“The purpose of business is to
create and keep a customer.”
The initial sale is critical, but
it’s just the tip of the iceberg
What is Customer Success?
Customer Success is when
your customers achieve their
Desired Outcome through
their interactions with your
company.
Why is Customer Success
something you should care
about?
David Skok | Matrix Partners | http://www.forentrepreneurs.com/why-churn-is-critical-in-saas/
Customer Success Drives First-order Growth
Customer Success Drives Second-order Growth
0x
5x
15x
20x
EV/RevenueMultiple
Dollar Net Renewal Rate
60% 70% 80% 90% 100% 110% 120%
Source: Altimeter and FactSet 10/2014
10x 7X
15X
CSM Drives Third-order Value
It’s too important to be
thought of as “post-sale” or be
left to chance.
How is Customer Success
different than what most
companies normally do?
Copyright © 2015 Sixteen Ventures. All rights reserved.
Copyright © 2015 Sixteen Ventures. All rights reserved.
Customer Success is Transformational
1. Acquire the Best Customers
2. Engage & Deliver Value Quickly
3. Expand Their Investment
4. Mobilize your Advocates
5. Retain & Renew Customers
1. ACQUIRE THE RIGHT
CUSTOMERS
Ready
Willing
Able
Acquisition Efficiency
Success Potential
Expansion Potential
Advocacy Potential
Ideal Customer Profile
Ready
Willing
Able
Acquisition Efficiency
Success Potential
Expansion Potential
Advocacy Potential
Ideal Customer Profile
Success Potential
• Only Acquire Customers with Success Potential
• Technical Fit
• Functional Fit
• Experience Fit
• Support Fit
Use Customer Success to
influence your
Marketing and Sales
“Enter the conversation already
taking place in your customer’s
mind.” – Robert Collier
“Enter the conversation
already taking place in
your customer’s mind.” –
Robert Collier, c1937
Customer Success = Their Desired Outcome
Customer Success = Their Desired Outcome
2. ENGAGE & DELIVER VALUE
QUICKLY
Success Milestones are the
steps required for a customer
to achieve their ever-evolving
Desired Outcome.
3. EXPAND THEIR
INVESTMENT
“Customers that take an
upsell offer stay longer”
- McKinsey & Company
Customer Lifetime Value is the
Key Metric
4. MOBILIZE YOUR
ADVOCATES
“Customers that come in
through advocacy stay
longer and buy more.”
- McKinsey & Company
“Customers that advocate
for you become stronger
customers themselves.”
- Influitive
5. RETAIN & RENEW
CUSTOMERS
When Customer Success is
operationalized around Desired
Outcome-based Success Milestones,
renewals become a non-issue…
renewals just happen.
WHAT ABOUT CHURN?
“The purpose of business is to
create and keep a customer.”
©2015 Gainsight. All Rights Reserved.
Lincoln Murphy
Customer Success Evangelist
@lincolnmurphy
lmurphy@gainsight.com
©2015 Gainsight. All Rights Reserved.
INTERMISSION
We will return shortly…
45
Budgeting for Customer
Success in 2016
©2015 Gainsight. All Rights Reserved.
Allison Pickens
VP of Customer Success
@PickensAllison
apickens@gainsight.com
©2015 Gainsight. All Rights Reserved.
10 Tips for Planning for 2016
(1) Position Customer Success as a Company Imperative
(2) Articulate the Benefit to Other Departments
(3) Pinpoint Your Metrics
(4) Invest in Data
(5) Budget to Benchmarks
(6) Focus on What’s Scalable
(7) Plan to Specialize
(8) Assign Value to High-Touch CS
(9) Develop a Repeatable Methodology
(10) Invest in Customer Success Operations
©2015 Gainsight. All Rights Reserved.
Customer
Sales
Renewals
Support
Services
Marketing
Product
Ensure solid handoff
Create more targeted renewals
experience
Highlight high-priority customers
Reduce implementation time
Identify customer advocates better
Give visibility into non-adopted features
#1: Position CS as a Company Imperative
©2015 Gainsight. All Rights Reserved.
Customer
Sales
Renewals
Support
Services
Marketing
Product
Get visibility into customer details
Drive higher renewal rates and
expansion
Prioritize tickets
Identify opportunities for services
Proactively identify advocates
Prioritize customer enhancement requests
Finance
Drive collections
#2: Articulate the Benefit to Other Departments
©2015 Gainsight. All Rights Reserved.
#3: Pinpoint Your Metrics
Operational Financial
Renewal Rate
Upsell ARR
New Business ARR
Risks Resolved
NPS
“Green” Customers
Opportunities Identified
Advocates Created
Sponsor Changes Identified
“Green” Customers = CSM version of “SQL”:
• Objectively valuable: No one can contest the achievement.
