The document provides information on Novagold Resources Inc., including cautionary statements regarding forward-looking statements. It summarizes two of Novagold's projects - Donlin Gold and Galore Creek. Donlin Gold is described as one of the most important undeveloped gold projects in the world due to its large size, high grade, and favorable jurisdiction in Alaska. It has the potential to be the largest gold producer. Galore Creek has the potential to be the largest and lowest cash cost copper mine in Canada if developed. The document outlines Novagold's goals for 2013 which include advancing permitting for Donlin Gold and updating studies for both projects.
Bank of America Merrill Lynch 19th Annual Canada Mining ConferenceNOVAGOLD
NOVAGOLD presented at the Bank of America Merrill Lynch 19th Annual Canada Mining Conference in Toronto. For more information on NOVAGOLD's top tier projects, visit our website www.novagold.com
The document summarizes Novagold's presentation at the Precious Metals Summit in Zurich in November 2013. It discusses Novagold's two main projects, Donlin Gold and Galore Creek, highlighting that Donlin Gold is one of the largest gold deposits in development and would be among the largest gold mines in production. It also notes that permitting has commenced for Donlin Gold and that Novagold is pursuing divestiture of Galore Creek to fund Donlin Gold's development. Additionally, the presentation outlines Novagold's goals to advance its projects on time and on budget in 2013.
NOVAGOLD Updated Corporate Presentation - June 2013 NOVAGOLD
NOVAGOLD has two of the world's largest and richest undeveloped gold and copper asset located in safe jurisdictions. Check out our corporate presentation to find out more about these extraordinary projects. Visit www.novagold.com for more information.
This document discusses the Donlin Gold project in Alaska. It begins with cautionary statements regarding forward-looking statements and scientific and technical information. The rest of the document then discusses Donlin Gold as having world-class scale and grade, being the largest gold development project in North America, its excellent exploration potential, and Novagold's goals to advance the project on time and on budget through 2013.
Cowen and Company 4th Annual Global Metals, Mining and Materials ConferenceNOVAGOLD
NOVAGOLD President & CEO, Greg Lang, presented in New York at the Cowen Global Metals, Mining and Materials Conference. A webcast replay is available on our website www.novagold.com
Bank of America Merrill Lynch 19th Annual Canada Mining ConferenceNOVAGOLD
NOVAGOLD presented at the Bank of America Merrill Lynch 19th Annual Canada Mining Conference in Toronto. For more information on NOVAGOLD's top tier projects, visit our website www.novagold.com
The document summarizes Novagold's presentation at the Precious Metals Summit in Zurich in November 2013. It discusses Novagold's two main projects, Donlin Gold and Galore Creek, highlighting that Donlin Gold is one of the largest gold deposits in development and would be among the largest gold mines in production. It also notes that permitting has commenced for Donlin Gold and that Novagold is pursuing divestiture of Galore Creek to fund Donlin Gold's development. Additionally, the presentation outlines Novagold's goals to advance its projects on time and on budget in 2013.
NOVAGOLD Updated Corporate Presentation - June 2013 NOVAGOLD
NOVAGOLD has two of the world's largest and richest undeveloped gold and copper asset located in safe jurisdictions. Check out our corporate presentation to find out more about these extraordinary projects. Visit www.novagold.com for more information.
This document discusses the Donlin Gold project in Alaska. It begins with cautionary statements regarding forward-looking statements and scientific and technical information. The rest of the document then discusses Donlin Gold as having world-class scale and grade, being the largest gold development project in North America, its excellent exploration potential, and Novagold's goals to advance the project on time and on budget through 2013.
Cowen and Company 4th Annual Global Metals, Mining and Materials ConferenceNOVAGOLD
NOVAGOLD President & CEO, Greg Lang, presented in New York at the Cowen Global Metals, Mining and Materials Conference. A webcast replay is available on our website www.novagold.com
2013 Metals & Minerals Investment Conference, San FranciscoNOVAGOLD
NOVAGOLD exhibited at the 2013 MMIC in San Francisco Nov. 25-26. Thank you to everyone one who visited our booth and joined our presentation. More information on our projects is available at www.novagold.com.
International Precious Metals & Commodities Show, MunichNOVAGOLD
It is the first time for NOVAGOLD to exhibit and present at the International Precious Metals & Commodities Show in Munich, we are having a great time! For the German version, please visit www.novagold.com
Vancouver Resource Investment Conference 2014NOVAGOLD
NOVAGOLD exhibited and presented at the Cambridge House Vancouver Resource Investment Conference, Jan 19-20. Thank you to everyone who visited our booth. For more information on the Company, please visit www.novagold.com
JOHN TUMAZOS VERY INDEPENDENT RESEARCH CONFERENCE, NYNOVAGOLD
The document is a presentation about Novagold Resources Inc., a mineral exploration company. It summarizes two of Novagold's key projects: Donlin Gold and Galore Creek. Donlin Gold is described as one of the largest, highest-grade gold deposits in the world located in Alaska. It has the potential to be the largest gold mine in the world. Galore Creek is a large copper-gold project in British Columbia that Novagold is pursuing divesting to fund development of Donlin Gold. The presentation outlines Novagold's goals to advance permitting of the projects and provides an overview of the company.
We announced our fourth quarter financial results Feb. 11, the conference call & webcast to discuss these results took place today. A replay is available on our website. Thank you!
BMO Capital Markets 2014 Global Metals & Mining ConferenceNOVAGOLD
NOVAGOLD is presenting at The BMO Capital Market's 23rd Conference dedicated exclusively to the metals & mining sector in Hollywood, Florida. Join the webcast available on our website for a detailed look at the Company's 2014 activities.
NOVAGOLD presenters, Greg Lang and David Ottewell, reviewed the Company's third quarter financial results and provided a project update. For more information on our projects, please visit www.novagold.com
NOVAGOLD release its fourth quarter and 2012 year-end financials followed by a conference call/webcast. If you missed the presentation, check out the replay at www.novagold.com
The document summarizes information presented at the PDAC convention in 2014 regarding Novagold Resources Inc. It discusses Novagold's booth number and includes cautionary statements regarding forward-looking statements and scientific and technical information for the Donlin Gold and Galore Creek projects. The document emphasizes that Donlin Gold is one of the largest gold development projects in the world in terms of size, grade, and production profile. It has substantial exploration potential along an 8km mineralized trend and is expected to have low costs and longevity as a 27-year mine.
Chairman, Thomas Kaplan, provided an update on the Company's recent development at the Dahlman Rose & Co. 3rd Annual Global Metals, Mining & Materials Conference. Webcast replay is available at www.novagold.com
This document provides an overview of the Donlin Gold project, which is a large, high-grade gold deposit located in Alaska. Some key points:
- Donlin Gold is expected to be one of the largest gold mines in the world, with an estimated 27-year mine life and potential to be one of the top producing assets in the industry.
- It has a high-grade resource that is approximately double the average grade of other global gold deposits.
- NOVAGOLD has a 50/50 partnership on the project with Barrick Gold, and it represents a scarce, large-scale development project in a top-tier jurisdiction.
Timothy Sykes turned his bar mitzvah money into over $1.2 million day trading penny stocks in college. He now earns an estimated $1.7-2 million per year from short selling penny stocks and selling trading education materials and alerts. With investments in other businesses, Timothy Sykes has an estimated net worth of $4-5 million from his career as a penny stock trader and teacher of over 2,000 students worldwide.
Cypress has discovered a 2 kilometer zone of lithium-rich claystones on its Clayton Valley lithium project in Nevada, with an average grade of 1,100 ppm Li. Leach testing of samples from this zone achieved a 95% lithium recovery rate using a weak acid water leach. Cypress plans to drill the project to explore for lithium-rich brines beneath the claystones, and to further evaluate the size and grade of the surface claystone zone. The project is located near the only lithium brine operation in North America and has year-round access to infrastructure.
Lithium Exploration Company Advancing Projects in Nevada
The document discusses Lithium Exploration Company's lithium projects in Nevada. It summarizes that a 2 km discovery zone of lithium-rich claystone averaging 1,100 ppm Li was found at the surface of the Clayton Valley project. Leach tests show 95% lithium recovery from these claystones using a weak acid method. The company plans to drill at Clayton Valley to test for lithium-rich brines and further explore the claystones. The Alkali Valley project covers lithium brine claims adjacent to an existing lithium mine and has potential for undiscovered deep basin brines.
A Canadian gold exploration company owns a significant project in British Columbia's Golden Triangle region. The Forrest Kerr Project covers over 23,000 hectares of prospective geology near existing infrastructure. Previous exploration has found numerous gold and polymetallic occurrences across the property. The company plans to re-interpret exploration models and move the project forward given recent major discoveries in the area.
The corporate presentation discusses PFSweb's financial performance and outlook. It provides key metrics such as service fee equivalent revenue, which was $185.3 million in 2015 and is projected to be $225 million in 2016. Adjusted EBITDA was $20.7 million in 2015 and is estimated to be $22.5 million in 2016. The presentation also outlines PFSweb's business segments and global operations across major eCommerce platforms. It positions the company as the only global provider of end-to-end eCommerce solutions and discusses how strategic acquisitions have expanded its total addressable market.
Lithium Exploration Company Advancing Projects in Nevada
The document discusses Lithium Exploration Company's lithium projects in Nevada. Key points include:
- A 2 km discovery zone of lithium-rich claystone averaging 1,100 ppm Li was found at the surface of the Clayton Valley project.
- Leach testing showed 95% lithium recovery from the claystones using a weak acid method.
- The company plans to drill at Clayton Valley to target lithium-rich brines and claystones.
- The company also has a 100% interest in the Alkali Valley lithium brine project near other active projects.
A Canadian gold exploration company owns a significant project in British Columbia's Golden Triangle region, a world-class gold district. The Forrest Kerr project covers over 23,000 hectares and requires $3 million in exploration spending by 2020 to earn 100% ownership. The property has favorable geology analogous to major deposits, numerous documented mineral occurrences, and potential for multiple deposit types. Moving forward, the company will re-interpret exploration models to maximize discovery potential.
- The company forecasts 2016 average production of 190,000-195,000 boepd, with an exit rate of 210,000-215,000 boepd and liquids production of 30,000 bpd. It has significant reserves and drilling inventory across its core areas in the Deep Basin, Montney, and Charlie Lake.
- Infrastructure includes 10 gas plants and pipelines to handle growing Deep Basin production, with a new Brazeau plant coming online in Q2 2016. Recent wells have exceeded the economic template.
- In the Montney the company has drilled 189 wells and sees potential for over 2,100 locations. Recent turbidite wells exceeded the type curve.
- The Charlie Lake play
2013 Metals & Minerals Investment Conference, San FranciscoNOVAGOLD
NOVAGOLD exhibited at the 2013 MMIC in San Francisco Nov. 25-26. Thank you to everyone one who visited our booth and joined our presentation. More information on our projects is available at www.novagold.com.
