Autor: Aleksandar Živković
Koautor: Aleksandar Krstić
Niš, april 2014.
ВИСОКА ТЕХНИЧКА ШКОЛА СТРУКОВНИХ СТУДИЈА- Niš
Naučno istraživački rad:
Cilj istraživanja?
Pronalazak rešenja za izgradnju male hidroelektrane iz obnovljivih resursa na Tisi u težnji da se doprinese boljem,
laksem i uspešnijem životu ljudstva u manastiru.
 Nagli tehnološki i industrijski razvoj, buran demografski rast brza urbanizacija, naročito u poslednjih
nekoliko decenija, suočavaju čovečanstvo sa četiri krupna problema: voda, hrana, energija i životna sredina.
 Problem vode je posebno izražen, jer je implicitno prisutan u ostala tri problema, odnosno proizvodnja hrane i
energije odlučujuće zavise od vode.
 Međutim u pogledu količine energije i sirovina na Zemlji sadašnje procene jasno pokazuju da izvori energije i
sirovina nisu neiscrpni i da se raspolaganje prirodnim dobrima u budućnosti mora zasnivati na velikoj
racionalnosti. Za stručnjake je ključno rešenje da se odvoji razvoj od povećanja potrošnje energije, pre svega
poboljšanjem energetske efikasnosti.
 U ovom radu je prikazano jedno od mogućih rešenja hidroelektrane postavljene u prelivnim poljima brane.
Predmet iztraživanja
1.1 Brana na Tisi kod Novog
Bečeja
• Kanal Dunav – Tisa – Dunav je sistem kanala koji se proteže na oko 12.700 km²,
između reka Dunav i Tisa, u Bačkoj i Banatu, na teritorije Vojvodine. Ukupna dužina
kanala je 929 km, sa 51 hidrotehničkim objektom (slika 1) i 180 mostova
• Najveći i jedan od najznačajnijih objekata na hidrosistemu Dunav – Tisa –
Dunav je brana na Tisi kod Novog Bečeja, koja je izgrađena 1977. godine. Brana
je izgrađena sa osnovnom namenom da se podizanjem nivoa Tise uzvodno od
brane, omogući gravitaciono snabdevanje banatskog dela HS DTD vodom.Slika 1. Karta sistema DTD sa
postojećim branama koje mogu
da se koriste za izgradju
hidroelektrana
Slika3.Izgled Brane na Tisi
Slika 2. Brana na Tisi u periodu velikih voda
1. Branom se pregrađuje korito Tise za veliku vodu u dužini od
520 m (slika 2 i 3). Sastoji se od betonskog i zemljanog dela i
brodske prevodnice za brodove do 1000 t nosivosti. Na
stubovima brane projektovan je drumski most širine 10 m, kao
saobraćajna veza između Banata i Bačke.
2. Reka Tisa ima vrlo neujednačen proticaj koji se kreće od 80
m3/s do blizu 4000 m3/s. Karakteristike režima proticaja reke
Tise u profilu brane su:
Minimalni zabeleženi proticaj Q = 80 m3/s
Srednji proticaj Q = 803 m3/s
Maksimalni zabeleženi proticaj Q = 3718 m3/s
Proticaj verovatnoće pojave 1% Q = 3893 m3/s
Normalni uspor od 74,00 do 75,50 m.n.m.
Kota donje vode od 70,50 do 79,97 m.n.m.
Iz krive trajanja za reku Tisu na lokaciji brane može se videti da postoji denivelacija između gornjeg i donjeg nivoa
vode u 305 dana u toku godine, koja se kreće od 0 do 5 metara. U ostalom delu godine brana je otvorena i nema
denivelacije.
1.2 Hidroelektrana na brani kod Novog Bečeja
I.Karakteristike usvojenog rešenja male hidroelektrane iz obnovljivih izvora
• usvojeno rešenje mora da omogući propuštanje velikih voda
• usvojeno rešenje mora da omogući i održavanje zahtevane kote gornje vode po važećem
pravilniku,
• da se pri njegovoj realizaciji ne menja građevinski deo brane,
• da je moguća izgradnja u suvom i
• da elektrana bude finasijski isplativa.
Uzimajući u obzir ograničenja i finansijske pokazatelje kao optimalna konfiguracija male hidroelektrane usvojeno je
rešenje kod koga se koriste četiri prelivna polja sa ukupno 24 turbine.
