Pembangunan dan Pengembangan Page | 5
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
LAMPIRAN 1
Proposal Pembangunan dan Pengembangan Page | 6
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
RENCANA ANGGARAN BIAYA
PROYEK : PEMBANGUNAN GEDUNG MASJID …………….
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 676 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN
PASIR
1 Galian pondasi SLOOF 48 m3 50.000,00 2.400.000,00
2 Galian pondasi TAPAK 139 m3 75.000,00 10.425.000,00
3 Urug tanah 28 m3 37.500,00 1.050.000,00
4 Lantai kerja 8 m3 -
Semen 106,28 zak 65.000,00 7.038.200,00
Pasir Beton 12,64 m3 200.000,00 2.528.000,00
Split 21,30 m3 200.000,00 4.260.000,00
5 Pasir urug bawah lantai +
sper 20%
8 m3 -
Pasir Urug 28,09 m3 200.000,00 5.618.000,00
33.319.200,00
B PEKERJAAN BATA
1 Pasang Bata 1.460 m2
Batu Bata Merah 323.080,31 bh 650,00 210.002.201,00
Semen 1.524,94 zak 65.000,00 99.121.100,00
Pasir Pasang 245,54 m3 200.000,00 25.108.000,00
2 Pas Plesteran dan Acian 2.921 m2
Semen 1.406,05 zak 65.000,00 91.393.250,00
Pasir Pasang 167,14 m3 200.000,00 33.428.000,00
459.052.551,00
C PEKERJAAN BETON
STRUKTUR
1 Pasang pondasi batukali 73
batu kali 256,90 m3 200.000,00 51.380.000,00
semen 753,57 zak 65.000,00 48.982.050,00
pasir pasang 81,35 m3 200.000,00 16.270.000,00
2 Cor Beton Sloof 25x40 24 -
Beton K.225 48 m3 -
Semen 957,96 zak 65.000,00 62.267.000,00
Pasir Beton 76,07 m3 200.000,00 15.214.000,00
Split 115,52 m3 200.000,00 23.104.000,00
Besi Beton 22.258,42 kg 13.000,00 289.359.460,00
Kawat Beton 890,34 kg 25.000,00 22.258.500,00
Bekesting Beton Sloof -
Papan 1.797,58 lbr 25.000,00 44.939.500,00
Paku Rata-rata 563,50 kg 25.000,00 14.087.500,00
Proposal Pembangunan dan Pengembangan Page | 7
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Kaso utk.rangka 35,22 m3 3.000.000,00 105.660.000,00
Kaso utk.stut 28,18 m3 3.000.000,00 84.540.000,00
3 Cor beton pondasi tapak -
Beton K.225 22 m3 -
Semen 447,38 zak 65.000,00 29.079.700,00
Pasir Beton 35,53 m3 200.000,00 7.106.000,00
Split 53,95 m3 200.000,00 10.790.000,00
Besi Beton 10.394,96 kg 13.000,00 135.134.480,00
kawat beton 415,80 kg 25.000,00 10.395.000,00
Bekesting beton tapak - -
PAPAN 839,49 lbr 25.000,00 20.987.250,00
paku rata-rata 263,16 kg 25.000,00 6.579.000,00
kaso utk.rangka 16,45 m3 3.000.000,00 49.350.000,00
kaso utk.stut 13,16 m3 3.000.000,00 39.480.000,00
-
4 Cor beton lantai/beton
susut t=8cm
101 m3 -
semen 1.356,91 zak 65.000,00 88.199.150,00
pasir beton 21,34 m3 200.000,00 4.268.000,00
split 271,98 m3 200.000,00 54.396.000,00
-
5 Cor beton kolom 67 m3 -
semen 1.346,79 zak 65.000,00 87.541.350,00
pasir beton 31,96 m3 200.000,00 6.392.000,00
split 162,41 m3 200.000,00 32.482.000,00
besi beton 31.293,17 kg 13.000,00 406.811.210,00
kawat beton 1.251,73 kg 25.000,00 31.293.250,00
Bekesting beton kolom -
triplek 9 mm 2.527,22 lbr 160.000,00 404.355.200,00
paku rata-rata 792,23 kg 25.000,00 19.805.750,00
kaso meranti utk.rangka 49,51 m3 3.000.000,00 148.530.000,00
kaso meranti utk.stut 39,61 m3 3.000.000,00 118.830.000,00
2.489.867.350,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 51 m3
semen 1.022,58 zak 65.000,00 66.467.700,00
pasir beton 81,20 m3 200.000,00 16.240.000,00
split 123,31 m3 200.000,00 24.662.000,00
besi beton 23.759,91 kg 13.000,00 308.878.830,00
kawat beton 950,40 kg 25.000,00 23.760.000,00
Bekesting beton plat -
triplek 9 mm 1.918,84 lbr 130.000,00 249.449.200,00
paku rata-rata 601,52 kg 25.000,00 15.038.000,00
kaso meranti utk.rangka 37,59 m3 3.000.000,00 112.779.000,00
Proposal Pembangunan dan Pengembangan Page | 8
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kaso meranti utk.stut 30,08 m3 3.000.000,00 90.240.000,00
-
2 Cor beton ring balk 15x20 32 m3 -
semen 639,11 zak 65.000,00 41.542.150,00
pasir beton 50,75 m3 200.000,00 10.150.000,00
split 77,07 m3 200.000,00 15.414.000,00
besi beton 14.849,95 kg 13.000,00 193.049.350,00
kawat beton 594,00 kg 25.000,00 14.850.000,00
Bekesting beton ring balok -
Papan 1.199,27 lbr 25.000,00 29.981.750,00
paku rata-rata 375,95 kg 25.000,00 9.398.750,00
kaso meranti utk.rangka 23,50 m3 3.000.000,00 70.500.000,00
kaso meranti utk.stut 18,80 m3 3.000.000,00 56.400.000,00
-
3 Cor beton plat lantai dan
overstek
109 m3 -
semen 2.191,80 zak 65.000,00 142.467.000,00
pasir beton 174,05 m3 200.000,00 34.810.000,00
split 264,31 m3 200.000,00 52.862.000,00
besi beton 50.927,06 kg 13.000,00 662.051.780,00
kawat beton 2.037,08 kg 25.000,00 50.927.000,00
Bekesting beton plat lantai - -
triplek 9 mm 4.112,84 lbr 130.000,00 534.669.000,00
paku rata-rata 1.289,29 kg 25.000,00 32.232.250,00
kaso meranti utk.rangka 80,58 m3 3.000.000,00 241.740.000,00
kaso meranti utk.stut 64,46 m3 3.000.000,00 193.380.000,00
-
3.293.939.760,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 1.353 m2
lantai keramik 4.191,84 m2 130.000,00 544.939.200,00
pasir pasang 199,61 m3 200.000,00 39.922.000,00
semen 1.197,67 zak 65.000,00 77.848.550,00
semen warna 479,07 kg 25.000,00 11.976.750,00
-
2 Pas keramik km/wc 54 m2 -
lantai keramik 165,85 m2 130.000,00 21.560.500,00
pasir pasang 7,90 m3 200.000,00 1.580.000,00
semen 47,39 zak 65.000,00 3.080.350,00
semen warna 18,95 kg 25.000,00 473.750,00
-
3 Pas keramik km/wc dinding 186 m2 -
lantai keramik 575,67 m2 130.000,00 74.837.100,00
Proposal Pembangunan dan Pengembangan Page | 9
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
4
pasir pasang 27,41 m3 200.000,00 5.482.000,00
semen 164,48 zak 65.000,00 10.691.200,00
semen warna 65,79 kg 25.000,00 1.644.750,00
-
Pas plint keramik 708 m1 -
plint keramik 2.109,49 m' 45.000,00 94.927.050,00
semen 41,77 zak 65.000,00 2.715.180,00
pasir pasang 4,18 m3 200.000,00 835.440,00
892.513.820,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum
t=9mm
1.373 m2
Hollow 4x4 cm 3.241,30 btg 25.000,00 81.032.500,00
Hollow 2x4 cm 2.025,81 btg 20.000,00 40.516.200,00
Gypsum 9 mm 1.620,65 lbr 65.000,00 105.342.250,00
Skrup Gypsum 36.464,61 bh 500,00 18.232.305,00
Penggantung + ramset 8.103,25 ttk 4.000,00 32.413.000,00
Compound Gypsum 243,10 zak 75.000,00 18.232.500,00
Textile tape 384,90 roll 20.000,00 7.698.000,00
amplas 1.215,49 lbr 6.000,00 7.292.940,00
-
2 Pasang list gypsum 708 m1 -
List Gypsum 2.088,60 m 25.000,00 52.215.000,00
Compound Gypsum 62,66 zak 65.000,00 4.072.770,00
amplas 313,29 lbr 6.000,00 1.879.740,00
368.927.205,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex setara 2.921 -
plamur tembok 1.723,10 kg 17.500,00 30.154.250,00
amplas 430,77 lbr 6.000,00 2.584.620,00
cat tembok Vinilex 2.153,87 kg 25.000,00 53.846.750,00
- -
2 Cat plafond ex Vinilex setara 1.353 m2 - -
plamur tembok 798,45 kg 17.500,00 13.972.875,00
amplas 199,61 lbr 6.000,00 1.197.660,00
cat tembok Vinilex 998,06 kg 25.000,00 24.951.500,00
126.707.655,00
H PEKERJAAN INSTALASI
LISTRIK
1 Instalasi titik lampu ex
BROCO
130 ttk
Kabel NYM 3 x 2,5 mm² 2.297,46 m1 12.000,00 27.569.520,00
Conduit 2.297,46 m1 5.000,00 11.487.300,00
Tee Doos 765,82 buah 6.000,00 4.594.920,00
Proposal Pembangunan dan Pengembangan Page | 10
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
One Way Doos 765,82 buah 6.000,00 4.594.920,00
Sock 765,82 buah 1.500,00 1.148.730,00
Klem 3.063,28 buah 1.000,00 3.063.280,00
Lasdop 1.531,64 buah 1.500,00 2.297.460,00
Flexible Pipa 765,82 m 8.000,00 6.126.560,00
Paku 3.446,19 buah 500,00 1.723.095,00
Sekrup 765,82 buah 500,00 382.910,00
Fisher 765,82 buah 800,00 612.656,00
Elbow 382,91 buah 2.000,00 765.820,00
-
2 Instalasi titik stop kontak ex
BROCO
35 ttk -
Kabel NYM 3 x 2,5 mm² 417,72 m1 12.000,00 5.012.640,00
Conduit 417,72 m1 5.000,00 2.088.600,00
Outlet Box Metal 104,43 buah 15.000,00 1.566.450,00
Tee Doos 104,43 buah 6.000,00 626.580,00
Sock 104,43 buah 6.000,00 626.580,00
Klem 417,72 buah 1.500,00 626.580,00
Lasdop 208,86 buah 1.000,00 208.860,00
Paku 104,43 m1 1.500,00 156.645,00
Sekrup 939,87 buah 8.000,00 7.518.960,00
Fisher 208,86 buah 500,00 104.430,00
Elbow 104,43 buah 2.000,00 208.860,00
4 Lampu baret 130 bh 600.000,00 77.880.000,00
5 Panel ex BROCO 6 bh 500.000,00 2.950.000,00
6 Test dan commisioning 3 ls 1.500.000,00 4.425.000,00
168.367.356,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 118 m1 27.000,00 3.186.000,00
2 Pipa distribusi Ø1/2" 118 m1 15.000,00 1.770.000,00
3 Closed jongkok 12 bh 600.000,00 7.080.000,00
4 kran tembok 18 bh 12.000,00 212.400,00
5 Fitting-fitting (Elbow, tee,
support)
3 ls 3.000.000,00 8.850.000,00
6 Support, klem 3 ls 3.000.000,00 8.850.000,00
7 Pipa PVC air kotor Ø 3" 71 m1 65.000,00 4.602.000,00
8 Pipa PVC air kotoran Ø 4" 71 m1 75.000,00 5.310.000,00
39.860.400,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 1.086 m2 220.000,00 238.832.000,00
2 Atap ZINK ALUM 1.086 m2 190.000,00 206.264.000,00
-
3 Pas.nok 123 -
nok 122,72 bh 135.000,00 16.567.200,00
Proposal Pembangunan dan Pengembangan Page | 11
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
semen 86,89 zak 65.000,00 5.647.850,00
pasir beton 13,76 m3 200.000,00 2.752.000,00
papan ruiter kamper 1,09 m3 3.000.000,00 3.258.216,00
-
3 Waterproofing atap 88,80 m2 65.000,00 5.772.000,00
479.093.266,00
K PEKERJAAN KUSEN
1 P1 15 bh -
balok 8/15 1,42 m3 12.000.000,00 16.992.000,00
paku 10,44 kg 25.000,00 261.075,00
lem putih 4,18 kg 20.000,00 83.544,00
papan 3/30 11,49 m3 12.000.000,00 137.847.600,00
paku rata-rata 37,28 kg 25.000,00 932.000,00
lem putih 50,83 kg 20.000,00 1.016.600,00
-
2 P2 6 bh -
balok 8/15 0,42 m3 12.000.000,00 5.097.600,00
paku 3,13 kg 25.000,00 78.250,00
lem putih 1,25 kg 20.000,00 25.000,00
00 papan 3/30 1,91 m3 12.000.000,00 22.974.600,00
paku rata-rata 6,21 kg 25.000,00 155.250,00
lem putih 8,47 kg 20.000,00 169.400,00
-
3 P3 KM/WC 4,00 bh 250.000,00 1.000.000,00
-
4 J1 56 bh -
balok 8/15 10,76 m3 12.000.000,00 129.139.200,00
paku 79,37 kg 25.000,00 1.984.170,00
lem putih 31,75 kg 20.000,00 635.000,00
papan kamper medan 22,74 m3 12.000.000,00 272.823.375,00
paku rata-rata 13,41 kg 25.000,00 335.250,00
lem putih 26,83 kg 20.000,00 536.600,00
list kayu 268,28 m' 25.000,00 6.707.000,00
kaca 5 mm 17,85 m2 90.000,00 1.606.500,00
600.400.014,00
-
EKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 33.319.200,00
B PEKERJAAN BATA Rp 459.052.551,00
C PEKERJAAN BETON STRUKTUR Rp 2.489.867.350,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 3.293.939.760,00
E PEK LANTAI DAN DINDING KERAMIK Rp 892.513.820,00
F PEKERJAAN PLAFOND Rp 368.927.205,00
G PEKERJAAN PENGECATAN/LABURAN Rp 126.707.655,00
H PEKERJAAN INSTALASI LISTRIK Rp 168.367.356,00
Proposal Pembangunan dan Pengembangan Page | 12
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
I INSTALASI PIPA UTAMA AIR BERSIH Rp 39.860.400,00
J PEKERJAAN ATAP Rp 479.093.266,00
K PEKERJAAN KUSEN Rp 600.400.014,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 9.189.168.577,00
DIBULATKAN Rp 9.189.000.000,00
Proposal Pembangunan dan Pengembangan Page | 13
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 14
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 15
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 16
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 17
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 18
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 19
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN GEDUNG SEKOLAH SMP PLUS AL FATAH, PUTRA DAN PUTRI
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 2400
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN
PASIR
81 Galian pondasi SLOOF 56 m3 50.000,00 2.800.000,00
2 Galian pondasi TAPAK 161 m3 75.000,00 12.075.000,00
3 Urug tanah 33 m3 37.500,00 1.237.500,00
4 Lantai kerja 9 m3 -
semen 142 zak 65.000,00 9.230.000,00
pasir beton 17 m3 200.000,00 3.400.000,00
split 28 m3 200.000,00 5.600.000,00
5 Pasir urug bawah lantai +
sper 20%
9 m3 -
pasir urug 37 m3 200.000,00 7.400.000,00
41.742.500,00
B PEKERJAAN BATA
1 Pasang bata 1.685 m2
batu bata merah 430.410 bh 650,00 279.766.500,00
semen 20.32 zak 65.000,00 132.080.000,00
pasir pasang 327 m3 200.000,00 65.400.000,00
- -
2 Pas plesteran dan acian 3.371 m2 -
semen 1.873 zak 65.000,00 121.745.000,00
pasir pasang 223 m3 200.000,00 44.600.000,00
643.591.500,00
C PEKERJAAN BETON
STRUKTUR
1 Pasang pondasi batukali 84
batu kali 342 m3 200.000,00 68.400.000,00
semen 1.004 zak 65.000,00 65.260.000,00
pasir pasang 108 m3 200.000,00 21.600.000,00
-
2 Cor beton sloof 25x40 28 -
Beton K.225 55 m3 -
semen 1.276 zak 65.000,00 82.940.000,00
pasir beton 101 m3 200.000,00 20.200.000,00
split 154 m3 200.000,00 30.800.000,00
besi beton 29.653 kg 13.000,00 385.489.000,00
kawat beton 1.186 kg 25.000,00 29.650.000,00
Bekesting beton sloof -
Papan 2.395 lbr 25.000,00 59.875.000,00
Proposal Pembangunan dan Pengembangan Page | 20
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
paku rata-rata 751 kg 25.000,00 18.775.0000,00
kaso utk.rangka 47 m3 3.000.000,00 141.000.000,00
kaso utk.stut 38 m3 3.000.000,00 114.000.000,00
-
3 Cor beton pondasi tapak -
Beton K.225 26 m3 -
semen 596 zak 65.000,00 38.740.000,00
pasir beton 47 m3 200.000,00 9.400.000,00
split 72 m3 200.000,00 14.400.000,00
besi beton 13.848 kg 13.000,00 180.024.000,00
kawat beton 554 kg 25.000,00 13.850.000,00
Bekesting beton tapak - -
Papan 1.118 lbr 25.000,00 27.950.000,00
paku rata-rata 351 kg 25.000,00 8.775.000,00
kaso utk.rangka 22 m3 3.000.000,00 66.000.000,00
kaso utk.stut 18 m3 3.000.000,00 54.000.000,00
-
4 Cor beton lantai/beton
susut t=8cm
117 m3 -
semen 1.808 zak 65.000,00 117.520.000,00
pasir beton 28 m3 200.000,00 5.600.000,00
split 362 m3 200.000,00 72.400.000,00
-
5 Cor beton kolom 77 m3 -
semen 1.794 zak 65.000,00 116.610.000,00
pasir beton 43 m3 200.000,00 8.600.000,00
split 216 m3 200.000,00 43.200.000,00
besi beton 41.689 kg 13.000,00 541.957.000,00
- -
kawat beton 1.668 kg 25.000,00 41.700.000,00
Bekesting beton kolom -
triplek 9 mm 3.367 lbr 160.000,00 538.720.000,00
paku rata-rata 1.055 kg 25.000,00 26.375.000,00
kaso meranti utk.rangka 66 m3 3.000.000,00 198.000.000,00
kaso meranti utk.stut 53 m3 3.000.000,00 3.000.000,00
3.333.785.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 59 m3
semen 1.362 zak 65.000,00 88.530.000,00
pasir beton 108 m3 200.000,00 21.600.000,00
split 164 m3 200.000,00 32.800.000,00
besi beton 31.653 kg 13.000,00 411.489.000,00
kawat beton 1.266 kg 25.000,00 31.650.000,00
Bekesting beton plat -
triplek 9 mm 2.556 lbr 130.000,00 332.280.000,00
Proposal Pembangunan dan Pengembangan Page | 21
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
paku rata-rata 801 kg 25.000,00 20.025.000,00
kaso meranti utk.rangka 50 m3 3.000.000,00 150.000.000,00
kaso meranti utk.stut 40 m3 3.000.000,00 120.000.000,00
-
2 Cor beton ring balk 15x20 37 m3 -
semen 851 zak 65.000,00 55.315.000,00
pasir beton 68 m3 200.000,00 13.600.000,00
split 103 m3 200.000,00 20.600.000,00
besi beton 19.783 kg 13.000,00 257.179.000,00
kawat beton 791 kg 25.000,00 19.775.000,00
Bekesting beton ring balok -
Papan 1.598 lbr 25.000,00 39.950.000,00
paku rata-rata 501 kg 25.000,00 12.525.000,00
kaso meranti utk.rangka 31 m3 3.000.000,00 93.000.000,00
kaso meranti utk.stut 25 m3 3.000.000,00 75.000.000,00
-
3 Cor beton plat lantai dan
overstek
126 m3 -
semen 2.920 zak 65.000,00 189.800.000,00
pasir beton 232 m3 200.000,00 46.400.000,00
split 352 m3 200.000,00 70.400.000,00
besi beton 67.845 kg 13.000,00 881.985.000,00
kawat beton 2.714 kg 25.000,00 67.850.000,00
Bekesting beton plat lantai - -
triplek 9 mm 5.479 lbr 130.000,00 712.270.000,00
paku rata-rata 1.718 kg 25.000,00 42.950.000,00
kaso meranti utk.rangka 107 m3 3.000.000,00 321.000.000,00
kaso meranti utk.stut 86 m3 3.000.000,00 258.000.000,00
-
4.385.973.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 1.562 m2
lantai keramik 5.584 m2 130.000,00 725.920.000,00
pasir pasang 266 m3 200.000,00 725.920.000,00
semen 1.596 zak 65.000,00 103.740.000,00
semen warna 638 kg 25.000,00 15.950.000,00
-
2 Pas keramik km/wc 62 m2 -
lantai keramik 221 m2 130.000,00 28.730.000,00
pasir pasang 11 m3 200.000,00 2.200.000,00
semen 63 zak 65.000,00 4.095.000,00
semen warna 25 kg 25.000,00 625.000,00
-
Proposal Pembangunan dan Pengembangan Page | 22
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
3 Pas keramik km/wc dinding 215 m2 -
4
lantai keramik 767 m2 130.000,00 99.710.000,00
pasir pasang 37 m3 200.000,00 7.400.000,00
semen 219 zak 65.000,00 14.235.000,00
semen warna 88 kg 25.000,00 2.200.000,00
-
Pas plint keramik 817 m1 -
plint keramik 2.810 m' 45.000,00 126.450.000,00
semen 56 zak 65.000,00 3.640.000,00
pasir pasang 6 m3 200.000,00 1.200.000,00
1.862.015.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum
t=9mm
1.585 m2
Hollow 4x4 cm 4.318 btg 25.000,00 107.950.000,00
Hollow 2x4 cm 2.699 btg 20.000,00 53.980.000,00
Gypsum 9 mm 2.159 lbr 65.000,00 140.335.000,00
Skrup Gypsum 48.578 bh 500,00 24.289.000,00
Penggantung + ramset 10.795 ttk 4.000,00 43.180.000,00
Compound Gypsum 324 zak 75.000,00 24.300.000,00
Textile tape 513 roll 20.000,00 10.260.000,00
amplas 1.619 lbr 6.000,00 9.714.000,00
-
2 Pasang list gypsum 817 m1 -
List Gypsum 2.782 m 25.000,00 69.550.000,00
Compound Gypsum 83 zak 65.000,00 5.395.000,00
amplas 417 lbr 6.000,00 2.502.000,00
491.455.000,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex setara 3.371 -
plamur tembok 2.296 kg 17.500,00 40.180.000,00
amplas 574 lbr 6.000,00 3.444.000,00
cat tembok Vinilex 2.869 kg 25.000,00 71.725.000,00
- -
2 Cat plafond ex Vinilex setara 1.562 m2 - -
plamur tembok 1.064 kg 17.500,00 18.620.000,00
amplas 266 lbr 6.000,00 1.596.000,00
cat tembok Vinilex 1.330 kg 25.000,00 33.250.000,00
168.815.000,00
H PEKERJAAN INSTALASI
LISTRIK
1 Instalasi titik lampu ex
BROCO
150 ttk
Kabel NYM 3 x 2,5 mm² 3.061 m1 12.000,00 36.732.000,00
Proposal Pembangunan dan Pengembangan Page | 23
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Conduit 3.061 m1 5.000,00 15.305.000,00
Tee Doos 1.020 buah 6.000,00 6.120.000,00
One Way Doos 1.020 buah 6.000,00 6.120.000,00
Sock 1.020 buah 1.500,00 1.530.000,00
Klem 4.081 buah 1.000,00 4.081.000,00
Lasdop 2.040 buah 1.500,00 3.060.000,00
Flexible Pipa 1.020 m1 8.000,00 8.160.000,00
Paku 4.591 buah 500,00 2.295.500,00
Sekrup 1.020 buah 500,00 510.000,00
Fisher 1.020 buah 800,00 816.000,00
Elbow 510 buah 2.000,00 1.020.000,00
-
2 Instalasi titik stop kontak ex
BROCO
41 ttk -
Kabel NYM 3 x 2,5 mm² 556 m1 12.000,00 6.672.000,00
Conduit 556 m1 5.000,00 2.780.000,00
3 Outlet Box Metal 139 buah 15.000,00 2.085.000,00
Tee Doos 139 buah 6.000,00 834.000,00
Sock 139 buah 6.000,00 834.000,00
Klem 556 buah 1.500,00 834.000,00
Lasdop 278 buah 1.000,00 278.000,00
Paku 139 m1 1.500,00 208.500,00
Sekrup 1.252 buah 8.000,00 10.016.000,00
Fisher 278 buah 500,00 1.390.000,00
Elbow 139 buah 2.000,00 278.000,00
4 Lampu baret 150 bh 600.000,00 90.000.000,00
5 Panel ex BROCO 7 bh 500.000,00 3.500.000,00
6 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00
209.959.000,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 136 m1 27.000,00 3.672.000,00
2 Pipa distribusi Ø1/2" 136 m1 15.000,00 2.040.000,00
3 Closed jongkok 14 bh 600.000,00 8.400.000,00
4 kran tembok 20 bh 12.000,00 240.000,00
5 Fitting-fitting (Elbow, tee,
support)
3 ls 3.000.000,00 9.000.000,00
6 Support, klem 3 ls 3.000.000,00 9.000.000,00
7 Pipa PVC air kotor Ø 3" 82 m1 65.000,00 5.330.000,00
8 Pipa PVC air kotoran Ø 4" 82 m1 75.000,00 6.150.000,00
43.832.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 1.253 m2 220.000,00 275.660.000,00
2 Atap ZINK ALUM 1.253 m2 190.000,00 238.070.000,00
3 Pas.nok 142 -
nok 142 bh 135.000,00 19.170.000,00
Proposal Pembangunan dan Pengembangan Page | 24
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
semen 116 zak 65.000,00 7.540.000,00
pasir beton 18 m3 200.000,00 3.600.000,,00
papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00
-
3 Waterproofing atap 89 m2 65.000,00 5.785.000,00
549.225.000,00
K PEKERJAAN KUSEN
1 P1 17 bh -
balok 8/15 2 m3 12.000.000,00 24.000.000,00
paku 14 kg 25.000,00 350.000,00
lem putih 6 kg 20.000,00 120.000,00
papan 3/30 15 m3 12.000.000,00 180.000.000,00
paku rata-rata 57 kg 25.000,00 1.425.000,00
lem putih 78 kg 20.000,00 1.560.000,00
-
2 P2 7 bh -
balok 8/15 0,5 m3 12.000.000,00 6.000.000,00
paku 4 kg 25.000,00 100.000,00
lem putih 2 kg 20.000,00 40.000,00
papan 3/30 3 m3 12.000.000,00 36.000.000,00
paku rata-rata 10 kg 25.000,00 250.000,00
lem putih 13 kg 20.000,00 260.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 P4 65 bh -
balok 8/15 12 m3 12.000.000,00 144.000.000,00