International Precious Metals & Commodities Show, MunichNOVAGOLD
It is the first time for NOVAGOLD to exhibit and present at the International Precious Metals & Commodities Show in Munich, we are having a great time! For the German version, please visit www.novagold.com
Vancouver Resource Investment Conference 2014NOVAGOLD
NOVAGOLD exhibited and presented at the Cambridge House Vancouver Resource Investment Conference, Jan 19-20. Thank you to everyone who visited our booth. For more information on the Company, please visit www.novagold.com
JOHN TUMAZOS VERY INDEPENDENT RESEARCH CONFERENCE, NYNOVAGOLD
The document is a presentation about Novagold Resources Inc., a mineral exploration company. It summarizes two of Novagold's key projects: Donlin Gold and Galore Creek. Donlin Gold is described as one of the largest, highest-grade gold deposits in the world located in Alaska. It has the potential to be the largest gold mine in the world. Galore Creek is a large copper-gold project in British Columbia that Novagold is pursuing divesting to fund development of Donlin Gold. The presentation outlines Novagold's goals to advance permitting of the projects and provides an overview of the company.
We announced our fourth quarter financial results Feb. 11, the conference call & webcast to discuss these results took place today. A replay is available on our website. Thank you!
BMO Capital Markets 2014 Global Metals & Mining ConferenceNOVAGOLD
NOVAGOLD is presenting at The BMO Capital Market's 23rd Conference dedicated exclusively to the metals & mining sector in Hollywood, Florida. Join the webcast available on our website for a detailed look at the Company's 2014 activities.
NOVAGOLD presenters, Greg Lang and David Ottewell, reviewed the Company's third quarter financial results and provided a project update. For more information on our projects, please visit www.novagold.com
NOVAGOLD release its fourth quarter and 2012 year-end financials followed by a conference call/webcast. If you missed the presentation, check out the replay at www.novagold.com
The document summarizes information presented at the PDAC convention in 2014 regarding Novagold Resources Inc. It discusses Novagold's booth number and includes cautionary statements regarding forward-looking statements and scientific and technical information for the Donlin Gold and Galore Creek projects. The document emphasizes that Donlin Gold is one of the largest gold development projects in the world in terms of size, grade, and production profile. It has substantial exploration potential along an 8km mineralized trend and is expected to have low costs and longevity as a 27-year mine.
Chairman, Thomas Kaplan, provided an update on the Company's recent development at the Dahlman Rose & Co. 3rd Annual Global Metals, Mining & Materials Conference. Webcast replay is available at www.novagold.com
This document provides an overview of the Donlin Gold project, which is a large, high-grade gold deposit located in Alaska. Some key points:
- Donlin Gold is expected to be one of the largest gold mines in the world, with an estimated 27-year mine life and potential to be one of the top producing assets in the industry.
- It has a high-grade resource that is approximately double the average grade of other global gold deposits.
- NOVAGOLD has a 50/50 partnership on the project with Barrick Gold, and it represents a scarce, large-scale development project in a top-tier jurisdiction.
Timothy Sykes turned his bar mitzvah money into over $1.2 million day trading penny stocks in college. He now earns an estimated $1.7-2 million per year from short selling penny stocks and selling trading education materials and alerts. With investments in other businesses, Timothy Sykes has an estimated net worth of $4-5 million from his career as a penny stock trader and teacher of over 2,000 students worldwide.
Cypress has discovered a 2 kilometer zone of lithium-rich claystones on its Clayton Valley lithium project in Nevada, with an average grade of 1,100 ppm Li. Leach testing of samples from this zone achieved a 95% lithium recovery rate using a weak acid water leach. Cypress plans to drill the project to explore for lithium-rich brines beneath the claystones, and to further evaluate the size and grade of the surface claystone zone. The project is located near the only lithium brine operation in North America and has year-round access to infrastructure.
Lithium Exploration Company Advancing Projects in Nevada
The document discusses Lithium Exploration Company's lithium projects in Nevada. It summarizes that a 2 km discovery zone of lithium-rich claystone averaging 1,100 ppm Li was found at the surface of the Clayton Valley project. Leach tests show 95% lithium recovery from these claystones using a weak acid method. The company plans to drill at Clayton Valley to test for lithium-rich brines and further explore the claystones. The Alkali Valley project covers lithium brine claims adjacent to an existing lithium mine and has potential for undiscovered deep basin brines.
A Canadian gold exploration company owns a significant project in British Columbia's Golden Triangle region. The Forrest Kerr Project covers over 23,000 hectares of prospective geology near existing infrastructure. Previous exploration has found numerous gold and polymetallic occurrences across the property. The company plans to re-interpret exploration models and move the project forward given recent major discoveries in the area.
The corporate presentation discusses PFSweb's financial performance and outlook. It provides key metrics such as service fee equivalent revenue, which was $185.3 million in 2015 and is projected to be $225 million in 2016. Adjusted EBITDA was $20.7 million in 2015 and is estimated to be $22.5 million in 2016. The presentation also outlines PFSweb's business segments and global operations across major eCommerce platforms. It positions the company as the only global provider of end-to-end eCommerce solutions and discusses how strategic acquisitions have expanded its total addressable market.
Lithium Exploration Company Advancing Projects in Nevada
The document discusses Lithium Exploration Company's lithium projects in Nevada. Key points include:
- A 2 km discovery zone of lithium-rich claystone averaging 1,100 ppm Li was found at the surface of the Clayton Valley project.
- Leach testing showed 95% lithium recovery from the claystones using a weak acid method.
- The company plans to drill at Clayton Valley to target lithium-rich brines and claystones.
- The company also has a 100% interest in the Alkali Valley lithium brine project near other active projects.
A Canadian gold exploration company owns a significant project in British Columbia's Golden Triangle region, a world-class gold district. The Forrest Kerr project covers over 23,000 hectares and requires $3 million in exploration spending by 2020 to earn 100% ownership. The property has favorable geology analogous to major deposits, numerous documented mineral occurrences, and potential for multiple deposit types. Moving forward, the company will re-interpret exploration models to maximize discovery potential.
- The company forecasts 2016 average production of 190,000-195,000 boepd, with an exit rate of 210,000-215,000 boepd and liquids production of 30,000 bpd. It has significant reserves and drilling inventory across its core areas in the Deep Basin, Montney, and Charlie Lake.
- Infrastructure includes 10 gas plants and pipelines to handle growing Deep Basin production, with a new Brazeau plant coming online in Q2 2016. Recent wells have exceeded the economic template.
- In the Montney the company has drilled 189 wells and sees potential for over 2,100 locations. Recent turbidite wells exceeded the type curve.
- The Charlie Lake play
Chase Corporation is a leading manufacturer of protective materials for high-reliability applications. It has a highly experienced management team and a track record of executing initiatives to grow organically and through acquisitions. Chase aims to be recognized as a trusted partner providing effective product solutions and to create long-term shareholder value through risk management and sustainable practices.
This document provides an overview of Novagold Resources Inc., including forward-looking statements and cautions regarding scientific and technical information. It summarizes Novagold's two flagship projects: Donlin Gold in Alaska, described as one of the most significant gold projects in the world due to its large size, high grade, and production potential; and Galore Creek in British Columbia, a large copper project. The document outlines Novagold's goals for 2013, including permitting and engineering updates for the projects.
This document discusses Novagold Resources Inc., a gold development company. It summarizes Novagold's two main projects: Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with over 39 million ounces of gold in measured and indicated resources. The document also notes that as gold reserve grades decline industry-wide and major discoveries become increasingly rare, large development projects like Donlin Gold that offer high-grade reserves are particularly valuable.
This document discusses the Donlin Gold project, a large-scale gold development project located in Alaska. It notes that Donlin Gold has substantial gold resources, with measured and indicated resources of 39 million ounces. It also has high grades for an open-pit deposit, with an average grade of 2.24 g/t for measured and indicated resources. The document states that as major gold discoveries have declined since 2006 and reserve grades have decreased, large development projects like Donlin Gold will be needed to sustain current global gold production levels. It also emphasizes the jurisdictional safety of Alaska as a favorable location compared to rising resource nationalism and geopolitical risks in other gold-producing regions.
The document discusses the Donlin Gold project in Alaska. It describes Donlin Gold as one of the largest gold development projects in the world, with 39 million ounces of gold in its measured and indicated resource categories. It is also highlighted as having one of the highest grades among large-scale open pit deposits globally. If developed, Donlin Gold is projected to become the largest gold producer in the world, producing over 1 million ounces annually over its 27-year mine life. The document emphasizes the project's scale, grade, production profile, and location in a safe jurisdiction as highlighting its significance as a development asset.
This document provides an update on NovaGold Resources Inc.'s second quarter of 2013 and its Donlin Gold and Galore Creek projects. It begins with an introduction of the conference call attendees who will discuss the corporate update, financial results, and closing remarks. The document then discusses cautionary statements regarding forward-looking statements and scientific and technical information disclosures. The remainder of the document provides details on NovaGold's projects, including highlights from the second quarter, operating performance and cash flow analysis, funding obligations, the Donlin Gold permitting process, engagement with permitting agencies, and examples of large mine permitting in the United States. It emphasizes the jurisdictional safety of operating in Alaska.
This document provides an update on NovaGold Resources Inc.'s second quarter of 2013 and its Donlin Gold and Galore Creek projects. It begins with an introduction of the conference call attendees who will discuss the corporate update, financial results, and closing remarks. The document then outlines cautionary statements regarding forward-looking statements and scientific and technical information disclosures. The remainder of the document provides details on NovaGold's projects, including highlights from the second quarter, operating performance and cash flow analyses, permitting processes and timelines for Donlin Gold, engagement with permitting agencies, and examples of other large mine permitting processes in the United States. It emphasizes the jurisdictional safety of Alaska for mining projects.
NOVAGOLD 2013 Annual General and Special Meeting of ShareholdersNOVAGOLD
The Company's 2013 Annual General and Special Meeting of Shareholders was held on May 29th @ 3PM Pacific. President & CEO, Greg Lang, and Chairman, Tom Kaplan, reviewed the 2012 results and provided an outlook on what's to come. The webcast replay is available on our website www.novagold.com.
NOVAGOLD Corporate Presentation - July 2017 NOVAGOLD
The document summarizes information about NovaGold Resources Inc., which is developing two major mining projects - Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with the potential to be one of the largest gold producers. It has a projected 27-year mine life and is located in a safe mining jurisdiction in Alaska. Galore Creek also has the potential to be one of the largest and lowest cost copper mines in Canada. The document notes that NovaGold is a development-stage company with two projects of exceptional scale, quality, and jurisdictional safety.
The document summarizes information about NovaGold Resources Inc., which is developing two major mining projects - Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with the potential to be one of the top gold producers globally. It has a large resource size, high grade, long mine life, and is located in a safe jurisdiction. Galore Creek also has the potential to be one of the largest and lowest cost copper mines in Canada.
NOVAGOLD Corporate Presentation - August 2017NOVAGOLD
The document summarizes information about NovaGold Resources Inc., which is developing two major mining projects - Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with the potential to be one of the top gold producers globally. It has a large resource size, high grade, long mine life, and is located in a safe jurisdiction. Galore Creek also has the potential to be one of the largest and lowest cost copper mines in Canada.
