Warehousing/
Waiting for Delivery
Shenzhen Metal Industries Ltd.
Process Flow Chart
Item: Button
Start
Raw Materials
Receive as
per PO
Raw Materials
Inspection AQL 2.5
Raw Materials
Metal detector
Check 100%
Storage after
inventory
Cooper Cutting
Pressing Section
for
CAP/SHANK/RIVET
Measurement/
Logo/Shape
Checking
Plating Section
for
Color dyeing
AQL 2.5 Color
Check
Nickel & Rusting
Check
Assembly
all Parts
QC Assembly
check 100%
Random Carton
QC Audit
QA AQL
Measurement
Inspection
Poly/Cartoning Pull Test Sample Send for
buyer Approval

Production Flowchart-Button.PPT

  • 1.
    Warehousing/ Waiting for Delivery ShenzhenMetal Industries Ltd. Process Flow Chart Item: Button Start Raw Materials Receive as per PO Raw Materials Inspection AQL 2.5 Raw Materials Metal detector Check 100% Storage after inventory Cooper Cutting Pressing Section for CAP/SHANK/RIVET Measurement/ Logo/Shape Checking Plating Section for Color dyeing AQL 2.5 Color Check Nickel & Rusting Check Assembly all Parts QC Assembly check 100% Random Carton QC Audit QA AQL Measurement Inspection Poly/Cartoning Pull Test Sample Send for buyer Approval