The production schedule outlines three scenes to be filmed on June 18th at 25 Sharman Road. Scene 1 will be filmed from 4:00pm-5:00pm and involves the main character waking up and going downstairs. Scene 2 is scheduled for 5:30pm-6:00pm and features the character putting a pencil in the bin and getting a drink of water. Scene 3 will be filmed from 6:00pm-6:20pm and shows the character putting on shoes and leaving the house. The same equipment and cast member, Maliek as the main character, will be used for all three scenes.