paku 106 kg 25.000,00 2.650.000,00
lem putih 42 kg 20.000,00 840.000,00
papan kamper medan 30 m3 12.000.000,00 360.000.000,00
paku rata-rata 21 kg 25.000,00 525.000,00
lem putih 41 kg 20.000,00 820.000,00
list kayu 413 m' 25.000,00 10.325.000,00
kaca 5 mm 21 m2 90.000,00 1.890.000,00
-
772.155.000,00
REKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 41.742.500,00
B PEKERJAN BATA Rp 643.591.500,00
C PEKERJAAN BETON STRUKTUR Rp 3.333.785.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 4.385.973.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 1.862.015.000,00
F PEKERJAAN PLAFOND Rp 491.455.000,00
G PEKERJAAN PENGECATAN/LABURAN Rp 168.815.000,00
H PEKERJAAN INSTALASI LISTRIK Rp 209.959.000,00
Proposal Pembangunan dan Pengembangan Page | 25
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
I INSTALASI PIPA UTAMA AIR BERSIH Rp 43.832.000,00
J PEKERJAAN ATAP Rp 549.225.000,00
K PEKERJAAN KUSEN Rp 772.155.000,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 12.739.668.000,00
DIBULATKAN Rp 12.739.600.000,00
Proposal Pembangunan dan Pengembangan Page | 26
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 27
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 28
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN GEDUNG SEKOLAH SMA PLUS AL FATAH, PUTRA & PUTRI
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 2400 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN
PASIR
1 Galian pondasi SLOOF 56 m3 50.000,00 2.800.000,00
2 Galian pondasi TAPAK 161 m3 75.000,00 12.075.000,00
3 Urug tanah 33 m3 37.500,00 1.237.500,00
4 Lantai kerja 9 m3 -
semen 142 zak 65.000,00 9.230.000,00
pasir beton 17 m3 200.000,00 3.400.000,00
split 28 m3 200.000,00 5.600.000,00
5 Pasir urug bawah lantai +
sper 20%
9 m3 -
pasir urug 37 m3 200.000,00 7.400.000,00
41.742.500,00
B PEKERJAAN BATA
1 Pasang bata 1.685 m2
batu bata merah 430.410 bh 650,00 279.766.500,00
semen 20.32 zak 65.000,00 132.080.000,00
pasir pasang 327 m3 200.000,00 65.400.000,00
- -
2 Pas plesteran dan acian 3.371 m2 -
semen 1.873 zak 65.000,00 121.745.000,00
pasir pasang 223 m3 200.000,00 44.600.000,00
643.591.500,00
C PEKERJAAN BETON
STRUKTUR
1 Pasang pondasi batukali 84
batu kali 342 m3 200.000,00 68.400.000,00
semen 1.004 zak 65.000,00 65.260.000,00
pasir pasang 108 m3 200.000,00 21.600.000,00
-
2 Cor beton sloof 25x40 28 -
Beton K.225 55 m3 -
semen 1.276 zak 65.000,00 82.940.000,00
pasir beton 101 m3 200.000,00 20.200.000,00
split 154 m3 200.000,00 30.800.000,00
besi beton 29.653 kg 13.000,00 385.489.000,00
Proposal Pembangunan dan Pengembangan Page | 29
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kawat beton 1.186 kg 25.000,00 29.650.000,00
Bekesting beton sloof -
Papan 2.395 lbr 25.000,00 59.875.000,00
paku rata-rata 751 kg 25.000,00 18.775.0000,00
kaso utk.rangka 47 m3 3.000.000,00 141.000.000,00
kaso utk.stut 38 m3 3.000.000,00 114.000.000,00
-
3 Cor beton pondasi tapak -
Beton K.225 26 m3 -
semen 596 zak 65.000,00 38.740.000,00
pasir beton 47 m3 200.000,00 9.400.000,00
split 72 m3 200.000,00 14.400.000,00
besi beton 13.848 kg 13.000,00 180.024.000,00
kawat beton 554 kg 25.000,00 13.850.000,00
Bekesting beton tapak - -
Papan 1.118 lbr 25.000,00 27.950.000,00
paku rata-rata 351 kg 25.000,00 8.775.000,00
kaso utk.rangka 22 m3 3.000.000,00 66.000.000,00
kaso utk.stut 18 m3 3.000.000,00 54.000.000,00
-
4 Cor beton lantai/beton susut
t=8cm
117 m3 -
semen 1.808 zak 65.000,00 117.520.000,00
pasir beton 28 m3 200.000,00 5.600.000,00
split 362 m3 200.000,00 72.400.000,00
-
5 Cor beton kolom 77 m3 -
semen 1.794 zak 65.000,00 116.610.000,00
pasir beton 43 m3 200.000,00 8.600.000,00
split 216 m3 200.000,00 43.200.000,00
besi beton 41.689 kg 13.000,00 541.957.000,00
- -
kawat beton 1.668 kg 25.000,00 41.700.000,00
Bekesting beton kolom -
triplek 9 mm 3.367 lbr 160.000,00 538.720.000,00
paku rata-rata 1.055 kg 25.000,00 26.375.000,00
kaso meranti utk.rangka 66 m3 3.000.000,00 198.000.000,00
kaso meranti utk.stut 53 m3 3.000.000,00 3.000.000,00
3.333.785.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 59 m3
semen 1.362 zak 65.000,00 88.530.000,00
pasir beton 108 m3 200.000,00 21.600.000,00
split 164 m3 200.000,00 32.800.000,00
besi beton 31.653 kg 13.000,00 411.489.000,00
Proposal Pembangunan dan Pengembangan Page | 30
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kawat beton 1.266 kg 25.000,00 31.650.000,00
Bekesting beton plat -
triplek 9 mm 2.556 lbr 130.000,00 332.280.000,00
paku rata-rata 801 kg 25.000,00 20.025.000,00
kaso meranti utk.rangka 50 m3 3.000.000,00 150.000.000,00
kaso meranti utk.stut 40 m3 3.000.000,00 120.000.000,00
-
2 Cor beton ring balk 15x20 37 m3 -
semen 851 zak 65.000,00 55.315.000,00
pasir beton 68 m3 200.000,00 13.600.000,00
split 103 m3 200.000,00 20.600.000,00
besi beton 19.783 kg 13.000,00 257.179.000,00
kawat beton 791 kg 25.000,00 19.775.000,00
Bekesting beton ring balok -
Papan 1.598 lbr 25.000,00 39.950.000,00
paku rata-rata 501 kg 25.000,00 12.525.000,00
kaso meranti utk.rangka 31 m3 3.000.000,00 93.000.000,00
kaso meranti utk.stut 25 m3 3.000.000,00 75.000.000,00
-
3 Cor beton plat lantai dan
overstek
126 m3 -
semen 2.920 zak 65.000,00 189.800.000,00
pasir beton 232 m3 200.000,00 46.400.000,00
split 352 m3 200.000,00 70.400.000,00
besi beton 67.845 kg 13.000,00 881.985.000,00
kawat beton 2.714 kg 25.000,00 67.850.000,00
Bekesting beton plat lantai - -
triplek 9 mm 5.479 lbr 130.000,00 712.270.000,00
paku rata-rata 1.718 kg 25.000,00 42.950.000,00
kaso meranti utk.rangka 107 m3 3.000.000,00 321.000.000,00
kaso meranti utk.stut 86 m3 3.000.000,00 258.000.000,00
-
4.385.973.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 1.562 m2
lantai keramik 5.584 m2 130.000,00 725.920.000,00
pasir pasang 266 m3 200.000,00 725.920.000,00
semen 1.596 zak 65.000,00 103.740.000,00
semen warna 638 kg 25.000,00 15.950.000,00
-
2 Pas keramik km/wc 62 m2 -
lantai keramik 221 m2 130.000,00 28.730.000,00
Proposal Pembangunan dan Pengembangan Page | 31
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
pasir pasang 11 m3 200.000,00 2.200.000,00
semen 63 zak 65.000,00 4.095.000,00
semen warna 25 kg 25.000,00 625.000,00
-
3 Pas keramik km/wc dinding 215 m2 -
4
lantai keramik 767 m2 130.000,00 99.710.000,00
pasir pasang 37 m3 200.000,00 7.400.000,00
semen 219 zak 65.000,00 14.235.000,00
semen warna 88 kg 25.000,00 2.200.000,00
-
Pas plint keramik 817 m1 -
plint keramik 2.810 m' 45.000,00 126.450.000,00
semen 56 zak 65.000,00 3.640.000,00
pasir pasang 6 m3 200.000,00 1.200.000,00
1.862.015.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum
t=9mm
1.585 m2
Hollow 4x4 cm 4.318 btg 25.000,00 107.950.000,00
Hollow 2x4 cm 2.699 btg 20.000,00 53.980.000,00
Gypsum 9 mm 2.159 lbr 65.000,00 140.335.000,00
Skrup Gypsum 48.578 bh 500,00 24.289.000,00
Penggantung + ramset 10.795 ttk 4.000,00 43.180.000,00
Compound Gypsum 324 zak 75.000,00 24.300.000,00
Textile tape 513 roll 20.000,00 10.260.000,00
amplas 1.619 lbr 6.000,00 9.714.000,00
-
2 Pasang list gypsum 817 m1 -
List Gypsum 2.782 m 25.000,00 69.550.000,00
Compound Gypsum 83 zak 65.000,00 5.395.000,00
amplas 417 lbr 6.000,00 2.502.000,00
491.455.000,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex setara 3.371 -
plamur tembok 2.296 kg 17.500,00 40.180.000,00
amplas 574 lbr 6.000,00 3.444.000,00
cat tembok Vinilex 2.869 kg 25.000,00 71.725.000,00
- -
2 Cat plafond ex Vinilex setara 1.562 m2 - -
plamur tembok 1.064 kg 17.500,00 18.620.000,00
amplas 266 lbr 6.000,00 1.596.000,00
cat tembok Vinilex 1.330 kg 25.000,00 33.250.000,00
168.815.000,00
H PEKERJAAN INSTALASI
Proposal Pembangunan dan Pengembangan Page | 32
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
LISTRIK
1 Instalasi titik lampu ex
BROCO
150 ttk
Kabel NYM 3 x 2,5 mm² 3.061 m1 12.000,00 36.732.000,00
Conduit 3.061 m1 5.000,00 15.305.000,00
Tee Doos 1.020 buah 6.000,00 6.120.000,00
One Way Doos 1.020 buah 6.000,00 6.120.000,00
Sock 1.020 buah 1.500,00 1.530.000,00
Klem 4.081 buah 1.000,00 4.081.000,00
Lasdop 2.040 buah 1.500,00 3.060.000,00
Flexible Pipa 1.020 m1 8.000,00 8.160.000,00
Paku 4.591 buah 500,00 2.295.500,00
Sekrup 1.020 buah 500,00 510.000,00
Fisher 1.020 buah 800,00 816.000,00
Elbow 510 buah 2.000,00 1.020.000,00
-
2 Instalasi titik stop kontak ex
BROCO
41 ttk -
Kabel NYM 3 x 2,5 mm² 556 m1 12.000,00 6.672.000,00
Conduit 556 m1 5.000,00 2.780.000,00
3 Outlet Box Metal 139 buah 15.000,00 2.085.000,00
Tee Doos 139 buah 6.000,00 834.000,00
Sock 139 buah 6.000,00 834.000,00
Klem 556 buah 1.500,00 834.000,00
Lasdop 278 buah 1.000,00 278.000,00
Paku 139 m1 1.500,00 208.500,00
Sekrup 1.252 buah 8.000,00 10.016.000,00
Fisher 278 buah 500,00 1.390.000,00
Elbow 139 buah 2.000,00 278.000,00
4 Lampu baret 150 bh 600.000,00 90.000.000,00
5 Panel ex BROCO 7 bh 500.000,00 3.500.000,00
6 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00
209.959.000,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 136 m1 27.000,00 3.672.000,00
2 Pipa distribusi Ø1/2" 136 m1 15.000,00 2.040.000,00
3 Closed jongkok 14 bh 600.000,00 8.400.000,00
4 kran tembok 20 bh 12.000,00 240.000,00
Proposal Pembangunan dan Pengembangan Page | 33
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
5 Fitting-fitting (Elbow, tee,
support)
3 ls 3.000.000,00 9.000.000,00
6 Support, klem 3 ls 3.000.000,00 9.000.000,00
7 Pipa PVC air kotor Ø 3" 82 m1 65.000,00 5.330.000,00
8 Pipa PVC air kotoran Ø 4" 82 m1 75.000,00 6.150.000,00
43.832.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 1.253 m2 220.000,00 275.660.000,00
2 Atap ZINK ALUM 1.253 m2 190.000,00 238.070.000,00
3 Pas.nok 142 -
nok 142 bh 135.000,00 19.170.000,00
semen 116 zak 65.000,00 7.540.000,00
pasir beton 18 m3 200.000,00 3.600.000,,00
papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00
-
4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
549.225.000,00
K PEKERJAAN KUSEN
1 P1 17 bh -
balok 8/15 2 m3 12.000.000,00 24.000.000,00
paku 14 kg 25.000,00 350.000,00
lem putih 6 kg 20.000,00 120.000,00
papan 3/30 15 m3 12.000.000,00 180.000.000,00
paku rata-rata 57 kg 25.000,00 1.425.000,00
lem putih 78 kg 20.000,00 1.560.000,00
-
2 P2 7 bh -
balok 8/15 0,5 m3 12.000.000,00 6.000.000,00
paku 4 kg 25.000,00 100.000,00
lem putih 2 kg 20.000,00 40.000,00
papan 3/30 3 m3 12.000.000,00 36.000.000,00
paku rata-rata 10 kg 25.000,00 250.000,00
lem putih 13 kg 20.000,00 260.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 P4 65 bh -
balok 8/15 12 m3 12.000.000,00 144.000.000,00
paku 106 kg 25.000,00 2.650.000,00
Proposal Pembangunan dan Pengembangan Page | 34
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
lem putih 42 kg 20.000,00 840.000,00
papan kamper medan 30 m3 12.000.000,00 360.000.000,00
paku rata-rata 21 kg 25.000,00 525.000,00
lem putih 41 kg 20.000,00 820.000,00
list kayu 413 m' 25.000,00 10.325.000,00
kaca 5 mm 21 m2 90.000,00 1.890.000,00
-
772.155.000,00
REKAPITULI
A PEKERJAAN TANAH DAN PASIR Rp 41.742.500,00
B PEKERJAN BATA Rp 643.591.500,00
C PEKERJAAN BETON STRUKTUR Rp 3.333.785.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 4.385.973.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 1.862.015.000,00
F PEKERJAAN PLAFOND Rp 491.455.000,00
G PEKERJAAN PENGECATAN/LABURAN Rp 168.815.000,00
H PEKERJAAN INSTALASI LISTRIK Rp 209.959.000,00
I INSTALASI PIPA UTAMA AIR BERSIH Rp 43.832.000,00
J PEKERJAAN ATAP Rp 549.225.000,00
K PEKERJAAN KUSEN Rp 772.155.000,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 12.739.668.000,00
DIBULATKAN Rp 12.739.600.000,00
Proposal Pembangunan dan Pengembangan Page | 35
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 36
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 37
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 38
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN GEDUNG SEKOLAH DASAR PLUS AL-FATAH, PUTRA & PUTRI
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 1100 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN
PASIR
1 Galian pondasi SLOOF 37 m3 50.000,00 1.850.000,00
2 Galian pondasi TAPAK 106 m3 75.000,00 7.950.000,00
3 Urug tanah 21 m3 37.500,00 787.500,00
4 Lantai kerja 6 m3 -
semen 61 zak 65.000,00 3.965.000,00
pasir beton 7 m3 200.000,00 1.400.000,00
split 12 m3 200.000,00 2.400.000,00
5 Pasir urug bawah lantai +
sper 20%
6 m3 -
pasir urug 16 m3 200.000,00 3.200.000,00
43.105.000,00
B PEKERJAAN BATA
1 Pasang bata 1.108 m2
batu bata merah 186.088 bh 650,00 120.957.200,00
semen 878 zak 65.000,00 57.070.000,00
pasir pasang 141 m3 200.000,00 28.200.000,00
- -
2 Pas plesteran dan acian 2.216 m2 -
semen 810 zak 65.000,00 52.650.000,00
pasir pasang 96 m3 200.000,00 19.200.000,00
278.077.200,00
C PEKERJAAN BETON
STRUKTUR
1 Pasang pondasi batukali 55
batu kali 148 m3 200.000,00 29.600.000,00
semen 434 zak 65.000,00 28.210.000,00
pasir pasang 47 m3 200.000,00 9.400.000,00
-
2 Cor beton sloof 25x40 18 -
Beton K.225 36 m3 -
semen 552 zak 65.000,00 35.880.000,00
pasir beton 44 m3 200.000,00 8.800.000,00
split 67 m3 200.000,00 13.400.000,00
besi beton 12.820 kg 13.000,00 166.660.000,00
-
kawat beton 513 kg 25.000,00 12.825.000,00
Bekesting beton sloof -
PAPAN 1.035 lbr 25.000,00 25.875.000,00
paku rata-rata 325 kg 25.000,00 8.125.000,00
Proposal Pembangunan dan Pengembangan Page | 39
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kaso utk.rangka 20 m3 3.000.000,00 60.000.000,00
kaso utk.stut 16 m3 3.000.000,00 48.000.000,00
-
3 Cor beton pondasi tapak -
Beton K.225 17 m3 -
semen 258 zak 65.000,00 16.770.000,00
pasir beton 20 m3 200.000,00 4.000.000,00
split 31 m3 200.000,00 6.200.000,00
besi beton 5.987 kg 13.000,00 77.831.000,00
kawat beton 239 kg 25.000,00 5.975.000,00
Bekesting beton tapak - -
PAPAN 484 lbr 25.000,00 12.100.000,00
paku rata-rata 152 kg 25.000,00 3.800.000,00
kaso utk.rangka 9 m3 3.000.000,00 27.000.000,00
kaso utk.stut 8 m3 3.000.000,00 24.000.000,00
-
4 Cor beton lantai/beton
susut t=8cm
77 m3 -
semen 782 zak 65.000,00 51.155.000,00
pasir beton 12 m3 200.000,00 2.400.000,00
split 157 m3 200.000,00 31.400.000,00
-
5 Cor beton kolom 51 m3 -
semen 776 zak 65.000,00 50.440.000,00
pasir beton 18 m3 200.000,00 3.600.000,00
split 94 m3 200.000,00 18.800.000,00
besi beton 18.024 kg 13.000,00 234.312.000,00
kawat beton 721 kg 25.000,00 18.025.000,00
Bekesting beton kolom -
triplek 9 mm 1.456 lbr 160.000,00 232.960.000,00
paku rata-rata 456 kg 25.000,00 11.400.000,00
kaso meranti utk.rangka 29 m3 3.000.000,00 87.000.000,00
kaso meranti utk.stut 23 m3 3.000.000,00 69.000.000,00
1.434.943.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 39 m3
semen 589 zak 65.000,00 38.285.000,00
pasir beton 47 m3 200.000,00 9.400.000,00
split 71 m3 200.000,00 14.200.000,00
besi beton 13.685 kg 13.000,00 177.905.000,00
-
kawat beton 547 kg 25.000,00 13.675.000,00
Bekesting beton plat -
triplek 9 mm 1.105 lbr 130.000,00 143.650.000,00
paku rata-rata 346 kg 25.000,00 8.650.000,00
kaso meranti utk.rangka 22 m3 3.000.000,00 66.000.000,00
kaso meranti utk.stut 17 m3 3.000.000,00 51.000.000,00
-
Proposal Pembangunan dan Pengembangan Page | 40
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
2 Cor beton ring balk 15x20 24 m3 -
semen 368 zak 65.000,00 23.920.000,00
pasir beton 29 m3 200.000,00 5.800.000,00
split 44 m3 200.000,00 8.800.000,00
besi beton 8.553 kg 13.000,00 111.189.000,00
-
kawat beton 342 kg 25.000,00 8.550.000,00
Bekesting beton ring balok -
Papan 691 lbr 25.000,00 17.275.000,00
paku rata-rata 217 kg 25.000,00 5.425.000,00
kaso meranti utk.rangka 14 m3 3.000.000,00 42.000.000,00
kaso meranti utk.stut 11 m3 3.000.000,00 33.000.000,00
-
3 Cor beton plat lantai dan
overstek
83 m3 -
semen 1.262 zak 65.000,00 82.030.000,00
pasir beton 100 m3 200.000,00 20.000.000,00
split 152 m3 200.000,00 30.400.000,00
besi beton 29.333 kg 13.000,00 381.329.000,00
-
kawat beton 1.173 kg 25.000,00 29.325.000,00
Bekesting beton plat lantai - -
triplek 9 mm 2.369 lbr 130.000,00 307.970.000,00
paku rata-rata 743 kg 25.000,00 18.575.000,00
kaso meranti utk.rangka 46 m3 3.000.000,00 138.000.000,00
kaso meranti utk.stut 37 m3 3.000.000,00 111.000.000,00
-
1.897.353.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 1.027 m2
lantai keramik 2.414 m2 130.000,00 313.820.000,00
pasir pasang 115 m3 200.000,00 23.000.000,00
semen 690 zak 65.000,00 44.850.000,00
semen warna 276 kg 25.000,00 6.900.000,00
-
2 Pas keramik km/wc 41 m2 -
lantai keramik 96 m2 130.000,00 12.480.000,00
pasir pasang 5 m3 200.000,00 1.000.000,00
semen 27 zak 65.000,00 1.755.000,00
semen warna 11 kg 25.000,00 275.000,00
3 Pas keramik km/wc dinding 141 m2 -
Lantai keramik 332 m2 130.000,00 43.160.000,00
Pasir pasang 16 m3 200.000,00 3.200.000,00
Semen 95 zak 65.000,00 6.175.000,00
Semen warna 38 Kg 25.000,00 950.000,00
-
Proposal Pembangunan dan Pengembangan Page | 41
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
4 Pas plint keramik 537 m1 -
plint keramik 1.215 m' 45.000,00 54.675.000,00
semen 24 zak 65.000,00 1.560.000,00
pasir pasang 2 m3 200.000,00 400.000,00
514.200.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum
t=9mm
1.042 m2
Hollow 4x4 cm 1.867 btg 25.000,00 46.675.000,00
Hollow 2x4 cm 1.167 btg 20.000,00 23.340.000,00
Gypsum 9 mm 933 lbr 65.000,00 60.645.000,00
Skrup Gypsum 21.003 bh 500,00 10.501.500,00
Penggantung + ramset 4.667 ttk 4.000,00 18.668.000,00
Compound Gypsum 140 zak 75.000,00 10.500.000,00
Textile tape 222 roll 20.000,00 4.440.000,00
amplas 700 lbr 6.000,00 4.200.000,00
-
2 Pasang list gypsum 537 m1 -
List Gypsum 1.203 m1 25.000,00 30.075.000,00
Compound Gypsum 36 zak 65.000,00 2.340.000,00
amplas 180 lbr 6.000,00 1.080.000,00
212.464.500,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex
setara
2.216 -
plamur tembok 992 kg 17.500,00 17.360.000,00
amplas 248 lbr 6.000,00 1.488.000,00
cat tembok Vinilex 1.241 kg 25.000,00 31.025.000,00
- -
2 Cat plafond ex Vinilex
setara
1.027 m2 - -
plamur tembok 460 kg 17.500,00 8.050.000,00
amplas 115 lbr 6.000,00 690.000,00
cat tembok Vinilex 575 kg 25.000,00 14.375.000,00
72.988.000,00
H PEKERJAAN INSTALASI
LISTRIK
1 Instalasi titik lampu ex
BROCO
99 ttk
Kabel NYM 3 x 2,5 mm² 1.323 m1 12.000,00 15.876.000,00
Conduit 1.323 m1 5.000,00 6.615.000,00
Tee Doos 441 buah 6.000,00 2.646.000,00
One Way Doos 441 buah 6.000,00 2.646.000,00
Sock 441 buah 1.500,00 661.500,00
Klem 1.764 buah 1.000,00 1.764.000,00
Proposal Pembangunan dan Pengembangan Page | 42
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Lasdop 882 buah 1.500,00 1.323.000,00
Flexible Pipa 441 m1 8.000,00 3.528.000,00
Paku 1.985 buah 500,00 992.500,00
Sekrup 441 buah 500,00 220.500,00
Fisher 441 buah 800,00 352.800,00
Elbow 221 buah 2.000,00 442.000,00
-
2 Instalasi titik stop kontak ex
BROCO
27 ttk
Kabel NYM 3 x 2,5 mm² 241 m1 12.000,00 2.892.000,00
Conduit 241 m1 5.000,00 1.205.000,00
Outlet Box Metal 60 buah 15.000,00 900.000,00
Tee Doos 60 buah 6.000,00 360.000,00
Sock 60 buah 6.000,00 360.000,00
Klem 241 buah 1.500,00 361.500,00
Lasdop 120 buah 1.000,00 120.000,00
Paku 60 m1 1.500,00 90.000,00
Sekrup 541 buah 8.000,00 4.328.000,00
Fisher 120 buah 500,00 60.000,00
Elbow 60 buah 2.000,00 120.000,00
4 Lampu baret 99 bh 600.000,00 59.400.000,00
5 Panel ex BROCO 4 bh 500.000,00 2.000.000,00
6 Test dan commisioning 2 ls 1.500.000,00 3.000.000,00
112.263.800,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 90 m1 27.000,00 2.430.000,00
2 Pipa distribusi Ø1/2" 90 m1 15.000,00 1.350.000,00
3 Closed jongkok 9 bh 600.000,00 5.400.000,00
4 kran tembok 13 bh 12.000,00 156.000,00
5 Fitting-fitting (Elbow, tee,
support)
2 ls 3.000.000,00 6.000.000,00
6 Support, klem 2 ls 3.000.000,00 6.000.000,00
7 Pipa PVC air kotor Ø 3" 54 m1 65.000,00 3.510.000,00
8 Pipa PVC air kotoran Ø 4" 54 m1 75.000,00 4.050.000,00
28.896.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 824 m2 220.000,00 181.280.000,00
2 Atap ZINK ALUM 824 m2 190.000,00 156.560.000,00
-
3 Pas.nok 93 -
nok 93 bh 135.000,00 12.555.000,00
semen 50 zak 65.000,00 3.250.000,00
pasir beton 8 m3 200.000,00 1.600.000,00
papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00
-
4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
Proposal Pembangunan dan Pengembangan Page | 43
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
364.030.000,00
K PEKERJAAN KUSEN
1 P1 11 bh -
balok 8/15 1 m3 12.000.000,00 12.000.000,00
paku 6 kg 25.000,00 150.000,00
lem putih 2 kg 20.000,00 40.000,00
papan 3/30 7 m3 12.000.000,00 84.000.000,00
paku rata-rata 16 kg 25.000,00 400.000,00