This document provides an overview of the Precious Metals Summit in Zurich and London and discusses Novagold Resources Inc., which is a development-stage mining company focused on two large gold and copper projects. It summarizes key details about the Donlin Gold project in Alaska and the Galore Creek project in British Columbia, highlighting their large scale, high quality, and location in safe mining jurisdictions. The document also contains cautionary statements regarding the use of forward-looking information and compliance with resource reporting standards.
BMO Capital Global Metals & Mining Conference 2017NOVAGOLD
The document summarizes information about Novagold Resources Inc., a development-stage mining company with two large projects located in Alaska and British Columbia. It highlights key details about Novagold's Donlin Gold project in Alaska, which is described as one of the largest, highest-grade gold deposits in the world. The summary also notes that Novagold is working with Barrick Gold to advance Donlin Gold through permitting and optimization studies with the goal of enhancing the project's value.
Donlin Gold is a large-scale gold project located in Alaska that is a joint venture between NOVAGOLD (50%) and Barrick Gold (50%). The project is expected to be one of the largest gold mines in the world, with an estimated 27-year mine life and average annual production of over 1 million ounces of gold per year during its first five full years of operation. Donlin Gold has significant exploration potential along an 8km mineralized trend and its high-grade ore of 2.24 g/t is double the industry average grade of 1.12 g/t. The project's economics are highly sensitive to gold price, with its after-tax NPV increasing over 20 times from $6.
2014 Annual & Special Meeting of ShareholdersNOVAGOLD
The document discusses Donlin Gold and Galore Creek, two mining projects owned by NOVAGOLD. It begins with cautionary statements regarding forward-looking statements and scientific and technical information in the presentation.
For Donlin Gold, it summarizes that it is a large, high-grade gold project located in Alaska. It has exceptional scale with 39 million ounces of M&I resources. It is expected to be one of the largest gold producers with projected annual production of 1.5 million ounces over its first five full years. Donlin Gold also has significant exploration potential.
For Galore Creek, it notes it is a significant copper-gold-silver asset in Canada with strong copper grades and growing resources in
Donlin Gold is a large-scale gold project located in Alaska that is expected to become one of the largest gold producing mines in the world. Some key points:
- Measured and indicated resource of 39 million ounces of gold grading 2.2 g/t gold. Proven and probable reserves of 27 years of mine life at 1.1 million ounces average annual production.
- The project is owned 50/50 by NOVAGOLD and Barrick Gold. It has received all major permits but is awaiting completion of the federal permitting process.
- Donlin Gold would be a very large scale, low-cost operation located in a top-tier mining jurisdiction. It has potential for further resource
The document summarizes information about NovaGold Resources Inc., which is developing two major gold and copper projects - Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with the potential to be one of the top gold producers globally. It has a large resource size, is located in a safe jurisdiction, and has the support of local stakeholders. The document notes that Donlin Gold has double the average grade of other gold deposits worldwide. NovaGold is also developing the Galore Creek copper project through a partnership. The document provides cautionary statements regarding the forward-looking and scientific nature of the information presented.
The document summarizes information about Novagold Resources Inc., a gold development company with two major projects: Donlin Gold in Alaska and Galore Creek in British Columbia. Donlin Gold is described as one of the largest gold development projects in the world with the potential to be one of the top gold producing mines globally. It has a large resource size, high grade, long mine life, and is located in a safe jurisdiction in Alaska. The document highlights Donlin Gold's exploration potential and how its value increases substantially with higher gold prices.
Goldman Sachs Global Metals & Mining Conference NOVAGOLD
This document provides an overview of Novagold Resources Inc. and its two development projects: Donlin Gold in Alaska and Galore Creek in British Columbia. Some key points:
- Donlin Gold is poised to be one of the largest gold producers in the world and has a high-grade resource that is double the world average for gold deposits.
- Galore Creek also has the potential to be one of the largest and lowest cost copper mines in Canada.
- Novagold is a development-stage company focused on advancing these two projects, which have exceptional scale, quality, and are located in safe jurisdictions for mining.
Donlin Gold is a large, high-grade gold deposit located in Alaska that is projected to be one of the largest gold mines in the world. It has a large mineral resource of 39 million ounces of gold and is projected to produce 1.5 million ounces of gold annually over its 27-year mine life. Donlin Gold has the potential for significant value increases with higher gold prices due to its size, grade, and location in a safe jurisdiction. The project is being advanced through permitting by the joint venture owners, Barrick Gold and NOVAGOLD, who are committed to developing the project.
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsCompany Spotlight
The document summarizes Cypress Development Corp's Clayton Valley lithium project in Nevada. Key points include:
- A Preliminary Economic Assessment shows promising economics including a 32.7% IRR and $1.45 billion NPV.
- Measured and indicated resources total 8.9 million tonnes LCE with additional inferred resources.
- The project has the potential for low-cost production due to favorable geology and metallurgy.
- Upcoming catalysts in 2019 include a metallurgical study and prefeasibility study to further de-risk the project.
Aben Resources has made a new high-grade gold discovery at its flagship Forrest Kerr project in BC's Golden Triangle region. The region is known for major gold deposits and saw $100 million in exploration spending in 2017. Recent improvements have made the Forrest Kerr project more accessible via new roads. Aben's technical team has reinterpreted historical data and identified additional exploration targets. The project covers over 23,000 hectares of prospective geology along the Forrest Kerr fault zone that is similar to other major deposits in the Golden Triangle.
Aben Resources has discovered high-grade gold zones at its Forrest Kerr project in British Columbia's Golden Triangle. The first hole of the 2018 drill program intersected four separate high-grade gold zones within 190 metres, including 331.0 g/t Au over 1.0 metre. Aben plans to expand drilling at the Boundary North Zone and test other gold anomalies identified through soil sampling. The company also holds the Justin project in Yukon and Chico project in Saskatchewan near recent discoveries.
Cypress Development Corp. owns lithium claims in Clayton Valley, Nevada near Albemarle's Silver Peak lithium mine. A preliminary economic assessment found the project could have a 32.7% IRR and $1.45 billion NPV. The project would extract lithium from claystone using leaching and have average annual production of 24,042 tonnes of lithium carbonate over 40 years. Capital costs are estimated at $482 million to build a 15,000 tonne per day operation.
The document discusses Aben Resources Ltd., a gold exploration company with projects in British Columbia's Golden Triangle region and other areas of Western Canada. It provides an overview of Aben's management team and directors, flagship Forrest Kerr project, recent drilling results showing new high-grade gold discoveries, and its strategy to advance exploration through 2018. The document also briefly outlines Aben's other projects including the Chico gold project in Saskatchewan and Justin gold project in Yukon.
Cypress Development Corp. owns the Clayton Valley lithium project in Nevada. Drilling in 2017 intersected lithium-bearing claystone averaging 921 ppm Li over 77 meters thick. A maiden resource estimate calculated 3.287 million tonnes of lithium carbonate equivalent in the indicated category and 2.916 million tonnes LCE in inferred. Metallurgical tests show the claystone is acid leachable and able to recover over 80% of the lithium. Cypress plans additional drilling, engineering studies, and permitting to advance the project towards production.
- Aben Resources has three highly prospective gold projects in Western Canada including its flagship Forrest Kerr Project in BC's Golden Triangle region, which had recent drilling success expanding the Boundary North Zone.
- Management has over 100 years of combined experience in Western Canada and a proven track record of success.
- The projects have significant historic work identifying high-grade gold and robust discovery potential remains.
Cypress Development Corp. owns the Clayton Valley lithium project in Nevada. Drilling in 2017 intersected lithium-bearing claystone averaging 921 ppm Li over 77 meters. A maiden resource estimate classified over 1.3 million tonnes of lithium carbonate equivalent as indicated and inferred. Metallurgical testing shows the claystone is leachable with over 80% lithium recovery. Cypress aims to advance the project with engineering studies and further drilling to define resources with the goal of becoming a domestic lithium producer for the growing battery market.
The document provides forward-looking statements and discusses risks associated with such statements. It notes that some statements may be deemed forward-looking and lists factors that could cause actual results to differ from forward-looking statements. The document also identifies the qualified person for the technical information as Cornell McDowell and provides Aben's trading symbols and recent share information.
The document provides an overview of Aben Resources Ltd., a mineral exploration company with gold projects in Western Canada. It summarizes Aben's three key projects - Forrest Kerr in BC's Golden Triangle region with recent drill results discovering the Boundary Zone, Chico in Saskatchewan near producing mines, and Justin in Yukon's White Gold district. It outlines the management team's expertise and provides company details like shares outstanding and trading symbols.
- Cypress Development Corp owns the Clayton Valley lithium project in Nevada located near Albemarle's Silver Peak lithium brine operation.
- Drilling in 2017 encountered lithium mineralization averaging 921 ppm Li over 77 meters in 14 holes drilled.
- Metallurgical tests show the claystone is acid leachable with over 80% lithium extraction possible.
- Cypress aims to define a resource estimate in 2018 and advance the project with feasibility studies to develop a lithium operation.
The document discusses forward-looking statements and provides disclaimers about them. It introduces the qualified person for the technical information presented. It also lists Aben's trading symbols and recent share information including price and market capitalization.
1) Cypress Development Corp owns the Clayton Valley lithium project located next to Albemarle's Silver Peak mine in Nevada. Drilling in 2017 intersected lithium-bearing claystone averaging over 900 ppm Li to a depth of over 100 meters.
2) A maiden resource estimate classified over 1.5 million tonnes of lithium carbonate equivalent as indicated and inferred. Metallurgical testing shows the claystone is acid leachable to extract over 80% of the lithium.
3) The project is located in a strategic location to supply the growing lithium-ion battery market in the US, with lithium demand accelerating due to the increased production of electric vehicles globally.
TerraX Minerals is a Canadian mineral exploration company focused on exploring and developing its 100% owned 772 square km Yellowknife City Gold project located adjacent to the city of Yellowknife, Northwest Territories. The project covers high-grade Archean gold districts and has had multiple high-grade gold discoveries. TerraX has a strong management team with experience discovering and developing gold deposits and low exploration costs due to the project's excellent infrastructure and year-round access near Yellowknife.
This document discusses forward-looking statements and provides information about Aben Resources Ltd., including its stock symbols, shares outstanding, recent share price, market capitalization, and three gold exploration projects in Western Canada. It summarizes the management team's experience and the company's investment highlights. Specifically, it owns the Forrest Kerr gold project in British Columbia's Golden Triangle region, which saw successful drilling results in 2017 that led to a new discovery called the North Boundary zone.
Cypress Development Corp owns lithium claystone deposits in Clayton Valley, Nevada near Albemarle's Silver Peak lithium mine. Drilling in 2017 encountered lithium mineralization averaging 921 ppm Li over 77 meters in 14 holes. Metallurgical tests show the claystone is acid leachable with up to 80% lithium extraction. Cypress plans additional drilling, process engineering, and a preliminary economic assessment in 2018 to advance the project. The company sees potential for the project given growing lithium demand from electric vehicles and batteries.
TerraX Minerals is a Canadian mineral exploration company focused on exploring its 100% owned 772 square km Yellowknife City Gold project located near Yellowknife, Northwest Territories. The project covers high-grade Archean gold districts with known deposits and past producers. TerraX has made multiple high-grade gold discoveries on the property and identified several high-priority targets for further exploration and drilling. The company has a strong management team with experience discovering and developing deposits in the region.