Tabela I Hidraulički proračun proticaja kroz branu sa četiri zauzeta prelivna polja
Polje/Turbina
Širina
polja
(m)
Koeficij
ent
potoplje
nosti
Cf
Koeficij
ent
prelivan
ja
Cd
𝟐𝒈
Kota
donje
vode
(m.n.m)
Kota
preliva
(m.n.m)
Visina
donje
vode
iznad
preliva
H(m)
Uspor
nabrani
kod
potoplje
nog
prelivan
ja
H(m)
Proticaj
preko
preliva
Q(m3/s)
Kota
gornje
vode
(m)
Preliv 1 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54
Preliv 2 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54
Preliv 3 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54
Preliv 4 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54
Preliv 5 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54
Preliv 6 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54
Preliv 7 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54
Pomoćni preliv 1 24.0 0.484
4.43
80.35 76.5 4.04 0.185 161.00 80.54
Pomoćni preliv 2 24.0 0.484
4.43
80.35 76.5 4.04 0.185 161.00 80.54
Pomoćni preliv 3 24.0 0.484
4.43
80.35 76.5 4.04 0.185 161.00 80.54
Ukupno 3942.29
HIDROENERGETSKI POTENCIJAL MALE HIDROELEKTARNE
HE TISA 2, QMAX = 240.0 M3/S, HMAX = 4.5 M, 24 X BULB 10 {1}
Periodugodini
Trajanje
(dan)
Trajanje
(sat)
Raspoloživiproticaj
(m3/s)
Proticajjedne
turbine
(m3/s)
Proticajsvihturbina
(m3/s)
Kotagornjevode
(m.n.m)
Kotadonjevode
(m.n.m)
Brutopad
(m)
Netopad
(m)
Mogućasnagana
turbinama
(kW)
Stvarnasnagana
turbinama
(kW)
Snaganageneratoru
(kW)
Proizvodnja
(kWh)
130-170 40 960 380.00 10.00 240.00 75.5 73.75 1.75 0.00 0
0 0 0
170-210 40 960
380.00 10.00
240.00
75.5
73.15 2.35 2.25 5297
4503 4098 3933637
210-260 50 1200
380.00 10.00
240.00
75.5
73.00 2.50 2.40 5651
4803 4371 5244850
260-310 50 1200 330.00 11.00 264.00
75.5
72.00 3.50 3.30 8546
7265 6611 7932835
310-350 40 960 250.00 10.42 250.00
75.5
71.45 4.05 3.85 9442
8026 7303 7011344
350-365 15 360 140.00 10.00 140.00 75.5 71.00 4.50 4.30 5906 5020 4568 1644479
Suma 5640 1720.00 1234.00 18.65
24596 25767146
Sr. vred. 286.67 205.67 3.11 2074000
Naziv Količina Jedinična cena Suma za poziciju
Vodozahvat 4 100.000,00 400.000,00
Kanal 0 0,00 0,00
Turbina i oprema 24 450.000,00 10.800.000,00
Elektrika
1 200.000,00 200.000,00
Mašinski prostor 4 240.000,00 960.000,00
Projektovanje
1 45.000,00 45.000,00
Merenja
1 15.000,00 15.000,00
Administrativni troškovi
1 35.000,00 35.000,00
Zemljište
0 0,00 0,00
Nepredviđeni troškovi 1 100.000,00 100.000,00
Ukupno materijalne investicije (€)
12.555.000,00
Ukupno finansijske investicije (€)
120 142.560,00 17.107.200,00
Predračun male hidroelektrane sa 24 turbine sa instalisanim proticajem od 240 m3/s [1]
Izbor turbine
Izbor turbine direktno zavisi od uslova i zahteva koji su morali da se ispune pri
usvajanju rešenja male hidroelektrane. Poštujući postavljene zahteve i ograničenja
usvojene su Hydromatrix turbine firme Andritz Hydro, Austrija (slika 4 i 5 ).
Turbina nema mogućnost rada sa promenljivim proticajima. Instalisani proticaj turbine je od
10 do 11 m3/s i turbina ili radi ili ne radi. Promene proticaja na prelivima se rešavaju brojem
turbina koje istovremeno rade. Ukupan broj od 24 turbine je dovoljan za finu regulaciju.
Slika 4. Izgled Hydromatrix turbine Slika 5. Poprečni presek preliva sa instaliranom Hydromatrix turbinom
Tehničko rešenje male hidroelektrane
• Pogodnost Hydromatrix turbina ogleda se pre svega u načinu njihovog postavljanja.