lem putih 22 kg 20.000,00 440.000,00
-
2 P2 4 bh -
balok 8/15 1 m3 12.000.000,00 12.000.000,00
paku 2 kg 25.000,00 50.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 1 m3 12.000.000,00 12.000.000,00
paku rata-rata 3 kg 25.000,00 75.000,00
lem putih 4 kg 20.000,00 80.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 J1 43 bh -
balok 8/15 8 m3 12.000.000,00 96.000.000,00
paku 46 kg 25.000,00 1.150.000,00
lem putih 18 kg 20.000,00 360.000,00
papan kamper medan 13 m3 12.000.000,00 156.000.000,00
paku rata-rata 6 kg 25.000,00 150.000,00
lem putih 12 kg 20.000,00 240.000,00
list kayu 117 m' 25.000,00 2.925.000,00
kaca 5 mm 14 m2 90.000,00 1.260.000,00
380.340.000,00
REKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 43.105.000,00
B PEKERJAAN BATA Rp 278.077.200,00
C PEKERJAAN BETON STRUKTUR Rp 1.434.943.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 1.897.353.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 514.200.000,00
F PEKERJAAN PLAFOND Rp 212.464.500,00
G PEKERJAAN PENGECATAN/LABURAN Rp 72.988.000,00
H PEKERJAAN INSTALASI LISTRIK Rp 112.263.800,00
I INSTALASI PIPA UTAMA AIR BERSIH Rp 28.896.000,00
J PEKERJAAN ATAP Rp 364.030.000,00
K PEKERJAAN KUSEN Rp 380.340.000,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 5.575.780.500,00
DIBULATKAN Rp 5.575.700.000,00
Proposal Pembangunan dan Pengembangan Page | 44
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 45
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 46
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 47
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 48
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 49
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 50
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN GEDUNG SERBA GUNA DAN LABORATORIUM AL-FATAH
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 1200 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN
PASIR
1 Galian pondasi SLOOF 48 m3 50.000,00 2.400.000,00
2 Galian pondasi TAPAK 138 m3 75.000,00 10.350.000,00
3 Urug tanah 28 m3 37.500,00 1.050.000,00
4 Lantai kerja 8 m3 -
semen 104 zak 65.000,00 6.760.000,00
pasir beton 12 m3 200.000,00 2.400.000,00
split 21 m3 200.000,00 4.200.000,00
5 Pasir urug bawah lantai +
sper 20%
8 m3 -
pasir urug 27 m3 200.000,00 5.400.000,00
32.560.000,00
B PEKERJAAN BATA
1 Pasang bata 1.443 m2
batu bata merah 315.498 Bh 650,00 205.073.700,00
semen 1.489 zak 65.000,00 96.785.000,00
pasir pasang 240 m3 200.000,00 48.000.000,00
- -
2 Pas plesteran dan acian 2.886 m2 -
semen 1.373 zak 65.000,00 89.245.000,00
pasir pasang 163 m3 200.000,00 32.600.000,00
471.703.700,00
C PEKERJAAN BETON
STRUKTUR
1 Pasang pondasi batukali 72
batu kali 251 m3 200.000,00 50.200.000,00
semen 736 zak 65.000,00 47.840.000,00
pasir pasang 79 m3 200.000,00 15.800.000,00
-
2 Cor beton sloof 25x40 24 -
Beton K.225 47 m3 -
semen 935 zak 65.000,00 60.775.000,00
pasir beton 74 m3 200.000,00 14.800.000,00
split 113 m3 200.000,00 22.600.000,00
besi beton 21.736 Kg 13.000,00 282.568.000,00
-
kawat beton 869 Kg 25.000,00 21.725.000,00
Bekesting beton sloof -
PAPAN 1.755 Lbr 25.000,00 43.875.000,00
paku rata-rata 550 Kg 25.000,00 13.750.000,00
Proposal Pembangunan dan Pengembangan Page | 51
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kaso utk.rangka 34 m3 3.000.000,00 102.000.000,00
kaso utk.stut 28 m3 3.000.000,00 84.000.000,00
-
3 Cor beton pondasi tapak -
Beton K.225 22 m3 -
semen 437 zak 65.000,00 28.405.000,00
pasir beton 35 m3 200.000,00 7.000.000,00
split 53 m3 200.000,00 10.600.000,00
besi beton 10.151 Kg 13.000,00 131.963.000,00
kawat beton 406 Kg 25.000,00 10.150.000,00
Bekesting beton tapak - -
PAPAN 820 Lbr 25.000,00 20.500.000,00
paku rata-rata 257 Kg 25.000,00 6.425.000,00
kaso utk.rangka 16 m3 3.000.000,00 48.000.000,00
kaso utk.stut 13 m3 3.000.000,00 39.000.000,00
-
4 Cor beton lantai/beton
susut t=8cm
100 m3 -
semen 1.325 zak 65.000,00 86.125.000,00
pasir beton 21 m3 200.000,00 4.200.000,00
split 266 m3 200.000,00 53.200.000,00
-
5 Cor beton kolom 66 m3 -
semen 1.315 zak 65.000,00 85.475.000,00
pasir beton 31 m3 200.000,00 6.200.000,00
split 159 m3 200.000,00 31.800.000,00
besi beton 30.559 kg 13.000,00 397.267.000,00
- -
kawat beton 1.222 kg 25.000,00 30.550.000,00
Bekesting beton kolom -
triplek 9 mm 2.468 lbr 160.000,00 394.880.000,00
paku rata-rata 774 kg 25.000,00 19.350.000,00
kaso meranti utk.rangka 48 m3 3.000.000,00 144.000.000,00
kaso meranti utk.stut 39 m3 3.000.000,00 117.000.000,00
2.432.023.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 50 m3
semen 999 zak 65.000,00 64.935.000,00
pasir beton 79 m3 200.000,00 15.800.000,00
split 120 m3 200.000,00 24.000.000,00
besi beton 23.202 Kg 13.000,00 301.626.000,00
-
kawat beton 928 Kg 25.000,00 23.200.000,00
Bekesting beton plat -
triplek 9 mm 1.874 Lbr 130.000,00 243.620.000,00
paku rata-rata 587 Kg 25.000,00 14.675.000,00
kaso meranti utk.rangka 37 m3 3.000.000,00 111.000.000,00
Proposal Pembangunan dan Pengembangan Page | 52
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
kaso meranti utk.stut 29 m3 3.000.000,00 87.000.000,00
-
2 Cor beton ring balk 15x20 31 m3 -
semen 624 zak 65.000,00 40.560.000,00
pasir beton 50 m3 200.000,00 10.000.000,00
split 75 m3 200.000,00 15.000.000,00
besi beton 14.501 Kg 13.000,00 188.513.000,00
-
kawat beton 580 Kg 25.000,00 14.500.000,00
Bekesting beton ring balok -
Papan 1.171 Lbr 25.000,00 29.275.000,00
paku rata-rata 367 Kg 25.000,00 9.175.000,00
kaso meranti utk.rangka 23 m3 3.000.000,00 69.000.000,00
kaso meranti utk.stut 18 m3 3.000.000,00 54.000.000,00
-
3 Cor beton plat lantai dan
overstek
108 m3 -
semen 2.140 zak 65.000,00 139.100.000,00
pasir beton 170 m3 200.000,00 34.000.000,00
split 258 m3 200.000,00 51.600.000,00
besi beton 49.732 Kg 13.000,00 646.516.000,00
-
kawat beton 1.989 Kg 25.000,00 49.725.000,00
Bekesting beton plat lantai - -
triplek 9 mm 4.016 Lbr 130.000,00 522.080.000,00
paku rata-rata 1.259 Kg 25.000,00 31.475.000,00
kaso meranti utk.rangka 79 m3 3.000.000,00 237.000.000,00
kaso meranti utk.stut 63 m3 3.000.000,00 189.000.000,00
3.216.375.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 1.337 m2
lantai keramik 4.093 m2 130.000,00 532.090.000,00
pasir pasang 195 m3 200.000,00 39.000.000,00
semen 1.170 zak 65.000,00 76.050.000,00
semen warna 468 Kg 25.000,00 11.700.000,00
-
2 Pas keramik km/wc 53 m2 -
lantai keramik 162 m2 130.000,00 21.060.000,00
pasir pasang 8 m3 200.000,00 1.600.000,00
semen 46 zak 65.000,00 2.990.000,00
semen warna 19 Kg 25.000,00 475.000,00
-
3 Pas keramik km/wc dinding 184 m2 -
lantai keramik 562 m2 130.000,00 73.060.000,00
pasir pasang 27 m3 200.000,00 5.400.000,00
semen 161 zak 65.000,00 10.465.000,00
Proposal Pembangunan dan Pengembangan Page | 53
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
4
semen warna 64 Kg 25.000,00 1.600.000,00
-
Pas plint keramik 700 m -
plint keramik 2.060 m' 45.000,00 92.700.000,00
semen 41 zak 65.000,00 2.665.000,00
pasir pasang 4 m3 200.000,00 800.000,00
871.655.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum
t=9mm
1.357 m2
Hollow 4x4 cm 3.165 btg 25.000,00 79.125.000,00
Hollow 2x4 cm 1.978 btg 20.000,00 39.560.000,00
Gypsum 9 mm 1.583 Lbr 65.000,00 102.895.000,00
Skrup Gypsum 35.609 Bh 500,00 17.804.500,00
Penggantung + ramset 7.913 Ttk 4.000,00 31.652.302,00
Compound Gypsum 237 zak 75.000,00 17.775.000,00
Textile tape 376 roll 20.000,00 7.520.000,00
amplas 1.187 Lbr 6.000,00 7.122.000,00
-
2 Pasang list gypsum 700 m -
List Gypsum 2.040 m 25.000,00 51.000.000,00
Compound Gypsum 61 zak 65.000,00 3.965.000,00
amplas 306 lbr 6.000,00 1.836.000,00
360.254.802,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex
setara
2.886 -
plamur tembok 1.683 Kg 17.500,00 29.452.500,00
amplas 421 lbr 6.000,00 2.526.000,00
cat tembok Vinilex 2.103 Kg 25.000,00 52.575.000,00
- -
2 Cat plafond ex Vinilex
setara
1.337 m2 - -
plamur tembok 780 Kg 17.500,00 13.650.000,00
amplas 195 lbr 6.000,00 1.170.000,00
cat tembok Vinilex 975 Kg 25.000,00 24.375.000,00
123.748.500,00
H PEKERJAAN INSTALASI
LISTRIK
1 Instalasi titik lampu ex
BROCO
128 ttk
Kabel NYM 3 x 2,5 mm² 2.244 m’ 12.000,00 26.928.000,00
Conduit 2.244 m’ 5.000,00 11.220.000,00
Tee Doos 748 buah 6.000,00 4.488.000,00
One Way Doos 748 buah 6.000,00 4.488.000,00
Proposal Pembangunan dan Pengembangan Page | 54
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Sock 748 buah 1.500,00 1.122.000,00
Klem 2.991 buah 1.000,00 2.991.000,00
Lasdop 1.496 buah 1.500,00 2.244.000,00
Flexible Pipa 748 m’ 8.000,00 5.984.000,00
Paku 3.365 buah 500,00 1.682.500,00
Sekrup 748 buah 500,00 374.000,00
Fisher 748 buah 800,00 598.400,00
Elbow 374 buah 2.000,00 748.000,00
-
2 Instalasi titik stop kontak ex
BROCO
35 ttk -
Kabel NYM 3 x 2,5 mm² 408 m 12.000,00 4.896.000,00
Conduit 408 m 5.000,00 2.040.000,00
Outlet Box Metal 102 buah 15.000,00 1.530.000,00
Tee Doos 102 buah 6.000,00 612.000,00
Sock 102 buah 6.000,00 612.000,00
Klem 408 buah 1.500,00 612.000,00
Lasdop 204 buah 1.000,00 204.000,00
Paku 102 m 1.500,00 153.000,00
Sekrup 918 buah 8.000,00 7.344.000,00
Fisher 204 buah 500,00 102.000,00
Elbow 102 buah 2.000,00 204.000,00
3 Lampu baret 128 Bh 600.000,00 76.800.000,00
4 Panel ex BROCO 6 bh 500.000,00 3.000.000,00
5 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00
165.476.900,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 117 m1 27.000,00 3.159.000,00
2 Pipa distribusi Ø1/2" 117 m1 15.000,00 1.755.000,00
3 Closed jongkok 12 bh 600.000,00 7.200.000,00
4 kran tembok 17 bh 12.000,00 204.000,00
5 Fitting-fitting (Elbow, tee,
support)
3 ls 3.000.000,00 9.000.000,00
6 Support, klem 3 ls 3.000.000,00 9.000.000,00
7 Pipa PVC air kotor Ø 3" 70 m1 65.000,00 4.550.000,00
8 Pipa PVC air kotoran Ø 4" 70 m1 75.000,00 5.250.000,00
40.118.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 1.073 m2 220.000,00 236.060.000,00
2 Atap ZINK ALUM 1.073 m2 190.000,00 203.870.000,00
-
3 Pas.nok 121 -
nok 121 bh 135.000,00 16.335.000,00
semen 85 zak 65.000,00 5.525.000,00
pasir beton 13 m3 200.000,00 2.600.000,00
Proposal Pembangunan dan Pengembangan Page | 55
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00
-
4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
473.175.000,00
K PEKERJAAN KUSEN
1 P1 15 bh -
balok 8/15 1 m3 12.000.000,00 12.000.000,00
paku 10 kg 25.000,00 250.000,00
lem putih 4 kg 20.000,00 80.000,00
papan 3/30 11 m3 12.000.000,00 132.000.000,00
paku rata-rata 36 kg 25.000,00 900.000,00
lem putih 49 kg 20.000,00 980.000,00
-
2 P2 6 bh -
balok 8/15 0,5 m3 12.000.000,00 6.000.000,00
paku 3 kg 25.000,00 75.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 2 m3 12.000.000,00 22.000.000,00
paku rata-rata 6 kg 25.000,00 150.000,00
lem putih 8 kg 20.000,00 160.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 J1 55 bh -
balok 8/15 11 m3 12.000.000,00 132.000.000,00
paku 78 kg 25.000,00 1.950.000,00
lem putih 31 kg 20.000,00 620.000,00
papan kamper medan 22 m3 12.000.000,00 264.000.000,00
paku rata-rata 13 kg 25.000,00 325.000,00
lem putih 26 kg 20.000,00 520.000,00
list kayu 259 m' 25.000,00 6.475.000,00
kaca 5 mm 18 m2 90.000,00 1.620.000,00
583.125.000,00
REKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 32.560.000,00
B PEKERJAAN BATA Rp 471.703.700,00
C PEKERJAAN BETON STRUKTUR Rp 2.432.023.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 3.216.375.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 871.655.000,00
F PEKERJAAN PLAFOND Rp 360.254.802,00
G PEKERJAAN PENGECATAN/LABURAN Rp 123.748.500,00
H PEKERJAAN INSTALASI LISTRIK Rp 165.476.900,00
I INSTALASI PIPA UTAMA AIR BERSIH Rp 40.118.000,00
J PEKERJAAN ATAP Rp 473.175.000,00
K PEKERJAAN KUSEN Rp 583.125.000,00
L UPAH TENAGA Rp 237.120.000,00
Proposal Pembangunan dan Pengembangan Page | 56
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
GRAND TOTAL Rp 9.007.334.902,00
DIBULATKAN Rp 9.007.300.000,00
Proposal Pembangunan dan Pengembangan Page | 57
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 58
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 59
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 60
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 61
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN KANTIN PUTRA PONPES AL-FATAH
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 400 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN PASIR
1 Galian pondasi SLOOF 21 m3 50.000,00 1.050.000,00
2 Galian pondasi TAPAK 60 m3 75.000,00 4.500.000,00
3 Urug tanah 12 m3 37.500,00 450.000,00
4 Lantai kerja 3 m3 -
semen 19 zak 65.000,00 1.235.000,00
pasir beton 2 m3 200.000,00 400.000,00
split 4 m3 200.000,00 800.000,00
5 Pasir urug bawah lantai + sper
20%
3 m3 -
pasir urug 5 m3 200.000,00 1.000.000,00
9.435.000,00
B PEKERJAAN BATA
1 Pasang bata 623 m2
batu bata merah 58.880 bh 650,00 38.272.000,00
semen 278 zak 65.000,00 18.070.000,00
pasir pasang 45 m3 200.000,00 9.000.000,00
- -
2 Pas plesteran dan acian 1.247 m2 -
semen 256 zak 65.000,00 16.640.000,00
pasir pasang 30 m3 200.000,00 6.000.000,00
87.982.000,00
C PEKERJAAN BETON STRUKTUR
1 Pasang pondasi batukali 31
batu kali 47 m3 200.000,00 9.400.000,00
semen 137 zak 65.000,00 8.905.000,00
pasir pasang 15 m3 200.000,00 3.000.000,00
-
2 Cor beton sloof 25x40 10 -
Beton K.225 20 m3 -
semen 175 zak 65.000,00 11.375.000,00
pasir beton 14 m3 200.000,00 2.800.000,00
split 21 m3 200.000,00 4.200.000,00
besi beton 4.056 kg 13.000,00 52.728.000,00
-
kawat beton 162 kg 25.000,00 4.050.000,00
Bekesting beton sloof -
PAPAN 328 lbr 25.000,00 8.200.000,00
paku rata-rata 103 kg 25.000,00 2.575.000,00
kaso utk.rangka 6 m3 3.000.000,00 18.000.000,00
kaso utk.stut 5 m3 3.000.000,00 15.000.000,00
Proposal Pembangunan dan Pengembangan Page | 62
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
-
3 Cor beton pondasi tapak -
Beton K.225 10 m3 -
semen 82 zak 65.000,00 5.330.000,00
pasir beton 6 m3 200.000,00 1.200.000,00
split 10 m3 200.000,00 2.000.000,00
besi beton 1.894 kg 13.000,00 24.622.000,00
kawat beton 76 kg 25.000,00 1.900.000,00
Bekesting beton tapak - -
PAPAN 153 lbr 25.000,00 3.825.000,00
paku rata-rata 48 kg 25.000,00 1.200.000,00
kaso utk.rangka 3 m3 3.000.000,00 9.000.000,00
kaso utk.stut 2 m3 3.000.000,00 6.000.000,00
-
4 Cor beton lantai/beton susut
t=8cm
43 m3 -
semen 247 zak 65.000,00 16.055.000,00
pasir beton 4 m3 200.000,00 800.000,00
split 50 m3 200.000,00 10.000.000,00
-
5 Cor beton kolom 29 m3 -
semen 245 zak 65.000,00 15.925.000,00
pasir beton 6 m3 200.000,00 1.200.000,00
split 30 m3 200.000,00 6.000.000,00
besi beton 5.703 kg 13.000,00 74.139.000,00
- -
kawat beton 228 kg 25.000,00 5.700.000,00
Bekesting beton kolom -
triplek 9 mm 461 lbr 160.000,00 73.760.000,00
paku rata-rata 144 kg 25.000,00 3.600.000,00
kaso meranti utk.rangka 9 m3 3.000.000,00 27.000.000,00
kaso meranti utk.stut 7 m3 3.000.000,00 21.000.000,00
450.489.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 22 m3
semen 186 zak 65.000,00 12.090.000,00
pasir beton 15 m3 200.000,00 3.000.000,00
split 22 m3 200.000,00 4.400.000,00
besi beton 4.330 kg 13.000,00 56.290.000,00
-
kawat beton 173 kg 25.000,00 4.325.000,00
Bekesting beton plat -
triplek 9 mm 350 lbr 130.000,00 45.500.000,00
paku rata-rata 110 kg 25.000,00 2.750.000,00
kaso meranti utk.rangka 7 m3 3.000.000,00 21.000.000,00
kaso meranti utk.stut 5 m3 3.000.000,00 15.000.000,00
-
2 Cor beton ring balk 15x20 14 m3 -
Proposal Pembangunan dan Pengembangan Page | 63
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
semen 116 zak 65.000,00 7.540.000,00
pasir beton 9 m3 200.000,00 1.800.000,00
split 14 m3 200.000,00 2.800.000,00
besi beton 2.706 kg 13.000,00 35.178.000,00
-
kawat beton 108 kg 25.000,00 2.700.000,00
Bekesting beton ring balok -
Papan 219 lbr 25.000,00 5.475.000,00
paku rata-rata 69 kg 25.000,00 1.725.000,00
kaso meranti utk.rangka 4 m3 3.000.000,00 12.000.000,00
kaso meranti utk.stut 3 m3 3.000.000,00 9.000.000,00
-
3 Cor beton plat lantai dan
overstek
47 m3 -
semen 399 zak 65.000,00 25.935.000,00
pasir beton 32 m3 200.000,00 6.400.000,00
split 48 m3 200.000,00 9.600.000,00
besi beton 9.281 kg 13.000,00 120.653.000,00
-
kawat beton 371 kg 25.000,00 9.275.000,00
Bekesting beton plat lantai - -
triplek 9 mm 750 lbr 130.000,00 97.500.000,00
paku rata-rata 235 kg 25.000,00 5.875.000,00
kaso meranti utk.rangka 15 m3 3.000.000,00 45.000.000,00
kaso meranti utk.stut 12 m3 3.000.000,00 36.000.000,00
598.811.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 578 m2
lantai keramik 764 m2 130.000,00 99.320.000,00
pasir pasang 36 m3 200.000,00 7.200.000,00
semen 218 zak 65.000,00 14.170.000,00
semen warna 87 kg 25.000,00 2.175.000,00
-
2 Pas keramik km/wc 23 m2 -
lantai keramik 30 m2 130.000,00 3.900.000,00
pasir pasang 1 m3 200.000,00 200.000,00
semen 9 zak 65.000,00 585.000,00
semen warna 3 kg 25.000,00 75.000,00
-
3 Pas keramik km/wc dinding 79 m2 -
lantai keramik 105 m2 130.000,00 13.650.000,00
pasir pasang 5 m3 200.000,00 1.000.000,00
semen 30 zak 65.000,00 1.950.000,00
semen warna 12 kg 25.000,00 300.000,00
-
4 Pas plint keramik 302 m1 -
plint keramik 384 m' 45.000,00 17.280.000,00
Proposal Pembangunan dan Pengembangan Page | 64
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
semen 8 zak 65.000,00 520.000,00
pasir pasang 1 m3 200.000,00 200.000,00
162.525.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum t=9mm 586 m2
Hollow 4x4 cm 591 btg 25.000,00 14.775.000,00
Hollow 2x4 cm 369 btg 20.000,00 7.380.000,00
Gypsum 9 mm 295 lbr 65.000,00 19.175.000,00
Skrup Gypsum 6.645 bh 500,00 3.322.500,00
Penggantung + ramset 1.477 ttk 4.000,00 5.908.000,00
Compound Gypsum 44 zak 75.000,00 3.300.000,00
Textile tape 70 roll 20.000,00 1.400.000,00
amplas 222 lbr 6.000,00 1.332.000,00
-
2 Pasang list gypsum 302 m1 -
List Gypsum 381 m 25.000,00 9.525.000,00
Compound Gypsum 11 zak 65.000,00 715.000,00
amplas 57 lbr 6.000,00 342.000,00
67.174.500,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex setara 1.247 -
plamur tembok 314 kg 17.500,00 5.495.000,00
amplas 79 lbr 6.000,00 474.000,00
cat tembok Vinilex 393 kg 25.000,00 9.825.000,00
- -
2 Cat plafond ex Vinilex setara 578 m2 - -
plamur tembok 146 kg 17.500,00 2.555.000,00
amplas 36 lbr 6.000,00 216.000,00
cat tembok Vinilex 182 kg 25.000,00 4.550.000,00
23.115.000,00
H PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu ex BROCO 55 ttk
Kabel NYM 3 x 2,5 mm² 419 m 12.000,00 5.028.000,00
Conduit 419 m 5.000,00 2.095.000,00
Tee Doos 140 buah 6.000,00 840.000,00
One Way Doos 140 buah 6.000,00 840.000,00
Sock 140 buah 1.500,00 210.000,00
Klem 558 buah 1.000,00 558.000,00
Lasdop 279 buah 1.500,00 418.500,00
Flexible Pipa 140 m 8.000,00 1.120.000,00
Paku 628 buah 500,00 314.000,00
Sekrup 140 buah 500,00 70.000,00
Fisher 140 buah 800,00 112.000,00
Elbow 70 buah 2.000,00 140.000,00
-
2 Instalasi titik stop kontak ex 15 ttk -
Proposal Pembangunan dan Pengembangan Page | 65
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
BROCO
Kabel NYM 3 x 2,5 mm² 76 m 12.000,00 912.000,00
Conduit 76 m 5.000,00 380.000,00
Outlet Box Metal 19 buah 15.000,00 285.000,00
Tee Doos 19 buah 6.000,00 114.000,00
Sock 19 buah 6.000,00 114.000,00
Klem 76 buah 1.500,00 114.000,00
Lasdop 38 buah 1.000,00 38.000,00
Paku 19 m 1.500,00 28.500,00
Sekrup 171 buah 8.000,00 1.368.000,00
Fisher 38 buah 500,00 19.000,00
3 Elbow 19 buah 2.000,00 38.000,00
Lampu baret 55 bh 600.000,00 33.000.000,00
4 Panel ex BROCO 3 bh 500.000,00 1.500.000,00
5 Test dan commisioning 1 ls 1.500.000,00 1.500.000,00
51.156.000,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 50 m1 27.000,00 1.350.000,00
2 Pipa distribusi Ø1/2" 50 m1 15.000,00 750.000,00
3 Closed jongkok 5 bh 600.000,00 3.000.000,00
4 kran tembok 8 bh 12.000,00 96.000,00
5 Fitting-fitting (Elbow, tee,
support)
1 ls 3.000.000,00 3.000.000,00
6 Support, klem 1 ls 3.000.000,00 3.000.000,00
7 Pipa PVC air kotor Ø 3" 30 m1 65.000,00 1.950.000,00
8 Pipa PVC air kotoran Ø 4" 30 m1 75.000,00 2.250.000,00
15.396.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 463 m2 220.000,00 101.860.000,00
2 Atap ZINK ALUM 463 m2 190.000,00 87.970.000,00
-
3 Pas.nok 52 -
nok 52 bh 135.000,00 7.020.000,00
semen 16 zak 65.000,00 1.040.000,00
pasir beton 3 m3 200.000,00 600.000,00
papan ruiter kamper 0,5 m3 3.000.000,00 1.500.000,00
-
4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
205.775.000,00
K PEKERJAAN KUSEN
1 P1 6 bh -
balok 8/15 0,7 m3 12.000.000,00 8.400.000,00
paku 2 kg 25.000,00 50.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 2 m3 12.000.000,00 24.000.000,00