• A discrete unit: It’s clear when the achievement is complete.
• Measurable: We can create a Gainsight dashboard to track our
achievements.
• Frequently achieved: We can recognize our achievements week-to-
week.
• Attributable to the CSM: No one can contest that the CSM is
primarily responsible.
#4: Invest in Data - “Green” Customers
52
#4: Invest in Data - “Green” Customers
#4: Invest in Data - “Green” Customers
Customers that move from Red/Yellow to Green/Lime in our Habits
Scorecard Measure
• Green: At least x% of licensed users are daily active users of
Cockpit
• Lime: At least y% of licensed users are daily active users (of any
part of the product)
• Yellow: Some usage, but not daily actives
• Red: No usage of Gainsight in the last week
#4: Invest in Data - “Green” Customers
©2015 Gainsight. All Rights Reserved.
4 Objectives in a Risk Framework:
• Address early warning signs
• Incorporate CSM judgment in assessment of risk
level
• Common view of risks across levels of the org
• Hold other departments accountable for contributing
to customer success
#4: Invest in Data – Risks Resolved
©2015 Gainsight. All Rights Reserved.
#4: Invest in Data – Risks Resolved
Support Company Sentiment Habits
Exec
Owner
Director of Support VP Customer Success VP Customer Success VP Customer Success
Definition
What volume of open
support tickets does
the customer have,
and what’s their
priority and duration?
Is there a change at the
company that will affect
the customer’s use of
Gainsight?
Is the customer generally
happy? (e.g. NPS)
Is the customer using
our product in a
significant, sticky way?
Readiness Implementation Product Bugs
Exec
Owner
VP Sales VP Services VP Product VP Engineering
Definition
Was the customer
ready to purchase
Gainsight?
Is the implementation
project plan on track?
Does the customer
require a product
enhancement?
Does the customer have
a high volume / priority
of bugs open?
1 2 3 4
5 6 7 8
©2015 Gainsight. All Rights Reserved.
#4: Invest in Data – Risks Resolved
©2015 Gainsight. All Rights Reserved.
#4: Invest in Data – Risks Resolved
59
#4: Invest in Data - Risks Resolved
©2015 Gainsight. All Rights Reserved.
#5: Budget to Benchmarks
15 Cents of
Fully Loaded CSM Cost
per $1 of ARR
>
Accounts /
CSM
$ ARR /
Account
Salary + Overhead /
CSM
x
Pacific Crest Survey 2015 showed that median spend on renewals is $0.13 per $1 of ARR
©2015 Gainsight. All Rights Reserved.
#6: Focus on What’s Scalable
Exec
Sponsor
Designated
CSM
Pooled CS
Support
Automated Outreaches
Content
Community
Product
“Automate your job”
©2015 Gainsight. All Rights Reserved.
Seed
“Unicorn” CSM
Series A
+ Support
+ Onboarding
+ Operations
Growth-stage
+ Customer
Marketing
+ Renewals
+ CS Architects
+ Premier CSM
Pre-IPO
+ Training
+ Advisory
Public
+ Partners
+ Managed
Services
+ Domain Experts
#7: Plan to Specialize
Premium +
Premium
Standard
#8: Assign Value to High-Touch CS
Client Strategy Manager
4 EBRs / year
Onsite Strategy Workshop
Change Management
Customer Success Manager
2 EBRs / year
Strategy Session
Best Practices Workshops
Pooled CS
1 EBR / year
Strategy Webinar
Content
#9: Develop a Repeatable Methodology
Predictable Revenue Predictable Value Delivery
Sales Development team Customer Success team
New Business ARR Renewal ARR
SQLs Green Adoption
#9: Develop a Repeatable Methodology
#9: Develop a Repeatable Methodology
Responsibilities Sales Operations CS Operations
Data
Reporting • Share sales results and forecasts • Share renewals/upsell results, forecasts
Analysis • Analyze leading indicators for sales • Analyze leading indicators for renewals and upsell
Processes
Engagement process
• Determine timing and content of meetings to
optimize conversion
• Determine touchpoints for CSMs to drive adoption
and NPS
External communication • Coordinate with marketing • Manage 1:M communications
Risk management • Provide visibility to at-risk deals • Detect early warning signs for at-risk customers
Opp. identification • Identify top accounts • Identify top customers for upsell
X-functional coordination
• Coordinate processes across teams to help
meet sales objectives
• Coordinate processes across teams to help deliver
on customer needs
People
Team structure
• Manage AE territories, account segments
and forecast hiring needs
• Tier customers, assign to CSMs, re-distribute load
and forecast hiring
Compensation • Determine structure and quotas • Determine metrics and targets
Enablement • Create collateral and data for AEs • Provide collateral and data for CSMs
Systems Technology • Implement and manage tools for sales • Implement and manage tools for CSMs
#10: Invest in Customer Success Operations
©2015 Gainsight. All Rights Reserved.
