SlideShare a Scribd company logo
1 of 5
Download to read offline
The Ontario Municipal Board (the “OMB”) is continued under the name Local Planning
Appeal Tribunal (the “Tribunal”), and any reference to the Ontario Municipal Board or
Board in any publication of the Tribunal is deemed to be a reference to the Tribunal.
PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O.
1990, c. P.13, as amended
Applicant and Appellant: Unipetro Investments Inc.
Subject: Application to amend Zoning By-law No. 270-2004 -
Neglect of the City of Brampton to make a decision
Existing Zoning: “Agricultural - A”, “Residential Estate Two - RE2” and
“Floodplain (F)”
Proposed Zoning: “Office Commercial - OC Special Sections”
Purpose: To permit the development of office, retail and hotel
uses
Property Address/Description: 7929 Mississauga Road
Municipality: City of Brampton
Municipality File No.: T04W15.027
OMB Case No.: PL171373
OMB File No.: PL171373
OMB Case Name: Unipetro Investment Inc. v. Brampton (City)
APPEARANCES:
Parties Counsel/Representative*
Unipetro Investments Inc. Michael Melling, Hannah Bahmanpour
City of Brampton Matthew Rea
Regional Municipality of Peel Rachel Godley
Local Planning Appeal Tribunal
Tribunal d’appel de l’aménagement
local
ISSUE DATE: June 05, 2019 CASE NO(S).: PL171373
Heard: February 6, 2019 in Brampton, Ontario
2019
CanLII
52911
(ON
LPAT)
2 PL171373
Metrus Central Properties
Limited
Aaron Kurts
2438284 Ontario Inc. Harinder Gahir
Credit Valley Conservation
Authority
Dorothy Di Berto*
DECISION DELIVERED BY ANNE MILCHBERG AND ORDER OF THE TRIBUNAL
[1] This was the first Pre-hearing Conference (“PHC”) on an appeal under Section
34(11) of the Planning Act (“Act”) by Unipetro Investments Inc. (“Applicant”; “Appellant”;
“Unipetro”). The City of Brampton (“City”) had failed to make a decision on a Zoning By-
law Amendment (“ZBA”) application within the time frame specified in the Act.
[2] The subject lands are located at 7929 Mississauga Road, and have a site area of
6.69 hectares. Proposed is a ZBA to permit approximately 10,400 square metres (“m2
”)
of retail uses; a six-storey, 8,400 m2
hotel and conference centre; and 17,668 m2
of
office space. The overall development is proposed to be phased.
[3] The subject lands are designated as “Office and “Open Space” in the City’s
Official Plan (“OP”), and are within Sub-Area 40-2 of the Bram West Secondary Plan
(“Secondary Plan”).
[4] On consent of Unipetro and the City, the Tribunal granted requested Party status
to the Regional Municipality of Peel (“Region”), Metrus Central Properties Limited
(“Metrus”), 2438284 Ontario Inc. (“2438284”), and the Credit Valley Conservation
Authority (“CVCA”).
[5] The Region advised the Tribunal that it may have an issue with the proposed
access on Steeles Avenue West, and possibly on Mississauga Road as well. They are
both Regional roads. At the time of this PHC, Regional planning staff had not yet
completed their review of the proposed development; therefore, their concerns were still
at a formative stage.
2019
CanLII
52911
(ON
LPAT)
3 PL171373
[6] The CVC’s concerns and interests relate to natural heritage and natural hazards,
as the planned site access on Mississauga Road will cross a watercourse regulated by
the CVC.
[7] 2438284 owns a small piece of property adjacent to the subject lands, and is
interested in obtaining an arrangement whereby there is shared access from its site and
the subject lands to Steeles Avenue West.
[8] Counsel for 2438284 has indicated that they do not intend to call witnesses at the
hearing, and would only make a case through cross-examining the witnesses of the
other Parties if Unipetro’s internal road plans change in a way that do not meet
2438284’s interests.
[9] Metrus owns property abutting the subject lands to the east. Counsel for Metrus
advised the Tribunal that Metrus and the Appellant are contemplating a shared access
route to Steeles Avenue West, to be located on their shared side lot line. Metrus does
not intend to raise issues or call witnesses at a contested hearing unless the planned
access road is impacted, and requested that it ought not to be subject to a requirement
to provide an issues list. The other Parties did not object to this.
PROCEDURAL ORDER (“PO”)
[10] In providing a draft of the PO to the Tribunal at the PHC, the City and the
Appellant asked the Tribunal to rule on two disputes that they were unable to resolve in
the draft.
[11] One dispute pertained to whether or not the Parties should be ordered by the
Tribunal to prepare a Joint Document Book in advance of the hearing and to cost-share
in its productions. The Appellant has asked for a Joint Document Book and cost
sharing; the City is opposed to this request, as the Tribunal’s Rules of Practice and
Procedure do not require the production of a Joint Document Book.
2019
CanLII
52911
(ON
LPAT)
4 PL171373
[12] While a Joint Document Book is a convenience for the Tribunal and saves on
paper and printing costs, the Tribunal does not consider it to be a requirement in this
matter, and is unwilling to force the City to involuntarily participate in what is typically a
voluntary, consensual exercise undertaken by Parties. The Parties are welcome to
cooperate on the production of a Joint Document Book if they wish.
[13] The other dispute between the Appellant and the City pertained to whether it was
appropriate for the City to keep in its Issues List the qualifying words “including but not
limited to” before enumerating the policy sections which it deems to be at issue in the
City’s OP and in the Secondary Plan. The Appellant considers the language “including
but not limited to” to be too open-ended, which does not give the Appellant certainty
regarding the scope of the City’s issues. At the same time, the Tribunal surmises that
the City wants the flexibility to add more OP and Secondary Plan sections to the list if
the need arises. Given that the hearing is not scheduled to begin until July, 2020, it is
indeed possible that changes in scope could be sought.
[14] The Tribunal finds for the Appellant, which needs certainty and finiteness to the
issues in order to prepare for the hearing. At the same time, as the hearing is not
scheduled to begin until July, 2020, the Tribunal has time to consider requests from the
City, on consent of the other Parties, to amend the lists of OP and Secondary Plan
policies cited in its Issues List. Likewise, other Parties may request amendments to
their Issues Lists on consent. Should the Parties not agree on changes in scope, they
should bring Motions forward by no later than Friday, May 1, 2020.
[15] The finalized PO for the contested hearing is Attachment 1 to this Decision, and
its content reflects the Tribunal’s findings noted above.
[16] The Tribunal orders a hearing of 15 days duration, commencing Monday, July 6,
2020 at 10 a.m. at:
West Tower
WT-2A Training Room (2nd Floor)
41 George Street South
Brampton, ON L6Y 2E1
2019
CanLII
52911
(ON
LPAT)
5 PL171373
[17] This Member is not seized.
[18] No further notice is required.
“Anne Milchberg”
ANNE MILCHBERG
MEMBER
If there is an attachment referred to in this document,
please visit www.elto.gov.on.ca to view the attachment in PDF format.
Local Planning Appeal Tribunal
A constituent tribunal of Tribunals Ontario - Environment and Land Division
Website: www.elto.gov.on.ca Telephone: 416-212-6349 Toll Free: 1-866-448-2248
2019
CanLII
52911
(ON
LPAT)

