This document presents a progress report submitted by Oluwatosin Grace Alasiri for her Bachelor of Science degree in Electronics and Electrical Engineering. The report details her work on a smart microgrid project focused on energy profiling and data acquisition. It includes sections on background, objectives, methodology, literature review and references. The supervisor certified that the study was carried out under his supervision. Tables and figures are listed but their contents are not included.