This document contains the structural schedule and construction timeline for the Prima Residences tower blocks A, B, and C in Quezon City from July 2011 to September 2011. It details the foundation work, installation of tower cranes, and concrete works for slabs, columns, shear walls and stairs on a block-by-block basis over this period. It also includes presentations on the marketing office, mock up units, and floor plans of sample studio, one-bedroom and two-bedroom units in the development.