4. LIST OF
COMPONENTS
• ENTRY GATE
• PARKING AREA FOR 20 VEHICLES
• WEIGH BRIDGE 1 NO.
• QUALITY LAB
• UNLOADING PIT & HYDRAULIC TIPPLER
(OPTIONAL)
• PROCESS TOWER WITH MATERIAL HANDLING
EQUIPMENTS & CLEANER
• PADDY DRYERS 2 NOS. (OPTIONAL)
• TRANSIT STORAGE BIN 250 MT
• BAGGING & STITCHING MACHINES 30 TPH X 2
NOS.
• BAG STACKER / BAG LOADER
• BASIC WORKSHOP
• ELECTRICAL SUBSTATION WITH DG SET
• OFFICE
• FIRE HYDRANT SYSTEM WITH WATER TANK 50 KL