More Related Content

Similar to Lawyers in Brampton Ontario

Insecurity of payment
Insecurity of paymentInsecurity of payment
Insecurity of payment
Cameron Ford
 
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
Rolf Warburton
 
Planning Process. Nairobi City County
Planning Process. Nairobi City CountyPlanning Process. Nairobi City County
Planning Process. Nairobi City County
Mido Collins
 
Evergreen oil plan support agreement
Evergreen oil plan support agreementEvergreen oil plan support agreement
Evergreen oil plan support agreement
Randall Reese
 

Similar to Lawyers in Brampton Ontario (20)

547 2018 03 01 edmonton (city) v can-west corporate air charters ltd
547 2018 03 01 edmonton (city) v can-west corporate air charters ltd547 2018 03 01 edmonton (city) v can-west corporate air charters ltd
547 2018 03 01 edmonton (city) v can-west corporate air charters ltd
 
CNA Memo on Application of SB 814
CNA Memo on Application of SB 814CNA Memo on Application of SB 814
CNA Memo on Application of SB 814
 
Article published in the Journal of Building Survey, Appraisal & Valuation of...
Article published in the Journal of Building Survey, Appraisal & Valuation of...Article published in the Journal of Building Survey, Appraisal & Valuation of...
Article published in the Journal of Building Survey, Appraisal & Valuation of...
 