• Tehničko rešenje male hidroelektrane na brani na Tisi podrazumeva postavljanje Hydromatrix turbina u
prelivno polje na dnu prelivnog praga. Zahvatanje vode za turbine se vrši kroz betonski propust dimenzija
24,5 x 2,0 metara koji se gradi preko prelivnog praga (slika 5 i 6).
• Turbine su postavljene na krajevima propusta koji je za svaku turbinu dimenzija na zahvatu 3,5 m širine i 2,0
m visine, a na ispustu 3,5 m širine i 3,0 m visine (slika 7 i 8).
• Iza turbine je metalni sifon dužine 4 metara. Brzina vode je 1,3 m/s za instalisani proticaj na turbini od 10
m3/s.
• Hidraulički gledano prelivno polje zauzeto turbinama i kada su turbine u radnom položaju, sposobno je da
propusti velike vode, osim ekstremno velikih voda,. Kada se turbine izdignu u remontni položaj praktično
nema razlike u proticaji između slobodnog prelivnog polja i prelivnog polja zazuzetog turbinama.
• Svaki slot od 6 turbina ima svoj trafo, a oni su vezani na postojeću elektro energetsku mrežu preko
zajedničke trafo stanice.
•Slika 6. Pogled nizvodno na preliv sa instaliranom
Hydromatrix turbinom
•Slika 7. Segmentna ustava na prelivnom
polju betonskog dela brane na Tisi
ZAKLJUČAK
U ovom radu je prikazano jedno od mogućih rešenja male hidroelektrane postavljene u
prelivnim poljima brane na Tisi kod Novog Bečeja, kojom bi se ostvarila značajna
produkcija zelene energije iz obnovljivih izvora tz.električne energije uz znatno manje
investicione troškove nego u slučaju izgradnje konvencionalne male hidroelektrane.
Izloženi primer pokazuje da je u cilju podsticanja izgradnje malih hidroelektrana u smislu
promovisanja tog vida energetske proizvodnje i sasvim novog pristupa njegovom razvoju,
potrebno detaljno sagledavanje mogućnosti izgradnje ovih objekata u okviru postojećih
višenamenskih vodoprivrednih sistema, posebno kada se imaju u vidu značajne prednosti i
znatno niže investicije po instalisanom kW u takvim slučajevima.

More Related Content

Featured

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
Expeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
Pixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
marketingartwork
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 

Featured (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

POSSIBILITIES OF HYDROPOWER POTENTIAL UTILIZATION OF THE TISA RIVER DAM IN NOVI BECEJ

  • 1. Autor: Aleksandar Živković Koautor: Aleksandar Krstić Niš, april 2014. ВИСОКА ТЕХНИЧКА ШКОЛА СТРУКОВНИХ СТУДИЈА- Niš Naučno istraživački rad:
  • 2. Cilj istraživanja? Pronalazak rešenja za izgradnju male hidroelektrane iz obnovljivih resursa na Tisi u težnji da se doprinese boljem, laksem i uspešnijem životu ljudstva u manastiru.  Nagli tehnološki i industrijski razvoj, buran demografski rast brza urbanizacija, naročito u poslednjih nekoliko decenija, suočavaju čovečanstvo sa četiri krupna problema: voda, hrana, energija i životna sredina.  Problem vode je posebno izražen, jer je implicitno prisutan u ostala tri problema, odnosno proizvodnja hrane i energije odlučujuće zavise od vode.  Međutim u pogledu količine energije i sirovina na Zemlji sadašnje procene jasno pokazuju da izvori energije i sirovina nisu neiscrpni i da se raspolaganje prirodnim dobrima u budućnosti mora zasnivati na velikoj racionalnosti. Za stručnjake je ključno rešenje da se odvoji razvoj od povećanja potrošnje energije, pre svega poboljšanjem energetske efikasnosti.  U ovom radu je prikazano jedno od mogućih rešenja hidroelektrane postavljene u prelivnim poljima brane.
