Final Year Project:
College Management System
Project ID:
Project Team
• Husnain Raza (Roll # MCSE-S19-019)
• Saqib Anwaar (MITE-S19-003)
• Ali Raza (Roll # MITE-S19-008)
• Supervisor: Sir, Ahmed Kahloon
Table of Content
• Problem
• Solution
• Progress Report Summary
 Requirements
 Design
 Implementation
• Next Steps
• Prototype / Report
Introduction & Background
• This project is about to facilitate students, Faculty members, as they
get their required information on just one click.
• In the initial era the all record was maintained manually.
• In the initial era students move towards offices to check their result
manually, one by one.
It was too much time consuming and wastage of resources, and
infrastructure and also was expensive.
• But, now it all can be done on just one click through the project.
Problem Statement
• It was too difficult to make record of all students and faculty
members manually, a lot of time and recourses were consumed to
accomplish these above activities.
• It was considering that a technology based project should be
developed and implemented to carry out the above activities with
minimum resources and time consumption.
• So a web based project decided to be developed to manage above
problems.
Solution
• As we know that the problems of old system to keep the record
there were many problems that is why we develop College
Management System Website. It keeps the record about, employee,
student, salary, fee, exam and all fields of the college in database.
There are very minor chances to loss the data. It secure data from
unauthorized person and it will manage easy to save, update, view
and delete the record
Features and Scope
• We aim to manage all the work of college using the College
Management System.
• The College Management System is the Educational management
system.
• At the time to run the Educational Institute the education is the basic
and main responsibility of the College.
• It helps the admin to keep the record, manage and control the entire
data of the college.
• It helps the admin to access the data easily.
Requirements
• Elicitation Techniques / Tools
 Interviews
 Market/Literature Survey
 Wire Framing / Prototyping
 etc.
• Specification / Documentation
 SRS
Requirements
• List of Different Users
 Admin
 Owner
 Customer
 etc.
• Use Cases
• Functional & Non Functional Requirements all are included in
Assignments.
Use Case Diagram
Functional & Non Functional Requirements
• The requirements that can be written in code are called functional
requirements.
• The requirements that can not be written in program code are called
non functional requirement for example performance of the
program.
• The above both types of all requirements are included in the
assignment with detail, on the base of which the project is
developed.
System Design
• Entity Relationship Diagram
• Class Diagram
• Sequence / Collaboration Diagram
• Component Diagram
• Activity Diagram
Entity Relationship Diagram
Class Diagram
Sequence / Collaboration Diagram
Component Diagram
Activity Diagram
Implementation
Tools and Technologies Tools and Technologies
Best Practices and coding
Challenges
• We have to face many problems int the old system that is painful for students, teacher
and other staff if we want to found any record in old system that was take much more
time old college system was a time wasted, facing problem in every field it was difficult
to store to a huge amount of data about the college. Then we feel need a system who
manage all management system of the college. The system gives a quick response on
the request. Then we develop a College Management System website who manage all
the management of the system. It contains all record about the teacher. It contains all
record about courses. It contains all record about other staff of the college. It contains
all record about the student and exam record. It works smoothly. The system gives us a
quick and accurate and correct result which we want to search. It is less time consuming
software. It helps us in every field of the college. Now everything will be managing
easily.
Login Page
Homepage
Admission form
Student Personal Info
Admin-page
Student Fee adding
Add New Course
Add New Subject
Student Attendance
Teacher Dashboard
Attendance by Teacher
Student’s Result
Teacher Subject
Report
• Link to report

Presentation Slides of College Management System Report

  • 1.
    Final Year Project: CollegeManagement System Project ID:
  • 2.
    Project Team • HusnainRaza (Roll # MCSE-S19-019) • Saqib Anwaar (MITE-S19-003) • Ali Raza (Roll # MITE-S19-008) • Supervisor: Sir, Ahmed Kahloon
  • 3.
    Table of Content •Problem • Solution • Progress Report Summary  Requirements  Design  Implementation • Next Steps • Prototype / Report
  • 4.
    Introduction & Background •This project is about to facilitate students, Faculty members, as they get their required information on just one click. • In the initial era the all record was maintained manually. • In the initial era students move towards offices to check their result manually, one by one. It was too much time consuming and wastage of resources, and infrastructure and also was expensive. • But, now it all can be done on just one click through the project.
  • 5.
    Problem Statement • Itwas too difficult to make record of all students and faculty members manually, a lot of time and recourses were consumed to accomplish these above activities. • It was considering that a technology based project should be developed and implemented to carry out the above activities with minimum resources and time consumption. • So a web based project decided to be developed to manage above problems.
  • 6.
    Solution • As weknow that the problems of old system to keep the record there were many problems that is why we develop College Management System Website. It keeps the record about, employee, student, salary, fee, exam and all fields of the college in database. There are very minor chances to loss the data. It secure data from unauthorized person and it will manage easy to save, update, view and delete the record
  • 7.
    Features and Scope •We aim to manage all the work of college using the College Management System. • The College Management System is the Educational management system. • At the time to run the Educational Institute the education is the basic and main responsibility of the College. • It helps the admin to keep the record, manage and control the entire data of the college. • It helps the admin to access the data easily.
  • 8.
    Requirements • Elicitation Techniques/ Tools  Interviews  Market/Literature Survey  Wire Framing / Prototyping  etc. • Specification / Documentation  SRS
  • 9.
    Requirements • List ofDifferent Users  Admin  Owner  Customer  etc. • Use Cases • Functional & Non Functional Requirements all are included in Assignments.
  • 10.
  • 11.
    Functional & NonFunctional Requirements • The requirements that can be written in code are called functional requirements. • The requirements that can not be written in program code are called non functional requirement for example performance of the program. • The above both types of all requirements are included in the assignment with detail, on the base of which the project is developed.
  • 12.
    System Design • EntityRelationship Diagram • Class Diagram • Sequence / Collaboration Diagram • Component Diagram • Activity Diagram
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
    Implementation Tools and TechnologiesTools and Technologies Best Practices and coding
  • 19.
    Challenges • We haveto face many problems int the old system that is painful for students, teacher and other staff if we want to found any record in old system that was take much more time old college system was a time wasted, facing problem in every field it was difficult to store to a huge amount of data about the college. Then we feel need a system who manage all management system of the college. The system gives a quick response on the request. Then we develop a College Management System website who manage all the management of the system. It contains all record about the teacher. It contains all record about courses. It contains all record about other staff of the college. It contains all record about the student and exam record. It works smoothly. The system gives us a quick and accurate and correct result which we want to search. It is less time consuming software. It helps us in every field of the college. Now everything will be managing easily.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.