TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 1
SOAL 1
No Massa Tanah % Tanah
Ayakan Diameter Tertahan Tertahan % Tanah Lolos
Pada Tiap
USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan
(mm) (gr) (gr) (gr)
.(1) .(2) .(3) .(4) .(5)
4 4.75 0 0 100
10 2 21.6 4.8 95.2
20 0.85 49.5 11 84.2
40 0.425 102.6 22.8 61.4
60 0.25 89.1 19.8 41.6
100 0.15 95.6 21.24 20.36
200 0.075 60.4 13.42 6.93
pan 31.2 6.93 0
Total 450
DISTRIBUSI BUTIRAN
%Lolos
100
90
80
70
D
60 60
50
40
D
30 30
20
D
10 10
0
0.01 0.09 0.1 0.19 0.4 1 10
Diameter Butiran (mm)
Dia
(mm) Cu Cc
D10 0.09 4.4 1.00
D30 0.19
D60 0.4
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 2
SOAL 2
Diketahui : D10 = 0.1 mm
D30 = 0.41 mm
D60 = 0.62 mm
Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC)
Jawab:
D
C = 60 = 0.62 = 6.2
U
D
10 0.1
(D )
2
C (0.41) 2
30
C
=
D xD
=
= 2.711
60 10 0.62x0.1
SOAL 3
Diketahui : D10 = 0.082 mm
D30 = 0.29 mm
D60 = 0.51 mm
Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC)
Jawab:
CU=
D
60=
0.51
=6.222
D100.082
CC=
(D )
2
(0.29) 2
= 2.01130
=
D xD
60 10
0.51x0.82
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 3
SOAL 4
No Massa Tanah % Tanah
Ayakan Diameter Tertahan Tertahan % Tanah Lolos
Pada Tiap
USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan
(mm) (gr) (gr) (gr)
.(1) .(2) .(3) .(4) .(5)
4 4.75 0 0 100
6 3.35 30 6 94
10 2 48.7 9.74 84.26
20 0.85 127.3 25.46 58.8
40 0.425 96.8 19.36 39.44
60 0.25 76.6 15.32 24.12
100 0.15 55.2 11.04 13.08
200 0.075 43.4 8.68 4.40
pan 22 4.40 0.00
Total 500
DISTRIBUSI BUTIRAN
%Lolos
D
60
D
30
D
10
0.01
100
90
80
70
60
50
40
30
20
10
0.31 0 0.95
0.1
0.125
1 10
Diameter Butiran (mm)
Dia
(mm) Cu Cc
D10 0.125 7.6 0.81
D30 0.31
D60 0.95
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 4
3
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 5
SOAL 5
No Massa Tanah % Tanah
Ayakan Diameter Tertahan Tertahan % Tanah Lolos
Pada Tiap
USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan
(mm) (gr) (gr) (gr)
.(1) .(2) .(3) .(4) .(5)
4 4.75 0 0 100
6 3.35 0 0 100
10 2 0 0 100
20 0.85 9.1 1.82 98.18
40 0.425 249.4 49.88 48.3
60 0.25 179.8 35.96 12.34
100 0.15 22.7 4.54 7.80
200 0.075 15.5 3.10 4.70
pan 23.5 4.70 0.00
Total 500
DISTRIBUSI BUTIRAN
100
90
80
70
D
%Lolos
60
D
60
50
40
30 30
20
D
10 10
0.185 0.325 0.5 0
0.01 0.1 1 10
Diameter Butiran (mm)
Dia
(mm) Cu Cc
D10 0.185 2.7 1.14
D30 0.325
D60 0.5
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 6
4
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 7
SOAL 6
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 0.425 92.1
60 0.25 85.8
0.15 77.3
200 0.075 62
0.04 50.80
0.02 41.00
0.01 34.30
0.006 29.00
0.002 23.00
DISTRIBUSI UKURAN BUTIRAN SISTEM
MIT
%Lolos
100 0.002 0.06 2
90
80
70
60
50 58%
40
30
20 23%
10
0 Ukuran Butiran (mm)
0.001 0.01 0.1 1 10
Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )
Persentase Butiran
Menurut Sistem MIT
Jenis Tanah %
Gravel 0
Sand 42
Silt 35
Clay 23
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 8
5
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 9
SOAL 7
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 0.425 92.1