Proposal Pembangunan dan Pengembangan Page | 66
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
paku rata-rata 3 kg 25.000,00 75.000,00
lem putih 4 kg 20.000,00 80.000,00
-
2 P2 3 bh -
balok 8/15 0,7 m3 12.000.000,00 8.400.000,00
paku 1 kg 25.000,00 25.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 0,3 m3 12.000.000,00 3.600.000,00
paku rata-rata 0,5 kg 25.000,00 12.500,00
lem putih 1 kg 20.000,00 20.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 J1 24 bh -
balok 8/15 5 m3 12.000.000,00 60.000.000,00
paku 14 kg 25.000,00 350.000,00
lem putih 6 kg 20.000,00 120.000,00
papan kamper medan 4 m3 12.000.000,00 48.000.000,00
paku rata-rata 1 kg 25.000,00 25.000,00
lem putih 2 kg 20.000,00 40.000,00
list kayu 21 m' 25.000,00 525.000,00
kaca 5 mm 8 m2 90.000,00 720.000,00
155.482.500,00
REKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 9.435.000,00
B PEKERJAAN BATA Rp 87.982.000,00
C PEKERJAAN BETON STRUKTUR Rp 450.489.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 598.811.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 162.525.000,00
F PEKERJAAN PLAFOND Rp 67.174.500,00
G PEKERJAAN PENGECATAN/LABURAN Rp 23.115.000,00
H PEKERJAAN INSTALASI LISTRIK Rp 51.156.000,00
I INSTALASI PIPA UTAMA AIR BERSIH Rp 15.396.000,00
J PEKERJAAN ATAP Rp 205.775.000,00
K PEKERJAAN KUSEN Rp 155.482.500,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 2.064.461.000,00
DIBULATKAN Rp 2.064.400.000,00
Proposal Pembangunan dan Pengembangan Page | 67
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 68
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 69
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 70
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 71
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 72
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
PROYEK : PEMBANGUNAN KANTIN PUTRI PONPES AL-FATAH
LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara
LUAS : 400 M2
NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH
A PEKERJAAN TANAH DAN PASIR
1 Galian pondasi SLOOF 21 m3 50.000,00 1.050.000,00
2 Galian pondasi TAPAK 60 m3 75.000,00 4.500.000,00
3 Urug tanah 12 m3 37.500,00 450.000,00
4 Lantai kerja 3 m3 -
semen 19 zak 65.000,00 1.235.000,00
pasir beton 2 m3 200.000,00 400.000,00
split 4 m3 200.000,00 800.000,00
5 Pasir urug bawah lantai + sper
20%
3 m3 -
pasir urug 5 m3 200.000,00 1.000.000,00
9.435.000,00
B PEKERJAAN BATA
1 Pasang bata 623 m2
batu bata merah 58.880 bh 650,00 38.272.000,00
semen 278 zak 65.000,00 18.070.000,00
pasir pasang 45 m3 200.000,00 9.000.000,00
- -
2 Pas plesteran dan acian 1.247 m2 -
semen 256 zak 65.000,00 16.640.000,00
pasir pasang 30 m3 200.000,00 6.000.000,00
87.982.000,00
C PEKERJAAN BETON STRUKTUR
1 Pasang pondasi batukali 31
batu kali 47 m3 200.000,00 9.400.000,00
semen 137 zak 65.000,00 8.905.000,00
pasir pasang 15 m3 200.000,00 3.000.000,00
-
2 Cor beton sloof 25x40 10 -
Beton K.225 20 m3 -
semen 175 zak 65.000,00 11.375.000,00
pasir beton 14 m3 200.000,00 2.800.000,00
split 21 m3 200.000,00 4.200.000,00
besi beton 4.056 kg 13.000,00 52.728.000,00
-
kawat beton 162 kg 25.000,00 4.050.000,00
Bekesting beton sloof -
PAPAN 328 lbr 25.000,00 8.200.000,00
paku rata-rata 103 kg 25.000,00 2.575.000,00
kaso utk.rangka 6 m3 3.000.000,00 18.000.000,00
kaso utk.stut 5 m3 3.000.000,00 15.000.000,00
Proposal Pembangunan dan Pengembangan Page | 73
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
-
3 Cor beton pondasi tapak -
Beton K.225 10 m3 -
semen 82 zak 65.000,00 5.330.000,00
pasir beton 6 m3 200.000,00 1.200.000,00
split 10 m3 200.000,00 2.000.000,00
besi beton 1.894 kg 13.000,00 24.622.000,00
kawat beton 76 kg 25.000,00 1.900.000,00
Bekesting beton tapak - -
PAPAN 153 lbr 25.000,00 3.825.000,00
paku rata-rata 48 kg 25.000,00 1.200.000,00
kaso utk.rangka 3 m3 3.000.000,00 9.000.000,00
kaso utk.stut 2 m3 3.000.000,00 6.000.000,00
-
4 Cor beton lantai/beton susut
t=8cm
43 m3 -
semen 247 zak 65.000,00 16.055.000,00
pasir beton 4 m3 200.000,00 800.000,00
split 50 m3 200.000,00 10.000.000,00
-
5 Cor beton kolom 29 m3 -
semen 245 zak 65.000,00 15.925.000,00
pasir beton 6 m3 200.000,00 1.200.000,00
split 30 m3 200.000,00 6.000.000,00
besi beton 5.703 kg 13.000,00 74.139.000,00
- -
kawat beton 228 kg 25.000,00 5.700.000,00
Bekesting beton kolom -
triplek 9 mm 461 lbr 160.000,00 73.760.000,00
paku rata-rata 144 kg 25.000,00 3.600.000,00
kaso meranti utk.rangka 9 m3 3.000.000,00 27.000.000,00
kaso meranti utk.stut 7 m3 3.000.000,00 21.000.000,00
450.489.000,00
D PEKERJAAN BALOK dan PLAT LANTAI
1 Cor balok B1 20X40 22 m3
semen 186 zak 65.000,00 12.090.000,00
pasir beton 15 m3 200.000,00 3.000.000,00
split 22 m3 200.000,00 4.400.000,00
besi beton 4.330 kg 13.000,00 56.290.000,00
-
kawat beton 173 kg 25.000,00 4.325.000,00
Bekesting beton plat -
triplek 9 mm 350 lbr 130.000,00 45.500.000,00
paku rata-rata 110 kg 25.000,00 2.750.000,00
kaso meranti utk.rangka 7 m3 3.000.000,00 21.000.000,00
kaso meranti utk.stut 5 m3 3.000.000,00 15.000.000,00
-
Proposal Pembangunan dan Pengembangan Page | 74
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
2 Cor beton ring balk 15x20 14 m3 -
semen 116 zak 65.000,00 7.540.000,00
pasir beton 9 m3 200.000,00 1.800.000,00
split 14 m3 200.000,00 2.800.000,00
besi beton 2.706 kg 13.000,00 35.178.000,00
-
kawat beton 108 kg 25.000,00 2.700.000,00
Bekesting beton ring balok -
Papan 219 lbr 25.000,00 5.475.000,00
paku rata-rata 69 kg 25.000,00 1.725.000,00
kaso meranti utk.rangka 4 m3 3.000.000,00 12.000.000,00
kaso meranti utk.stut 3 m3 3.000.000,00 9.000.000,00
-
3 Cor beton plat lantai dan
overstek
47 m3 -
semen 399 zak 65.000,00 25.935.000,00
pasir beton 32 m3 200.000,00 6.400.000,00
split 48 m3 200.000,00 9.600.000,00
besi beton 9.281 kg 13.000,00 120.653.000,00
-
kawat beton 371 kg 25.000,00 9.275.000,00
Bekesting beton plat lantai - -
triplek 9 mm 750 lbr 130.000,00 97.500.000,00
paku rata-rata 235 kg 25.000,00 5.875.000,00
kaso meranti utk.rangka 15 m3 3.000.000,00 45.000.000,00
kaso meranti utk.stut 12 m3 3.000.000,00 36.000.000,00
598.811.000,00
E PEK LANTAI DAN DINDING
KERAMIK
1 Pas keramik 578 m2
lantai keramik 764 m2 130.000,00 99.320.000,00
pasir pasang 36 m3 200.000,00 7.200.000,00
semen 218 zak 65.000,00 14.170.000,00
semen warna 87 kg 25.000,00 2.175.000,00
-
2 Pas keramik km/wc 23 m2 -
lantai keramik 30 m2 130.000,00 3.900.000,00
pasir pasang 1 m3 200.000,00 200.000,00
semen 9 zak 65.000,00 585.000,00
semen warna 3 kg 25.000,00 75.000,00
-
3 Pas keramik km/wc dinding 79 m2 -
lantai keramik 105 m2 130.000,00 13.650.000,00
pasir pasang 5 m3 200.000,00 1.000.000,00
semen 30 zak 65.000,00 1.950.000,00
semen warna 12 kg 25.000,00 300.000,00
-
Proposal Pembangunan dan Pengembangan Page | 75
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
4 Pas plint keramik 302 m1 -
plint keramik 384 m' 45.000,00 17.280.000,00
semen 8 zak 65.000,00 520.000,00
pasir pasang 1 m3 200.000,00 200.000,00
162.525.000,00
F PEKERJAAN PLAFOND
1 Pasang plafond gypsum t=9mm 586 m2
Hollow 4x4 cm 591 btg 25.000,00 14.775.000,00
Hollow 2x4 cm 369 btg 20.000,00 7.380.000,00
Gypsum 9 mm 295 lbr 65.000,00 19.175.000,00
Skrup Gypsum 6.645 bh 500,00 3.322.500,00
Penggantung + ramset 1.477 ttk 4.000,00 5.908.000,00
Compound Gypsum 44 zak 75.000,00 3.300.000,00
Textile tape 70 roll 20.000,00 1.400.000,00
amplas 222 lbr 6.000,00 1.332.000,00
-
2 Pasang list gypsum 302 m1 -
List Gypsum 381 m 25.000,00 9.525.000,00
Compound Gypsum 11 zak 65.000,00 715.000,00
amplas 57 lbr 6.000,00 342.000,00
67.174.500,00
G PEKERJAAN PENGECATAN/LABURAN -
1 Cat dinding ex Vinilex setara 1.247 -
plamur tembok 314 kg 17.500,00 5.495.000,00
amplas 79 lbr 6.000,00 474.000,00
cat tembok Vinilex 393 kg 25.000,00 9.825.000,00
- -
2 Cat plafond ex Vinilex setara 578 m2 - -
plamur tembok 146 kg 17.500,00 2.555.000,00
amplas 36 lbr 6.000,00 216.000,00
cat tembok Vinilex 182 kg 25.000,00 4.550.000,00
23.115.000,00
H PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu ex BROCO 55 ttk
Kabel NYM 3 x 2,5 mm² 419 m 12.000,00 5.028.000,00
Conduit 419 m 5.000,00 2.095.000,00
Tee Doos 140 buah 6.000,00 840.000,00
One Way Doos 140 buah 6.000,00 840.000,00
Sock 140 buah 1.500,00 210.000,00
Klem 558 buah 1.000,00 558.000,00
Lasdop 279 buah 1.500,00 418.500,00
Flexible Pipa 140 m 8.000,00 1.120.000,00
Paku 628 buah 500,00 314.000,00
Sekrup 140 buah 500,00 70.000,00
Fisher 140 buah 800,00 112.000,00
Proposal Pembangunan dan Pengembangan Page | 76
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Elbow 70 buah 2.000,00 140.000,00
-
2 Instalasi titik stop kontak ex
BROCO
15 ttk -
Kabel NYM 3 x 2,5 mm² 76 m 12.000,00 912.000,00
Conduit 76 m 5.000,00 380.000,00
Outlet Box Metal 19 buah 15.000,00 285.000,00
Tee Doos 19 buah 6.000,00 114.000,00
Sock 19 buah 6.000,00 114.000,00
Klem 76 buah 1.500,00 114.000,00
Lasdop 38 buah 1.000,00 38.000,00
Paku 19 m 1.500,00 28.500,00
Sekrup 171 buah 8.000,00 1.368.000,00
Fisher 38 buah 500,00 19.000,00
3 Elbow 19 buah 2.000,00 38.000,00
Lampu baret 55 bh 600.000,00 33.000.000,00
4 Panel ex BROCO 3 bh 500.000,00 1.500.000,00
5 Test dan commisioning 1 ls 1.500.000,00 1.500.000,00
51.156.000,00
I INSTALASI PIPA UTAMA AIR
BERSIH
1 Pipa distribusi Ø1 1/2" 50 m1 27.000,00 1.350.000,00
2 Pipa distribusi Ø1/2" 50 m1 15.000,00 750.000,00
3 Closed jongkok 5 bh 600.000,00 3.000.000,00
4 kran tembok 8 bh 12.000,00 96.000,00
5 Fitting-fitting (Elbow, tee,
support)
1 ls 3.000.000,00 3.000.000,00
6 Support, klem 1 ls 3.000.000,00 3.000.000,00
7 Pipa PVC air kotor Ø 3" 30 m1 65.000,00 1.950.000,00
8 Pipa PVC air kotoran Ø 4" 30 m1 75.000,00 2.250.000,00
15.396.000,00
J PEKERJAAN ATAP
1 Pasang atap baja ringan 463 m2 220.000,00 101.860.000,00
2 Atap ZINK ALUM 463 m2 190.000,00 87.970.000,00
-
3 Pas.nok 52 -
nok 52 bh 135.000,00 7.020.000,00
semen 16 zak 65.000,00 1.040.000,00
pasir beton 3 m3 200.000,00 600.000,00
papan ruiter kamper 0,5 m3 3.000.000,00 1.500.000,00
-
4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
205.775.000,00
K PEKERJAAN KUSEN
1 P1 6 bh -
Proposal Pembangunan dan Pengembangan Page | 77
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
balok 8/15 0,7 m3 12.000.000,00 8.400.000,00
paku 2 kg 25.000,00 50.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 2 m3 12.000.000,00 24.000.000,00
paku rata-rata 3 kg 25.000,00 75.000,00
lem putih 4 kg 20.000,00 80.000,00
-
2 P2 3 bh -
balok 8/15 0,7 m3
paku 1 kg 25.000,00 25.000,00
lem putih 1 kg 20.000,00 20.000,00
papan 3/30 0,3 m3 12.000.000,00 3.600.000,00
paku rata-rata 0,5 kg 25.000,00 12.500,00
lem putih 1 kg 20.000,00 20.000,00
-
3 P3 KM/WC 4 bh 250.000,00 1.000.000,00
-
4 J1 24 bh -
balok 8/15 5 m3 12.000.000,00 60.000.000,00
paku 14 kg 25.000,00 350.000,00
lem putih 6 kg 20.000,00 120.000,00
papan kamper medan 4 m3 12.000.000,00 48.000.000,00
paku rata-rata 1 kg 25.000,00 25.000,00
lem putih 2 kg 20.000,00 40.000,00
list kayu 21 m' 25.000,00 525.000,00
kaca 5 mm 8 m2 90.000,00 720.000,00
155.482.500,00
REKAPITULASI
A PEKERJAAN TANAH DAN PASIR Rp 9.435.000,00
B PEKERJAAN BATA Rp 87.982.000,00
C PEKERJAAN BETON STRUKTUR Rp 450.489.000,00
D PEKERJAAN BALOK dan PLAT LANTAI Rp 598.811.000,00
E PEK LANTAI DAN DINDING KERAMIK Rp 162.525.000,00
F PEKERJAAN PLAFOND Rp 67.174.500,00
G PEKERJAAN PENGECATAN/LABURAN Rp 23.115.000,00
H PEKERJAAN INSTALASI LISTRIK Rp 51.156.000,00
I INSTALASI PIPA UTAMA AIR BERSIH Rp 15.396.000,00
J PEKERJAAN ATAP Rp 205.775.000,00
K PEKERJAAN KUSEN Rp 155.482.500,00
L UPAH TENAGA Rp 237.120.000,00
GRAND TOTAL Rp 2.064.461.000,00
DIBULATKAN Rp 2.064.400.000,00
Proposal Pembangunan dan Pengembangan Page | 78
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 79
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 80
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 81
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 82
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 83
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Proposal Pembangunan dan Pengembangan Page | 84
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
Masterplan
Proposal Pembangunan dan Pengembangan Page | 85
Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan

More Related Content

Featured

Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 

Featured (20)

Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 

proposal al fatah bacan final.docx

  • 1. ‫الرحيم‬ ‫الرحمن‬ ‫هللا‬ ‫بسم‬ PROPOSAL PEMBANGUNAN & PENGEMBANGAN PONDOK PESANTREN AL-FATAH SULTAN MUKSIN SYAH - BACAN Dusun Moifi – Desa Panamboang Kec.Bacan Selatan – Kab.Halmahera Selatan Maluku Utara Kode Pos 97791 Hp. 0821 1445 0443 / 0813 5343 6754
  • 2. Proposal Pembangunan dan Pengembangan Page | 1 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PENDAHULUAN Alhamdulilah, segala puji bagi Allah Subhanahu Wa Ta’ala, shalawat dan salam semoga Allah curahkan kepada junjungan Nabi Muhammad Shallallahu ‘Alaihi Wasallam, para shahabat dan para pengikutnya yang setia sampai hari kiamat. Aamin yaa Rabbal ‘alamiin. Pondok Pesantren Shuffah Hizbullah Al-Fatah Sultan Muksin Syah, yang berlokasi di Dusun Moifi, Desa Panamboang, Kec.Bacan Selatan, Kab.Halmahera Selatan, Propinsi Maluku Utara sedang membangun dan mengembangkan Pusat Pendidikan terpadu dan Kegiatan Pembinaan Ummat melewati Majlis Ta’lim dan Da’wah Islam yang representative untuk melayani aktifitas santri dan masyarakat Islam sekitarnya serta kaum muslimin pada umumnya. Salah satu sarana dan prasarana yang sangat vital sebagai tempat ibadah, dan member bimbingan para santri dan umat menjadi muslim yang bertaqwa dan berakhlaq mulia adalah Gedung Masjid, Gedung Lokal Madrasah, dan Gedung Asrama. Namun dengan semakin meningkatnya perkembangan dan kegiatan pendidikan dari tingkat TK/TPA, SD sampai SMA yang dipercayakan pada Pondok Pesantren Al-Fatah, masjid yang ada saat ini (dibangun sejak tahun 1981) sudah tidak mampu menampung jama’ah dan tidak lagi memadai. Guna memenuhi keperluan tersebut, dengan mengharap ridlo dan pertolongan Allah Subhanahu Wa Ta’ala, kami berniat untuk melakukan pembangunan dan pengembangan Pondok Pesantren Shuffah Hizbullah Al-Fatah Sultan Muksin Syah Bacan (Al-Fatah Bacan) yang berada di Dusun Moifi, Desa Panamboang, Kecamtan Bacan Selatan, Kabupaten Halmahera Selatan, Maluku Utara, Kode Pos 97791. Dengan recana pembangunan dan pengembangan lokasi Pondok Pesantren diatas, sebagai salah satu pusat kegiatan pendidikan keagamaan baik formal, non formal, diharapkan segera terealisasi dan berfungsi sebagai sarana kegiatan keagamaan shalat berjama’ah lima waktu dan tempat pendidikan serta kegiatan social keagamaan masyarakat dapat tertampung dan berjalan lebih baik. Dalam hal ini tidak mungkin dapat kami lakukan sendiri kecuali dengan uluran dan bantuan dana dari Bapak-Bapak, Ibu-Ibu, Saudara kaum muslimin yang dimuliakan Allah. Kepada Allah jua kami berharap semoga Allah senantiasa melimpahkan curahan rahmat dan kasih sayang-Nya, sehingga Bapak-Bapak, Ibu-Ibu dan Saudara-Saudara diberi kelapangan rizqi dan kemudahan-kemudahan untuk dapat turut serta beramal jariyah membangun dan mengembangkan Pondok Pesantren Al-Fatah Sultan Muksin Syah di Bacan. Aamiin yaa Rabbal ‘alamiin. LANDASAN Firman Allah Subhanahu Wa Ta’ala : “Hanya yang memakmurkan masjid-masjid Allah, ialah orang-orang yang beriman kepada Allah dan hari akhir serta tetap mendirikan shalat, mengeluarkan zakat dan tidak takut melainkan kepada Allah. Lantaran itu mudah-mudahan mereka menjadi orang-orang yang mendapat petunjuk.” (QS. At-Taubah : 18)
  • 3. Proposal Pembangunan dan Pengembangan Page | 2 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan “Siapakah yang mau memberi pinjaman kepada Allah, pinjaman yang baik (menafkahkan hartanya di jalan Allah), maka Allah akan melipatgandakan pem-bayaran kepadanya dengan lipat ganda yang banyak. Dan Allah menyempitkan dan melapangkan (rizqi) dan kepada-Nya lah kamu dikembalikan.” (QS. Al-Baqarah : 245) “Wahai orang-orang yang beriman, belanjakanlah (di jalan Allah) sebagian dari rizki yang telah kami berikan kepadamu sebelum dating hari yang pada hari itu tidak ada lagi jual beli dan tidak ada lagi persahabatan yang akrab dan tidak ada lagi syafa’at. Dan orang-orang kafir itulah yang zalim.” (QS. Al-Baqarah : 254) Sabda Rasulullah Shallallahu ‘Alaihi Wasallam : “Barang siapa yang mendirikan masjid karena Allah, maka Allah akan membangunkannya rumah di surga”. (HR. Muslim dari Usman bin Affan). LOKASI Dusun Moifi – Desa Panamboang Kec.Bacan Selatan – Kab.Halmahera Selatan Maluku Utara Kode Pos 97791 TAHAP PEMBANGUNAN Tahap Pertama : Pembangunan Masjid dengan luas 30 m x 30 m, dibangun 2 (dua) lantai. Lantai 1 seluas 676 m2 dan lantai 2 seluas 676 m2 (plus pelataran) Tahap Kedua : Pengembangan Pondok Pesantren, masyarakat dan muslimin. Perlengkapan dan Fasilitas Pendukung aktifitas Masjid. RENCANA BIAYA 1. Tanah bersertifikat wakaf seluas 400 m x 250 m = 100.000 m2, berbentuk tanah kebun atau 10 Ha dan masih keadaan semak belukar atau hutan dengan biaya pemeliharaan lahan perbulan Rp. 5.000.000,- ( Lima juta Rupiah ) 2. Anggaran Biaya renovasi mess semi permanent 6m x 4m Rp. 30.000.000 (Tiga puluh juta rupiah ) Rekapitulasi Biaya 3. Tahap kedua : pengembangan Pondok Pesantren yang meliputi beberapa bangunan permament, diantaranya : 1) Bangunan Gedung Sekolah SMP dan SMA PUTRA seluas 60 m x 20 m = 1200 m2 x 2
  • 4. Proposal Pembangunan dan Pengembangan Page | 3 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Lantai = 2.400 m2 2) Bangunan Gedung Sekolah SMP dan SMA PUTRI seluas 60 m x 20 m = 1200 m2 x 2 Lantai = 2.400 m2 3) Bangunan Gedung Sekolah Dasar PUTRA Al-Fatah seluas 55 m x 10 m = 550 m2 x 2 Lantai = 1.100 m2 4) Bangunan Gedung Sekolah Dasar PUTRI Al-Fatah seluas 55 m x 10 m = 550 m2 x 2 Lantai = 1.100 m2 5) Bangunan Gedung Serba Guna / Auditorium Al-Fatah seluas 50 m x 33 m =1.650 m2 x 2 Lantai = 3.300 m2. Plus Ruang Genset dan Diesel seluas 26 m x 10 m = 260 m2. = 3.560 m2 6) Bangunan Gedung Kantin Putra Al-Fatah seluas 36 m x 24 m = 864 m2 x 2 Lantai = 1.728 m2 7) Bangunan Gedung Kantin Putri Al-Fatah seluas 36 m x 24 m = 864 m2 x 2 Lantai = 1.728 m2 Dengan Total Anggaran Tahap pertama dan tahap kedua sejumlah Rp. 3.767.250.000,- (tiga milyar tujuh ratus enam puluh tujuh juta dua ratus lima puluh rupiah) SUMBER DANA 1) Berupa uang atau bahan bangunan atau kedua-duanya 2) Donatur tetap 3) Instansi/ organisasi, perusahaan yang tidak mengikat 4) Masyarakat Muslimin secara umum 5) Usaha lain yang halal dan tidak mengikat CARA MENYUMBANG Untuk sumbangan berupa barang ataupun uang yang ingin diserahkan dapat langsung ke alamat kami : PANITIA PEMBANGUNAN & PENGEMBANGAN PONDOK PESANTREN SHUFFAH AL FATAH SULTAN MUKSIN SYAH BACAN Dusun Moifi – Desa Panamboang Kec.Bacan Selatan – Kab.Halmahera Selatan Kode Pos 97791 PH / HP. +62 821 1445 0443. +62 813 5343 6754
  • 5. Proposal Pembangunan dan Pengembangan Page | 4 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Atau melalui transfer ke rekening : 1. Rekening No. 5220.01.036608.53.6 BRI Unit Bacan Ternate a.n Yayasan Al Fatah Bacan 2. Rekening No. xxxx.xx.xxxx. BSM Unit Bacan Ternate a.n Panitia Pembangunan dan Pengembangan Pon-Pes Shuffah Al-fatah Sultan Muksin Syah Bacan SUSUNAN PANITIA Penasihat : Drs. KH. Yakhsyallah Manshur, M.Ag. : Sultan Bacan Pembina : Aziz Aly Hp. 0821 2682 9872 : Dr. Arif Rahman Fitriyanto Hp. 0812 8005 1732 Pengasuh : M. Buchari E. Zabir Syah Hp. 0812 8496 9686 Ketua Panitia : M. Babullah Zabir Syah Hp. 0853 4583 4910 Wakil Ketua : Muhammad Arsyad Ridho Hp. 0812 1481 3171 Sekretaris : Taslim Yamin, Amd, Kep. Hp. 0821 9080 7069 : Hanifah Muslimah, Amd, Keb. Hp. 0813 2262 4013 Bendahara : Saepudin Ace Hp. 0823 4820 3759 : Firman Mustaqim Hp. 0821 2617 4712 TIM PENGGALANGAN DANA 1. H. Shafril Lubis 2. H. Nurdin 3. H. Mad Idris 4. H. Asep Rahman 5. H. Bustami Utje 6. H. Sakuri, SH 7. H. Sahlan Damiri 8. H. Wawan Ruswandi 9. Arif Rahman Fitrianto, MA 10. M. Anshorullah 11. Ir. Sulis Diantoro PENUTUP Karena Allah dan mengharap Ridho-nya semata-mata, kami mengetuk hati para dermawan Muslimin untuk turut serta membantu dan meraih Anugrah ALLAH dalam pembiayaan Pembangunan dan Pengembangan Pondok Pesantren Al Fatah Sultan Muksin Syah Bacan ini. Atas kemurahan hati para dermawan semoga mendapat balasan pahala yang berlipat ganda disisi_nya. Amin yaa Robbal ‘alamin. Terima Kasih dan Jazakumullah Khairon.
