The document discusses the progress of fabrication and installation for the Pearl GTL project. It mentions that the lower deck module has been installed on Pearl 1 and that 20-inch spools have been fabricated, cladded, and painted for Pearl 2. It also notes that 2-inch spools for the flare line and HPU spools for Pearl 1 have undergone hydrotesting.