  • 3. Predmet iztraživanja 1.1 Brana na Tisi kod Novog Bečeja • Kanal Dunav – Tisa – Dunav je sistem kanala koji se proteže na oko 12.700 km², između reka Dunav i Tisa, u Bačkoj i Banatu, na teritorije Vojvodine. Ukupna dužina kanala je 929 km, sa 51 hidrotehničkim objektom (slika 1) i 180 mostova • Najveći i jedan od najznačajnijih objekata na hidrosistemu Dunav – Tisa – Dunav je brana na Tisi kod Novog Bečeja, koja je izgrađena 1977. godine. Brana je izgrađena sa osnovnom namenom da se podizanjem nivoa Tise uzvodno od brane, omogući gravitaciono snabdevanje banatskog dela HS DTD vodom.Slika 1. Karta sistema DTD sa postojećim branama koje mogu da se koriste za izgradju hidroelektrana Slika3.Izgled Brane na Tisi
  • 4. Slika 2. Brana na Tisi u periodu velikih voda 1. Branom se pregrađuje korito Tise za veliku vodu u dužini od 520 m (slika 2 i 3). Sastoji se od betonskog i zemljanog dela i brodske prevodnice za brodove do 1000 t nosivosti. Na stubovima brane projektovan je drumski most širine 10 m, kao saobraćajna veza između Banata i Bačke. 2. Reka Tisa ima vrlo neujednačen proticaj koji se kreće od 80 m3/s do blizu 4000 m3/s. Karakteristike režima proticaja reke Tise u profilu brane su: Minimalni zabeleženi proticaj Q = 80 m3/s Srednji proticaj Q = 803 m3/s Maksimalni zabeleženi proticaj Q = 3718 m3/s Proticaj verovatnoće pojave 1% Q = 3893 m3/s Normalni uspor od 74,00 do 75,50 m.n.m. Kota donje vode od 70,50 do 79,97 m.n.m. Iz krive trajanja za reku Tisu na lokaciji brane može se videti da postoji denivelacija između gornjeg i donjeg nivoa vode u 305 dana u toku godine, koja se kreće od 0 do 5 metara. U ostalom delu godine brana je otvorena i nema denivelacije.
  • 5. 1.2 Hidroelektrana na brani kod Novog Bečeja I.Karakteristike usvojenog rešenja male hidroelektrane iz obnovljivih izvora • usvojeno rešenje mora da omogući propuštanje velikih voda • usvojeno rešenje mora da omogući i održavanje zahtevane kote gornje vode po važećem pravilniku, • da se pri njegovoj realizaciji ne menja građevinski deo brane, • da je moguća izgradnja u suvom i • da elektrana bude finasijski isplativa. Uzimajući u obzir ograničenja i finansijske pokazatelje kao optimalna konfiguracija male hidroelektrane usvojeno je rešenje kod koga se koriste četiri prelivna polja sa ukupno 24 turbine. Tabela I Hidraulički proračun proticaja kroz branu sa četiri zauzeta prelivna polja Polje/Turbina Širina polja (m) Koeficij ent potoplje nosti Cf Koeficij ent prelivan ja Cd 𝟐𝒈 Kota donje vode (m.n.m) Kota preliva (m.n.m) Visina donje vode iznad preliva H(m) Uspor nabrani kod potoplje nog prelivan ja H(m) Proticaj preko preliva Q(m3/s) Kota gornje vode (m) Preliv 1 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54 Preliv 2 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54 Preliv 3 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54 Preliv 4 sa turbinama 24.5 0.96 4.43 80.35 70.5 9.85 0.185 449.72 80.54 Preliv 5 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54 Preliv 6 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54 Preliv 7 24.5 0.96 4.43 80.35 68.0 12.35 0.185 553.47 80.54 Pomoćni preliv 1 24.0 0.484 4.43 80.35 76.5 4.04 0.185 161.00 80.54 Pomoćni preliv 2 24.0 0.484 4.43 80.35 76.5 4.04 0.185 161.00 80.54 Pomoćni preliv 3 24.0 0.484 4.43 80.35 76.5 4.04 0.185 161.00 80.54 Ukupno 3942.29
