The Story of
Seadragonz
It all started with a
seed sown by Paul
Sadler of Paul Sadler
Swimland in Victoria,
who asked Lari why
she was wasting her
time working for
someone else who
would not appreciate
nor reward her talents.
Lari had never
considered the
thought of her own
swim school.
After a lot of thought
Lari realised Paul was
right and made the
decision to jump off the
cliff and see what it felt
like. It was scary and
exhilarating and Lari
spent hours excited and
thinking ‘oh my gosh,
what have I done’.
Being the first purpose built
swim school in Western
Australia we climbed over many
speed humps and fell into a lot
of pot holes.
At last, after
kerthumping
over speed
humps and
into potholes
we finally
broke ground.
And so we got this
far and that was
all for months
The grandchildren found an awesome new
playground
The roof structure arrives
And in the meantime the weeds made a
new home
One of the
speed
humps was
the required
over-
engineering
of the roof.
We were
required to
make this
cyclone
proof to
228kph.
Yes, we
know that
happens
frequently in
Perth.
Fact: In
1974
Cyclone
Tracy
knocked
over Darwin
with 217kph
winds.
Each pole sits in a 44 gallon drum of solid
concrete.
The baby eucalypts joined the weeds
in their new home.
The tiger snake also thought he had found
a new home.
Furiously working men making the perfect floor
slopes. They were threatened with drowning if
there was puddling water.
Decision makers
Roof top
construction
And we work
until the job is
done!
And the cover goes on
Weeding
time
Pool completion
begins
Vinyl liner is completed welded to the
concrete
Water would
be good
And the
grandchildren
waited
Water at last
The dogs
watched the
final stages
possibly
pondering that
their regular
ball throwers
and playmates
(the
construction
crew) would be
around no
longer.
Finishing touches
January 29,
2007
Day 1
National Swim Australia Awards 2008 - Community Service
Award
Presented by Hayley Lewis & Karni Liddell
National Swim Australia Awards 2009 – Community Service
Award
Presented by Hayley Lewis
ational Swim Australia Awards 2009 – Australia’s Most
nvironmentally Friendly Swim School
resented by Jessica Schipper
WA Chamber of Commerce Business Development Award
2009
WA Environment Awards 2009 – Small Business Leading
by Example
WA Environmental
Awards 2009 –
Overall Winner
National Swim Australia Awards 2010 – Best Swim School
Marketing Award
Presented by Tracey Wickham & Emily Seebolm
WA Chamber of
Commerce 2010 –
Certificate of Merit
National Swim Australia Awards 2011
Presented by Libby Trickett
National Savewater! Awards 2011 - Finalist
National Swim Australia Awards 2012
Most Environmentally Friendly Swim School Award
Presented by Emily Seebolm & Brittany Elmslie
Australia's 1st
Accredited
Swim School
Our Story - Seadragonz

Our Story - Seadragonz

Editor's Notes

  • #5 1st in WA – benchmark for all others Council – dumb birds – meeting with group – red carpet Health Dept – State – define rules Drawing plans – friends are awesome Submissions – HD ok –council and toilets - DUET BILL & LARI –moving wall 6cm – change room doors – 4 months Process was 8 months Finding a builder – colin and joker - getting a builder in perth??
  • #6 Party day
  • #7 Really oh really – progress at last
  • #9 Now who worked out the number of bricks Now they have to be got out
  • #10 And the children played Hmmm what happens if i jump in it – run through it Tastes yummy What fun A pool with water in it even if it wasn’t the right kind!!! These children own the pool – they know all the stories
  • #11 The roof bits arrived Story of the roof – Dowerin – one set of plans sitting in a girls house to redraw for ppl – sent to 1 engineer – and the story of how it goes BILL AND LARI And then.........(toilet arrives)
  • #12 We waited The water from winter dried out – we had a sandy bottom again – we had the 1st spring weeds starting to grow But.....there were signs of a pool in the making
  • #13 The drums for the posts + same for next pic
  • #15 Looking good – mighty good work Colin – very straight – look at that perfect alignment with the angle bits and all Col was amazing – no idea but cluey and so willing to ‘she’ll be right – we’ll work it out!! – Couldn’t have got better
  • #16 And grew some more and even the trees decided well we may as well start growing again –lots of space to grow I don’t think so!!!!!
  • #17 And the tiger snake took up resident in the pool jungle
  • #18 And now it looks like a hole with a wall around it One complete wall NOW THAT IS SATISFACTION – and signs of progress we hope???? WRONG AGAIN – labour on holidays lost plot never to return!! But he forgot to tell the brickie!!! And..... The pool men returned to start doing some touches now that WE were progressing ....next pic
  • #19 AND THE MEN WERE ON THEIR KNEES Hand trowel – 12 of them there – one pour – no cracks, blah blah
  • #20 Ever the perfectionist!!!
  • #21 And the men discussed some more Still making it up and working it out as we went along Until Wow oh wow we started to see even more buliding!!
  • #22 Beginning of roof construction Jade from Narrogin – long drive – you would all kill for employees of this calibre – country boy Now you really see what making it up as you go along was all about!!! NEXT SLIDE IS A SHOW OF HOOP GOING OVER
  • #24 And yes i can do anything under the moonlight!!
  • #25 But at time i need a little help Back the next day – 2 hours there and back every day he had to come up – made the most of it as u have seen
  • #27 The roof covering slides on in one piece – is easily replaced -10 year warranty on fabric. + next two slides and then tightened
  • #29 And it was time for the weeding program to begin Forward HO!!
  • #30 And the final stages of pool construction were under way
  • #31 The walls were rendered.......
  • #32 Ready for the floor pour.......
  • #36 Starting the welding of the vinyl – all welded no spot welds – only the best for Seadragonz + next slide
  • #38 And the children waited some more These kids were hanging out!!!!
  • #39 Oh Well – running lanes will do – probably the only opportunity we will ever get !!!
  • #40 And at long last...........we get to put water in!!!!! Now when can we get in!!!!
  • #41 Meeting Canine inspection – does this mean we can’t run along the concrete anymore? And Holly wants to know if her obliging ball throwers were going to end
  • #42 The sign goes up – note it is the female on the roof!!! + next slide
  • #43 The final touches Car park Story of blanket Bio Cycle system Ledge markers The heater Now to preparations for finding staff........did a group session at the zoo
  • #44 And Finally.......... My birthday