60 0.25 85.8
0.15 77.3
200 0.075 62
0.04 50.80
0.02 41.00
0.01 34.30
0.006 29.00
0.002 23.00
DISTRIBUSI UKURAN BUTIRAN SISTEM USDA
100 0.00 0.05 2
90
80
70
Lolos
60
50 55
%
40
30
20
10 23
0
0.001 0.01 0.1 1Ukuran Butiran (mm) 10
Clay Lanau (Silt ) Pasir Kerikil(Gravel )
Persentase Butiran
Menurut Sistem USDA
Jenis Tanah %
Gravel 0
Sand 45
Silt 32
Clay 23
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 10
6
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 11
SOAL 8
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 92.10.425
60 85.80.25
77.30.15
200 620.075
50.800.04
41.000.02
34.300.01
29.000.006
23.000.002
DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO
100
0.00 0.07 2
90
80
70
L
o
l
o
s
60 62%
50
%
40
30
20
23%
10
0 Ukuran Butiran (mm)
0.001 0.01 0.1 1 10
Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )
Persentase Butiran
Menurut Sistem
AASTHO
Jenis Tanah %
Gravel 0
Sand 38
Silt 39
Clay 23
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 12
7
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 13
SOAL 9
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 0.425 100
60 0.25 94.1
0.15 79.3
200 0.075 34.1
0.04 28.00
0.02 25.20
0.01 21.80
0.006 18.90
0.002 14.00
%Lolos
DISTRIBUSI UKURAN BUTIRAN SISTEM
MIT
100 0.002 0.06 2
90
80
70
60
50
40
30 32%
20
10 14%
0 Ukuran Butiran (mm)
0.001 0.01 0.1 1 10
Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )
Persentase Butiran
Menurut Sistem MIT
Jenis Tanah %
Gravel 0
Sand 68
Silt 18
Clay 14
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 14
8
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 15
SOAL 10
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 0.425 100
60 0.25 94.1
0.15 79.3
200 0.075 34.1
0.04 28.00
0.02 25.20
0.01 21.80
0.006 18.90
0.002 14.00
DISTRIBUSI UKURAN BUTIRAN SISTEM USDA
%Lolos
0.002 0.05 2100
90
80
70
60
50
40
30
20 29
10 14%
0
0.001 0.01 0.1 1Ukuran Butiran (mm) 10
Clay Lanau (Silt ) Pasir Kerikil(Gravel )
Persentase Butiran Menurut Sistem USDA
Jenis Tanah %
Gravel 0
Sand 71
Silt 15
Clay 14
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 16
9
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 17
SOAL 11
No
Ayakan Diameter % Tanah Lolos
USA ayakan Pada Tiap Ayakan
(mm) (gr)
.(1) .(2) .(3)
20 0.85 100
40 0.425 100
60 0.25 94.1
0.15 79.3
200 0.075 34.1
0.04 28.00
0.02 25.20
0.01 21.80
0.006 18.90
0.002 14.00
%Lolos
DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO
100
0.002 0.07 2
90
80
70
60
50
40
30 34.1
20
10 14%
0 Ukuran Butiran (mm)
0.001 0.01 0.1 1 10
Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel )
Persentase Butiran Menurut Sistem AASTHO
Jenis Tanah %
Gravel 0
Sand 65.9
Silt 20.1
Clay 14
Total 100
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 18
10
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 19
SOAL 12
Diket: Uji hydrometer
GS = 2.70
T = 22° C L
= 11.9 cm
t. = 30 menit
Ditanya : Diameter ukuran butir terkecil
Jawab: Berdasarkan Tabel 1.7 (hal 20) didapat nilai K = 0.01199
D = K L = 0.01199 11.9= 0.001887 mm
t 30
TUGAS IV MEKANIKA TANAH I
ZUL ANWAR
1310015211092
CIVIL ENGINEERING
BUNG HATTA UNIVERSITY Page 20
11