  • 6. Proposal Pembangunan dan Pengembangan Page | 5 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan LAMPIRAN 1
  • 7. Proposal Pembangunan dan Pengembangan Page | 6 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan RENCANA ANGGARAN BIAYA PROYEK : PEMBANGUNAN GEDUNG MASJID ……………. LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 676 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 48 m3 50.000,00 2.400.000,00 2 Galian pondasi TAPAK 139 m3 75.000,00 10.425.000,00 3 Urug tanah 28 m3 37.500,00 1.050.000,00 4 Lantai kerja 8 m3 - Semen 106,28 zak 65.000,00 7.038.200,00 Pasir Beton 12,64 m3 200.000,00 2.528.000,00 Split 21,30 m3 200.000,00 4.260.000,00 5 Pasir urug bawah lantai + sper 20% 8 m3 - Pasir Urug 28,09 m3 200.000,00 5.618.000,00 33.319.200,00 B PEKERJAAN BATA 1 Pasang Bata 1.460 m2 Batu Bata Merah 323.080,31 bh 650,00 210.002.201,00 Semen 1.524,94 zak 65.000,00 99.121.100,00 Pasir Pasang 245,54 m3 200.000,00 25.108.000,00 2 Pas Plesteran dan Acian 2.921 m2 Semen 1.406,05 zak 65.000,00 91.393.250,00 Pasir Pasang 167,14 m3 200.000,00 33.428.000,00 459.052.551,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 73 batu kali 256,90 m3 200.000,00 51.380.000,00 semen 753,57 zak 65.000,00 48.982.050,00 pasir pasang 81,35 m3 200.000,00 16.270.000,00 2 Cor Beton Sloof 25x40 24 - Beton K.225 48 m3 - Semen 957,96 zak 65.000,00 62.267.000,00 Pasir Beton 76,07 m3 200.000,00 15.214.000,00 Split 115,52 m3 200.000,00 23.104.000,00 Besi Beton 22.258,42 kg 13.000,00 289.359.460,00 Kawat Beton 890,34 kg 25.000,00 22.258.500,00 Bekesting Beton Sloof - Papan 1.797,58 lbr 25.000,00 44.939.500,00 Paku Rata-rata 563,50 kg 25.000,00 14.087.500,00
  • 8. Proposal Pembangunan dan Pengembangan Page | 7 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Kaso utk.rangka 35,22 m3 3.000.000,00 105.660.000,00 Kaso utk.stut 28,18 m3 3.000.000,00 84.540.000,00 3 Cor beton pondasi tapak - Beton K.225 22 m3 - Semen 447,38 zak 65.000,00 29.079.700,00 Pasir Beton 35,53 m3 200.000,00 7.106.000,00 Split 53,95 m3 200.000,00 10.790.000,00 Besi Beton 10.394,96 kg 13.000,00 135.134.480,00 kawat beton 415,80 kg 25.000,00 10.395.000,00 Bekesting beton tapak - - PAPAN 839,49 lbr 25.000,00 20.987.250,00 paku rata-rata 263,16 kg 25.000,00 6.579.000,00 kaso utk.rangka 16,45 m3 3.000.000,00 49.350.000,00 kaso utk.stut 13,16 m3 3.000.000,00 39.480.000,00 - 4 Cor beton lantai/beton susut t=8cm 101 m3 - semen 1.356,91 zak 65.000,00 88.199.150,00 pasir beton 21,34 m3 200.000,00 4.268.000,00 split 271,98 m3 200.000,00 54.396.000,00 - 5 Cor beton kolom 67 m3 - semen 1.346,79 zak 65.000,00 87.541.350,00 pasir beton 31,96 m3 200.000,00 6.392.000,00 split 162,41 m3 200.000,00 32.482.000,00 besi beton 31.293,17 kg 13.000,00 406.811.210,00 kawat beton 1.251,73 kg 25.000,00 31.293.250,00 Bekesting beton kolom - triplek 9 mm 2.527,22 lbr 160.000,00 404.355.200,00 paku rata-rata 792,23 kg 25.000,00 19.805.750,00 kaso meranti utk.rangka 49,51 m3 3.000.000,00 148.530.000,00 kaso meranti utk.stut 39,61 m3 3.000.000,00 118.830.000,00 2.489.867.350,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 51 m3 semen 1.022,58 zak 65.000,00 66.467.700,00 pasir beton 81,20 m3 200.000,00 16.240.000,00 split 123,31 m3 200.000,00 24.662.000,00 besi beton 23.759,91 kg 13.000,00 308.878.830,00 kawat beton 950,40 kg 25.000,00 23.760.000,00 Bekesting beton plat - triplek 9 mm 1.918,84 lbr 130.000,00 249.449.200,00 paku rata-rata 601,52 kg 25.000,00 15.038.000,00 kaso meranti utk.rangka 37,59 m3 3.000.000,00 112.779.000,00
  • 9. Proposal Pembangunan dan Pengembangan Page | 8 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kaso meranti utk.stut 30,08 m3 3.000.000,00 90.240.000,00 - 2 Cor beton ring balk 15x20 32 m3 - semen 639,11 zak 65.000,00 41.542.150,00 pasir beton 50,75 m3 200.000,00 10.150.000,00 split 77,07 m3 200.000,00 15.414.000,00 besi beton 14.849,95 kg 13.000,00 193.049.350,00 kawat beton 594,00 kg 25.000,00 14.850.000,00 Bekesting beton ring balok - Papan 1.199,27 lbr 25.000,00 29.981.750,00 paku rata-rata 375,95 kg 25.000,00 9.398.750,00 kaso meranti utk.rangka 23,50 m3 3.000.000,00 70.500.000,00 kaso meranti utk.stut 18,80 m3 3.000.000,00 56.400.000,00 - 3 Cor beton plat lantai dan overstek 109 m3 - semen 2.191,80 zak 65.000,00 142.467.000,00 pasir beton 174,05 m3 200.000,00 34.810.000,00 split 264,31 m3 200.000,00 52.862.000,00 besi beton 50.927,06 kg 13.000,00 662.051.780,00 kawat beton 2.037,08 kg 25.000,00 50.927.000,00 Bekesting beton plat lantai - - triplek 9 mm 4.112,84 lbr 130.000,00 534.669.000,00 paku rata-rata 1.289,29 kg 25.000,00 32.232.250,00 kaso meranti utk.rangka 80,58 m3 3.000.000,00 241.740.000,00 kaso meranti utk.stut 64,46 m3 3.000.000,00 193.380.000,00 - 3.293.939.760,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 1.353 m2 lantai keramik 4.191,84 m2 130.000,00 544.939.200,00 pasir pasang 199,61 m3 200.000,00 39.922.000,00 semen 1.197,67 zak 65.000,00 77.848.550,00 semen warna 479,07 kg 25.000,00 11.976.750,00 - 2 Pas keramik km/wc 54 m2 - lantai keramik 165,85 m2 130.000,00 21.560.500,00 pasir pasang 7,90 m3 200.000,00 1.580.000,00 semen 47,39 zak 65.000,00 3.080.350,00 semen warna 18,95 kg 25.000,00 473.750,00 - 3 Pas keramik km/wc dinding 186 m2 - lantai keramik 575,67 m2 130.000,00 74.837.100,00
  • 10. Proposal Pembangunan dan Pengembangan Page | 9 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 4 pasir pasang 27,41 m3 200.000,00 5.482.000,00 semen 164,48 zak 65.000,00 10.691.200,00 semen warna 65,79 kg 25.000,00 1.644.750,00 - Pas plint keramik 708 m1 - plint keramik 2.109,49 m' 45.000,00 94.927.050,00 semen 41,77 zak 65.000,00 2.715.180,00 pasir pasang 4,18 m3 200.000,00 835.440,00 892.513.820,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 1.373 m2 Hollow 4x4 cm 3.241,30 btg 25.000,00 81.032.500,00 Hollow 2x4 cm 2.025,81 btg 20.000,00 40.516.200,00 Gypsum 9 mm 1.620,65 lbr 65.000,00 105.342.250,00 Skrup Gypsum 36.464,61 bh 500,00 18.232.305,00 Penggantung + ramset 8.103,25 ttk 4.000,00 32.413.000,00 Compound Gypsum 243,10 zak 75.000,00 18.232.500,00 Textile tape 384,90 roll 20.000,00 7.698.000,00 amplas 1.215,49 lbr 6.000,00 7.292.940,00 - 2 Pasang list gypsum 708 m1 - List Gypsum 2.088,60 m 25.000,00 52.215.000,00 Compound Gypsum 62,66 zak 65.000,00 4.072.770,00 amplas 313,29 lbr 6.000,00 1.879.740,00 368.927.205,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 2.921 - plamur tembok 1.723,10 kg 17.500,00 30.154.250,00 amplas 430,77 lbr 6.000,00 2.584.620,00 cat tembok Vinilex 2.153,87 kg 25.000,00 53.846.750,00 - - 2 Cat plafond ex Vinilex setara 1.353 m2 - - plamur tembok 798,45 kg 17.500,00 13.972.875,00 amplas 199,61 lbr 6.000,00 1.197.660,00 cat tembok Vinilex 998,06 kg 25.000,00 24.951.500,00 126.707.655,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 130 ttk Kabel NYM 3 x 2,5 mm² 2.297,46 m1 12.000,00 27.569.520,00 Conduit 2.297,46 m1 5.000,00 11.487.300,00 Tee Doos 765,82 buah 6.000,00 4.594.920,00
  • 11. Proposal Pembangunan dan Pengembangan Page | 10 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan One Way Doos 765,82 buah 6.000,00 4.594.920,00 Sock 765,82 buah 1.500,00 1.148.730,00 Klem 3.063,28 buah 1.000,00 3.063.280,00 Lasdop 1.531,64 buah 1.500,00 2.297.460,00 Flexible Pipa 765,82 m 8.000,00 6.126.560,00 Paku 3.446,19 buah 500,00 1.723.095,00 Sekrup 765,82 buah 500,00 382.910,00 Fisher 765,82 buah 800,00 612.656,00 Elbow 382,91 buah 2.000,00 765.820,00 - 2 Instalasi titik stop kontak ex BROCO 35 ttk - Kabel NYM 3 x 2,5 mm² 417,72 m1 12.000,00 5.012.640,00 Conduit 417,72 m1 5.000,00 2.088.600,00 Outlet Box Metal 104,43 buah 15.000,00 1.566.450,00 Tee Doos 104,43 buah 6.000,00 626.580,00 Sock 104,43 buah 6.000,00 626.580,00 Klem 417,72 buah 1.500,00 626.580,00 Lasdop 208,86 buah 1.000,00 208.860,00 Paku 104,43 m1 1.500,00 156.645,00 Sekrup 939,87 buah 8.000,00 7.518.960,00 Fisher 208,86 buah 500,00 104.430,00 Elbow 104,43 buah 2.000,00 208.860,00 4 Lampu baret 130 bh 600.000,00 77.880.000,00 5 Panel ex BROCO 6 bh 500.000,00 2.950.000,00 6 Test dan commisioning 3 ls 1.500.000,00 4.425.000,00 168.367.356,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 118 m1 27.000,00 3.186.000,00 2 Pipa distribusi Ø1/2" 118 m1 15.000,00 1.770.000,00 3 Closed jongkok 12 bh 600.000,00 7.080.000,00 4 kran tembok 18 bh 12.000,00 212.400,00 5 Fitting-fitting (Elbow, tee, support) 3 ls 3.000.000,00 8.850.000,00 6 Support, klem 3 ls 3.000.000,00 8.850.000,00 7 Pipa PVC air kotor Ø 3" 71 m1 65.000,00 4.602.000,00 8 Pipa PVC air kotoran Ø 4" 71 m1 75.000,00 5.310.000,00 39.860.400,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 1.086 m2 220.000,00 238.832.000,00 2 Atap ZINK ALUM 1.086 m2 190.000,00 206.264.000,00 - 3 Pas.nok 123 - nok 122,72 bh 135.000,00 16.567.200,00
  • 12. Proposal Pembangunan dan Pengembangan Page | 11 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan semen 86,89 zak 65.000,00 5.647.850,00 pasir beton 13,76 m3 200.000,00 2.752.000,00 papan ruiter kamper 1,09 m3 3.000.000,00 3.258.216,00 - 3 Waterproofing atap 88,80 m2 65.000,00 5.772.000,00 479.093.266,00 K PEKERJAAN KUSEN 1 P1 15 bh - balok 8/15 1,42 m3 12.000.000,00 16.992.000,00 paku 10,44 kg 25.000,00 261.075,00 lem putih 4,18 kg 20.000,00 83.544,00 papan 3/30 11,49 m3 12.000.000,00 137.847.600,00 paku rata-rata 37,28 kg 25.000,00 932.000,00 lem putih 50,83 kg 20.000,00 1.016.600,00 - 2 P2 6 bh - balok 8/15 0,42 m3 12.000.000,00 5.097.600,00 paku 3,13 kg 25.000,00 78.250,00 lem putih 1,25 kg 20.000,00 25.000,00 00 papan 3/30 1,91 m3 12.000.000,00 22.974.600,00 paku rata-rata 6,21 kg 25.000,00 155.250,00 lem putih 8,47 kg 20.000,00 169.400,00 - 3 P3 KM/WC 4,00 bh 250.000,00 1.000.000,00 - 4 J1 56 bh - balok 8/15 10,76 m3 12.000.000,00 129.139.200,00 paku 79,37 kg 25.000,00 1.984.170,00 lem putih 31,75 kg 20.000,00 635.000,00 papan kamper medan 22,74 m3 12.000.000,00 272.823.375,00 paku rata-rata 13,41 kg 25.000,00 335.250,00 lem putih 26,83 kg 20.000,00 536.600,00 list kayu 268,28 m' 25.000,00 6.707.000,00 kaca 5 mm 17,85 m2 90.000,00 1.606.500,00 600.400.014,00 - EKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 33.319.200,00 B PEKERJAAN BATA Rp 459.052.551,00 C PEKERJAAN BETON STRUKTUR Rp 2.489.867.350,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 3.293.939.760,00 E PEK LANTAI DAN DINDING KERAMIK Rp 892.513.820,00 F PEKERJAAN PLAFOND Rp 368.927.205,00 G PEKERJAAN PENGECATAN/LABURAN Rp 126.707.655,00 H PEKERJAAN INSTALASI LISTRIK Rp 168.367.356,00
  • 13. Proposal Pembangunan dan Pengembangan Page | 12 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan I INSTALASI PIPA UTAMA AIR BERSIH Rp 39.860.400,00 J PEKERJAAN ATAP Rp 479.093.266,00 K PEKERJAAN KUSEN Rp 600.400.014,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 9.189.168.577,00 DIBULATKAN Rp 9.189.000.000,00
  • 14. Proposal Pembangunan dan Pengembangan Page | 13 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 15. Proposal Pembangunan dan Pengembangan Page | 14 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 16. Proposal Pembangunan dan Pengembangan Page | 15 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 17. Proposal Pembangunan dan Pengembangan Page | 16 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 18. Proposal Pembangunan dan Pengembangan Page | 17 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 19. Proposal Pembangunan dan Pengembangan Page | 18 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 20. Proposal Pembangunan dan Pengembangan Page | 19 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN GEDUNG SEKOLAH SMP PLUS AL FATAH, PUTRA DAN PUTRI LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 2400 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 81 Galian pondasi SLOOF 56 m3 50.000,00 2.800.000,00 2 Galian pondasi TAPAK 161 m3 75.000,00 12.075.000,00 3 Urug tanah 33 m3 37.500,00 1.237.500,00 4 Lantai kerja 9 m3 - semen 142 zak 65.000,00 9.230.000,00 pasir beton 17 m3 200.000,00 3.400.000,00 split 28 m3 200.000,00 5.600.000,00 5 Pasir urug bawah lantai + sper 20% 9 m3 - pasir urug 37 m3 200.000,00 7.400.000,00 41.742.500,00 B PEKERJAAN BATA 1 Pasang bata 1.685 m2 batu bata merah 430.410 bh 650,00 279.766.500,00 semen 20.32 zak 65.000,00 132.080.000,00 pasir pasang 327 m3 200.000,00 65.400.000,00 - - 2 Pas plesteran dan acian 3.371 m2 - semen 1.873 zak 65.000,00 121.745.000,00 pasir pasang 223 m3 200.000,00 44.600.000,00 643.591.500,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 84 batu kali 342 m3 200.000,00 68.400.000,00 semen 1.004 zak 65.000,00 65.260.000,00 pasir pasang 108 m3 200.000,00 21.600.000,00 - 2 Cor beton sloof 25x40 28 - Beton K.225 55 m3 - semen 1.276 zak 65.000,00 82.940.000,00 pasir beton 101 m3 200.000,00 20.200.000,00 split 154 m3 200.000,00 30.800.000,00 besi beton 29.653 kg 13.000,00 385.489.000,00 kawat beton 1.186 kg 25.000,00 29.650.000,00 Bekesting beton sloof - Papan 2.395 lbr 25.000,00 59.875.000,00
  • 21. Proposal Pembangunan dan Pengembangan Page | 20 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan paku rata-rata 751 kg 25.000,00 18.775.0000,00 kaso utk.rangka 47 m3 3.000.000,00 141.000.000,00 kaso utk.stut 38 m3 3.000.000,00 114.000.000,00 - 3 Cor beton pondasi tapak - Beton K.225 26 m3 - semen 596 zak 65.000,00 38.740.000,00 pasir beton 47 m3 200.000,00 9.400.000,00 split 72 m3 200.000,00 14.400.000,00 besi beton 13.848 kg 13.000,00 180.024.000,00 kawat beton 554 kg 25.000,00 13.850.000,00 Bekesting beton tapak - - Papan 1.118 lbr 25.000,00 27.950.000,00 paku rata-rata 351 kg 25.000,00 8.775.000,00 kaso utk.rangka 22 m3 3.000.000,00 66.000.000,00 kaso utk.stut 18 m3 3.000.000,00 54.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 117 m3 - semen 1.808 zak 65.000,00 117.520.000,00 pasir beton 28 m3 200.000,00 5.600.000,00 split 362 m3 200.000,00 72.400.000,00 - 5 Cor beton kolom 77 m3 - semen 1.794 zak 65.000,00 116.610.000,00 pasir beton 43 m3 200.000,00 8.600.000,00 split 216 m3 200.000,00 43.200.000,00 besi beton 41.689 kg 13.000,00 541.957.000,00 - - kawat beton 1.668 kg 25.000,00 41.700.000,00 Bekesting beton kolom - triplek 9 mm 3.367 lbr 160.000,00 538.720.000,00 paku rata-rata 1.055 kg 25.000,00 26.375.000,00 kaso meranti utk.rangka 66 m3 3.000.000,00 198.000.000,00 kaso meranti utk.stut 53 m3 3.000.000,00 3.000.000,00 3.333.785.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 59 m3 semen 1.362 zak 65.000,00 88.530.000,00 pasir beton 108 m3 200.000,00 21.600.000,00 split 164 m3 200.000,00 32.800.000,00 besi beton 31.653 kg 13.000,00 411.489.000,00 kawat beton 1.266 kg 25.000,00 31.650.000,00 Bekesting beton plat - triplek 9 mm 2.556 lbr 130.000,00 332.280.000,00
  • 22. Proposal Pembangunan dan Pengembangan Page | 21 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan paku rata-rata 801 kg 25.000,00 20.025.000,00 kaso meranti utk.rangka 50 m3 3.000.000,00 150.000.000,00 kaso meranti utk.stut 40 m3 3.000.000,00 120.000.000,00 - 2 Cor beton ring balk 15x20 37 m3 - semen 851 zak 65.000,00 55.315.000,00 pasir beton 68 m3 200.000,00 13.600.000,00 split 103 m3 200.000,00 20.600.000,00 besi beton 19.783 kg 13.000,00 257.179.000,00 kawat beton 791 kg 25.000,00 19.775.000,00 Bekesting beton ring balok - Papan 1.598 lbr 25.000,00 39.950.000,00 paku rata-rata 501 kg 25.000,00 12.525.000,00 kaso meranti utk.rangka 31 m3 3.000.000,00 93.000.000,00 kaso meranti utk.stut 25 m3 3.000.000,00 75.000.000,00 - 3 Cor beton plat lantai dan overstek 126 m3 - semen 2.920 zak 65.000,00 189.800.000,00 pasir beton 232 m3 200.000,00 46.400.000,00 split 352 m3 200.000,00 70.400.000,00 besi beton 67.845 kg 13.000,00 881.985.000,00 kawat beton 2.714 kg 25.000,00 67.850.000,00 Bekesting beton plat lantai - - triplek 9 mm 5.479 lbr 130.000,00 712.270.000,00 paku rata-rata 1.718 kg 25.000,00 42.950.000,00 kaso meranti utk.rangka 107 m3 3.000.000,00 321.000.000,00 kaso meranti utk.stut 86 m3 3.000.000,00 258.000.000,00 - 4.385.973.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 1.562 m2 lantai keramik 5.584 m2 130.000,00 725.920.000,00 pasir pasang 266 m3 200.000,00 725.920.000,00 semen 1.596 zak 65.000,00 103.740.000,00 semen warna 638 kg 25.000,00 15.950.000,00 - 2 Pas keramik km/wc 62 m2 - lantai keramik 221 m2 130.000,00 28.730.000,00 pasir pasang 11 m3 200.000,00 2.200.000,00 semen 63 zak 65.000,00 4.095.000,00 semen warna 25 kg 25.000,00 625.000,00 -
  • 23. Proposal Pembangunan dan Pengembangan Page | 22 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 3 Pas keramik km/wc dinding 215 m2 - 4 lantai keramik 767 m2 130.000,00 99.710.000,00 pasir pasang 37 m3 200.000,00 7.400.000,00 semen 219 zak 65.000,00 14.235.000,00 semen warna 88 kg 25.000,00 2.200.000,00 - Pas plint keramik 817 m1 - plint keramik 2.810 m' 45.000,00 126.450.000,00 semen 56 zak 65.000,00 3.640.000,00 pasir pasang 6 m3 200.000,00 1.200.000,00 1.862.015.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 1.585 m2 Hollow 4x4 cm 4.318 btg 25.000,00 107.950.000,00 Hollow 2x4 cm 2.699 btg 20.000,00 53.980.000,00 Gypsum 9 mm 2.159 lbr 65.000,00 140.335.000,00 Skrup Gypsum 48.578 bh 500,00 24.289.000,00 Penggantung + ramset 10.795 ttk 4.000,00 43.180.000,00 Compound Gypsum 324 zak 75.000,00 24.300.000,00 Textile tape 513 roll 20.000,00 10.260.000,00 amplas 1.619 lbr 6.000,00 9.714.000,00 - 2 Pasang list gypsum 817 m1 - List Gypsum 2.782 m 25.000,00 69.550.000,00 Compound Gypsum 83 zak 65.000,00 5.395.000,00 amplas 417 lbr 6.000,00 2.502.000,00 491.455.000,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 3.371 - plamur tembok 2.296 kg 17.500,00 40.180.000,00 amplas 574 lbr 6.000,00 3.444.000,00 cat tembok Vinilex 2.869 kg 25.000,00 71.725.000,00 - - 2 Cat plafond ex Vinilex setara 1.562 m2 - - plamur tembok 1.064 kg 17.500,00 18.620.000,00 amplas 266 lbr 6.000,00 1.596.000,00 cat tembok Vinilex 1.330 kg 25.000,00 33.250.000,00 168.815.000,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 150 ttk Kabel NYM 3 x 2,5 mm² 3.061 m1 12.000,00 36.732.000,00
