2. In this test the bridge held up to 1000lbs
of force but started to fail at the joints.
It weighed around 10.5oz
In this test the force was set at
475lbs but only weighed around
3.5oz
3. Stage 1
Jig fixture to create the X
design
Stage 2
Glue stringers and
inner support wall
Stage 3
glue top brace, inner
truss, then bottom
braces
BUILD PROCESS