More Related Content

Viewers also liked

LinkedIn Employer brand playbook
LinkedIn Employer brand playbookLinkedIn Employer brand playbook
LinkedIn Employer brand playbookFredrik Hammarsten
 
Tugas III Mekanika Tanah I
Tugas III Mekanika Tanah ITugas III Mekanika Tanah I
Tugas III Mekanika Tanah IZul Anwar
 
Service marketing of apollo
Service marketing of apollo Service marketing of apollo
Service marketing of apollo prathimap
 
insurance and Risk management ppt
insurance and Risk management pptinsurance and Risk management ppt
insurance and Risk management pptprathimap
 

Viewers also liked (7)

LinkedIn Employer brand playbook
LinkedIn Employer brand playbookLinkedIn Employer brand playbook
LinkedIn Employer brand playbook
 
The Career Development Process
The Career Development ProcessThe Career Development Process
The Career Development Process
 
Tugas III Mekanika Tanah I
Tugas III Mekanika Tanah ITugas III Mekanika Tanah I
Tugas III Mekanika Tanah I
 
Service marketing of apollo
Service marketing of apollo Service marketing of apollo
Service marketing of apollo
 
insurance and Risk management ppt
insurance and Risk management pptinsurance and Risk management ppt
insurance and Risk management ppt
 
Realty minister
Realty ministerRealty minister
Realty minister
 
Mektan 5
Mektan 5Mektan 5
Mektan 5
 

Similar to Mektan 4

Tugas Ke IV Mekanika Tanah I, Redha Arima RM
Tugas Ke IV Mekanika Tanah I, Redha Arima RMTugas Ke IV Mekanika Tanah I, Redha Arima RM
Tugas Ke IV Mekanika Tanah I, Redha Arima RMRedha RM
 
Tugas 4 Mekanika Tanah I, Redha Arima RM
Tugas 4 Mekanika Tanah I, Redha Arima RMTugas 4 Mekanika Tanah I, Redha Arima RM
Tugas 4 Mekanika Tanah I, Redha Arima RMRedha RM
 
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Muhammad Irfan
 
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...IOSR Journals
 
Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...IAEME Publication
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...IAEME Publication
 

Similar to Mektan 4 (9)

Tugas mektan 4 michael
Tugas mektan 4 michaelTugas mektan 4 michael
Tugas mektan 4 michael
 
Tugas Ke IV Mekanika Tanah I, Redha Arima RM
Tugas Ke IV Mekanika Tanah I, Redha Arima RMTugas Ke IV Mekanika Tanah I, Redha Arima RM
Tugas Ke IV Mekanika Tanah I, Redha Arima RM
 
Tugas 4 Mekanika Tanah I, Redha Arima RM
Tugas 4 Mekanika Tanah I, Redha Arima RMTugas 4 Mekanika Tanah I, Redha Arima RM
Tugas 4 Mekanika Tanah I, Redha Arima RM
 
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
Geotechnical Engineering-I [Lec #7: Sieve Analysis-2]
 
Sieve analysis for Soil
Sieve analysis for SoilSieve analysis for Soil
Sieve analysis for Soil
 
J012127176
J012127176J012127176
J012127176
 
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...
Suitability of Umuahia Sand for Field Compaction Quality Control: A Mechanica...
 
Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...Experimental study on flexural behavior of the self compacting concrete with ...
Experimental study on flexural behavior of the self compacting concrete with ...
 
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
EXPERIMENTAL STUDY ON FLEXURAL BEHAVIOR OF THE SELF-COMPACTING CONCRETE WITH ...
 