Cypress Development Corp owns lithium claystone deposits in Clayton Valley, Nevada that have the potential to be a significant lithium resource. Drilling in 2017 encountered mineralization averaging 921 ppm lithium over 77 meters thick in 14 drill holes. Metallurgical testing shows the claystone is acid leachable with up to 80% lithium extraction. Cypress plans additional drilling, metallurgical testing, and a preliminary economic assessment in 2018 to further define the resource potential.
Cypress Development Corp owns lithium claystone deposits in Clayton Valley, Nevada near Albemarle's Silver Peak lithium mine. Drilling in 2017 encountered mineralization averaging 921 ppm lithium over 77 meters thick in 14 drill holes. Metallurgical tests show the claystone is acid leachable with up to 80% lithium extraction. Cypress plans additional drilling, metallurgical testing, and a preliminary economic assessment in 2018 to evaluate the project's potential.
Cypress Development Corp is exploring for lithium resources in Clayton Valley, Nevada. Recent drilling has encountered lithium-bearing claystone up to 112 meters below surface, with grades averaging over 800 ppm lithium. Metallurgical testing indicates 80% of the lithium can be extracted using a weak sulfuric acid solution. Cypress plans additional drilling in 2018 and expects to publish a initial lithium resource estimate in Q1 2018 to advance the project towards a preliminary economic assessment. The project is located near existing lithium production and infrastructure to be a potential new supply of lithium for the growing battery market.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....Lacey Max
“After being the most listed dog breed in the United States for 31
years in a row, the Labrador Retriever has dropped to second place
in the American Kennel Club's annual survey of the country's most
popular canines. The French Bulldog is the new top dog in the
United States as of 2022. The stylish puppy has ascended the
rankings in rapid time despite having health concerns and limited
color choices.”
𝐔𝐧𝐯𝐞𝐢𝐥 𝐭𝐡𝐞 𝐅𝐮𝐭𝐮𝐫𝐞 𝐨𝐟 𝐄𝐧𝐞𝐫𝐠𝐲 𝐄𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲 𝐰𝐢𝐭𝐡 𝐍𝐄𝐖𝐍𝐓𝐈𝐃𝐄’𝐬 𝐋𝐚𝐭𝐞𝐬𝐭 𝐎𝐟𝐟𝐞𝐫𝐢𝐧𝐠𝐬
Explore the details in our newly released product manual, which showcases NEWNTIDE's advanced heat pump technologies. Delve into our energy-efficient and eco-friendly solutions tailored for diverse global markets.
The Most Inspiring Entrepreneurs to Follow in 2024.pdfthesiliconleaders
In a world where the potential of youth innovation remains vastly untouched, there emerges a guiding light in the form of Norm Goldstein, the Founder and CEO of EduNetwork Partners. His dedication to this cause has earned him recognition as a Congressional Leadership Award recipient.
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...BBPMedia1
Nathalie zal delen hoe DEI en ESG een fundamentele rol kunnen spelen in je merkstrategie en je de juiste aansluiting kan creëren met je doelgroep. Door middel van voorbeelden en simpele handvatten toont ze hoe dit in jouw organisatie toegepast kan worden.
How MJ Global Leads the Packaging Industry.pdfMJ Global
MJ Global's success in staying ahead of the curve in the packaging industry is a testament to its dedication to innovation, sustainability, and customer-centricity. By embracing technological advancements, leading in eco-friendly solutions, collaborating with industry leaders, and adapting to evolving consumer preferences, MJ Global continues to set new standards in the packaging sector.
Starting a business is like embarking on an unpredictable adventure. It’s a journey filled with highs and lows, victories and defeats. But what if I told you that those setbacks and failures could be the very stepping stones that lead you to fortune? Let’s explore how resilience, adaptability, and strategic thinking can transform adversity into opportunity.
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
2. NYSE-MKT, TSX: NG
2
www.novagold.com
CAUTIONARY STATEMENTS
REGARDING FORWARD-LOOKING STATEMENTS
This presentation includes certain “forward-looking statements” within the meaning of applicable securities laws, including the United States Private Securities Litigation Reform Act of
1995. All statements, other than statements of historical fact, included herein including, without limitation, statements relating to Donlin Gold’s future operating or financial performance,
are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as “plans”, “expects”, “anticipates”, “believes”, “intends”, “estimates”,
“potential”, “possible” and similar expressions, or statements that events, conditions or results “will”, “may”, “could”, or “should” occur or be achieved. These forward-looking statements
are set forth in the slides pertaining to the implementation of the Donlin Gold second updated Feasibility Study and pertaining to the implementation of the Galore Creek Pre-Feasibility
Study and may include statements regarding perceived merit of properties; exploration results and budgets; mineral reserves and resource estimates; work programs; capital
expenditures; timelines; strategic plans; completion of transactions; market price of precious base metals; or other statements that are not statements of fact. Forward-looking
statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially
from those anticipated in such statements. Important factors that could cause actual results to differ materially from our expectations include the uncertainties involving the need for
additional financing to explore and develop properties and availability of financing in the debt and capital markets; uncertainties involved in the interpretation of drilling results and
geological tests and the estimation of reserves and resources; the need for continued cooperation between NOVAGOLD and Barrick Gold in the exploration and development of the
Donlin Gold property; the need for continued cooperation between NOVAGOLD and Teck Resources Ltd. in the exploration and development of the Galore Creek property; the need for
cooperation of government agencies and native groups in the development and operation of properties; the need to obtain permits and governmental approvals; risks of construction
and mining projects such as accidents, equipment breakdowns, bad weather, non-compliance with environmental and permit requirements, unanticipated variation in geological
structures, ore grades or recovery rates; unexpected cost increases; fluctuations in metal prices and currency exchange rates; and other risk and uncertainties disclosed in reports and
documents filed by NOVAGOLD with applicable securities regulatory authorities from time to time. The forward-looking statements made herein reflect our beliefs, opinions and
projections on the date the statements are made. Except as required by law, we assume no obligation to update the forward-looking statements of beliefs, opinions, projections, or other
factors, should they change.
REGARDING SCIENTIFIC AND TECHNICAL INFORMATION
Unless otherwise indicated, all reserve and resource estimates included in this presentation have been prepared in accordance with Canadian National Instrument 43-101 Standards of
Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (“CIM
Definition Standards”). Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and
reserve and resource information in this presentation may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the
foregoing, the term “resource” does not equate to the term “‘reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been
made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC’s disclosure standards normally do not
permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of
mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC. U.S. investors should also understand that “inferred mineral
resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an
“inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility
studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of
“contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute
“reserves” by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as
those of the SEC, and reserves reported in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set
forth herein may not be comparable to information made public by companies that report in accordance with United States standards.
3. NYSE-MKT, TSX: NG
3
www.novagold.com
Tier 1 Projects – Exceptional in Scale, Quality and Jurisdictional Safety
THE NOVAGOLD OPPORTUNITY
Donlin Gold
▸ In terms of combined size, grade,
exploration potential, production
profile and jurisdictional safety,
Donlin Gold is arguably the most
important undeveloped gold
project in the world
▸ Permitting commenced in Q3/12
Galore Creek
▸ If placed into production, as per
the latest pre-feasibility study,
would be the largest and lowest
cash cost copper mine in Canada
▸ Pursuing divestiture to fund
development of Donlin Gold
4. NYSE-MKT, TSX: NG
4
www.novagold.com
80% Institutional Ownership
THE NOVAGOLD OPPORTUNITY
Top Shareholders 1
Electrum Strategic Holdings, L.L.C
Paulson & Co. Inc.
The Baupost Group, L.L.C.
Tocqueville Asset Management LP
MAK Capital One, LLC
Solid.
▸ Significant High Grade Reserves
▸ Excellent Exploration Potential
▸ Experienced Management Team
Secure.
▸ Healthy Balance Sheet
▸ Jurisdictional Safety
Golden.
▸ Committed to Shareholder Value
▸ Superior Leverage to Gold
1) Shareholder positions are based on the latest 13-F filings
Institutional Quality Investment
5. NYSE-MKT, TSX: NG
5
www.novagold.com
ENHANCED UPSIDE POTENTIAL
Significant Progress Has Been Made to De-risk the Company
Filed Galore Creek pre-feasibility study
Filed Donlin Gold updated feasibility study & initiated
permitting
Completed bought-deal financing US$318M (net)
Completed company reorganization with NovaCopper
spinoff and divestiture of non core assets
Built a management team with expertise in permitting,
developing and operating large-scale projects
Completed 27,873 meter drilling program and
discovered the new Legacy Zone at Galore Creek
In less than two years, NOVAGOLD…
6. NYSE-MKT, TSX: NG
6
www.novagold.com
2013 GOALS AND MILESTONES
Focused on Advancing Our Projects On Time and On Budget
Q2 - 13
Q1 - 13
Donlin Gold permitting updateQ4/13
Donlin Gold cost reduction opportunities updateQ4/13
Galore Creek resource update
Reduced convertible debt by $72.8M1
Completed public scoping for Donlin Gold EIS
Q2/13
Appointed Richard Williams VP Engineering & Development
strengthening technical expertiseQ1/13
Galore Creek exploration drill resultsQ1/13
Received $54.0 M proceeds from in the money warrantsQ1/13
Q2/13
Q3/13
1) Outstanding Convertible Notes mature on May 1, 2015. The holders of the Notes had the right to require the Company to repurchase all or part of their Notes on May 1, 2013 (“put option”)
7. NYSE-MKT, TSX: NG
7
www.novagold.com
Safe: In Alaska, 2nd largest gold producing state in U.S.
Excellent expansion potential along strike & at depth
Poised to be world’s largest gold producer, one of only six >1Moz/year
Among the highest grade large-scale open-pit deposits
THE RIGHT PROJECT – DONLIN GOLD
Arguably the World’s Most Significant Gold Project
Largest gold project in development
PRODUCTION PROFILE
8. NYSE-MKT, TSX: NG
8
www.novagold.com
DONLIN GOLD: THE LARGEST DEVELOPMENT-STAGE GOLD DEPOSIT
World’s Five Biggest and Advanced Undeveloped Gold Deposits
Notes:
• Donlin Gold data as per Donlin Creek Gold Project Alaska, USA, NI 43-101 Technical Report on Second “Updated Feasibility Study”, effective November 18, 2011, as amended January 20, 2012 (the “updated feasibility study”). Measured and Indicated
resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
• Peer group data as per latest company documents, public filings and websites. Comparison group based on large, open-pit, gold-focused development projects with Resources over 10 million ounces of gold. The Kibali project has both open-pit and
underground portions included in the comparison.
1) Projected annual gold production during first five full years of mine life.
2) Projected annual gold production during full life of mine.
