vrs PACE handled a major fire loss at a warehouse in Beijer Örnsköldsvik, Sweden that destroyed an entire warehouse and saw facility. A claim team was assembled and investigated the cause of the fire, which was determined to be an electrical fault. The warehouse was rebuilt and operations resumed within 6 months through streamlined procurement and coordination between the insurer's local adjuster and local management to minimize costs and disruption. The initial reserve of 32.4 million SEK was reduced to an actual loss of 14.9 million SEK as operations recovered faster than expected with lower construction costs and shorter loss of profits than anticipated.