Mektan 4

  • 1. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 1 SOAL 1 No Massa Tanah % Tanah Ayakan Diameter Tertahan Tertahan % Tanah Lolos Pada Tiap USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan (mm) (gr) (gr) (gr) .(1) .(2) .(3) .(4) .(5) 4 4.75 0 0 100 10 2 21.6 4.8 95.2 20 0.85 49.5 11 84.2 40 0.425 102.6 22.8 61.4 60 0.25 89.1 19.8 41.6 100 0.15 95.6 21.24 20.36 200 0.075 60.4 13.42 6.93 pan 31.2 6.93 0 Total 450 DISTRIBUSI BUTIRAN %Lolos 100 90 80 70 D 60 60 50 40 D 30 30 20 D 10 10 0 0.01 0.09 0.1 0.19 0.4 1 10 Diameter Butiran (mm) Dia (mm) Cu Cc D10 0.09 4.4 1.00 D30 0.19 D60 0.4
  • 2. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 2 SOAL 2 Diketahui : D10 = 0.1 mm D30 = 0.41 mm D60 = 0.62 mm Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC) Jawab: D C = 60 = 0.62 = 6.2 U D 10 0.1 (D ) 2 C (0.41) 2 30 C = D xD = = 2.711 60 10 0.62x0.1 SOAL 3 Diketahui : D10 = 0.082 mm D30 = 0.29 mm D60 = 0.51 mm Ditanya : Koefisien Keseragaman (CU) dan Koefisien Gradasi (CC) Jawab: CU= D 60= 0.51 =6.222 D100.082 CC= (D ) 2 (0.29) 2 = 2.01130 = D xD 60 10 0.51x0.82
  • 3. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 3 SOAL 4 No Massa Tanah % Tanah Ayakan Diameter Tertahan Tertahan % Tanah Lolos Pada Tiap USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan (mm) (gr) (gr) (gr) .(1) .(2) .(3) .(4) .(5) 4 4.75 0 0 100 6 3.35 30 6 94 10 2 48.7 9.74 84.26 20 0.85 127.3 25.46 58.8 40 0.425 96.8 19.36 39.44 60 0.25 76.6 15.32 24.12 100 0.15 55.2 11.04 13.08 200 0.075 43.4 8.68 4.40 pan 22 4.40 0.00 Total 500 DISTRIBUSI BUTIRAN %Lolos D 60 D 30 D 10 0.01 100 90 80 70 60 50 40 30 20 10 0.31 0 0.95 0.1 0.125 1 10 Diameter Butiran (mm) Dia (mm) Cu Cc D10 0.125 7.6 0.81 D30 0.31 D60 0.95
  • 4. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 4 3
  • 5. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 5 SOAL 5 No Massa Tanah % Tanah Ayakan Diameter Tertahan Tertahan % Tanah Lolos Pada Tiap USA ayakan Pada Tiap Ayakan Ayakan Pada Tiap Ayakan (mm) (gr) (gr) (gr) .(1) .(2) .(3) .(4) .(5) 4 4.75 0 0 100 6 3.35 0 0 100 10 2 0 0 100 20 0.85 9.1 1.82 98.18 40 0.425 249.4 49.88 48.3 60 0.25 179.8 35.96 12.34 100 0.15 22.7 4.54 7.80 200 0.075 15.5 3.10 4.70 pan 23.5 4.70 0.00 Total 500 DISTRIBUSI BUTIRAN 100 90 80 70 D %Lolos 60 D 60 50 40 30 30 20 D 10 10 0.185 0.325 0.5 0 0.01 0.1 1 10 Diameter Butiran (mm) Dia (mm) Cu Cc D10 0.185 2.7 1.14 D30 0.325 D60 0.5
  • 6. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 6 4
  • 7. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 7 SOAL 6 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 0.425 92.1 60 0.25 85.8 0.15 77.3 200 0.075 62 0.04 50.80 0.02 41.00 0.01 34.30 0.006 29.00 0.002 23.00 DISTRIBUSI UKURAN BUTIRAN SISTEM MIT %Lolos 100 0.002 0.06 2 90 80 70 60 50 58% 40 30 20 23% 10 0 Ukuran Butiran (mm) 0.001 0.01 0.1 1 10 Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel ) Persentase Butiran Menurut Sistem MIT Jenis Tanah % Gravel 0 Sand 42 Silt 35 Clay 23 Total 100
  • 8. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 8 5