  • 6. HIDROENERGETSKI POTENCIJAL MALE HIDROELEKTARNE HE TISA 2, QMAX = 240.0 M3/S, HMAX = 4.5 M, 24 X BULB 10 {1} Periodugodini Trajanje (dan) Trajanje (sat) Raspoloživiproticaj (m3/s) Proticajjedne turbine (m3/s) Proticajsvihturbina (m3/s) Kotagornjevode (m.n.m) Kotadonjevode (m.n.m) Brutopad (m) Netopad (m) Mogućasnagana turbinama (kW) Stvarnasnagana turbinama (kW) Snaganageneratoru (kW) Proizvodnja (kWh) 130-170 40 960 380.00 10.00 240.00 75.5 73.75 1.75 0.00 0 0 0 0 170-210 40 960 380.00 10.00 240.00 75.5 73.15 2.35 2.25 5297 4503 4098 3933637 210-260 50 1200 380.00 10.00 240.00 75.5 73.00 2.50 2.40 5651 4803 4371 5244850 260-310 50 1200 330.00 11.00 264.00 75.5 72.00 3.50 3.30 8546 7265 6611 7932835 310-350 40 960 250.00 10.42 250.00 75.5 71.45 4.05 3.85 9442 8026 7303 7011344 350-365 15 360 140.00 10.00 140.00 75.5 71.00 4.50 4.30 5906 5020 4568 1644479 Suma 5640 1720.00 1234.00 18.65 24596 25767146 Sr. vred. 286.67 205.67 3.11 2074000
  • 7. Naziv Količina Jedinična cena Suma za poziciju Vodozahvat 4 100.000,00 400.000,00 Kanal 0 0,00 0,00 Turbina i oprema 24 450.000,00 10.800.000,00 Elektrika 1 200.000,00 200.000,00 Mašinski prostor 4 240.000,00 960.000,00 Projektovanje 1 45.000,00 45.000,00 Merenja 1 15.000,00 15.000,00 Administrativni troškovi 1 35.000,00 35.000,00 Zemljište 0 0,00 0,00 Nepredviđeni troškovi 1 100.000,00 100.000,00 Ukupno materijalne investicije (€) 12.555.000,00 Ukupno finansijske investicije (€) 120 142.560,00 17.107.200,00 Predračun male hidroelektrane sa 24 turbine sa instalisanim proticajem od 240 m3/s [1]
  • 8. Izbor turbine Izbor turbine direktno zavisi od uslova i zahteva koji su morali da se ispune pri usvajanju rešenja male hidroelektrane. Poštujući postavljene zahteve i ograničenja usvojene su Hydromatrix turbine firme Andritz Hydro, Austrija (slika 4 i 5 ). Turbina nema mogućnost rada sa promenljivim proticajima. Instalisani proticaj turbine je od 10 do 11 m3/s i turbina ili radi ili ne radi. Promene proticaja na prelivima se rešavaju brojem turbina koje istovremeno rade. Ukupan broj od 24 turbine je dovoljan za finu regulaciju. Slika 4. Izgled Hydromatrix turbine Slika 5. Poprečni presek preliva sa instaliranom Hydromatrix turbinom
  • 9. Tehničko rešenje male hidroelektrane • Pogodnost Hydromatrix turbina ogleda se pre svega u načinu njihovog postavljanja. • Tehničko rešenje male hidroelektrane na brani na Tisi podrazumeva postavljanje Hydromatrix turbina u prelivno polje na dnu prelivnog praga. Zahvatanje vode za turbine se vrši kroz betonski propust dimenzija 24,5 x 2,0 metara koji se gradi preko prelivnog praga (slika 5 i 6). • Turbine su postavljene na krajevima propusta koji je za svaku turbinu dimenzija na zahvatu 3,5 m širine i 2,0 m visine, a na ispustu 3,5 m širine i 3,0 m visine (slika 7 i 8). • Iza turbine je metalni sifon dužine 4 metara. Brzina vode je 1,3 m/s za instalisani proticaj na turbini od 10 m3/s. • Hidraulički gledano prelivno polje zauzeto turbinama i kada su turbine u radnom položaju, sposobno je da propusti velike vode, osim ekstremno velikih voda,. Kada se turbine izdignu u remontni položaj praktično nema razlike u proticaji između slobodnog prelivnog polja i prelivnog polja zazuzetog turbinama. • Svaki slot od 6 turbina ima svoj trafo, a oni su vezani na postojeću elektro energetsku mrežu preko zajedničke trafo stanice. •Slika 6. Pogled nizvodno na preliv sa instaliranom Hydromatrix turbinom •Slika 7. Segmentna ustava na prelivnom polju betonskog dela brane na Tisi
  • 10. ZAKLJUČAK U ovom radu je prikazano jedno od mogućih rešenja male hidroelektrane postavljene u prelivnim poljima brane na Tisi kod Novog Bečeja, kojom bi se ostvarila značajna produkcija zelene energije iz obnovljivih izvora tz.električne energije uz znatno manje investicione troškove nego u slučaju izgradnje konvencionalne male hidroelektrane. Izloženi primer pokazuje da je u cilju podsticanja izgradnje malih hidroelektrana u smislu promovisanja tog vida energetske proizvodnje i sasvim novog pristupa njegovom razvoju, potrebno detaljno sagledavanje mogućnosti izgradnje ovih objekata u okviru postojećih višenamenskih vodoprivrednih sistema, posebno kada se imaju u vidu značajne prednosti i znatno niže investicije po instalisanom kW u takvim slučajevima.