The document summarizes the history and renovation planning process for the Northridge Recreation Center. It details renovations and additions to the building since its original construction in 1982. In 2014, a focus group was formed and surveys conducted to determine priorities for renovating the center. This led to a proposed concept plan in 2016 to improve the entrance and lobby area, which was approved by delegates. The next steps outlined completing design and contractor selection in 2017 to begin construction with an anticipated completion in November 2017.