  • 24. Proposal Pembangunan dan Pengembangan Page | 23 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Conduit 3.061 m1 5.000,00 15.305.000,00 Tee Doos 1.020 buah 6.000,00 6.120.000,00 One Way Doos 1.020 buah 6.000,00 6.120.000,00 Sock 1.020 buah 1.500,00 1.530.000,00 Klem 4.081 buah 1.000,00 4.081.000,00 Lasdop 2.040 buah 1.500,00 3.060.000,00 Flexible Pipa 1.020 m1 8.000,00 8.160.000,00 Paku 4.591 buah 500,00 2.295.500,00 Sekrup 1.020 buah 500,00 510.000,00 Fisher 1.020 buah 800,00 816.000,00 Elbow 510 buah 2.000,00 1.020.000,00 - 2 Instalasi titik stop kontak ex BROCO 41 ttk - Kabel NYM 3 x 2,5 mm² 556 m1 12.000,00 6.672.000,00 Conduit 556 m1 5.000,00 2.780.000,00 3 Outlet Box Metal 139 buah 15.000,00 2.085.000,00 Tee Doos 139 buah 6.000,00 834.000,00 Sock 139 buah 6.000,00 834.000,00 Klem 556 buah 1.500,00 834.000,00 Lasdop 278 buah 1.000,00 278.000,00 Paku 139 m1 1.500,00 208.500,00 Sekrup 1.252 buah 8.000,00 10.016.000,00 Fisher 278 buah 500,00 1.390.000,00 Elbow 139 buah 2.000,00 278.000,00 4 Lampu baret 150 bh 600.000,00 90.000.000,00 5 Panel ex BROCO 7 bh 500.000,00 3.500.000,00 6 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00 209.959.000,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 136 m1 27.000,00 3.672.000,00 2 Pipa distribusi Ø1/2" 136 m1 15.000,00 2.040.000,00 3 Closed jongkok 14 bh 600.000,00 8.400.000,00 4 kran tembok 20 bh 12.000,00 240.000,00 5 Fitting-fitting (Elbow, tee, support) 3 ls 3.000.000,00 9.000.000,00 6 Support, klem 3 ls 3.000.000,00 9.000.000,00 7 Pipa PVC air kotor Ø 3" 82 m1 65.000,00 5.330.000,00 8 Pipa PVC air kotoran Ø 4" 82 m1 75.000,00 6.150.000,00 43.832.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 1.253 m2 220.000,00 275.660.000,00 2 Atap ZINK ALUM 1.253 m2 190.000,00 238.070.000,00 3 Pas.nok 142 - nok 142 bh 135.000,00 19.170.000,00
  • 25. Proposal Pembangunan dan Pengembangan Page | 24 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan semen 116 zak 65.000,00 7.540.000,00 pasir beton 18 m3 200.000,00 3.600.000,,00 papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00 - 3 Waterproofing atap 89 m2 65.000,00 5.785.000,00 549.225.000,00 K PEKERJAAN KUSEN 1 P1 17 bh - balok 8/15 2 m3 12.000.000,00 24.000.000,00 paku 14 kg 25.000,00 350.000,00 lem putih 6 kg 20.000,00 120.000,00 papan 3/30 15 m3 12.000.000,00 180.000.000,00 paku rata-rata 57 kg 25.000,00 1.425.000,00 lem putih 78 kg 20.000,00 1.560.000,00 - 2 P2 7 bh - balok 8/15 0,5 m3 12.000.000,00 6.000.000,00 paku 4 kg 25.000,00 100.000,00 lem putih 2 kg 20.000,00 40.000,00 papan 3/30 3 m3 12.000.000,00 36.000.000,00 paku rata-rata 10 kg 25.000,00 250.000,00 lem putih 13 kg 20.000,00 260.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 P4 65 bh - balok 8/15 12 m3 12.000.000,00 144.000.000,00 paku 106 kg 25.000,00 2.650.000,00 lem putih 42 kg 20.000,00 840.000,00 papan kamper medan 30 m3 12.000.000,00 360.000.000,00 paku rata-rata 21 kg 25.000,00 525.000,00 lem putih 41 kg 20.000,00 820.000,00 list kayu 413 m' 25.000,00 10.325.000,00 kaca 5 mm 21 m2 90.000,00 1.890.000,00 - 772.155.000,00 REKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 41.742.500,00 B PEKERJAN BATA Rp 643.591.500,00 C PEKERJAAN BETON STRUKTUR Rp 3.333.785.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 4.385.973.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 1.862.015.000,00 F PEKERJAAN PLAFOND Rp 491.455.000,00 G PEKERJAAN PENGECATAN/LABURAN Rp 168.815.000,00 H PEKERJAAN INSTALASI LISTRIK Rp 209.959.000,00
  • 26. Proposal Pembangunan dan Pengembangan Page | 25 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan I INSTALASI PIPA UTAMA AIR BERSIH Rp 43.832.000,00 J PEKERJAAN ATAP Rp 549.225.000,00 K PEKERJAAN KUSEN Rp 772.155.000,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 12.739.668.000,00 DIBULATKAN Rp 12.739.600.000,00
  • 27. Proposal Pembangunan dan Pengembangan Page | 26 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 28. Proposal Pembangunan dan Pengembangan Page | 27 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 29. Proposal Pembangunan dan Pengembangan Page | 28 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN GEDUNG SEKOLAH SMA PLUS AL FATAH, PUTRA & PUTRI LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 2400 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 56 m3 50.000,00 2.800.000,00 2 Galian pondasi TAPAK 161 m3 75.000,00 12.075.000,00 3 Urug tanah 33 m3 37.500,00 1.237.500,00 4 Lantai kerja 9 m3 - semen 142 zak 65.000,00 9.230.000,00 pasir beton 17 m3 200.000,00 3.400.000,00 split 28 m3 200.000,00 5.600.000,00 5 Pasir urug bawah lantai + sper 20% 9 m3 - pasir urug 37 m3 200.000,00 7.400.000,00 41.742.500,00 B PEKERJAAN BATA 1 Pasang bata 1.685 m2 batu bata merah 430.410 bh 650,00 279.766.500,00 semen 20.32 zak 65.000,00 132.080.000,00 pasir pasang 327 m3 200.000,00 65.400.000,00 - - 2 Pas plesteran dan acian 3.371 m2 - semen 1.873 zak 65.000,00 121.745.000,00 pasir pasang 223 m3 200.000,00 44.600.000,00 643.591.500,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 84 batu kali 342 m3 200.000,00 68.400.000,00 semen 1.004 zak 65.000,00 65.260.000,00 pasir pasang 108 m3 200.000,00 21.600.000,00 - 2 Cor beton sloof 25x40 28 - Beton K.225 55 m3 - semen 1.276 zak 65.000,00 82.940.000,00 pasir beton 101 m3 200.000,00 20.200.000,00 split 154 m3 200.000,00 30.800.000,00 besi beton 29.653 kg 13.000,00 385.489.000,00
  • 30. Proposal Pembangunan dan Pengembangan Page | 29 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kawat beton 1.186 kg 25.000,00 29.650.000,00 Bekesting beton sloof - Papan 2.395 lbr 25.000,00 59.875.000,00 paku rata-rata 751 kg 25.000,00 18.775.0000,00 kaso utk.rangka 47 m3 3.000.000,00 141.000.000,00 kaso utk.stut 38 m3 3.000.000,00 114.000.000,00 - 3 Cor beton pondasi tapak - Beton K.225 26 m3 - semen 596 zak 65.000,00 38.740.000,00 pasir beton 47 m3 200.000,00 9.400.000,00 split 72 m3 200.000,00 14.400.000,00 besi beton 13.848 kg 13.000,00 180.024.000,00 kawat beton 554 kg 25.000,00 13.850.000,00 Bekesting beton tapak - - Papan 1.118 lbr 25.000,00 27.950.000,00 paku rata-rata 351 kg 25.000,00 8.775.000,00 kaso utk.rangka 22 m3 3.000.000,00 66.000.000,00 kaso utk.stut 18 m3 3.000.000,00 54.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 117 m3 - semen 1.808 zak 65.000,00 117.520.000,00 pasir beton 28 m3 200.000,00 5.600.000,00 split 362 m3 200.000,00 72.400.000,00 - 5 Cor beton kolom 77 m3 - semen 1.794 zak 65.000,00 116.610.000,00 pasir beton 43 m3 200.000,00 8.600.000,00 split 216 m3 200.000,00 43.200.000,00 besi beton 41.689 kg 13.000,00 541.957.000,00 - - kawat beton 1.668 kg 25.000,00 41.700.000,00 Bekesting beton kolom - triplek 9 mm 3.367 lbr 160.000,00 538.720.000,00 paku rata-rata 1.055 kg 25.000,00 26.375.000,00 kaso meranti utk.rangka 66 m3 3.000.000,00 198.000.000,00 kaso meranti utk.stut 53 m3 3.000.000,00 3.000.000,00 3.333.785.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 59 m3 semen 1.362 zak 65.000,00 88.530.000,00 pasir beton 108 m3 200.000,00 21.600.000,00 split 164 m3 200.000,00 32.800.000,00 besi beton 31.653 kg 13.000,00 411.489.000,00
  • 31. Proposal Pembangunan dan Pengembangan Page | 30 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kawat beton 1.266 kg 25.000,00 31.650.000,00 Bekesting beton plat - triplek 9 mm 2.556 lbr 130.000,00 332.280.000,00 paku rata-rata 801 kg 25.000,00 20.025.000,00 kaso meranti utk.rangka 50 m3 3.000.000,00 150.000.000,00 kaso meranti utk.stut 40 m3 3.000.000,00 120.000.000,00 - 2 Cor beton ring balk 15x20 37 m3 - semen 851 zak 65.000,00 55.315.000,00 pasir beton 68 m3 200.000,00 13.600.000,00 split 103 m3 200.000,00 20.600.000,00 besi beton 19.783 kg 13.000,00 257.179.000,00 kawat beton 791 kg 25.000,00 19.775.000,00 Bekesting beton ring balok - Papan 1.598 lbr 25.000,00 39.950.000,00 paku rata-rata 501 kg 25.000,00 12.525.000,00 kaso meranti utk.rangka 31 m3 3.000.000,00 93.000.000,00 kaso meranti utk.stut 25 m3 3.000.000,00 75.000.000,00 - 3 Cor beton plat lantai dan overstek 126 m3 - semen 2.920 zak 65.000,00 189.800.000,00 pasir beton 232 m3 200.000,00 46.400.000,00 split 352 m3 200.000,00 70.400.000,00 besi beton 67.845 kg 13.000,00 881.985.000,00 kawat beton 2.714 kg 25.000,00 67.850.000,00 Bekesting beton plat lantai - - triplek 9 mm 5.479 lbr 130.000,00 712.270.000,00 paku rata-rata 1.718 kg 25.000,00 42.950.000,00 kaso meranti utk.rangka 107 m3 3.000.000,00 321.000.000,00 kaso meranti utk.stut 86 m3 3.000.000,00 258.000.000,00 - 4.385.973.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 1.562 m2 lantai keramik 5.584 m2 130.000,00 725.920.000,00 pasir pasang 266 m3 200.000,00 725.920.000,00 semen 1.596 zak 65.000,00 103.740.000,00 semen warna 638 kg 25.000,00 15.950.000,00 - 2 Pas keramik km/wc 62 m2 - lantai keramik 221 m2 130.000,00 28.730.000,00
  • 32. Proposal Pembangunan dan Pengembangan Page | 31 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan pasir pasang 11 m3 200.000,00 2.200.000,00 semen 63 zak 65.000,00 4.095.000,00 semen warna 25 kg 25.000,00 625.000,00 - 3 Pas keramik km/wc dinding 215 m2 - 4 lantai keramik 767 m2 130.000,00 99.710.000,00 pasir pasang 37 m3 200.000,00 7.400.000,00 semen 219 zak 65.000,00 14.235.000,00 semen warna 88 kg 25.000,00 2.200.000,00 - Pas plint keramik 817 m1 - plint keramik 2.810 m' 45.000,00 126.450.000,00 semen 56 zak 65.000,00 3.640.000,00 pasir pasang 6 m3 200.000,00 1.200.000,00 1.862.015.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 1.585 m2 Hollow 4x4 cm 4.318 btg 25.000,00 107.950.000,00 Hollow 2x4 cm 2.699 btg 20.000,00 53.980.000,00 Gypsum 9 mm 2.159 lbr 65.000,00 140.335.000,00 Skrup Gypsum 48.578 bh 500,00 24.289.000,00 Penggantung + ramset 10.795 ttk 4.000,00 43.180.000,00 Compound Gypsum 324 zak 75.000,00 24.300.000,00 Textile tape 513 roll 20.000,00 10.260.000,00 amplas 1.619 lbr 6.000,00 9.714.000,00 - 2 Pasang list gypsum 817 m1 - List Gypsum 2.782 m 25.000,00 69.550.000,00 Compound Gypsum 83 zak 65.000,00 5.395.000,00 amplas 417 lbr 6.000,00 2.502.000,00 491.455.000,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 3.371 - plamur tembok 2.296 kg 17.500,00 40.180.000,00 amplas 574 lbr 6.000,00 3.444.000,00 cat tembok Vinilex 2.869 kg 25.000,00 71.725.000,00 - - 2 Cat plafond ex Vinilex setara 1.562 m2 - - plamur tembok 1.064 kg 17.500,00 18.620.000,00 amplas 266 lbr 6.000,00 1.596.000,00 cat tembok Vinilex 1.330 kg 25.000,00 33.250.000,00 168.815.000,00 H PEKERJAAN INSTALASI
  • 33. Proposal Pembangunan dan Pengembangan Page | 32 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan LISTRIK 1 Instalasi titik lampu ex BROCO 150 ttk Kabel NYM 3 x 2,5 mm² 3.061 m1 12.000,00 36.732.000,00 Conduit 3.061 m1 5.000,00 15.305.000,00 Tee Doos 1.020 buah 6.000,00 6.120.000,00 One Way Doos 1.020 buah 6.000,00 6.120.000,00 Sock 1.020 buah 1.500,00 1.530.000,00 Klem 4.081 buah 1.000,00 4.081.000,00 Lasdop 2.040 buah 1.500,00 3.060.000,00 Flexible Pipa 1.020 m1 8.000,00 8.160.000,00 Paku 4.591 buah 500,00 2.295.500,00 Sekrup 1.020 buah 500,00 510.000,00 Fisher 1.020 buah 800,00 816.000,00 Elbow 510 buah 2.000,00 1.020.000,00 - 2 Instalasi titik stop kontak ex BROCO 41 ttk - Kabel NYM 3 x 2,5 mm² 556 m1 12.000,00 6.672.000,00 Conduit 556 m1 5.000,00 2.780.000,00 3 Outlet Box Metal 139 buah 15.000,00 2.085.000,00 Tee Doos 139 buah 6.000,00 834.000,00 Sock 139 buah 6.000,00 834.000,00 Klem 556 buah 1.500,00 834.000,00 Lasdop 278 buah 1.000,00 278.000,00 Paku 139 m1 1.500,00 208.500,00 Sekrup 1.252 buah 8.000,00 10.016.000,00 Fisher 278 buah 500,00 1.390.000,00 Elbow 139 buah 2.000,00 278.000,00 4 Lampu baret 150 bh 600.000,00 90.000.000,00 5 Panel ex BROCO 7 bh 500.000,00 3.500.000,00 6 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00 209.959.000,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 136 m1 27.000,00 3.672.000,00 2 Pipa distribusi Ø1/2" 136 m1 15.000,00 2.040.000,00 3 Closed jongkok 14 bh 600.000,00 8.400.000,00 4 kran tembok 20 bh 12.000,00 240.000,00
  • 34. Proposal Pembangunan dan Pengembangan Page | 33 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 5 Fitting-fitting (Elbow, tee, support) 3 ls 3.000.000,00 9.000.000,00 6 Support, klem 3 ls 3.000.000,00 9.000.000,00 7 Pipa PVC air kotor Ø 3" 82 m1 65.000,00 5.330.000,00 8 Pipa PVC air kotoran Ø 4" 82 m1 75.000,00 6.150.000,00 43.832.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 1.253 m2 220.000,00 275.660.000,00 2 Atap ZINK ALUM 1.253 m2 190.000,00 238.070.000,00 3 Pas.nok 142 - nok 142 bh 135.000,00 19.170.000,00 semen 116 zak 65.000,00 7.540.000,00 pasir beton 18 m3 200.000,00 3.600.000,,00 papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00 - 4 Waterproofing atap 89 m2 65.000,00 5.785.000,00 549.225.000,00 K PEKERJAAN KUSEN 1 P1 17 bh - balok 8/15 2 m3 12.000.000,00 24.000.000,00 paku 14 kg 25.000,00 350.000,00 lem putih 6 kg 20.000,00 120.000,00 papan 3/30 15 m3 12.000.000,00 180.000.000,00 paku rata-rata 57 kg 25.000,00 1.425.000,00 lem putih 78 kg 20.000,00 1.560.000,00 - 2 P2 7 bh - balok 8/15 0,5 m3 12.000.000,00 6.000.000,00 paku 4 kg 25.000,00 100.000,00 lem putih 2 kg 20.000,00 40.000,00 papan 3/30 3 m3 12.000.000,00 36.000.000,00 paku rata-rata 10 kg 25.000,00 250.000,00 lem putih 13 kg 20.000,00 260.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 P4 65 bh - balok 8/15 12 m3 12.000.000,00 144.000.000,00 paku 106 kg 25.000,00 2.650.000,00
  • 35. Proposal Pembangunan dan Pengembangan Page | 34 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan lem putih 42 kg 20.000,00 840.000,00 papan kamper medan 30 m3 12.000.000,00 360.000.000,00 paku rata-rata 21 kg 25.000,00 525.000,00 lem putih 41 kg 20.000,00 820.000,00 list kayu 413 m' 25.000,00 10.325.000,00 kaca 5 mm 21 m2 90.000,00 1.890.000,00 - 772.155.000,00 REKAPITULI A PEKERJAAN TANAH DAN PASIR Rp 41.742.500,00 B PEKERJAN BATA Rp 643.591.500,00 C PEKERJAAN BETON STRUKTUR Rp 3.333.785.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 4.385.973.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 1.862.015.000,00 F PEKERJAAN PLAFOND Rp 491.455.000,00 G PEKERJAAN PENGECATAN/LABURAN Rp 168.815.000,00 H PEKERJAAN INSTALASI LISTRIK Rp 209.959.000,00 I INSTALASI PIPA UTAMA AIR BERSIH Rp 43.832.000,00 J PEKERJAAN ATAP Rp 549.225.000,00 K PEKERJAAN KUSEN Rp 772.155.000,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 12.739.668.000,00 DIBULATKAN Rp 12.739.600.000,00
  • 36. Proposal Pembangunan dan Pengembangan Page | 35 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 37. Proposal Pembangunan dan Pengembangan Page | 36 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 38. Proposal Pembangunan dan Pengembangan Page | 37 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 39. Proposal Pembangunan dan Pengembangan Page | 38 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN GEDUNG SEKOLAH DASAR PLUS AL-FATAH, PUTRA & PUTRI LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 1100 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 37 m3 50.000,00 1.850.000,00 2 Galian pondasi TAPAK 106 m3 75.000,00 7.950.000,00 3 Urug tanah 21 m3 37.500,00 787.500,00 4 Lantai kerja 6 m3 - semen 61 zak 65.000,00 3.965.000,00 pasir beton 7 m3 200.000,00 1.400.000,00 split 12 m3 200.000,00 2.400.000,00 5 Pasir urug bawah lantai + sper 20% 6 m3 - pasir urug 16 m3 200.000,00 3.200.000,00 43.105.000,00 B PEKERJAAN BATA 1 Pasang bata 1.108 m2 batu bata merah 186.088 bh 650,00 120.957.200,00 semen 878 zak 65.000,00 57.070.000,00 pasir pasang 141 m3 200.000,00 28.200.000,00 - - 2 Pas plesteran dan acian 2.216 m2 - semen 810 zak 65.000,00 52.650.000,00 pasir pasang 96 m3 200.000,00 19.200.000,00 278.077.200,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 55 batu kali 148 m3 200.000,00 29.600.000,00 semen 434 zak 65.000,00 28.210.000,00 pasir pasang 47 m3 200.000,00 9.400.000,00 - 2 Cor beton sloof 25x40 18 - Beton K.225 36 m3 - semen 552 zak 65.000,00 35.880.000,00 pasir beton 44 m3 200.000,00 8.800.000,00 split 67 m3 200.000,00 13.400.000,00 besi beton 12.820 kg 13.000,00 166.660.000,00 - kawat beton 513 kg 25.000,00 12.825.000,00 Bekesting beton sloof - PAPAN 1.035 lbr 25.000,00 25.875.000,00 paku rata-rata 325 kg 25.000,00 8.125.000,00
  • 40. Proposal Pembangunan dan Pengembangan Page | 39 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kaso utk.rangka 20 m3 3.000.000,00 60.000.000,00 kaso utk.stut 16 m3 3.000.000,00 48.000.000,00 - 3 Cor beton pondasi tapak - Beton K.225 17 m3 - semen 258 zak 65.000,00 16.770.000,00 pasir beton 20 m3 200.000,00 4.000.000,00 split 31 m3 200.000,00 6.200.000,00 besi beton 5.987 kg 13.000,00 77.831.000,00 kawat beton 239 kg 25.000,00 5.975.000,00 Bekesting beton tapak - - PAPAN 484 lbr 25.000,00 12.100.000,00 paku rata-rata 152 kg 25.000,00 3.800.000,00 kaso utk.rangka 9 m3 3.000.000,00 27.000.000,00 kaso utk.stut 8 m3 3.000.000,00 24.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 77 m3 - semen 782 zak 65.000,00 51.155.000,00 pasir beton 12 m3 200.000,00 2.400.000,00 split 157 m3 200.000,00 31.400.000,00 - 5 Cor beton kolom 51 m3 - semen 776 zak 65.000,00 50.440.000,00 pasir beton 18 m3 200.000,00 3.600.000,00 split 94 m3 200.000,00 18.800.000,00 besi beton 18.024 kg 13.000,00 234.312.000,00 kawat beton 721 kg 25.000,00 18.025.000,00 Bekesting beton kolom - triplek 9 mm 1.456 lbr 160.000,00 232.960.000,00 paku rata-rata 456 kg 25.000,00 11.400.000,00 kaso meranti utk.rangka 29 m3 3.000.000,00 87.000.000,00 kaso meranti utk.stut 23 m3 3.000.000,00 69.000.000,00 1.434.943.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 39 m3 semen 589 zak 65.000,00 38.285.000,00 pasir beton 47 m3 200.000,00 9.400.000,00 split 71 m3 200.000,00 14.200.000,00 besi beton 13.685 kg 13.000,00 177.905.000,00 - kawat beton 547 kg 25.000,00 13.675.000,00 Bekesting beton plat - triplek 9 mm 1.105 lbr 130.000,00 143.650.000,00 paku rata-rata 346 kg 25.000,00 8.650.000,00 kaso meranti utk.rangka 22 m3 3.000.000,00 66.000.000,00 kaso meranti utk.stut 17 m3 3.000.000,00 51.000.000,00 -
  • 41. Proposal Pembangunan dan Pengembangan Page | 40 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 2 Cor beton ring balk 15x20 24 m3 - semen 368 zak 65.000,00 23.920.000,00 pasir beton 29 m3 200.000,00 5.800.000,00 split 44 m3 200.000,00 8.800.000,00 besi beton 8.553 kg 13.000,00 111.189.000,00 - kawat beton 342 kg 25.000,00 8.550.000,00 Bekesting beton ring balok - Papan 691 lbr 25.000,00 17.275.000,00 paku rata-rata 217 kg 25.000,00 5.425.000,00 kaso meranti utk.rangka 14 m3 3.000.000,00 42.000.000,00 kaso meranti utk.stut 11 m3 3.000.000,00 33.000.000,00 - 3 Cor beton plat lantai dan overstek 83 m3 - semen 1.262 zak 65.000,00 82.030.000,00 pasir beton 100 m3 200.000,00 20.000.000,00 split 152 m3 200.000,00 30.400.000,00 besi beton 29.333 kg 13.000,00 381.329.000,00 - kawat beton 1.173 kg 25.000,00 29.325.000,00 Bekesting beton plat lantai - - triplek 9 mm 2.369 lbr 130.000,00 307.970.000,00 paku rata-rata 743 kg 25.000,00 18.575.000,00 kaso meranti utk.rangka 46 m3 3.000.000,00 138.000.000,00 kaso meranti utk.stut 37 m3 3.000.000,00 111.000.000,00 - 1.897.353.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 1.027 m2 lantai keramik 2.414 m2 130.000,00 313.820.000,00 pasir pasang 115 m3 200.000,00 23.000.000,00 semen 690 zak 65.000,00 44.850.000,00 semen warna 276 kg 25.000,00 6.900.000,00 - 2 Pas keramik km/wc 41 m2 - lantai keramik 96 m2 130.000,00 12.480.000,00 pasir pasang 5 m3 200.000,00 1.000.000,00 semen 27 zak 65.000,00 1.755.000,00 semen warna 11 kg 25.000,00 275.000,00 3 Pas keramik km/wc dinding 141 m2 - Lantai keramik 332 m2 130.000,00 43.160.000,00 Pasir pasang 16 m3 200.000,00 3.200.000,00 Semen 95 zak 65.000,00 6.175.000,00 Semen warna 38 Kg 25.000,00 950.000,00 -