Allison Pickens
VP of Customer Success
@PickensAllison
apickens@gainsight.com
©2015 Gainsight. All Rights Reserved.
INTERMISSION
We will return shortly…
70
Building a Best-in-Class
Customer Success Team
©2015 Gainsight. All Rights Reserved.
Barr Moses
Senior Manager of Business Operations
bmoses@gainsight.com
©2015 Gainsight. All Rights Reserved.
Agenda
• Define Metrics for Customer Success
• Track progress and celebrate achievements
• Segment Your Customer Base…
• …and structure your CSM team accordingly
• Operationalize Customer Success
• Create Standard Best Practices for Customers Success
Managers
©2015 Gainsight. All Rights Reserved.
Agenda
• Define Metrics for Customer Success
• Track progress and celebrate achievements
• Segment Your Customer Base…
• …and structure your CSM team accordingly
• Operationalize Customer Success
• Create standard Best Practices for your team
©2015 Gainsight. All Rights Reserved.
Questions to Consider
• Do we track Retention or Renewal Rate?
• What does Healthy Usage mean for us?
• What is our target cost of CSM / ARR managed?
Executive and Board Dashboards
Dashboards for CSM Management
©2015 Gainsight. All Rights Reserved.
Week-over-Week Renewal Rate
Gross Renewal Rate
Net Renewal Rate
©2015 Gainsight. All Rights Reserved.
Week-over-Week Renewal Rate
Gross Renewal Rate = ARR secured / ARR due
Net Renewal Rate = ARR secured + Upsell / ARR due
©2015 Gainsight. All Rights Reserved.
Renewal, Upsell, ARR
©2015 Gainsight. All Rights Reserved.
Upsell Drivers
©2015 Gainsight. All Rights Reserved.
Usage: Page Views and Active Users
©2015 Gainsight. All Rights Reserved.
Customers by Top Usage
©2015 Gainsight. All Rights Reserved.
Features by Top Usage
©2015 Gainsight. All Rights Reserved.
Growth in Healthy Users
©2015 Gainsight. All Rights Reserved.
Agenda
• Define Metrics for Customer Success
• Track progress and celebrate achievements
• Segment Your Customer Base…
• …and structure your CSM team accordingly
• Operationalize Customer Success
• Create Standard Best Practices for Customers Success
Managers
Burning questions:
• Why do we segment customers? What are the objectives, design principles?
• How do our customers segment and structure their engagement models?
• How do companies use one-to-many engagement models at scale?
• How does Gainsight segment their customers?
• How do you implement a segmented engagement model?
Segmented engagement models
1
2
3
4
5
Objectives and Design Principles
In order to execute at scale, segmentation is critical to deliver what each type of customer needs
in a manner that’s scalable for the company.
Customer Needs
Value to company
• What do our customers need in order to be successful?
• Are there themes across these groups?
• What is the value of each type of customer to us?
• How can we affordably serve each segment?
1
Segmenting the customer base is essential to understanding the key breakpoints in your customer contact and CSM
coverage model strategy. The below charts show the segmentation strategy most commonly deployed within the
industry.
Customer Base Segmentation Strategy
2 Tiers 20%
3 Tiers 56%
4 Tiers 18%
> 4 Tiers 7%
Tier
Allocation
75%of
respondents tier their
customer base as
part of their contact
strategy
Key segmentation considerations:
• Expected annual customer touch points per
segment
• Target net renewal rate performance for each
segment
• Potential revenue or expansion customers in
low-$ segments
• Expected cost-of-sale % per segment
• Avg. contract size per segment / segment
volumes
• Areas for efficiency gain
23%
30%
47%
Other / Combo
ARR $
Customer ## of customers
Revenue
Other / combo
Source: Gainsight customer success benchmark report, 2015
2
1:Many Tactics
3%
61%
29%
3% 3%
Weekly Monthly Quarterly Bi-annually Annually
CSM Email Marketing Cadence
5%
15%
33%
47%
50%
52%
65%
Other
None
User Groups
Events
Online Community
CSM Email Marketing
Webinars
Deploying a robust one-to-many strategy is key not only to drive new sales by efficiently expanding your market
reach, but to drive product adoption and customer retention. The below charts show the most popular strategies
being deployed today.