39.0
19.0
17.1 16.9
15.7
--
5
10
15
20
25
30
35
40
45
Donlin Gold Metates Rosia Montana Kibali Livengood
3.55
2.24
1.04
0.61
0.50
--
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
Kibali Donlin Gold Rosia Montana Livengood Metates
1.102
0.66
0.60 0.58
0.48
1.501
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Donlin Gold Metates Kibali Livengood Rosia Montana
LOCATION: USA USAD.R. CONGOROMANIAMEXICO
M&IAuResources(Moz)
M&IAuGrade(g/t)LOMAverageAnnualProduction(Moz)
▸ Donlin Gold has the largest resource of its peer
group and it’s located in North America
▸ It is among the highest-grade deposits in the
world, the top for an open-pit deposit
▸ Anticipated to be the leading gold producer by
a wide margin
9. NYSE-MKT, TSX: NG
9
www.novagold.com
DONLIN GOLD: SUBSTANTIAL EXPLORATION POTENTIAL
Multiple Drill Prospects and Targets Exist Along 8km Trend
See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
▸ All current reserves and resources
are contained in the Donlin Gold pit
• 39Moz M&I resources inclusive
of 34Moz P&P reserves
▸ Future mine situated in 3km
segment of 8km mineralized trend
▸ Over the last six years, the mineral
endowment has more than doubled
▸ Located largely on private land,
designated for mining
▸ Gold-bearing drill holes along the
8km trend
▸ Exploration upside:
• In-pit resource conversion
• In-pit/deep-pit exploration
• Near-pit targets (East ACMA,
Akivik Zone and Snow)
• Area resource potential
10. NYSE-MKT, TSX: NG
10
www.novagold.com
DONLIN GOLD: POISED TO BE WORLD’S BIGGEST GOLD MINE
Expected Production Rivals 11 Largest Existing Gold Mines
Notes: 2012 production figures based on public filings and websites
1) Projected annual gold production during first five full years of mine life as per the updated feasibility study.
2) Projected annual gold production during full life of mine as per the updated feasibility study.
3) Projected 2013 gold production disclosed in Barrick Gold’s press release dated 02/14/13.
See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
Gold(M/oz)
LOCATION:
1.10
2
1.37
1.35
1.17
0.963
0.91
0.77
0.75 0.72
0.65 0.63
0.58
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Donlin Gold Cortez Yanacocha Goldstrike Pueblo Viejo Grasberg Mine Veladero Lagunas Norte Boddington The Super Pit West Wits Vaal River
1.50
1
USA USA PERU USA DOMINICAN
REPUBLIC
INDONESIA ARGENTINA PERU AUSTRALIA AUSTRALIA SOUTH
AFRICA
SOUTH
AFRICA
11. NYSE-MKT, TSX: NG
11
www.novagold.com
Only Six Projects in the World are Slated to Produce >1Moz/year
MINES THE SIZE OF DONLIN GOLD ARE SCARCE
Source: RBC
1) Based on 2012 actual production where available, excludes Newmont’s Nevada operations that consist of multiple mines. Analysis includes
life of mine data for Donlin Gold
2) If put into production as contemplated by the updated feasibility study
156 MINES
>100 Koz
21 MINES
>500 Koz
8 MINES
>800 Koz
6 MINES/
Projects
>1 Moz
MURUNTAU
Uzbekistan
CORTEZ
USA
YANACOCHA
Peru
GOLDSTRIKE
USA
PUEBLO VIEJO
Dominican Republic
DONLIN GOLD
USA
▸ 1.5 Moz/year in first five full years2
▸ 1.1 Moz/year LOM2
2 MINES & 1 PROJECT1
Located in North America
Donlin Gold:
Only undeveloped asset in this
category
1
12. NYSE-MKT, TSX: NG
12
www.novagold.com
DONLIN GOLD
Low Cost Profile in a Climate of Declining Grades and Escalating Costs
What does gold production cost?
▸ Global gold industry experienced
substantial cost escalation and a
decrease in grade over the last decade
due to…
▸ Operations mining significantly
above reserve grade
▸ Inflationary pressures
▸ Donlin Gold’s low cost profile…
▸ Contributes to meaningful cash flow
generation over the 27-year mine life
▸ Accelerates payback period
Notes:
• Donlin Gold estimates as per the most recent updated feasibility study, please see slide 35 of the appendix.
• Q2-2013 industry average total cash cost and all-in sustaining cost as per National Bank Financial report
published on 08/03/13, based on 67 companies representing ~44% of worldwide quarterly gold production.
1) Industry average AISC include Total cash costs, depreciation expenses, exploration expenses, corporate G&A,
and cash taxes paid reported during the quarter.
2) Donlin Gold AISC include Total cash costs, sustaining capex, stripping capex (IFRS), corporate G&A,
reclamation, and community development (IFRS).
$1,223/oz1
$735/oz2
$-
$200
$400
$600
$800
$1,000
$1,200
$1,400
Industry Average Life Of Mine
40%
Less than current
industry average
Donlin Gold
Life of Mine
All-InSustainingCost($US/oz)
13. NYSE-MKT, TSX: NG
13
www.novagold.com
DONLIN GOLD HAS EXCEPTIONAL LEVERAGE TO GOLD
NPV Increases ~20x with ~2x Increase in Gold Price
All amounts in US dollars
Notes: updated feasibility study. All dollar figures are in USD and reflect after-tax net present value (at a 0% and 5% discount rates) of the Donlin Gold project as of 1/1/2014. At a 5% discount rate, the net present value is: $547 m @
$1,200 gold; $3,147m @ $1,500 gold; $4,581 m @ $1,700 gold; $6,722 m @ $2,000 gold; and $10,243 m @ $2,500 gold. Project development costs prior to 1/1/2014 are treated as sunk costs. See “Cautionary Note Concerning
Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
$6.2B
$11.6B
$14.6B
$19.2B
$27.0B
0
5,000
10,000
15,000
20,000
25,000
30,000
$1,200 $1,500 $1,700 $2,000 $2,500
NPV(US$inmillions)
Gold Price (US$)
NPV at 5% NPV at 0%
14. NYSE-MKT, TSX: NG
14
www.novagold.com
THE PRODUCTION CLIFF – AN INEVITABLE PHENOMENON
Donlin Gold Project to Come into Play at a Key Time for the Industry
Notes: National Bank Financial – The Gold Production Cliff; Industry Congestion Part 3, January 31, 2013.
Based on Company Reports, NBF Estimates
1) Projected annual gold production during first five full years of mine life as per the updated feasibility study
▸ 2017 onward, material declines in gold production across the industry
▸ Project queue & discovery frequency inadequate to replace production,
creating a supply-demand disequilibrium in gold
Donlin Gold expected to commence production 1.5M oz Au/yr1
15. NYSE-MKT, TSX: NG
15
www.novagold.com
MAJOR DISCOVERIES ARE INCREASINGLY RARE
Very Few Quality Development Assets Left
▸ Sector facing gold production cliff
▸ Lack of discoveries
▸ Rapidly depleting reserves in operating mines
▸ The industry saw 25 discoveries with 20+ million ounces of gold through the
1980s and 1990s1
▸ Five discoveries over the past ten years
▸ None over the last two years that meet this criteria
▸ Once Donlin Gold comes into production, many major companies are expected
to have significantly depleted their reserves
▸ With a 27 year mine life, Donlin Gold would provide 1,500,000 gold ounces in
the first 5 years and 1,100,000 gold ounces for the life of mine spanning beyond
2046
▸ As gold reserves are being mined out at a high rate, big projects are needed to
sustain the industry
1) “Roundup 2013: Lassonde calls for exploration ‘paradigm shift,’” The Northern Miner, 01/31/13
16. NYSE-MKT, TSX: NG
16
www.novagold.com
COMPELLING OPPORTUNITY
Against a Backdrop of Industry-Wide Reductions
▸ Improved access to mining talent
▸ First world top tier operation
▸ United States versus risky locations
▸ Mining equipment in today’s market
▸ Readily available
▸ Greater flexibility to negotiate lease agreements
▸ Capital cost estimate
▸ Commodity prices have stabilized which should present cost
saving opportunities
▸ Plan to revisit capital cost estimate as we get closer to the
completion of permitting
▸ Evaluating third-party opportunities to develop and operate
infrastructure such as the gas pipeline, oxygen plant and port
facilities
17. NYSE-MKT, TSX: NG
17
www.novagold.com
DONLIN GOLD
Well Positioned to Share Upfront Costs with Third Parties
Areas US$M1 Opportunities1
Mining 345 Leasing equipment ~$170M
Site preparation/roads 236
Process facilities 1,326 Oxygen plant could be built by third party ~$130M
Tailings 120
Utilities 1,302
Ancillary buildings 304
Off-site facilities 243
Total Direct Costs 3,876
Owners’ cost 414
Indirect Costs 1,405
Contingency 984 Healthy Contingency
Total Owner’s & Indirect
Costs, and Contingency
2,803
Total Project Cost 6,679 >$1B potential capital reductions
Gas pipeline could be built by third party $834M
1) Represents 100% of project’s capital expenditures
18. NYSE-MKT, TSX: NG
18
www.novagold.com
CONVENTIONAL MINING AND MILLING PROCESS
Well Tested and Available Technology
▸ Cut-off grade optimization to feed
high-value ore early in mine life
▸ Conventional primary crushing &
grinding equipment
▸ Conventional flotation circuit
equipment
▸ Ore amenable to flotation,
lowering the pressure oxidation
capacity requirement compared
to whole-ore processes
▸ Conventional CIL and refining
circuits for on site doré production
19. NYSE-MKT, TSX: NG
19
www.novagold.com
DONLIN GOLD: STANDARD TECHNOLOGY
Well Established Mining and Mineral Processing Methodology
Donlin Gold Pueblo Viejo Detour Lake
Capital Expenditures US$6.7B1 ~US$4.0B2 C$1.5B4
Location Alaska, US Sanchez Ramirez, Dominican
Republic
Ontario, Canada
Mining Method Open Pit Open Pit Open Pit
Project Status Permitting Commercial Operation Start Up
Total M&I Resources
(inclusive of reserves)
39.0 Moz 36.3 Moz 23.3 Moz
Nameplate Design Throughput (tpd) 53,500 24,000 61,000
M&I Grade (g/t) 2.24 2.41 1.07
Recovery (%) 89.8 92 91
Strip Ratio 5.5 1.2 3.7
Expected Average Annual Production
(oz)
1,500,000 3 1,042,000 – 1,125,000 3 ~650,000
Processing Method Flotation/Autoclaving/Leaching Autoclave/Leaching/Ag/Cu Recovery Gravity Concentration/High-Intensity Leaching
Ball Mill Underflow & Gravity Tails Leaching
Number of Autoclaves 2 medium 4 large N/A
Key Infrastructure Natural gas pipeline/Power plant
Oxygen plant
Power plant and Transmission Line/
Oxygen plant/Lime Kilns/Limestone
Grinding
180 km 230kV Transmission Line
Mine Life 27 years 25 years 22 years
Notes: updated feasibility study, company documents, public filings and websites. Measured and indicated resources are inclusive of Proven and Probable reserves. See “Cautionary Note Concerning Reserve & Resource Estimates” and
“Reserve & Resource Base” with footnotes in the appendix.
1) Capital expenditure shown on a 100% project basis.
2) Capital expenditure of US$3.7B disclosed in Barrick Gold’s press release dated 01/15/13, plus a net incremental cost of approximately US$300M for the power plant.
3) Production expected for first full five years of operation.