  • 9. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 9 SOAL 7 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 0.425 92.1 60 0.25 85.8 0.15 77.3 200 0.075 62 0.04 50.80 0.02 41.00 0.01 34.30 0.006 29.00 0.002 23.00 DISTRIBUSI UKURAN BUTIRAN SISTEM USDA 100 0.00 0.05 2 90 80 70 Lolos 60 50 55 % 40 30 20 10 23 0 0.001 0.01 0.1 1Ukuran Butiran (mm) 10 Clay Lanau (Silt ) Pasir Kerikil(Gravel ) Persentase Butiran Menurut Sistem USDA Jenis Tanah % Gravel 0 Sand 45 Silt 32 Clay 23 Total 100
  • 10. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 10 6
  • 11. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 11 SOAL 8 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 92.10.425 60 85.80.25 77.30.15 200 620.075 50.800.04 41.000.02 34.300.01 29.000.006 23.000.002 DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO 100 0.00 0.07 2 90 80 70 L o l o s 60 62% 50 % 40 30 20 23% 10 0 Ukuran Butiran (mm) 0.001 0.01 0.1 1 10 Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel ) Persentase Butiran Menurut Sistem AASTHO Jenis Tanah % Gravel 0 Sand 38 Silt 39 Clay 23 Total 100
  • 12. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 12 7
  • 13. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 13 SOAL 9 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 0.425 100 60 0.25 94.1 0.15 79.3 200 0.075 34.1 0.04 28.00 0.02 25.20 0.01 21.80 0.006 18.90 0.002 14.00 %Lolos DISTRIBUSI UKURAN BUTIRAN SISTEM MIT 100 0.002 0.06 2 90 80 70 60 50 40 30 32% 20 10 14% 0 Ukuran Butiran (mm) 0.001 0.01 0.1 1 10 Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel ) Persentase Butiran Menurut Sistem MIT Jenis Tanah % Gravel 0 Sand 68 Silt 18 Clay 14 Total 100
  • 14. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 14 8
  • 15. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 15 SOAL 10 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 0.425 100 60 0.25 94.1 0.15 79.3 200 0.075 34.1 0.04 28.00 0.02 25.20 0.01 21.80 0.006 18.90 0.002 14.00 DISTRIBUSI UKURAN BUTIRAN SISTEM USDA %Lolos 0.002 0.05 2100 90 80 70 60 50 40 30 20 29 10 14% 0 0.001 0.01 0.1 1Ukuran Butiran (mm) 10 Clay Lanau (Silt ) Pasir Kerikil(Gravel ) Persentase Butiran Menurut Sistem USDA Jenis Tanah % Gravel 0 Sand 71 Silt 15 Clay 14 Total 100
  • 16. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 16 9
  • 17. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 17 SOAL 11 No Ayakan Diameter % Tanah Lolos USA ayakan Pada Tiap Ayakan (mm) (gr) .(1) .(2) .(3) 20 0.85 100 40 0.425 100 60 0.25 94.1 0.15 79.3 200 0.075 34.1 0.04 28.00 0.02 25.20 0.01 21.80 0.006 18.90 0.002 14.00 %Lolos DISTRIBUSI UKURAN BUTIRAN SISTEM AASTHO 100 0.002 0.07 2 90 80 70 60 50 40 30 34.1 20 10 14% 0 Ukuran Butiran (mm) 0.001 0.01 0.1 1 10 Clay Lanau (Silt ) Pasir (Sand) Kerikil(Gravel ) Persentase Butiran Menurut Sistem AASTHO Jenis Tanah % Gravel 0 Sand 65.9 Silt 20.1 Clay 14 Total 100
  • 18. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 18 10
  • 19. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 19 SOAL 12 Diket: Uji hydrometer GS = 2.70 T = 22° C L = 11.9 cm t. = 30 menit Ditanya : Diameter ukuran butir terkecil Jawab: Berdasarkan Tabel 1.7 (hal 20) didapat nilai K = 0.01199 D = K L = 0.01199 11.9= 0.001887 mm t 30
  • 20. TUGAS IV MEKANIKA TANAH I ZUL ANWAR 1310015211092 CIVIL ENGINEERING BUNG HATTA UNIVERSITY Page 20 11