  • 42. Proposal Pembangunan dan Pengembangan Page | 41 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 4 Pas plint keramik 537 m1 - plint keramik 1.215 m' 45.000,00 54.675.000,00 semen 24 zak 65.000,00 1.560.000,00 pasir pasang 2 m3 200.000,00 400.000,00 514.200.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 1.042 m2 Hollow 4x4 cm 1.867 btg 25.000,00 46.675.000,00 Hollow 2x4 cm 1.167 btg 20.000,00 23.340.000,00 Gypsum 9 mm 933 lbr 65.000,00 60.645.000,00 Skrup Gypsum 21.003 bh 500,00 10.501.500,00 Penggantung + ramset 4.667 ttk 4.000,00 18.668.000,00 Compound Gypsum 140 zak 75.000,00 10.500.000,00 Textile tape 222 roll 20.000,00 4.440.000,00 amplas 700 lbr 6.000,00 4.200.000,00 - 2 Pasang list gypsum 537 m1 - List Gypsum 1.203 m1 25.000,00 30.075.000,00 Compound Gypsum 36 zak 65.000,00 2.340.000,00 amplas 180 lbr 6.000,00 1.080.000,00 212.464.500,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 2.216 - plamur tembok 992 kg 17.500,00 17.360.000,00 amplas 248 lbr 6.000,00 1.488.000,00 cat tembok Vinilex 1.241 kg 25.000,00 31.025.000,00 - - 2 Cat plafond ex Vinilex setara 1.027 m2 - - plamur tembok 460 kg 17.500,00 8.050.000,00 amplas 115 lbr 6.000,00 690.000,00 cat tembok Vinilex 575 kg 25.000,00 14.375.000,00 72.988.000,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 99 ttk Kabel NYM 3 x 2,5 mm² 1.323 m1 12.000,00 15.876.000,00 Conduit 1.323 m1 5.000,00 6.615.000,00 Tee Doos 441 buah 6.000,00 2.646.000,00 One Way Doos 441 buah 6.000,00 2.646.000,00 Sock 441 buah 1.500,00 661.500,00 Klem 1.764 buah 1.000,00 1.764.000,00
  • 43. Proposal Pembangunan dan Pengembangan Page | 42 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Lasdop 882 buah 1.500,00 1.323.000,00 Flexible Pipa 441 m1 8.000,00 3.528.000,00 Paku 1.985 buah 500,00 992.500,00 Sekrup 441 buah 500,00 220.500,00 Fisher 441 buah 800,00 352.800,00 Elbow 221 buah 2.000,00 442.000,00 - 2 Instalasi titik stop kontak ex BROCO 27 ttk Kabel NYM 3 x 2,5 mm² 241 m1 12.000,00 2.892.000,00 Conduit 241 m1 5.000,00 1.205.000,00 Outlet Box Metal 60 buah 15.000,00 900.000,00 Tee Doos 60 buah 6.000,00 360.000,00 Sock 60 buah 6.000,00 360.000,00 Klem 241 buah 1.500,00 361.500,00 Lasdop 120 buah 1.000,00 120.000,00 Paku 60 m1 1.500,00 90.000,00 Sekrup 541 buah 8.000,00 4.328.000,00 Fisher 120 buah 500,00 60.000,00 Elbow 60 buah 2.000,00 120.000,00 4 Lampu baret 99 bh 600.000,00 59.400.000,00 5 Panel ex BROCO 4 bh 500.000,00 2.000.000,00 6 Test dan commisioning 2 ls 1.500.000,00 3.000.000,00 112.263.800,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 90 m1 27.000,00 2.430.000,00 2 Pipa distribusi Ø1/2" 90 m1 15.000,00 1.350.000,00 3 Closed jongkok 9 bh 600.000,00 5.400.000,00 4 kran tembok 13 bh 12.000,00 156.000,00 5 Fitting-fitting (Elbow, tee, support) 2 ls 3.000.000,00 6.000.000,00 6 Support, klem 2 ls 3.000.000,00 6.000.000,00 7 Pipa PVC air kotor Ø 3" 54 m1 65.000,00 3.510.000,00 8 Pipa PVC air kotoran Ø 4" 54 m1 75.000,00 4.050.000,00 28.896.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 824 m2 220.000,00 181.280.000,00 2 Atap ZINK ALUM 824 m2 190.000,00 156.560.000,00 - 3 Pas.nok 93 - nok 93 bh 135.000,00 12.555.000,00 semen 50 zak 65.000,00 3.250.000,00 pasir beton 8 m3 200.000,00 1.600.000,00 papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00 - 4 Waterproofing atap 89 m2 65.000,00 5.785.000,00
  • 44. Proposal Pembangunan dan Pengembangan Page | 43 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 364.030.000,00 K PEKERJAAN KUSEN 1 P1 11 bh - balok 8/15 1 m3 12.000.000,00 12.000.000,00 paku 6 kg 25.000,00 150.000,00 lem putih 2 kg 20.000,00 40.000,00 papan 3/30 7 m3 12.000.000,00 84.000.000,00 paku rata-rata 16 kg 25.000,00 400.000,00 lem putih 22 kg 20.000,00 440.000,00 - 2 P2 4 bh - balok 8/15 1 m3 12.000.000,00 12.000.000,00 paku 2 kg 25.000,00 50.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 1 m3 12.000.000,00 12.000.000,00 paku rata-rata 3 kg 25.000,00 75.000,00 lem putih 4 kg 20.000,00 80.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 J1 43 bh - balok 8/15 8 m3 12.000.000,00 96.000.000,00 paku 46 kg 25.000,00 1.150.000,00 lem putih 18 kg 20.000,00 360.000,00 papan kamper medan 13 m3 12.000.000,00 156.000.000,00 paku rata-rata 6 kg 25.000,00 150.000,00 lem putih 12 kg 20.000,00 240.000,00 list kayu 117 m' 25.000,00 2.925.000,00 kaca 5 mm 14 m2 90.000,00 1.260.000,00 380.340.000,00 REKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 43.105.000,00 B PEKERJAAN BATA Rp 278.077.200,00 C PEKERJAAN BETON STRUKTUR Rp 1.434.943.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 1.897.353.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 514.200.000,00 F PEKERJAAN PLAFOND Rp 212.464.500,00 G PEKERJAAN PENGECATAN/LABURAN Rp 72.988.000,00 H PEKERJAAN INSTALASI LISTRIK Rp 112.263.800,00 I INSTALASI PIPA UTAMA AIR BERSIH Rp 28.896.000,00 J PEKERJAAN ATAP Rp 364.030.000,00 K PEKERJAAN KUSEN Rp 380.340.000,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 5.575.780.500,00 DIBULATKAN Rp 5.575.700.000,00
  • 45. Proposal Pembangunan dan Pengembangan Page | 44 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 46. Proposal Pembangunan dan Pengembangan Page | 45 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 47. Proposal Pembangunan dan Pengembangan Page | 46 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 48. Proposal Pembangunan dan Pengembangan Page | 47 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 49. Proposal Pembangunan dan Pengembangan Page | 48 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 50. Proposal Pembangunan dan Pengembangan Page | 49 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 51. Proposal Pembangunan dan Pengembangan Page | 50 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN GEDUNG SERBA GUNA DAN LABORATORIUM AL-FATAH LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 1200 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 48 m3 50.000,00 2.400.000,00 2 Galian pondasi TAPAK 138 m3 75.000,00 10.350.000,00 3 Urug tanah 28 m3 37.500,00 1.050.000,00 4 Lantai kerja 8 m3 - semen 104 zak 65.000,00 6.760.000,00 pasir beton 12 m3 200.000,00 2.400.000,00 split 21 m3 200.000,00 4.200.000,00 5 Pasir urug bawah lantai + sper 20% 8 m3 - pasir urug 27 m3 200.000,00 5.400.000,00 32.560.000,00 B PEKERJAAN BATA 1 Pasang bata 1.443 m2 batu bata merah 315.498 Bh 650,00 205.073.700,00 semen 1.489 zak 65.000,00 96.785.000,00 pasir pasang 240 m3 200.000,00 48.000.000,00 - - 2 Pas plesteran dan acian 2.886 m2 - semen 1.373 zak 65.000,00 89.245.000,00 pasir pasang 163 m3 200.000,00 32.600.000,00 471.703.700,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 72 batu kali 251 m3 200.000,00 50.200.000,00 semen 736 zak 65.000,00 47.840.000,00 pasir pasang 79 m3 200.000,00 15.800.000,00 - 2 Cor beton sloof 25x40 24 - Beton K.225 47 m3 - semen 935 zak 65.000,00 60.775.000,00 pasir beton 74 m3 200.000,00 14.800.000,00 split 113 m3 200.000,00 22.600.000,00 besi beton 21.736 Kg 13.000,00 282.568.000,00 - kawat beton 869 Kg 25.000,00 21.725.000,00 Bekesting beton sloof - PAPAN 1.755 Lbr 25.000,00 43.875.000,00 paku rata-rata 550 Kg 25.000,00 13.750.000,00
  • 52. Proposal Pembangunan dan Pengembangan Page | 51 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kaso utk.rangka 34 m3 3.000.000,00 102.000.000,00 kaso utk.stut 28 m3 3.000.000,00 84.000.000,00 - 3 Cor beton pondasi tapak - Beton K.225 22 m3 - semen 437 zak 65.000,00 28.405.000,00 pasir beton 35 m3 200.000,00 7.000.000,00 split 53 m3 200.000,00 10.600.000,00 besi beton 10.151 Kg 13.000,00 131.963.000,00 kawat beton 406 Kg 25.000,00 10.150.000,00 Bekesting beton tapak - - PAPAN 820 Lbr 25.000,00 20.500.000,00 paku rata-rata 257 Kg 25.000,00 6.425.000,00 kaso utk.rangka 16 m3 3.000.000,00 48.000.000,00 kaso utk.stut 13 m3 3.000.000,00 39.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 100 m3 - semen 1.325 zak 65.000,00 86.125.000,00 pasir beton 21 m3 200.000,00 4.200.000,00 split 266 m3 200.000,00 53.200.000,00 - 5 Cor beton kolom 66 m3 - semen 1.315 zak 65.000,00 85.475.000,00 pasir beton 31 m3 200.000,00 6.200.000,00 split 159 m3 200.000,00 31.800.000,00 besi beton 30.559 kg 13.000,00 397.267.000,00 - - kawat beton 1.222 kg 25.000,00 30.550.000,00 Bekesting beton kolom - triplek 9 mm 2.468 lbr 160.000,00 394.880.000,00 paku rata-rata 774 kg 25.000,00 19.350.000,00 kaso meranti utk.rangka 48 m3 3.000.000,00 144.000.000,00 kaso meranti utk.stut 39 m3 3.000.000,00 117.000.000,00 2.432.023.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 50 m3 semen 999 zak 65.000,00 64.935.000,00 pasir beton 79 m3 200.000,00 15.800.000,00 split 120 m3 200.000,00 24.000.000,00 besi beton 23.202 Kg 13.000,00 301.626.000,00 - kawat beton 928 Kg 25.000,00 23.200.000,00 Bekesting beton plat - triplek 9 mm 1.874 Lbr 130.000,00 243.620.000,00 paku rata-rata 587 Kg 25.000,00 14.675.000,00 kaso meranti utk.rangka 37 m3 3.000.000,00 111.000.000,00
  • 53. Proposal Pembangunan dan Pengembangan Page | 52 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan kaso meranti utk.stut 29 m3 3.000.000,00 87.000.000,00 - 2 Cor beton ring balk 15x20 31 m3 - semen 624 zak 65.000,00 40.560.000,00 pasir beton 50 m3 200.000,00 10.000.000,00 split 75 m3 200.000,00 15.000.000,00 besi beton 14.501 Kg 13.000,00 188.513.000,00 - kawat beton 580 Kg 25.000,00 14.500.000,00 Bekesting beton ring balok - Papan 1.171 Lbr 25.000,00 29.275.000,00 paku rata-rata 367 Kg 25.000,00 9.175.000,00 kaso meranti utk.rangka 23 m3 3.000.000,00 69.000.000,00 kaso meranti utk.stut 18 m3 3.000.000,00 54.000.000,00 - 3 Cor beton plat lantai dan overstek 108 m3 - semen 2.140 zak 65.000,00 139.100.000,00 pasir beton 170 m3 200.000,00 34.000.000,00 split 258 m3 200.000,00 51.600.000,00 besi beton 49.732 Kg 13.000,00 646.516.000,00 - kawat beton 1.989 Kg 25.000,00 49.725.000,00 Bekesting beton plat lantai - - triplek 9 mm 4.016 Lbr 130.000,00 522.080.000,00 paku rata-rata 1.259 Kg 25.000,00 31.475.000,00 kaso meranti utk.rangka 79 m3 3.000.000,00 237.000.000,00 kaso meranti utk.stut 63 m3 3.000.000,00 189.000.000,00 3.216.375.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 1.337 m2 lantai keramik 4.093 m2 130.000,00 532.090.000,00 pasir pasang 195 m3 200.000,00 39.000.000,00 semen 1.170 zak 65.000,00 76.050.000,00 semen warna 468 Kg 25.000,00 11.700.000,00 - 2 Pas keramik km/wc 53 m2 - lantai keramik 162 m2 130.000,00 21.060.000,00 pasir pasang 8 m3 200.000,00 1.600.000,00 semen 46 zak 65.000,00 2.990.000,00 semen warna 19 Kg 25.000,00 475.000,00 - 3 Pas keramik km/wc dinding 184 m2 - lantai keramik 562 m2 130.000,00 73.060.000,00 pasir pasang 27 m3 200.000,00 5.400.000,00 semen 161 zak 65.000,00 10.465.000,00
  • 54. Proposal Pembangunan dan Pengembangan Page | 53 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 4 semen warna 64 Kg 25.000,00 1.600.000,00 - Pas plint keramik 700 m - plint keramik 2.060 m' 45.000,00 92.700.000,00 semen 41 zak 65.000,00 2.665.000,00 pasir pasang 4 m3 200.000,00 800.000,00 871.655.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 1.357 m2 Hollow 4x4 cm 3.165 btg 25.000,00 79.125.000,00 Hollow 2x4 cm 1.978 btg 20.000,00 39.560.000,00 Gypsum 9 mm 1.583 Lbr 65.000,00 102.895.000,00 Skrup Gypsum 35.609 Bh 500,00 17.804.500,00 Penggantung + ramset 7.913 Ttk 4.000,00 31.652.302,00 Compound Gypsum 237 zak 75.000,00 17.775.000,00 Textile tape 376 roll 20.000,00 7.520.000,00 amplas 1.187 Lbr 6.000,00 7.122.000,00 - 2 Pasang list gypsum 700 m - List Gypsum 2.040 m 25.000,00 51.000.000,00 Compound Gypsum 61 zak 65.000,00 3.965.000,00 amplas 306 lbr 6.000,00 1.836.000,00 360.254.802,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 2.886 - plamur tembok 1.683 Kg 17.500,00 29.452.500,00 amplas 421 lbr 6.000,00 2.526.000,00 cat tembok Vinilex 2.103 Kg 25.000,00 52.575.000,00 - - 2 Cat plafond ex Vinilex setara 1.337 m2 - - plamur tembok 780 Kg 17.500,00 13.650.000,00 amplas 195 lbr 6.000,00 1.170.000,00 cat tembok Vinilex 975 Kg 25.000,00 24.375.000,00 123.748.500,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 128 ttk Kabel NYM 3 x 2,5 mm² 2.244 m’ 12.000,00 26.928.000,00 Conduit 2.244 m’ 5.000,00 11.220.000,00 Tee Doos 748 buah 6.000,00 4.488.000,00 One Way Doos 748 buah 6.000,00 4.488.000,00
  • 55. Proposal Pembangunan dan Pengembangan Page | 54 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Sock 748 buah 1.500,00 1.122.000,00 Klem 2.991 buah 1.000,00 2.991.000,00 Lasdop 1.496 buah 1.500,00 2.244.000,00 Flexible Pipa 748 m’ 8.000,00 5.984.000,00 Paku 3.365 buah 500,00 1.682.500,00 Sekrup 748 buah 500,00 374.000,00 Fisher 748 buah 800,00 598.400,00 Elbow 374 buah 2.000,00 748.000,00 - 2 Instalasi titik stop kontak ex BROCO 35 ttk - Kabel NYM 3 x 2,5 mm² 408 m 12.000,00 4.896.000,00 Conduit 408 m 5.000,00 2.040.000,00 Outlet Box Metal 102 buah 15.000,00 1.530.000,00 Tee Doos 102 buah 6.000,00 612.000,00 Sock 102 buah 6.000,00 612.000,00 Klem 408 buah 1.500,00 612.000,00 Lasdop 204 buah 1.000,00 204.000,00 Paku 102 m 1.500,00 153.000,00 Sekrup 918 buah 8.000,00 7.344.000,00 Fisher 204 buah 500,00 102.000,00 Elbow 102 buah 2.000,00 204.000,00 3 Lampu baret 128 Bh 600.000,00 76.800.000,00 4 Panel ex BROCO 6 bh 500.000,00 3.000.000,00 5 Test dan commisioning 3 ls 1.500.000,00 4.500.000,00 165.476.900,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 117 m1 27.000,00 3.159.000,00 2 Pipa distribusi Ø1/2" 117 m1 15.000,00 1.755.000,00 3 Closed jongkok 12 bh 600.000,00 7.200.000,00 4 kran tembok 17 bh 12.000,00 204.000,00 5 Fitting-fitting (Elbow, tee, support) 3 ls 3.000.000,00 9.000.000,00 6 Support, klem 3 ls 3.000.000,00 9.000.000,00 7 Pipa PVC air kotor Ø 3" 70 m1 65.000,00 4.550.000,00 8 Pipa PVC air kotoran Ø 4" 70 m1 75.000,00 5.250.000,00 40.118.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 1.073 m2 220.000,00 236.060.000,00 2 Atap ZINK ALUM 1.073 m2 190.000,00 203.870.000,00 - 3 Pas.nok 121 - nok 121 bh 135.000,00 16.335.000,00 semen 85 zak 65.000,00 5.525.000,00 pasir beton 13 m3 200.000,00 2.600.000,00
  • 56. Proposal Pembangunan dan Pengembangan Page | 55 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan papan ruiter kamper 1 m3 3.000.000,00 3.000.000,00 - 4 Waterproofing atap 89 m2 65.000,00 5.785.000,00 473.175.000,00 K PEKERJAAN KUSEN 1 P1 15 bh - balok 8/15 1 m3 12.000.000,00 12.000.000,00 paku 10 kg 25.000,00 250.000,00 lem putih 4 kg 20.000,00 80.000,00 papan 3/30 11 m3 12.000.000,00 132.000.000,00 paku rata-rata 36 kg 25.000,00 900.000,00 lem putih 49 kg 20.000,00 980.000,00 - 2 P2 6 bh - balok 8/15 0,5 m3 12.000.000,00 6.000.000,00 paku 3 kg 25.000,00 75.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 2 m3 12.000.000,00 22.000.000,00 paku rata-rata 6 kg 25.000,00 150.000,00 lem putih 8 kg 20.000,00 160.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 J1 55 bh - balok 8/15 11 m3 12.000.000,00 132.000.000,00 paku 78 kg 25.000,00 1.950.000,00 lem putih 31 kg 20.000,00 620.000,00 papan kamper medan 22 m3 12.000.000,00 264.000.000,00 paku rata-rata 13 kg 25.000,00 325.000,00 lem putih 26 kg 20.000,00 520.000,00 list kayu 259 m' 25.000,00 6.475.000,00 kaca 5 mm 18 m2 90.000,00 1.620.000,00 583.125.000,00 REKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 32.560.000,00 B PEKERJAAN BATA Rp 471.703.700,00 C PEKERJAAN BETON STRUKTUR Rp 2.432.023.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 3.216.375.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 871.655.000,00 F PEKERJAAN PLAFOND Rp 360.254.802,00 G PEKERJAAN PENGECATAN/LABURAN Rp 123.748.500,00 H PEKERJAAN INSTALASI LISTRIK Rp 165.476.900,00 I INSTALASI PIPA UTAMA AIR BERSIH Rp 40.118.000,00 J PEKERJAAN ATAP Rp 473.175.000,00 K PEKERJAAN KUSEN Rp 583.125.000,00 L UPAH TENAGA Rp 237.120.000,00
  • 57. Proposal Pembangunan dan Pengembangan Page | 56 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan GRAND TOTAL Rp 9.007.334.902,00 DIBULATKAN Rp 9.007.300.000,00
  • 58. Proposal Pembangunan dan Pengembangan Page | 57 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 59. Proposal Pembangunan dan Pengembangan Page | 58 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 60. Proposal Pembangunan dan Pengembangan Page | 59 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 61. Proposal Pembangunan dan Pengembangan Page | 60 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 62. Proposal Pembangunan dan Pengembangan Page | 61 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN KANTIN PUTRA PONPES AL-FATAH LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 400 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 21 m3 50.000,00 1.050.000,00 2 Galian pondasi TAPAK 60 m3 75.000,00 4.500.000,00 3 Urug tanah 12 m3 37.500,00 450.000,00 4 Lantai kerja 3 m3 - semen 19 zak 65.000,00 1.235.000,00 pasir beton 2 m3 200.000,00 400.000,00 split 4 m3 200.000,00 800.000,00 5 Pasir urug bawah lantai + sper 20% 3 m3 - pasir urug 5 m3 200.000,00 1.000.000,00 9.435.000,00 B PEKERJAAN BATA 1 Pasang bata 623 m2 batu bata merah 58.880 bh 650,00 38.272.000,00 semen 278 zak 65.000,00 18.070.000,00 pasir pasang 45 m3 200.000,00 9.000.000,00 - - 2 Pas plesteran dan acian 1.247 m2 - semen 256 zak 65.000,00 16.640.000,00 pasir pasang 30 m3 200.000,00 6.000.000,00 87.982.000,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 31 batu kali 47 m3 200.000,00 9.400.000,00 semen 137 zak 65.000,00 8.905.000,00 pasir pasang 15 m3 200.000,00 3.000.000,00 - 2 Cor beton sloof 25x40 10 - Beton K.225 20 m3 - semen 175 zak 65.000,00 11.375.000,00 pasir beton 14 m3 200.000,00 2.800.000,00 split 21 m3 200.000,00 4.200.000,00 besi beton 4.056 kg 13.000,00 52.728.000,00 - kawat beton 162 kg 25.000,00 4.050.000,00 Bekesting beton sloof - PAPAN 328 lbr 25.000,00 8.200.000,00 paku rata-rata 103 kg 25.000,00 2.575.000,00 kaso utk.rangka 6 m3 3.000.000,00 18.000.000,00 kaso utk.stut 5 m3 3.000.000,00 15.000.000,00