4) Revised at end of 3Q 2012, as per press release dated 11/8/12.
21. NYSE-MKT, TSX: NG
21
www.novagold.com
Right Project, Location & Stakeholders
THE RIGHT LOCATION – ALASKA
▸ Alaska is the second largest U.S.
gold-producing State
▸ Four gold, as well as a number of
coal and base metals mining
operations
▸ Natural resource projects integral
to the State’s economy
▸ Donlin Gold has no proximity to
major population areas; located
on private land designated for
mining
▸ Strong and time-tested
community support
22. NYSE-MKT, TSX: NG
22
www.novagold.com
THE RIGHT STAKEHOLDERS
Jurisdictional Safety is More Than Geographic Location
Committed Stakeholders
▸ Calista Corporation
▸ The Kuskokwim Corporation
“Calista would like to take this opportunity to assert and inform the
U.S. Army Corps of Engineers and the public of its legislated
mandate under ANCSA and its proper status as Project Proponent.
Calista and TKC are not only stakeholders, but are the legislatively
mandated landowners charged with the responsibility of seeing the
project to fruition in an environmentally responsible manner.”
– June MacAtee, Calista Corporation VP
23. NYSE-MKT, TSX: NG
23
www.novagold.com
PERMITTING IN THE U.S.
Large Projects Have Been Successfully Permitted
Project Name Location Metal Time Description
Red Dog Mine Alaska Lead/zinc ~2 years
• Expansion
• EIS completed in 2009
• Development started on schedule in 2010
Fort Knox Alaska Gold ~3 years
• Expansion – new heap leach facility
• Permitting completed in 2007
Pogo Alaska Gold ~3 years
• New mine
• Permitting completed in 2004
• Operations began in 2006
Rochester Mine Nevada Silver ~1 year
• Expansion – new heap leach & mine reopening
• EA/permitting completed in 2011
Cortez Gold Nevada Gold ~3 years
• Major pit expansion
• EIS/permitting completed in 2008/2009
Goldstrike Nevada Gold ~2 years
• Major pit expansion
• Waste rock and tailings facilities
• ROD approving the project was in 2009
Hycroft Gold Nevada Gold ~2 years
• Reactivation
• EIS/permitting completed in 2012
Climax Molybdenum Colorado Molybdenum ~5 years
• Re-opening
• State permitting completed in 2012
• New production began in 2012
24. NYSE-MKT, TSX: NG
24
www.novagold.com
2016
DONLIN GOLD PERMITTING PROCESS
Final
EIS/Permit
Issuance
Preliminary Draft EIS
* Public Comment
Period
August 2012
** Record of
Decision
Permit
Applications
Submitted
08/12
Current Status
Regulatory Process Currently Focused on Environmental Impact Statement (“EIS”)
Permitting Process ~ 4 years
Draft EIS
Scoping summary document
Development of alternatives
Prepare preliminary DEIS
Agency Review
Prepare DEIS
DEIS Comments
Summary/Responses
Agency Review of Comment
Prepare Preliminary FEIS
Agency Review
Prepare FEIS
Record of Decision subject to 30-
day appeal period
* **Notice of
Intent
Submitted
12/14/12
Public
Scoping
Ended
03/29/13
25. NYSE-MKT, TSX: NG
25
www.novagold.com
DONLIN GOLD PUBLIC SCOPING PERIOD
▸ U.S. Army Corps of Engineers (the “Corps”) EIS website:
www.donlingoldeis.com
▸ Donlin Gold public scoping period (Dec. 14/12 - March 29/13)
▸ 2nd phase of the EIS process to help define the scope of the EIS analysis
▸ 14 public meetings in villages/communities in Western Alaska and
Anchorage
▸ Very well attended with knowledgeable audience and overall positive
feedback
▸ The Corps received constructive comments that will be used in
developing a robust EIS
▸ Top public comment areas – subsistence, socioeconomics, water, air,
barging, reclamation, health, hazardous materials
Communication on all Levels is a Core Value
26. NYSE-MKT, TSX: NG
26
www.novagold.com
CURRENT WORK
▸ Maintaining strong working relationships with the agencies and providing
input throughout the permitting process
▸ Baseline Data Review – ongoing
▸ EIS contractor completed data adequacy review and agency
coordination
▸ Follow-up technical workshops highlighting core components of
baseline environmental and social studies
▸ Supplemental field studies completed by end of summer 2013
▸ EIS Alternatives Development – ongoing
▸ Reasonable range of alternatives considered to address key issues
(ie: power – gas pipeline vs. diesel)
▸ Must be feasible, practicable, and permittable
▸ PDEIS Preparation – underway
▸ Initial draft chapters in review
Proceeding on Schedule as per EIS Timeline
27. NYSE-MKT, TSX: NG
27
www.novagold.com
GALORE CREEK
Projected to be Largest Copper Mine in a Mining-Friendly Jurisdiction, Canada
Location BC, Canada
Mining Method Open Pit
Owners 50/50 (NG/TCK)
M&I Resources1, 2 Copper 8.9 Blb 0.5%
Gold 8.0 Moz 0.3 g/t
Silver 136 Moz 5.2 g/t
1) See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
2) M&I: Measured and Indicated resources inclusive of Proven and Probable reserves
▸ Once in production, as envisioned
by the pre-feasibility study, Galore
Creek is expected to be the
largest and lowest cash cost
copper mine in Canada
28. NYSE-MKT, TSX: NG
28
www.novagold.com
GALORE CREEK
2013 Drilling Program Focused on Defining the new Legacy Zone
▸ Completed 10,000 meters of delineation drilling to define the extent of the Legacy
mineralization and assess its impact on future mine design
▸ This year’s program is a follow up on the success of the 2012 drill results which reported
significant intercepts, including 86 meters grading 1.31%Cu and 0.46 g/t Au
▸ Led to the discovery of the new Legacy zone, a 700-meter long mineralized zone,
adjacent to the Central Pit and currently open in several directions
▸ 2013 program aims to improve the overall economics of this project
29. NYSE-MKT, TSX: NG
29
www.novagold.com
$24
$15
$18
$15
$16
$8
$44
$21
$5
$3
-
20.0
40.0
60.0
80.0
100.0
120.0
140.0
1 2
FINANCIAL OBLIGATIONS HAVE DECREASED SUBSTANTIALLYUS$(Millions)
1) 2013 anticipated budget expenditure disclosed on February 12, 2013
2) Market Capitalization as of August 30, 2013.
Share structure as of May 31,2013:
• Shares issued & outstanding: 316.6M
• Options: 16.3M
• Fully diluted: 332.9M (excludes convertible notes)
3) Cash and cash equivalents as of May 31, 2013
4) The Notes mature on May 1, 2015. Interest on the remaining
Notes will amount to $1,219,845 per year for the next two years.
Clear Focus Begins with Strong Funding to Execute on All Fronts
2013 Budget1
NovaCopper Galore Creek
G&A and MiscellaneousDonlin Gold Interest
Rock Creek
2012 Actual
62 %
Reduction in
Operating Expenses
Market Cap2
US$868M
Cash Position3
US$215M
Outstanding Debt4
US$22.2M
30. NYSE-MKT, TSX: NG
30
www.novagold.com
WHY NOVAGOLD? WHY NOW?
NOVAGOLD Well Positioned to Deliver on All Corporate Objectives
Top Tier Assets
Broad community support. Native corporations and
First Nations are important stakeholders in our
projects.
Located in safest mining jurisdictions in the world.
Superior Leverage to Gold
Committed Stakeholders
Simplified Corporate Structure
Strong Cash Balance
Offers great leverage in a secular bull market in gold.
Near-ground-level entry into a growth-oriented
pure gold play poised to deliver superior returns
for decades to come.
Sufficient funds to take Donlin Gold through
permitting and satisfy corporate needs.
32. NYSE-MKT, TSX: NG
32
www.novagold.com
PROJECT OVERVIEW
▸ Donlin Gold LLC is the operating company
▸ 50/50 ownership by NOVAGOLD and Barrick Gold
▸ Board of Directors has two representatives from each company
> Chairman rotates every year
> Each company has the right to appoint the Donlin Gold General Manager every
two years
▸ Operates under agreements with Alaska Native Claims Settlement Act (ANCSA)
landowners
▸ Calista Corporation (Subsurface minerals and surface lease)
▸ The Kuskokwim Corporation (Surface use agreement)
▸ Project office in Anchorage
> 37 full-time employees and 9 contractors
▸ Strong track record for local hiring
Advancing Donlin Gold Up the Value Chain
33. NYSE-MKT, TSX: NG
33
www.novagold.com
PROJECT HIGHLIGHTS
Reserves: 33.9 Moz Au (505M tonnes ore)1
Resources: 5.1 Moz M&I (excluding P&P) and 6.0 Moz Inferred1
Mine Life: ~27 years
Production: Year 1-5,1.5 Moz/year; LOM,1.1 Moz/year
Operation: Open-pit, conventional truck & shovel
Milling: 53.5k tonnes/day, sulfide flotation, pressure
oxidation (POX), carbon-in-leach recovery (CIL)
Strip ratio: 5.5 = 2.8B tonnes waste rock
Tailings: Fully lined storage facility
Power: 153MW average site-generated load, fueled by natural gas
transported via a 315-mile pipeline
Logistics: All consumables supplied by Kuskokwim River transportation
system with port near Jungjuk Creek
1) See “Cautionary Note Concerning Reserve & Resource Estimates” and “Reserve and Resource Base” table with footnotes.
Donlin Gold Slated to be a State-of-the-Art Significant Mine
34. NYSE-MKT, TSX: NG
34
www.novagold.com
Potential Capex Reduction from $6.7B1 to $5.7B (amounts in US dollars)
~$1B in Contingency based on updated feasibility study
1) Represents 100% of capital expenditures to be shared equally with co-owners Barrick Gold Corporation
2) Utilities include process facilities (ie: oxygen plant) and utilities (ie: power plant & gas pipeline)
3) Ancillary Infrastructure/Mining: site preparation, roads, tailings, ancillary buildings and off-site facilities
DONLIN GOLD
Healthy Contingency Represents 17% Total Capex
Capital
Expenditures
$4.7B
Contingency
$984M
Capital
Expenditures
Reduction
Opportunities
~$1.0B
Opportunities Include:
- Third-party built gas pipeline
- Third-party built oxygen plant
- Leasing mining equipment
Process/
Utilities2
$2.6B
Ancillary
Infrastructure/
Mining3 $1.2B
Owner's Cost
$414M
Indirect $1.4B
Contingency
$984M
35. NYSE-MKT, TSX: NG
35
www.novagold.com
DONLIN GOLD
Area US$/oz
Open-pit mining1 228
Processing 257
G&A, royalties, land & other2 100
Total $585
Area US$/oz
Open-pit mining1 133
Processing 208
G&A, royalties, land & other2 68
Total $409
Life of Mine Cash Costs
First Five Years Cash Costs
Notes:
• Donlin Gold estimates as per the most recent updated feasibility study.