Source: Gainsight customer success benchmark report, 2015
3
Gainsight Customer Segmentation
We carved out 3 segments based on revenue (ARR) and whether or not a customer represents a
strategic relationship.
Strategic Enterprise / Mid-market SMB
Overview
Present a major upsell opportunity
or help us open up a market for a
new use case for Gainsight
Customer above a certain ARR
threshold that are not strategic
Customers below a certain ARR
threshold that are not strategic
Customer
Needs
• Need guidance in shaping the
evolution of their CS
organizations
• Want us to support the change
management effort
• Already experts in growing their
team, but need guidance in
executing their CS strategy
within Gainsight
• Starting to build their CS teams
and want to digest all the
information they can get on best
practices
Value to
Gainsight
• Highest potential ARR customers
• Huge expansion potential
• High retention rates
• Strong brand value
• Significant ARR & high retention
rates
• Fast sales cycle
• High advocacy rate
• Substantial product feedback
4
Implementing a Segmentation for Your
Customer Base
Five considerations for implementation:
1. Ensure consistency in messaging from marketing  sales  CSM
2. Limit “transitions” across segments (ideally, never)
3. When transitions are necessary, emphasize benefits of how the new model matches specific
needs of the customer
4. Consider bundled prices for CSM support
5. Encourage innovation: How can we scale every touch point?
5
©2015 Gainsight. All Rights Reserved.
Agenda
• Define Metrics for Customer Success
• Track progress and celebrate achievements
• Segment Your Customer Base…
• …and structure your CSM team accordingly
• Operationalize Customer Success
• Create Standard Best Practices for Customers Success
Managers
5 Pillars of Customer Success
Demonstrate the value you deliver
to your customers to promote
adoption, advocacy, and growth
DEMONSTRATE
Value
5 Pillars of Customer Success
Build a consistent, effective customer
journey through one-to-many strategies
and high-impact, timely one-on-one
interactions
OPERATIONALIZE
Customer Lifecycle
Build a world-class organization by
measuring impact and improving
cross-functional coordination
ENABLE
Cross-functional Visibility
Make it easy to spot and act on
opportunities for growth and candidates
for advocacy
DRIVE
Expansion & Advocacy
Proactively identify signs of
customer risk and collaborate
cross-functionally to address
issues
MANAGE
Customer Risk
Demonstrate the value you deliver
to your customers to promote
adoption, advocacy, and growth
DEMONSTRATE
Value
5 Pillars of Customer Success
Build a consistent, effective customer
journey through one-to-many strategies
and high-impact, timely one-on-one
interactions
OPERATIONALIZE
Customer Lifecycle
Build a world-class organization by
measuring impact and improving
cross-functional coordination
ENABLE
Cross-functional Visibility
Make it easy to spot and act on
opportunities for growth and candidates
for advocacy
DRIVE
Expansion & Advocacy
Proactively identify signs of
customer risk and collaborate
cross-functionally to address
issues
MANAGE
Customer Risk
Today’s example
©2015 Gainsight. All Rights Reserved.
CSM Touch
(Automated
CTAs)
Tech Touch
(CoPilot)
New Customer Onboarding Adoption
Seasoned
Customer
1:many
welcome email
1:many emails
boosting
adoption +
best practices
1:many nurture
(e.g. product
releases)
1:many email
with project
plan + training
content
Schedule kick-
off call and send
gift basket
EBR every X
months
(depends on
the segment)
Detailed
playbook 90
days before
renewal
Schedule
check-in +
trainings with
customer
Best Practices to Define
Your Lifecycle Touches
1) OPERATIONALIZE
CUSTOMER LIFECYLE
Designing Your Lifecycle Strategy
• What are your customer lifecycle stages?
• How will lifecycle touches vary by customer segment?
• What types of 1:many communication (emails, blogs, webinars) will be most
effective with each segment?
1) OPERATIONALIZE
CUSTOMER LIFECYLE
DEMONSTRATE
Value
5 Pillars of Customer Success
OPERATIONALIZE
Customer Lifecycle
ENABLE
Cross-functional Visibility
DRIVE
Expansion & Advocacy
MANAGE
Customer Risk
Today’s example
©2015 Gainsight. All Rights Reserved.
Questions?
Allison Pickens
VP of Customer Success
@PickensAllison
apickens@gainsight.com
Barr Moses
Senior Manager
Business Operations
bmoses@gainsight.com
Lincoln Murphy
Customer Success
Evangelist
@lincolnmurphy
lmurphy@gainsight.com

Make 2016 the Year You Conquer Customer Success

  • 1.
    ©2015 Gainsight. AllRights Reserved.
  • 2.