  • 63. Proposal Pembangunan dan Pengembangan Page | 62 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan - 3 Cor beton pondasi tapak - Beton K.225 10 m3 - semen 82 zak 65.000,00 5.330.000,00 pasir beton 6 m3 200.000,00 1.200.000,00 split 10 m3 200.000,00 2.000.000,00 besi beton 1.894 kg 13.000,00 24.622.000,00 kawat beton 76 kg 25.000,00 1.900.000,00 Bekesting beton tapak - - PAPAN 153 lbr 25.000,00 3.825.000,00 paku rata-rata 48 kg 25.000,00 1.200.000,00 kaso utk.rangka 3 m3 3.000.000,00 9.000.000,00 kaso utk.stut 2 m3 3.000.000,00 6.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 43 m3 - semen 247 zak 65.000,00 16.055.000,00 pasir beton 4 m3 200.000,00 800.000,00 split 50 m3 200.000,00 10.000.000,00 - 5 Cor beton kolom 29 m3 - semen 245 zak 65.000,00 15.925.000,00 pasir beton 6 m3 200.000,00 1.200.000,00 split 30 m3 200.000,00 6.000.000,00 besi beton 5.703 kg 13.000,00 74.139.000,00 - - kawat beton 228 kg 25.000,00 5.700.000,00 Bekesting beton kolom - triplek 9 mm 461 lbr 160.000,00 73.760.000,00 paku rata-rata 144 kg 25.000,00 3.600.000,00 kaso meranti utk.rangka 9 m3 3.000.000,00 27.000.000,00 kaso meranti utk.stut 7 m3 3.000.000,00 21.000.000,00 450.489.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 22 m3 semen 186 zak 65.000,00 12.090.000,00 pasir beton 15 m3 200.000,00 3.000.000,00 split 22 m3 200.000,00 4.400.000,00 besi beton 4.330 kg 13.000,00 56.290.000,00 - kawat beton 173 kg 25.000,00 4.325.000,00 Bekesting beton plat - triplek 9 mm 350 lbr 130.000,00 45.500.000,00 paku rata-rata 110 kg 25.000,00 2.750.000,00 kaso meranti utk.rangka 7 m3 3.000.000,00 21.000.000,00 kaso meranti utk.stut 5 m3 3.000.000,00 15.000.000,00 - 2 Cor beton ring balk 15x20 14 m3 -
  • 64. Proposal Pembangunan dan Pengembangan Page | 63 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan semen 116 zak 65.000,00 7.540.000,00 pasir beton 9 m3 200.000,00 1.800.000,00 split 14 m3 200.000,00 2.800.000,00 besi beton 2.706 kg 13.000,00 35.178.000,00 - kawat beton 108 kg 25.000,00 2.700.000,00 Bekesting beton ring balok - Papan 219 lbr 25.000,00 5.475.000,00 paku rata-rata 69 kg 25.000,00 1.725.000,00 kaso meranti utk.rangka 4 m3 3.000.000,00 12.000.000,00 kaso meranti utk.stut 3 m3 3.000.000,00 9.000.000,00 - 3 Cor beton plat lantai dan overstek 47 m3 - semen 399 zak 65.000,00 25.935.000,00 pasir beton 32 m3 200.000,00 6.400.000,00 split 48 m3 200.000,00 9.600.000,00 besi beton 9.281 kg 13.000,00 120.653.000,00 - kawat beton 371 kg 25.000,00 9.275.000,00 Bekesting beton plat lantai - - triplek 9 mm 750 lbr 130.000,00 97.500.000,00 paku rata-rata 235 kg 25.000,00 5.875.000,00 kaso meranti utk.rangka 15 m3 3.000.000,00 45.000.000,00 kaso meranti utk.stut 12 m3 3.000.000,00 36.000.000,00 598.811.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 578 m2 lantai keramik 764 m2 130.000,00 99.320.000,00 pasir pasang 36 m3 200.000,00 7.200.000,00 semen 218 zak 65.000,00 14.170.000,00 semen warna 87 kg 25.000,00 2.175.000,00 - 2 Pas keramik km/wc 23 m2 - lantai keramik 30 m2 130.000,00 3.900.000,00 pasir pasang 1 m3 200.000,00 200.000,00 semen 9 zak 65.000,00 585.000,00 semen warna 3 kg 25.000,00 75.000,00 - 3 Pas keramik km/wc dinding 79 m2 - lantai keramik 105 m2 130.000,00 13.650.000,00 pasir pasang 5 m3 200.000,00 1.000.000,00 semen 30 zak 65.000,00 1.950.000,00 semen warna 12 kg 25.000,00 300.000,00 - 4 Pas plint keramik 302 m1 - plint keramik 384 m' 45.000,00 17.280.000,00
  • 65. Proposal Pembangunan dan Pengembangan Page | 64 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan semen 8 zak 65.000,00 520.000,00 pasir pasang 1 m3 200.000,00 200.000,00 162.525.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 586 m2 Hollow 4x4 cm 591 btg 25.000,00 14.775.000,00 Hollow 2x4 cm 369 btg 20.000,00 7.380.000,00 Gypsum 9 mm 295 lbr 65.000,00 19.175.000,00 Skrup Gypsum 6.645 bh 500,00 3.322.500,00 Penggantung + ramset 1.477 ttk 4.000,00 5.908.000,00 Compound Gypsum 44 zak 75.000,00 3.300.000,00 Textile tape 70 roll 20.000,00 1.400.000,00 amplas 222 lbr 6.000,00 1.332.000,00 - 2 Pasang list gypsum 302 m1 - List Gypsum 381 m 25.000,00 9.525.000,00 Compound Gypsum 11 zak 65.000,00 715.000,00 amplas 57 lbr 6.000,00 342.000,00 67.174.500,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 1.247 - plamur tembok 314 kg 17.500,00 5.495.000,00 amplas 79 lbr 6.000,00 474.000,00 cat tembok Vinilex 393 kg 25.000,00 9.825.000,00 - - 2 Cat plafond ex Vinilex setara 578 m2 - - plamur tembok 146 kg 17.500,00 2.555.000,00 amplas 36 lbr 6.000,00 216.000,00 cat tembok Vinilex 182 kg 25.000,00 4.550.000,00 23.115.000,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 55 ttk Kabel NYM 3 x 2,5 mm² 419 m 12.000,00 5.028.000,00 Conduit 419 m 5.000,00 2.095.000,00 Tee Doos 140 buah 6.000,00 840.000,00 One Way Doos 140 buah 6.000,00 840.000,00 Sock 140 buah 1.500,00 210.000,00 Klem 558 buah 1.000,00 558.000,00 Lasdop 279 buah 1.500,00 418.500,00 Flexible Pipa 140 m 8.000,00 1.120.000,00 Paku 628 buah 500,00 314.000,00 Sekrup 140 buah 500,00 70.000,00 Fisher 140 buah 800,00 112.000,00 Elbow 70 buah 2.000,00 140.000,00 - 2 Instalasi titik stop kontak ex 15 ttk -
  • 66. Proposal Pembangunan dan Pengembangan Page | 65 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan BROCO Kabel NYM 3 x 2,5 mm² 76 m 12.000,00 912.000,00 Conduit 76 m 5.000,00 380.000,00 Outlet Box Metal 19 buah 15.000,00 285.000,00 Tee Doos 19 buah 6.000,00 114.000,00 Sock 19 buah 6.000,00 114.000,00 Klem 76 buah 1.500,00 114.000,00 Lasdop 38 buah 1.000,00 38.000,00 Paku 19 m 1.500,00 28.500,00 Sekrup 171 buah 8.000,00 1.368.000,00 Fisher 38 buah 500,00 19.000,00 3 Elbow 19 buah 2.000,00 38.000,00 Lampu baret 55 bh 600.000,00 33.000.000,00 4 Panel ex BROCO 3 bh 500.000,00 1.500.000,00 5 Test dan commisioning 1 ls 1.500.000,00 1.500.000,00 51.156.000,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 50 m1 27.000,00 1.350.000,00 2 Pipa distribusi Ø1/2" 50 m1 15.000,00 750.000,00 3 Closed jongkok 5 bh 600.000,00 3.000.000,00 4 kran tembok 8 bh 12.000,00 96.000,00 5 Fitting-fitting (Elbow, tee, support) 1 ls 3.000.000,00 3.000.000,00 6 Support, klem 1 ls 3.000.000,00 3.000.000,00 7 Pipa PVC air kotor Ø 3" 30 m1 65.000,00 1.950.000,00 8 Pipa PVC air kotoran Ø 4" 30 m1 75.000,00 2.250.000,00 15.396.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 463 m2 220.000,00 101.860.000,00 2 Atap ZINK ALUM 463 m2 190.000,00 87.970.000,00 - 3 Pas.nok 52 - nok 52 bh 135.000,00 7.020.000,00 semen 16 zak 65.000,00 1.040.000,00 pasir beton 3 m3 200.000,00 600.000,00 papan ruiter kamper 0,5 m3 3.000.000,00 1.500.000,00 - 4 Waterproofing atap 89 m2 65.000,00 5.785.000,00 205.775.000,00 K PEKERJAAN KUSEN 1 P1 6 bh - balok 8/15 0,7 m3 12.000.000,00 8.400.000,00 paku 2 kg 25.000,00 50.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 2 m3 12.000.000,00 24.000.000,00
  • 67. Proposal Pembangunan dan Pengembangan Page | 66 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan paku rata-rata 3 kg 25.000,00 75.000,00 lem putih 4 kg 20.000,00 80.000,00 - 2 P2 3 bh - balok 8/15 0,7 m3 12.000.000,00 8.400.000,00 paku 1 kg 25.000,00 25.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 0,3 m3 12.000.000,00 3.600.000,00 paku rata-rata 0,5 kg 25.000,00 12.500,00 lem putih 1 kg 20.000,00 20.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 J1 24 bh - balok 8/15 5 m3 12.000.000,00 60.000.000,00 paku 14 kg 25.000,00 350.000,00 lem putih 6 kg 20.000,00 120.000,00 papan kamper medan 4 m3 12.000.000,00 48.000.000,00 paku rata-rata 1 kg 25.000,00 25.000,00 lem putih 2 kg 20.000,00 40.000,00 list kayu 21 m' 25.000,00 525.000,00 kaca 5 mm 8 m2 90.000,00 720.000,00 155.482.500,00 REKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 9.435.000,00 B PEKERJAAN BATA Rp 87.982.000,00 C PEKERJAAN BETON STRUKTUR Rp 450.489.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 598.811.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 162.525.000,00 F PEKERJAAN PLAFOND Rp 67.174.500,00 G PEKERJAAN PENGECATAN/LABURAN Rp 23.115.000,00 H PEKERJAAN INSTALASI LISTRIK Rp 51.156.000,00 I INSTALASI PIPA UTAMA AIR BERSIH Rp 15.396.000,00 J PEKERJAAN ATAP Rp 205.775.000,00 K PEKERJAAN KUSEN Rp 155.482.500,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 2.064.461.000,00 DIBULATKAN Rp 2.064.400.000,00
  • 68. Proposal Pembangunan dan Pengembangan Page | 67 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 69. Proposal Pembangunan dan Pengembangan Page | 68 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 70. Proposal Pembangunan dan Pengembangan Page | 69 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 71. Proposal Pembangunan dan Pengembangan Page | 70 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 72. Proposal Pembangunan dan Pengembangan Page | 71 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 73. Proposal Pembangunan dan Pengembangan Page | 72 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan PROYEK : PEMBANGUNAN KANTIN PUTRI PONPES AL-FATAH LOKASI : Bacan Selatan, Halmahera Selatan, Maluku Utara LUAS : 400 M2 NO URAIAN PEKERJAAN VOLUME MATERIAL SAT HARSAT JUMLAH A PEKERJAAN TANAH DAN PASIR 1 Galian pondasi SLOOF 21 m3 50.000,00 1.050.000,00 2 Galian pondasi TAPAK 60 m3 75.000,00 4.500.000,00 3 Urug tanah 12 m3 37.500,00 450.000,00 4 Lantai kerja 3 m3 - semen 19 zak 65.000,00 1.235.000,00 pasir beton 2 m3 200.000,00 400.000,00 split 4 m3 200.000,00 800.000,00 5 Pasir urug bawah lantai + sper 20% 3 m3 - pasir urug 5 m3 200.000,00 1.000.000,00 9.435.000,00 B PEKERJAAN BATA 1 Pasang bata 623 m2 batu bata merah 58.880 bh 650,00 38.272.000,00 semen 278 zak 65.000,00 18.070.000,00 pasir pasang 45 m3 200.000,00 9.000.000,00 - - 2 Pas plesteran dan acian 1.247 m2 - semen 256 zak 65.000,00 16.640.000,00 pasir pasang 30 m3 200.000,00 6.000.000,00 87.982.000,00 C PEKERJAAN BETON STRUKTUR 1 Pasang pondasi batukali 31 batu kali 47 m3 200.000,00 9.400.000,00 semen 137 zak 65.000,00 8.905.000,00 pasir pasang 15 m3 200.000,00 3.000.000,00 - 2 Cor beton sloof 25x40 10 - Beton K.225 20 m3 - semen 175 zak 65.000,00 11.375.000,00 pasir beton 14 m3 200.000,00 2.800.000,00 split 21 m3 200.000,00 4.200.000,00 besi beton 4.056 kg 13.000,00 52.728.000,00 - kawat beton 162 kg 25.000,00 4.050.000,00 Bekesting beton sloof - PAPAN 328 lbr 25.000,00 8.200.000,00 paku rata-rata 103 kg 25.000,00 2.575.000,00 kaso utk.rangka 6 m3 3.000.000,00 18.000.000,00 kaso utk.stut 5 m3 3.000.000,00 15.000.000,00
  • 74. Proposal Pembangunan dan Pengembangan Page | 73 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan - 3 Cor beton pondasi tapak - Beton K.225 10 m3 - semen 82 zak 65.000,00 5.330.000,00 pasir beton 6 m3 200.000,00 1.200.000,00 split 10 m3 200.000,00 2.000.000,00 besi beton 1.894 kg 13.000,00 24.622.000,00 kawat beton 76 kg 25.000,00 1.900.000,00 Bekesting beton tapak - - PAPAN 153 lbr 25.000,00 3.825.000,00 paku rata-rata 48 kg 25.000,00 1.200.000,00 kaso utk.rangka 3 m3 3.000.000,00 9.000.000,00 kaso utk.stut 2 m3 3.000.000,00 6.000.000,00 - 4 Cor beton lantai/beton susut t=8cm 43 m3 - semen 247 zak 65.000,00 16.055.000,00 pasir beton 4 m3 200.000,00 800.000,00 split 50 m3 200.000,00 10.000.000,00 - 5 Cor beton kolom 29 m3 - semen 245 zak 65.000,00 15.925.000,00 pasir beton 6 m3 200.000,00 1.200.000,00 split 30 m3 200.000,00 6.000.000,00 besi beton 5.703 kg 13.000,00 74.139.000,00 - - kawat beton 228 kg 25.000,00 5.700.000,00 Bekesting beton kolom - triplek 9 mm 461 lbr 160.000,00 73.760.000,00 paku rata-rata 144 kg 25.000,00 3.600.000,00 kaso meranti utk.rangka 9 m3 3.000.000,00 27.000.000,00 kaso meranti utk.stut 7 m3 3.000.000,00 21.000.000,00 450.489.000,00 D PEKERJAAN BALOK dan PLAT LANTAI 1 Cor balok B1 20X40 22 m3 semen 186 zak 65.000,00 12.090.000,00 pasir beton 15 m3 200.000,00 3.000.000,00 split 22 m3 200.000,00 4.400.000,00 besi beton 4.330 kg 13.000,00 56.290.000,00 - kawat beton 173 kg 25.000,00 4.325.000,00 Bekesting beton plat - triplek 9 mm 350 lbr 130.000,00 45.500.000,00 paku rata-rata 110 kg 25.000,00 2.750.000,00 kaso meranti utk.rangka 7 m3 3.000.000,00 21.000.000,00 kaso meranti utk.stut 5 m3 3.000.000,00 15.000.000,00 -
  • 75. Proposal Pembangunan dan Pengembangan Page | 74 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 2 Cor beton ring balk 15x20 14 m3 - semen 116 zak 65.000,00 7.540.000,00 pasir beton 9 m3 200.000,00 1.800.000,00 split 14 m3 200.000,00 2.800.000,00 besi beton 2.706 kg 13.000,00 35.178.000,00 - kawat beton 108 kg 25.000,00 2.700.000,00 Bekesting beton ring balok - Papan 219 lbr 25.000,00 5.475.000,00 paku rata-rata 69 kg 25.000,00 1.725.000,00 kaso meranti utk.rangka 4 m3 3.000.000,00 12.000.000,00 kaso meranti utk.stut 3 m3 3.000.000,00 9.000.000,00 - 3 Cor beton plat lantai dan overstek 47 m3 - semen 399 zak 65.000,00 25.935.000,00 pasir beton 32 m3 200.000,00 6.400.000,00 split 48 m3 200.000,00 9.600.000,00 besi beton 9.281 kg 13.000,00 120.653.000,00 - kawat beton 371 kg 25.000,00 9.275.000,00 Bekesting beton plat lantai - - triplek 9 mm 750 lbr 130.000,00 97.500.000,00 paku rata-rata 235 kg 25.000,00 5.875.000,00 kaso meranti utk.rangka 15 m3 3.000.000,00 45.000.000,00 kaso meranti utk.stut 12 m3 3.000.000,00 36.000.000,00 598.811.000,00 E PEK LANTAI DAN DINDING KERAMIK 1 Pas keramik 578 m2 lantai keramik 764 m2 130.000,00 99.320.000,00 pasir pasang 36 m3 200.000,00 7.200.000,00 semen 218 zak 65.000,00 14.170.000,00 semen warna 87 kg 25.000,00 2.175.000,00 - 2 Pas keramik km/wc 23 m2 - lantai keramik 30 m2 130.000,00 3.900.000,00 pasir pasang 1 m3 200.000,00 200.000,00 semen 9 zak 65.000,00 585.000,00 semen warna 3 kg 25.000,00 75.000,00 - 3 Pas keramik km/wc dinding 79 m2 - lantai keramik 105 m2 130.000,00 13.650.000,00 pasir pasang 5 m3 200.000,00 1.000.000,00 semen 30 zak 65.000,00 1.950.000,00 semen warna 12 kg 25.000,00 300.000,00 -
  • 76. Proposal Pembangunan dan Pengembangan Page | 75 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan 4 Pas plint keramik 302 m1 - plint keramik 384 m' 45.000,00 17.280.000,00 semen 8 zak 65.000,00 520.000,00 pasir pasang 1 m3 200.000,00 200.000,00 162.525.000,00 F PEKERJAAN PLAFOND 1 Pasang plafond gypsum t=9mm 586 m2 Hollow 4x4 cm 591 btg 25.000,00 14.775.000,00 Hollow 2x4 cm 369 btg 20.000,00 7.380.000,00 Gypsum 9 mm 295 lbr 65.000,00 19.175.000,00 Skrup Gypsum 6.645 bh 500,00 3.322.500,00 Penggantung + ramset 1.477 ttk 4.000,00 5.908.000,00 Compound Gypsum 44 zak 75.000,00 3.300.000,00 Textile tape 70 roll 20.000,00 1.400.000,00 amplas 222 lbr 6.000,00 1.332.000,00 - 2 Pasang list gypsum 302 m1 - List Gypsum 381 m 25.000,00 9.525.000,00 Compound Gypsum 11 zak 65.000,00 715.000,00 amplas 57 lbr 6.000,00 342.000,00 67.174.500,00 G PEKERJAAN PENGECATAN/LABURAN - 1 Cat dinding ex Vinilex setara 1.247 - plamur tembok 314 kg 17.500,00 5.495.000,00 amplas 79 lbr 6.000,00 474.000,00 cat tembok Vinilex 393 kg 25.000,00 9.825.000,00 - - 2 Cat plafond ex Vinilex setara 578 m2 - - plamur tembok 146 kg 17.500,00 2.555.000,00 amplas 36 lbr 6.000,00 216.000,00 cat tembok Vinilex 182 kg 25.000,00 4.550.000,00 23.115.000,00 H PEKERJAAN INSTALASI LISTRIK 1 Instalasi titik lampu ex BROCO 55 ttk Kabel NYM 3 x 2,5 mm² 419 m 12.000,00 5.028.000,00 Conduit 419 m 5.000,00 2.095.000,00 Tee Doos 140 buah 6.000,00 840.000,00 One Way Doos 140 buah 6.000,00 840.000,00 Sock 140 buah 1.500,00 210.000,00 Klem 558 buah 1.000,00 558.000,00 Lasdop 279 buah 1.500,00 418.500,00 Flexible Pipa 140 m 8.000,00 1.120.000,00 Paku 628 buah 500,00 314.000,00 Sekrup 140 buah 500,00 70.000,00 Fisher 140 buah 800,00 112.000,00
  • 77. Proposal Pembangunan dan Pengembangan Page | 76 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Elbow 70 buah 2.000,00 140.000,00 - 2 Instalasi titik stop kontak ex BROCO 15 ttk - Kabel NYM 3 x 2,5 mm² 76 m 12.000,00 912.000,00 Conduit 76 m 5.000,00 380.000,00 Outlet Box Metal 19 buah 15.000,00 285.000,00 Tee Doos 19 buah 6.000,00 114.000,00 Sock 19 buah 6.000,00 114.000,00 Klem 76 buah 1.500,00 114.000,00 Lasdop 38 buah 1.000,00 38.000,00 Paku 19 m 1.500,00 28.500,00 Sekrup 171 buah 8.000,00 1.368.000,00 Fisher 38 buah 500,00 19.000,00 3 Elbow 19 buah 2.000,00 38.000,00 Lampu baret 55 bh 600.000,00 33.000.000,00 4 Panel ex BROCO 3 bh 500.000,00 1.500.000,00 5 Test dan commisioning 1 ls 1.500.000,00 1.500.000,00 51.156.000,00 I INSTALASI PIPA UTAMA AIR BERSIH 1 Pipa distribusi Ø1 1/2" 50 m1 27.000,00 1.350.000,00 2 Pipa distribusi Ø1/2" 50 m1 15.000,00 750.000,00 3 Closed jongkok 5 bh 600.000,00 3.000.000,00 4 kran tembok 8 bh 12.000,00 96.000,00 5 Fitting-fitting (Elbow, tee, support) 1 ls 3.000.000,00 3.000.000,00 6 Support, klem 1 ls 3.000.000,00 3.000.000,00 7 Pipa PVC air kotor Ø 3" 30 m1 65.000,00 1.950.000,00 8 Pipa PVC air kotoran Ø 4" 30 m1 75.000,00 2.250.000,00 15.396.000,00 J PEKERJAAN ATAP 1 Pasang atap baja ringan 463 m2 220.000,00 101.860.000,00 2 Atap ZINK ALUM 463 m2 190.000,00 87.970.000,00 - 3 Pas.nok 52 - nok 52 bh 135.000,00 7.020.000,00 semen 16 zak 65.000,00 1.040.000,00 pasir beton 3 m3 200.000,00 600.000,00 papan ruiter kamper 0,5 m3 3.000.000,00 1.500.000,00 - 4 Waterproofing atap 89 m2 65.000,00 5.785.000,00 205.775.000,00 K PEKERJAAN KUSEN 1 P1 6 bh -
  • 78. Proposal Pembangunan dan Pengembangan Page | 77 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan balok 8/15 0,7 m3 12.000.000,00 8.400.000,00 paku 2 kg 25.000,00 50.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 2 m3 12.000.000,00 24.000.000,00 paku rata-rata 3 kg 25.000,00 75.000,00 lem putih 4 kg 20.000,00 80.000,00 - 2 P2 3 bh - balok 8/15 0,7 m3 paku 1 kg 25.000,00 25.000,00 lem putih 1 kg 20.000,00 20.000,00 papan 3/30 0,3 m3 12.000.000,00 3.600.000,00 paku rata-rata 0,5 kg 25.000,00 12.500,00 lem putih 1 kg 20.000,00 20.000,00 - 3 P3 KM/WC 4 bh 250.000,00 1.000.000,00 - 4 J1 24 bh - balok 8/15 5 m3 12.000.000,00 60.000.000,00 paku 14 kg 25.000,00 350.000,00 lem putih 6 kg 20.000,00 120.000,00 papan kamper medan 4 m3 12.000.000,00 48.000.000,00 paku rata-rata 1 kg 25.000,00 25.000,00 lem putih 2 kg 20.000,00 40.000,00 list kayu 21 m' 25.000,00 525.000,00 kaca 5 mm 8 m2 90.000,00 720.000,00 155.482.500,00 REKAPITULASI A PEKERJAAN TANAH DAN PASIR Rp 9.435.000,00 B PEKERJAAN BATA Rp 87.982.000,00 C PEKERJAAN BETON STRUKTUR Rp 450.489.000,00 D PEKERJAAN BALOK dan PLAT LANTAI Rp 598.811.000,00 E PEK LANTAI DAN DINDING KERAMIK Rp 162.525.000,00 F PEKERJAAN PLAFOND Rp 67.174.500,00 G PEKERJAAN PENGECATAN/LABURAN Rp 23.115.000,00 H PEKERJAAN INSTALASI LISTRIK Rp 51.156.000,00 I INSTALASI PIPA UTAMA AIR BERSIH Rp 15.396.000,00 J PEKERJAAN ATAP Rp 205.775.000,00 K PEKERJAAN KUSEN Rp 155.482.500,00 L UPAH TENAGA Rp 237.120.000,00 GRAND TOTAL Rp 2.064.461.000,00 DIBULATKAN Rp 2.064.400.000,00
  • 79. Proposal Pembangunan dan Pengembangan Page | 78 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 80. Proposal Pembangunan dan Pengembangan Page | 79 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 81. Proposal Pembangunan dan Pengembangan Page | 80 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 82. Proposal Pembangunan dan Pengembangan Page | 81 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 83. Proposal Pembangunan dan Pengembangan Page | 82 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 84. Proposal Pembangunan dan Pengembangan Page | 83 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan
  • 85. Proposal Pembangunan dan Pengembangan Page | 84 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan Masterplan
  • 86. Proposal Pembangunan dan Pengembangan Page | 85 Ponpes Shuffah Al-Fatah Sultan Muksin Syah Bacan