1) Net of deferred costs
2) Based on US$1,200/oz gold price
Low Operating Cash Costs and All-In Sustaining Costs
Life of Mine All-in Sustaining Costs
Area US$/oz
Cash costs 585
Sustaining capex 50
Stripping capex (IFRS) 46
Corporate administration 27
Reclamation 22
Community development (IFRS) 5
Total $735
First Five Years All-in Sustaining Costs
Area US$/oz
Cash costs 409
Sustaining capex 45
Stripping capex (IFRS) 0
Corporate administration 21
Reclamation 17
Community development (IFRS) 4
Total $496
37. NYSE-MKT, TSX: NG
37
www.novagold.com
DONLIN GOLD KEY PERFORMANCE INDICATORS
Gold Price
Unit $1,000/oz $1,200/oz
Base Case
$1,700/oz $2,000/oz $2,500/oz
Average annual
after-tax cash flow
(first full five years)
$M 670 950 1,500 1,785 2,185
Average annual
after-tax cash flow (LOM)
$M 350 500 815 990 1,275
NPV (5%) after-tax1 $M (1,340) 550 4,580 6,720 10,240
NPV (0%) after-tax1 $M 2,100 6,200 14,620 19,250 26,975
IRR after-tax1 % 2.3 6.0 12.3 15.1 19.1
Payback period Years 19.1 9.2 5.3 4.4 3.5
Notes: updated feasibility study. All dollar figures are in USD and reflect after-tax net present value (at a 0% and 5% discount rates) of the Donlin Gold Project as of 1/1/2014. At a 5% discount rate, the net present value
is: $547 m @ $1,200 gold; $4,581 m @ $1,700 gold; $6,722 m @ $2,000 gold; and $10,243 m @ $2,500 gold. Project development costs prior to that date are treated as sunk costs. See “Cautionary Note Concerning
Reserve & Resource Estimates” and “Reserve & Resource Base” with footnotes in the appendix.
All amounts in US dollars
1) NPVs and IRRs as at January 1, 2014. Project development costs prior to that date are treated as sunk costs.
Robust Economics Highly Leveraged to Gold Prices
41. NYSE-MKT, TSX: NG
41
www.novagold.com
DONLIN GOLD PERMITTING PROCESS
Clear Steps Outlined and Good Working Relationship at State & Federal Levels
State Federal
AK Department of
Natural Resources
AK Department of
Environmental
Conservation
US Army Corps
of Engineers
US Environmental
Protection Agency
Bureau of Land
Management
Water Discharge
Reclamation Air Quality
Fish Habitat
Waste Management
Pipeline Right-of-
Way
Wetlands
Agencies
Permits/Approvals
Water Rights
US Fish and
Wildlife ServiceAK Department of Fish & Game
Permitting Process is Approximately 4 years
National Marine
Fisheries
Service
Pipeline Special Permit
Dam Safety
US Pipeline and
Hazardous
Materials Safety
Administration
43. NYSE-MKT, TSX: NG
43
www.novagold.com
DIFFICULT INVESTMENT LANDSCAPES FOR MINERS
See work cited on slide 49
Recently Highlighted Regions/Countries with Heightened Geopolitical Risk
South America
1. Peru: Construction halted at largest mine
due to gov’t review and social unrest.
2. Ecuador: Political obstacles and windfall
tax discourage foreign investment in mining.
3. Venezuela: Five mining companies seeking
compensation through World Bank’s
arbitration court following nationalizations.
4. Bolivia: Nationalization of various natural
resources assets.
5. Argentina: Miners required to repatriate
revenues from foreign sales, limitations
imposed on foreign exchange. Controls on
imports of equipment/supplies have also
been tightened.
Africa
6. Ghana: Increase in tariffs on mines
and introduced a windfall tax,
halting project expansions.
7. Guinea: New law gives
government a 35% stake; threat of
nationalization.
8. Mali: Recent military coup creating
political uncertainty.
9. Kenya: Rising mineral royalties
and drilling fees for mining.
10. Congo: Plans to revise mining
code, raise taxes and increase
stake in mining projects.
11. Zimbabwe: Gov’t plans to seize
control of foreign-owned mines.
12. South Africa: Ongoing dialogue to
nationalize mining industry.
Russia, Asia & Australia
13. Indonesia: Proposed new legislation
limits foreign ownership of mines to
49%.
14. Philippines: New royalties and taxes
being imposed on mining companies.
15. Mongolia: Drafting investment law to
restrict foreign ownership.
16. Australia: Government passed
Mineral Resources Rent Tax of 30%.
17. Kyrgyzstan: Parliamentary motion
calling for increased government stake
in one of its largest gold mines.
44. NYSE-MKT, TSX: NG
44
www.novagold.com
SIGNIFICANT DROP IN DISCOVERIES SINCE 2006
Source: Metals Economics Group – Strategies for Gold Reserves Replacement 2012
Note: Major gold discoveries based on a cut off of 2 M/oz of gold in total reserves, resources and past production (or at least 1 M/oz in defined
reserves)
45. NYSE-MKT, TSX: NG
45
www.novagold.com
0
200
400
600
800
1,000
1,200
0.0
0.5
1.0
1.5
2.0
2.5
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Total cash cost Depreciation Exploration & sustaining capex Other and administrative
THE CLIMATE OF DECLINING GRADE AND ESCALATING COSTS
Donlin Gold Has Among the Highest Grade for an Open-Pit Deposit
Notes: GFMS Mine Economics, LBMA, World Gold Council
1) 2002-2004 data set includes primary Gold mines only, 2005 onwards, includes porphyry copper gold mines
2) Includes exceptional items
Donlin Gold
2.24 g/t average M&I
grade
2
Mined grade1
Grade, g/t Cost US$/oz
Reserve grade
Pierre Lassonde,
Roundup 2013
Mining
36%
above reserve grade“80% of the companies
talking about their
guidance today, what
are they telling you?
Less production, and
higher costs. That’s
because of the quality
of the deposits: we
need better-quality
discoveries, and we
need more of them."
46. NYSE-MKT, TSX: NG
46
www.novagold.com
THE NOVAGOLD TEAM
Gregory A. Lang
President & CEO
▸ Former President of Barrick Gold North America
▸ 35 years experience building & operating major mines
▸ Intimate knowledge of Donlin Gold
David Deisley
Executive Vice President and
General Counsel
▸ Former EVP and General Counsel of Goldcorp
▸ Regional General Counsel for Barrick Gold North America
▸ Extensive track record in project permitting, corporate social responsibility,
mergers and acquisitions and corporate development
▸ 25 years of mining industry experience
David Ottewell
Vice President and Chief
Financial Officer
▸ Former VP and Corporate Controller of Newmont Mining Corporation
▸ 25 years of mining industry experience
▸ Diverse experience in all facets of financial management, from mine operations
to executive corporate financial management of premier gold producers
Mélanie Hennessey
Vice President, Corporate
Communications
▸ Held variety of senior IR & corporate communications positions with Goldcorp
Inc., New Gold Inc., and Hecla Mining Company
▸ Leading NOVAGOLD’s internal and external communications functions
Ron Rimelman
Vice President, Environment,
Health, Safety & Sustainability
▸ 25 years of environmental experience, managing environmental impact
assessments and permitting activities world-wide
▸ Leadership role on mine permitting and NEPA evaluations for mine projects in
Alaska since 1993
Richard Williams
Vice President, Engineering
and Development
▸ Former Project Director for the Pueblo Viejo project in the Dominican Republic
▸ 30 years of experience developing and operating major mines world-wide
▸ Particular expertise in autoclave technology
MANAGEMENT
Senior Industry Leaders to Bring Donlin Gold through Permitting and Beyond
47. NYSE-MKT, TSX: NG
47
www.novagold.com
NOVAGOLD BOARD OF DIRECTORS
Dr. Thomas S. Kaplan
Chairman
Chairman and CEO of The Electrum Group LLC, a privately held natural resources
investor that controls a diversified portfolio of precious and base metals assets
Sharon Dowdall
Former Chief Legal Officer and Corporate Secretary with Franco-Nevada, transforming an
industry pioneer into one of the most successful precious metals enterprises in the world
Dr. Marc Faber
Publishes a monthly investment newsletter entitled The Gloom, Boom & Doom
Report and is the author of several books
Greg Lang
President & CEO
Former President of Barrick Gold North America, 35 years experience building &
operating major mines with intimate knowledge of Donlin Gold
Gil Leathley
COO and Director of Sunward Resources, former Senior Vice President and Chief
Operating Officer of the Company
Igor Levental
President of The Electrum Group LLC, former VP of Homestake Mining and International
Corona Corp.
Kalidas Madhavpeddi Former Executive with Phelps Dodge
Gerald McConnell Former Chairman and CEO of NOVAGOLD, CEO of Namibia Rare Earths Inc.
Clynton Nauman CEO of Alexco Resources, formerly with Viceroy Gold and Kennecott Minerals
Rick Van Nieuwenhuyse CEO of NovaCopper, founder and former CEO of NOVAGOLD
Anthony P. Walsh
Former President and Chief Executive Officer of Miramar Mining Corporation, which in
2007 was sold to Newmont Mining Company.
48. NYSE-MKT, TSX: NG
48
www.novagold.com
DONLIN GOLD MANAGEMENT TEAM
Stanley Foo
President/General
Manager
30+ years mining industry experience in exploration, mine geology, operations management, project management
and permitting; 12 years mine operations experience in NV including superintendent roles at Cortez and Bald Mtn;
15 years in Alaska in project management and permitting; Previous Project Manager roles with Donlin 1997-99,
2005-2007, served on Donlin Gold LLC board 2008-2010.
James Fueg
Study Manager
Led Donlin Gold’s recent feasibility studies and coordinates all engineering and technical work for project;
20+ years experience in mining, exploration and environmental science; 16 years in Alaska; at Donlin since 2004.
Robert Nick Enos
Environmental and
Permitting Manager
Leads permitting and environmental management for project; primary contact for reg. agencies; 20 years
experience in Alaska in geology, environmental science and permitting management; Previous experience
includes Greens Creek, Calista Corp., as environmental/permitting consultant; Joined Donlin in 2005.
Kurt Parkan
External Affairs
Manager
Leads Donlin Gold’s community affairs, communications, government relations and corporate social responsibility
functions; Nearly 30 years public affairs experience in Alaska; Previous roles: External Affairs Director of Nature
Conservancy of Alaska, Deputy Commissioner for Alaska Department of Transportation and Public Facilities,
Special Assistant to the Governor, Legislative Aide and as staff for Alaska House of Representatives Finance
Committee.
Meg Day
Human Resources
Manager
22 years human resources experience in the mining industry including 17 years in Alaska; Served in various
senior management positions in Alaska, Utah and Washington and has been involved in the start up of several
mines. Serves on Alaska Miners Association HR Committee, Society of HR Management and Advisory Board
member of University of Alaska.
Jan Halstead
Administrative and
Finance Manager
25+ years accounting and financial analysis experience in construction, investment, telecommunications;
Responsible for growth and development of Accounting, Administration, Purchasing and Contract functions for
Donlin Gold LLC.
49. NYSE-MKT, TSX: NG
49
www.novagold.com
WORKS CITED (SLIDE 43)
1. “Newmont Says Peru Review Is Expected in ‘Next Few Weeks’,” Liezel Hill & Margaret Brenna, Bloomberg News, 03/29/12.