    ©2015 Gainsight. AllRights Reserved. Scott Golden Director of Customer Success Strategy @SctGldn sgolden@gainsight.com
  • 3.
    3 The Secret toRapid Growth in 2016
  • 4.
    ©2015 Gainsight. AllRights Reserved. Lincoln Murphy Customer Success Evangelist @lincolnmurphy lmurphy@gainsight.com
  • 5.
    “The purpose ofbusiness is to create and keep a customer.”
  • 6.
    The initial saleis critical, but it’s just the tip of the iceberg
  • 7.
  • 8.
    Customer Success iswhen your customers achieve their Desired Outcome through their interactions with your company.
  • 10.
    Why is CustomerSuccess something you should care about?
  • 11.
    David Skok |Matrix Partners | http://www.forentrepreneurs.com/why-churn-is-critical-in-saas/ Customer Success Drives First-order Growth
  • 12.
    Customer Success DrivesSecond-order Growth
  • 13.
    0x 5x 15x 20x EV/RevenueMultiple Dollar Net RenewalRate 60% 70% 80% 90% 100% 110% 120% Source: Altimeter and FactSet 10/2014 10x 7X 15X CSM Drives Third-order Value
  • 14.
    It’s too importantto be thought of as “post-sale” or be left to chance.
  • 15.
    How is CustomerSuccess different than what most companies normally do?
  • 16.
    Copyright © 2015Sixteen Ventures. All rights reserved.
  • 17.
    Copyright © 2015Sixteen Ventures. All rights reserved.
  • 18.
    Customer Success isTransformational 1. Acquire the Best Customers 2. Engage & Deliver Value Quickly 3. Expand Their Investment 4. Mobilize your Advocates 5. Retain & Renew Customers
  • 19.
    1. ACQUIRE THERIGHT CUSTOMERS
  • 20.
  • 21.
  • 22.
    Success Potential • OnlyAcquire Customers with Success Potential • Technical Fit • Functional Fit • Experience Fit • Support Fit
  • 23.
    Use Customer Successto influence your Marketing and Sales
  • 24.
    “Enter the conversationalready taking place in your customer’s mind.” – Robert Collier
  • 25.
    “Enter the conversation alreadytaking place in your customer’s mind.” – Robert Collier, c1937
  • 26.
    Customer Success =Their Desired Outcome
  • 27.
    Customer Success =Their Desired Outcome
  • 28.
    2. ENGAGE &DELIVER VALUE QUICKLY
  • 29.
    Success Milestones arethe steps required for a customer to achieve their ever-evolving Desired Outcome.
  • 31.
  • 32.
    “Customers that takean upsell offer stay longer” - McKinsey & Company
  • 34.
    Customer Lifetime Valueis the Key Metric
  • 35.
  • 36.
    “Customers that comein through advocacy stay longer and buy more.” - McKinsey & Company
  • 37.
    “Customers that advocate foryou become stronger customers themselves.” - Influitive
  • 39.
    5. RETAIN &RENEW CUSTOMERS
  • 40.
    When Customer Successis operationalized around Desired Outcome-based Success Milestones, renewals become a non-issue… renewals just happen.
  • 41.
  • 42.
    “The purpose ofbusiness is to create and keep a customer.”
  • 43.
    ©2015 Gainsight. AllRights Reserved. Lincoln Murphy Customer Success Evangelist @lincolnmurphy lmurphy@gainsight.com
  • 44.
    ©2015 Gainsight. AllRights Reserved. INTERMISSION We will return shortly…
  • 45.
  • 46.
    ©2015 Gainsight. AllRights Reserved. Allison Pickens VP of Customer Success @PickensAllison apickens@gainsight.com
  • 47.
    ©2015 Gainsight. AllRights Reserved. 10 Tips for Planning for 2016 (1) Position Customer Success as a Company Imperative (2) Articulate the Benefit to Other Departments (3) Pinpoint Your Metrics (4) Invest in Data (5) Budget to Benchmarks (6) Focus on What’s Scalable (7) Plan to Specialize (8) Assign Value to High-Touch CS (9) Develop a Repeatable Methodology (10) Invest in Customer Success Operations
  • 48.
    ©2015 Gainsight. AllRights Reserved. Customer Sales Renewals Support Services Marketing Product Ensure solid handoff Create more targeted renewals experience Highlight high-priority customers Reduce implementation time Identify customer advocates better Give visibility into non-adopted features #1: Position CS as a Company Imperative
  • 49.
    ©2015 Gainsight. AllRights Reserved. Customer Sales Renewals Support Services Marketing Product Get visibility into customer details Drive higher renewal rates and expansion Prioritize tickets Identify opportunities for services Proactively identify advocates Prioritize customer enhancement requests Finance Drive collections #2: Articulate the Benefit to Other Departments
  • 50.