2. “New Agreements Extract Big Bucks from Foreign Mining Operators in Ecuador,” Mineweb, 12/06/11.
3. “Venezuela Decrees Nationalization of Nation’s Gold Industry,” Bloomberg BusinessWeek, 09/19/11.
4. “Glencore Protests Bolivia’s Move on Mine,” Wall Street Journal, 06/22/12.
5. “Argentine currency rules hit mine exports-industry,” Reuters, 06/19/2012
6. “National Coalition on Mining Commends Government on Mining Taxes,” Ministry of Finance & Economic Planning, Republic of
Ghana, 11/23/11.
7. “Guinea Passes Long-Awaited Mining Code, Launches Contract Review,” IHS Global Insight: Country & Industry Forecasting,
09/14/11.
8. “Mali coup: West African leaders abandon visit,” BBC News Africa, 02/29/12.
9. “Kenya Raises Mineral Royalties, Drilling Charges for Mining,” David Malingha Doya, Bloomberg News, 08/06/2013.
10. “Congo to Boost State’s Share of Mining Projects, Raise Taxes,” Michael J. Kavanagh, Bloomberg News, 03/21/2012.
11. “Zimbabwe to Seize Mines, Compensate Banks in $7 Billion Plan,” Franz Wild, Bloomberg News, 08/06/2013.
12. “South Africa: Nationalization – It’s Not Over Until Mangaung Sings,” All Africa, 07/0/12.
13. “Geoff Breen, “IAU.AX – Luncheon Provides Greater Clarity but Timing Remains Uncertain,” RBC Capital Markets Research
Report, 03/26/12. (Indonesia)
14. “Philippine mining rule change would hurt investor sentiment – groups,” Reuters, 02/14/12.
15. “Mongolia eyes new foreign investment law,” Financial Times, 05/02/12.
16. “Still a Great Place to Dig for Minerals,” Sydney Morning Herald 03/19/12.
17. “Investors flee Centerra on Kyrgyz gold mine vote,” Stock House 06/27/12.
51. NYSE-MKT, TSX: NG
51
www.novagold.com
RESERVE/RESOURCE TABLE (CON’T)
Resources (100%)5,6 Tonnage Grade* Metal content NOVAGOLD share**
COPPER Mt %Cu Mlbs Mlbs
Inferred 53.7 0.50 592.0 414.4
GOLD Mt g/t Moz Moz
Inferred 53.7 0.73 1.26 0.88
SILVER Mt g/t Moz Moz
Inferred 53.7 10.60 18.36 12.85
Copper Canyon (NOVAGOLD 70%)
t = metric tonne
M = million
g/t = grams/tonne
* Reserve grade is diluted; resource
grade is in situ.
** NOVAGOLD share net after earn-ins
Approximate cut-off grades (see Resource Footnotes below):
Donlin Gold Reserves1: 0.57 g/t gold
Resources3: 0.46 g/t gold
Galore Creek Reserves2: C$10.08 NSR
Resources4: C$10.08 NSR
Copper Canyon Resources5,6: 0.6% copper equivalent
52. NYSE-MKT, TSX: NG
52
www.novagold.com
RESERVE/RESOURCE TABLE (CON’T)
Notes:
a. These resource estimates have been prepared in accordance with NI43-101 and the CIM Definition Standard, unless otherwise noted.
b. See numbered footnotes below on resource information.
c. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content
d. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds
Resource Footnotes:
Mineral Reserves are contained within Measured and Indicated pit designs, and supported by a mine plan, featuring variable throughput rates, stockpiling and cut-off optimization. The pit designs and mine plan were optimized on diluted grades using the following economic and technical parameters: Metal price for
gold of US$975/oz; reference mining cost of US$1.67/t incremented US$0.0031/t/m with depth from the 220 m elevation (equates to an average mining cost of US$2.14/t), variable processing cost based on the formula 2.1874 x (S%) + 10.65 for each US$/t processed; general and administrative cost of US$2.27/t
processed; stockpile rehandle costs of US$0.19/t processed assuming that 45% of mill feed is rehandled; variable recoveries by rock type, ranging from 86.66% in shale to 94.17% in intrusive rocks in the Akivik domain; refining and freight charges of US$1.78/oz gold; royalty considerations of 4.5%; and variable pit
slope angles, ranging from 23º to 43º. Mineral Reserves are reported using an optimized net sales return value based on the following equation: Net Sales Return = Au grade * Recovery * (US$975/oz – (1.78 + (US$975/oz – 1.78) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.27 + 0.19) and reported in US$/tonne. Assuming
an average recovery of 89.54% and an average S% grade of 1.07%, the marginal gold cutoff grade would be approximately 0.57 g/t, or the gold grade that would equate to a 0.001 NSR cutoff at these same values. The life of mine strip ratio is 5.48. The assumed life-of-mine throughput rate is 53.5 kt/d.
Mineral Reserves are contained within Measured and Indicated pit designs using metal prices for copper, gold and silver of US$2.50/lb, US$1,050/oz, and US$16.85/oz, respectively. Appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles varing from 42º to 55º were used to
generate the pit phase designs. Mineral Reserves have been calculated using a 'cashflow grade' ($NSR/SAG mill hr) cut-off which was varied from year to year to optimize NPV. The net smelter return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Net
Smelter Return; TCRC = Transportation and Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using metal prices of US$2.50/lb, US$1,050/oz, and US$16.85/oz for copper, gold, and silver, respectively, at an exchange rate of
CDN$1.1 to US$1.0; Cu Recovery = Recovery for copper based on mineral zone and total copper grade; for Mineral Reserves this NSR calculation includes mining dilution. SAG throughputs were modeled by correlation with alteration types. Cash flow grades were calculated as the product of NSR value in $/t and
throughput in t/hr. The life of mine strip ratio is 2.16.
Mineral Resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the following assumptions: gold price of US$1,200/oz; variable process cost based on 2.1874 * (sulphur grade) + 10.6485; administration cost of US$2.29/t; refining, freight & marketing (selling costs) of
US$1.85/oz recovered; stockpile rehandle costs of US$0.20/t processed assuming that 45% of mill feed is rehandled; variable royalty rate, based on royalty of 4.5% * (Au price – selling cost). Mineral Resources have been estimated using a constant Net Sales Return cut-off of US$0.001/t milled. The Net Sales Return
was calculated using the formula: Net Sales Return = Au grade * Recovery * (US$1200/oz – (1.85 + ((US$1200/oz – 1.85) * 0.045)) - (10.65 + 2.1874 * (S%) + 2.29 + 0.20)) and reported in US$/tonne. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have
demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever
be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".
Mineral resources are contained within a conceptual Measured, Indicated and Inferred optimized pit shell using the same economic and technical parameters as used for Mineral Reserves. Tonnages are assigned based on proportion of the block below topography. The overburden/bedrock boundary has been
assigned on a whole block basis. Mineral resources have been estimated using a constant NSR cut-off of C$10.08/t milled. The Net Smelter Return (NSR) was calculated as follows: NSR = Recoverable Revenue – TCRC (on a per tonne basis), where: NSR = Diluted Net Smelter Return; TCRC = Transportation and
Refining Costs; Recoverable Revenue = Revenue in Canadian dollars for recoverable copper, recoverable gold, and recoverable silver using silver using the economic and technical parameters mentioned above. The mineral resource includes material within the conceptual M,I&I pit that is not scheduled for processing
in the mine plan but is above cutoff. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred Resources have a great amount of uncertainty
as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".
The copper-equivalent grade was calculated as follows: CuEq = Recoverable Revenue ÷ 2204.62 * 100 ÷ 1.55. Where: CuEq = Copper equivalent grade; Recoverable Revenue = Revenue in US dollars for recoverable copper, recoverable gold and recoverable silver using metal prices of US$1.55/lb, US$650/oz, and
US$11/oz for copper, gold, and silver, respectively; for the purposes of the equivalency formula, Cu Recovery is assumed to be 100%. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Resources are in addition to Measured and Indicated Resources. Inferred
Resources have a great amount of uncertainty as to their existence and whether they can be mined legally or economically. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category. See "Cautionary Note Concerning Reserve & Resource Estimates".
NOVAGOLD Canada Inc. has agreed to transfer its 60% joint venture interest in the Copper Canyon property to the Galore Creek Partnership, which is equally owned by NOVAGOLD Canada Inc. and a subsidiary of Teck Resources Limited. The remaining 40% joint venture interest in the Copper Canyon property is
owned by another wholly owned subsidiary of NOVAGOLD.
Cautionary Note Concerning Reserve & Resource Estimates
This summary table uses the term “resources”, “measured resources”, “indicated resources” and “inferred resources”. United States investors are advised that, while such terms are recognized and required by Canadian securities laws, the United States Securities and Exchange Commission (the “SEC”) does not
recognize them. Under United States standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Mineral resources that are not mineral reserves
do not have demonstrated economic viability. United States investors are cautioned not to assume that all or any part of measured or indicated resources will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined
legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exist, or that they can be mined legally or economically. Disclosure of
“contained ounces” is permitted disclosure under Canadian regulations, however, the SEC normally only permits issuers to report “resources” as in place tonnage and grade without reference to unit measures. Accordingly, information concerning descriptions of mineralization and resources contained in this release
may not be comparable to information made public by United States companies subject to the reporting and disclosure requirements of the SEC.
NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all resource estimates contained in this circular have been prepared in
accordance with NI 43-101 and the CIM Definition Standards.
Technical Reports and Qualified Persons
The documents referenced below provide supporting technical information for each of NOVAGOLD's projects.
Project Qualified Person(s) Most Recent Disclosure & Filing Date
Donlin Gold Tony Lipiec, P. Eng., AMEC Donlin Creek Gold Project
Gordon Seibel R.M. SME, AMEC Alaska, USA
Kirk Hanson P.E., AMEC NI 43-101 Technical Report on Second Updated Feasibility Study amended filing on January 23, 2012
Galore Creek Robert Gill, P.Eng., AMEC Galore Creek Copper–Gold Project,
Jay Melnyk, P.Eng., AMEC British Columbia, NI 43-101 Technical Report on Pre-Feasibility Study,
Greg Kulla, P.Geo., AMEC filed on September 12, 2011
Greg Wortman, P.Eng., AMEC
Dana Rogers, P.Eng., Lemley International
Heather White, B.Sc., P.Eng., who is a consultant to NOVAGOLD and a “qualified person” under NI 43-101, has approved the scientific and technical information included in this section related to: (i) Donlin Gold since the issuance of the technical report filed on January 23, 2012, and (ii) Galore Creek since the
issuance of the technical report filed on September 12, 2011.
53. NYSE-MKT, TSX: NG
53
www.novagold.com
CONTACT US
NOVAGOLD RESOURCES INC.
Suite 720 – 789 West Pender Street
Vancouver, BC
Canada V6C 1H2
T 604 669 6227 TF 1 866 669 6227 F 604 669 6272
www.novagold.com
info@novagold.com
Mélanie Hennessey
VP, Corporate Communications
melanie.hennessey@novagold.com
Erin O’Toole
Analyst, Investor Relations
erin.otoole@novagold.com