    ©2015 Gainsight. AllRights Reserved. #3: Pinpoint Your Metrics Operational Financial Renewal Rate Upsell ARR New Business ARR Risks Resolved NPS “Green” Customers Opportunities Identified Advocates Created Sponsor Changes Identified
  • 51.
    “Green” Customers =CSM version of “SQL”: • Objectively valuable: No one can contest the achievement. • A discrete unit: It’s clear when the achievement is complete. • Measurable: We can create a Gainsight dashboard to track our achievements. • Frequently achieved: We can recognize our achievements week-to- week. • Attributable to the CSM: No one can contest that the CSM is primarily responsible. #4: Invest in Data - “Green” Customers
  • 52.
    52 #4: Invest inData - “Green” Customers
  • 53.
    #4: Invest inData - “Green” Customers
  • 54.
    Customers that movefrom Red/Yellow to Green/Lime in our Habits Scorecard Measure • Green: At least x% of licensed users are daily active users of Cockpit • Lime: At least y% of licensed users are daily active users (of any part of the product) • Yellow: Some usage, but not daily actives • Red: No usage of Gainsight in the last week #4: Invest in Data - “Green” Customers
  • 55.
    ©2015 Gainsight. AllRights Reserved. 4 Objectives in a Risk Framework: • Address early warning signs • Incorporate CSM judgment in assessment of risk level • Common view of risks across levels of the org • Hold other departments accountable for contributing to customer success #4: Invest in Data – Risks Resolved
  • 56.
    ©2015 Gainsight. AllRights Reserved. #4: Invest in Data – Risks Resolved Support Company Sentiment Habits Exec Owner Director of Support VP Customer Success VP Customer Success VP Customer Success Definition What volume of open support tickets does the customer have, and what’s their priority and duration? Is there a change at the company that will affect the customer’s use of Gainsight? Is the customer generally happy? (e.g. NPS) Is the customer using our product in a significant, sticky way? Readiness Implementation Product Bugs Exec Owner VP Sales VP Services VP Product VP Engineering Definition Was the customer ready to purchase Gainsight? Is the implementation project plan on track? Does the customer require a product enhancement? Does the customer have a high volume / priority of bugs open? 1 2 3 4 5 6 7 8
  • 57.
    ©2015 Gainsight. AllRights Reserved. #4: Invest in Data – Risks Resolved
  • 58.
    ©2015 Gainsight. AllRights Reserved. #4: Invest in Data – Risks Resolved
  • 59.
    59 #4: Invest inData - Risks Resolved
  • 60.
    ©2015 Gainsight. AllRights Reserved. #5: Budget to Benchmarks 15 Cents of Fully Loaded CSM Cost per $1 of ARR > Accounts / CSM $ ARR / Account Salary + Overhead / CSM x Pacific Crest Survey 2015 showed that median spend on renewals is $0.13 per $1 of ARR
  • 61.
    ©2015 Gainsight. AllRights Reserved. #6: Focus on What’s Scalable Exec Sponsor Designated CSM Pooled CS Support Automated Outreaches Content Community Product “Automate your job”
  • 62.
    ©2015 Gainsight. AllRights Reserved. Seed “Unicorn” CSM Series A + Support + Onboarding + Operations Growth-stage + Customer Marketing + Renewals + CS Architects + Premier CSM Pre-IPO + Training + Advisory Public + Partners + Managed Services + Domain Experts #7: Plan to Specialize
  • 63.
    Premium + Premium Standard #8: AssignValue to High-Touch CS Client Strategy Manager 4 EBRs / year Onsite Strategy Workshop Change Management Customer Success Manager 2 EBRs / year Strategy Session Best Practices Workshops Pooled CS 1 EBR / year Strategy Webinar Content
  • 64.
    #9: Develop aRepeatable Methodology Predictable Revenue Predictable Value Delivery Sales Development team Customer Success team New Business ARR Renewal ARR SQLs Green Adoption
  • 65.
    #9: Develop aRepeatable Methodology
  • 66.
    #9: Develop aRepeatable Methodology
  • 67.
    Responsibilities Sales OperationsCS Operations Data Reporting • Share sales results and forecasts • Share renewals/upsell results, forecasts Analysis • Analyze leading indicators for sales • Analyze leading indicators for renewals and upsell Processes Engagement process • Determine timing and content of meetings to optimize conversion • Determine touchpoints for CSMs to drive adoption and NPS External communication • Coordinate with marketing • Manage 1:M communications Risk management • Provide visibility to at-risk deals • Detect early warning signs for at-risk customers Opp. identification • Identify top accounts • Identify top customers for upsell X-functional coordination • Coordinate processes across teams to help meet sales objectives • Coordinate processes across teams to help deliver on customer needs People Team structure • Manage AE territories, account segments and forecast hiring needs • Tier customers, assign to CSMs, re-distribute load and forecast hiring Compensation • Determine structure and quotas • Determine metrics and targets Enablement • Create collateral and data for AEs • Provide collateral and data for CSMs Systems Technology • Implement and manage tools for sales • Implement and manage tools for CSMs #10: Invest in Customer Success Operations
  • 68.
    ©2015 Gainsight. AllRights Reserved. Allison Pickens VP of Customer Success @PickensAllison apickens@gainsight.com
  • 69.
    ©2015 Gainsight. AllRights Reserved. INTERMISSION We will return shortly…
  • 70.
  • 71.
    ©2015 Gainsight. AllRights Reserved. Barr Moses Senior Manager of Business Operations bmoses@gainsight.com
  • 72.
    ©2015 Gainsight. AllRights Reserved. Agenda • Define Metrics for Customer Success • Track progress and celebrate achievements • Segment Your Customer Base… • …and structure your CSM team accordingly • Operationalize Customer Success • Create Standard Best Practices for Customers Success Managers
  • 73.
    ©2015 Gainsight. AllRights Reserved. Agenda • Define Metrics for Customer Success • Track progress and celebrate achievements • Segment Your Customer Base… • …and structure your CSM team accordingly • Operationalize Customer Success • Create standard Best Practices for your team
  • 74.
    ©2015 Gainsight. AllRights Reserved. Questions to Consider • Do we track Retention or Renewal Rate? • What does Healthy Usage mean for us? • What is our target cost of CSM / ARR managed?
  • 75.
  • 76.
  • 77.
    ©2015 Gainsight. AllRights Reserved. Week-over-Week Renewal Rate Gross Renewal Rate Net Renewal Rate
  • 78.
    ©2015 Gainsight. AllRights Reserved. Week-over-Week Renewal Rate Gross Renewal Rate = ARR secured / ARR due Net Renewal Rate = ARR secured + Upsell / ARR due
  • 79.
    ©2015 Gainsight. AllRights Reserved. Renewal, Upsell, ARR
  • 80.
    ©2015 Gainsight. AllRights Reserved. Upsell Drivers
  • 81.
    ©2015 Gainsight. AllRights Reserved. Usage: Page Views and Active Users
  • 82.
    ©2015 Gainsight. AllRights Reserved. Customers by Top Usage
  • 83.
    ©2015 Gainsight. AllRights Reserved. Features by Top Usage
  • 84.
    ©2015 Gainsight. AllRights Reserved. Growth in Healthy Users
  • 85.
    ©2015 Gainsight. AllRights Reserved. Agenda • Define Metrics for Customer Success • Track progress and celebrate achievements • Segment Your Customer Base… • …and structure your CSM team accordingly • Operationalize Customer Success • Create Standard Best Practices for Customers Success Managers
  • 86.
    Burning questions: • Whydo we segment customers? What are the objectives, design principles? • How do our customers segment and structure their engagement models? • How do companies use one-to-many engagement models at scale? • How does Gainsight segment their customers? • How do you implement a segmented engagement model? Segmented engagement models 1 2 3 4 5
  • 87.
    Objectives and DesignPrinciples In order to execute at scale, segmentation is critical to deliver what each type of customer needs in a manner that’s scalable for the company. Customer Needs Value to company • What do our customers need in order to be successful? • Are there themes across these groups? • What is the value of each type of customer to us? • How can we affordably serve each segment? 1
  • 88.
    Segmenting the customerbase is essential to understanding the key breakpoints in your customer contact and CSM coverage model strategy. The below charts show the segmentation strategy most commonly deployed within the industry. Customer Base Segmentation Strategy 2 Tiers 20% 3 Tiers 56% 4 Tiers 18% > 4 Tiers 7% Tier Allocation 75%of respondents tier their customer base as part of their contact strategy Key segmentation considerations: • Expected annual customer touch points per segment • Target net renewal rate performance for each segment • Potential revenue or expansion customers in low-$ segments • Expected cost-of-sale % per segment • Avg. contract size per segment / segment volumes • Areas for efficiency gain 23% 30% 47% Other / Combo ARR $ Customer ## of customers Revenue Other / combo Source: Gainsight customer success benchmark report, 2015 2
  • 89.
    1:Many Tactics 3% 61% 29% 3% 3% WeeklyMonthly Quarterly Bi-annually Annually CSM Email Marketing Cadence 5% 15% 33% 47% 50% 52% 65% Other None User Groups Events Online Community CSM Email Marketing Webinars Deploying a robust one-to-many strategy is key not only to drive new sales by efficiently expanding your market reach, but to drive product adoption and customer retention. The below charts show the most popular strategies being deployed today. Source: Gainsight customer success benchmark report, 2015 3
  • 90.
    Gainsight Customer Segmentation Wecarved out 3 segments based on revenue (ARR) and whether or not a customer represents a strategic relationship. Strategic Enterprise / Mid-market SMB Overview Present a major upsell opportunity or help us open up a market for a new use case for Gainsight Customer above a certain ARR threshold that are not strategic Customers below a certain ARR threshold that are not strategic Customer Needs • Need guidance in shaping the evolution of their CS organizations • Want us to support the change management effort • Already experts in growing their team, but need guidance in executing their CS strategy within Gainsight • Starting to build their CS teams and want to digest all the information they can get on best practices Value to Gainsight • Highest potential ARR customers • Huge expansion potential • High retention rates • Strong brand value • Significant ARR & high retention rates • Fast sales cycle • High advocacy rate • Substantial product feedback 4
  • 91.
    Implementing a Segmentationfor Your Customer Base Five considerations for implementation: 1. Ensure consistency in messaging from marketing  sales  CSM 2. Limit “transitions” across segments (ideally, never) 3. When transitions are necessary, emphasize benefits of how the new model matches specific needs of the customer 4. Consider bundled prices for CSM support 5. Encourage innovation: How can we scale every touch point? 5
  • 92.
    ©2015 Gainsight. AllRights Reserved. Agenda • Define Metrics for Customer Success • Track progress and celebrate achievements • Segment Your Customer Base… • …and structure your CSM team accordingly • Operationalize Customer Success • Create Standard Best Practices for Customers Success Managers
  • 93.
    5 Pillars ofCustomer Success
  • 94.
    Demonstrate the valueyou deliver to your customers to promote adoption, advocacy, and growth DEMONSTRATE Value 5 Pillars of Customer Success Build a consistent, effective customer journey through one-to-many strategies and high-impact, timely one-on-one interactions OPERATIONALIZE Customer Lifecycle Build a world-class organization by measuring impact and improving cross-functional coordination ENABLE Cross-functional Visibility Make it easy to spot and act on opportunities for growth and candidates for advocacy DRIVE Expansion & Advocacy Proactively identify signs of customer risk and collaborate cross-functionally to address issues MANAGE Customer Risk
  • 95.
    Demonstrate the valueyou deliver to your customers to promote adoption, advocacy, and growth DEMONSTRATE Value 5 Pillars of Customer Success Build a consistent, effective customer journey through one-to-many strategies and high-impact, timely one-on-one interactions OPERATIONALIZE Customer Lifecycle Build a world-class organization by measuring impact and improving cross-functional coordination ENABLE Cross-functional Visibility Make it easy to spot and act on opportunities for growth and candidates for advocacy DRIVE Expansion & Advocacy Proactively identify signs of customer risk and collaborate cross-functionally to address issues MANAGE Customer Risk Today’s example
  • 96.
    ©2015 Gainsight. AllRights Reserved. CSM Touch (Automated CTAs) Tech Touch (CoPilot) New Customer Onboarding Adoption Seasoned Customer 1:many welcome email 1:many emails boosting adoption + best practices 1:many nurture (e.g. product releases) 1:many email with project plan + training content Schedule kick- off call and send gift basket EBR every X months (depends on the segment) Detailed playbook 90 days before renewal Schedule check-in + trainings with customer Best Practices to Define Your Lifecycle Touches 1) OPERATIONALIZE CUSTOMER LIFECYLE
  • 97.
    Designing Your LifecycleStrategy • What are your customer lifecycle stages? • How will lifecycle touches vary by customer segment? • What types of 1:many communication (emails, blogs, webinars) will be most effective with each segment? 1) OPERATIONALIZE CUSTOMER LIFECYLE
  • 98.
    DEMONSTRATE Value 5 Pillars ofCustomer Success OPERATIONALIZE Customer Lifecycle ENABLE Cross-functional Visibility DRIVE Expansion & Advocacy MANAGE Customer Risk Today’s example
  • 99.
    ©2015 Gainsight. AllRights Reserved. Questions? Allison Pickens VP of Customer Success @PickensAllison apickens@gainsight.com Barr Moses Senior Manager Business Operations bmoses@gainsight.com Lincoln Murphy Customer Success Evangelist @lincolnmurphy lmurphy@gainsight.com