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
Items # 7&8 - 6401 & 6403 and 6421 Broadway (Replat)
 
Insecurity of payment
Insecurity of paymentInsecurity of payment
Insecurity of payment
 
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
Atco Lumber Ltd. v. Kootenay Boundary (Reg. Dist.), British Columbia 2014 BCS...
 
SC Judgement - Appointment Of Third Arbitrator
SC Judgement - Appointment Of Third ArbitratorSC Judgement - Appointment Of Third Arbitrator
SC Judgement - Appointment Of Third Arbitrator
 
Supreme Court on Climate Change and Urban Development
Supreme Court on Climate Change and Urban DevelopmentSupreme Court on Climate Change and Urban Development
Supreme Court on Climate Change and Urban Development
 
FMC Fall Real Estate Seminar 2011
FMC Fall Real Estate Seminar 2011FMC Fall Real Estate Seminar 2011
FMC Fall Real Estate Seminar 2011
 
5) land acquisition
5) land acquisition5) land acquisition
5) land acquisition
 
Register tgl8252 1
Register tgl8252 1Register tgl8252 1
Register tgl8252 1
 
Public Matters July 2016
Public Matters July 2016Public Matters July 2016
Public Matters July 2016
 
Environmental Justice: Challenges, Access and Necessity of National Network
Environmental Justice:Challenges, Access and Necessity of National NetworkEnvironmental Justice:Challenges, Access and Necessity of National Network
Environmental Justice: Challenges, Access and Necessity of National Network
 
2017.04.17 mpb (amended)
2017.04.17 mpb (amended)2017.04.17 mpb (amended)
2017.04.17 mpb (amended)
 
Planning Process. Nairobi City County
Planning Process. Nairobi City CountyPlanning Process. Nairobi City County
Planning Process. Nairobi City County
 
Evergreen oil plan support agreement
Evergreen oil plan support agreementEvergreen oil plan support agreement
Evergreen oil plan support agreement
 
October 1, 2013 Agenda Packet
October 1, 2013 Agenda PacketOctober 1, 2013 Agenda Packet
October 1, 2013 Agenda Packet
 
UK Adjudicators September 2019 newsletter
UK Adjudicators September 2019 newsletterUK Adjudicators September 2019 newsletter
UK Adjudicators September 2019 newsletter
 
Building Your Tax Base: Creating and Using Redevelopment Incentives
Building Your Tax Base: Creating and Using Redevelopment Incentives Building Your Tax Base: Creating and Using Redevelopment Incentives
Building Your Tax Base: Creating and Using Redevelopment Incentives
 
King county-superior-court-order-on-rha-v-city-of-seattle-22421
King county-superior-court-order-on-rha-v-city-of-seattle-22421King county-superior-court-order-on-rha-v-city-of-seattle-22421
King county-superior-court-order-on-rha-v-city-of-seattle-22421
 

Recently uploaded

一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
doypbe
 
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
mefyqyn
 
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
acyefsa
 

Recently uploaded (20)

一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
 
Essential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard ProgramEssential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard Program
 
Petitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxPetitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docx
 
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
 
From Scratch to Strong: Introduction to Drafting of Criminal Cases and Applic...
From Scratch to Strong: Introduction to Drafting of Criminal Cases and Applic...From Scratch to Strong: Introduction to Drafting of Criminal Cases and Applic...
From Scratch to Strong: Introduction to Drafting of Criminal Cases and Applic...
 
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekpEmbed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
 
How to Protect Your Children During a Divorce?
How to Protect Your Children During a Divorce?How to Protect Your Children During a Divorce?
How to Protect Your Children During a Divorce?
 
2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations Seminar2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations Seminar
 
File Taxes Online Simple Steps for Efficient Filing.pdf
File Taxes Online Simple Steps for Efficient Filing.pdfFile Taxes Online Simple Steps for Efficient Filing.pdf
File Taxes Online Simple Steps for Efficient Filing.pdf
 
CASE STYDY Lalman Shukla v Gauri Dutt BY MUKUL TYAGI.pptx
CASE STYDY Lalman Shukla v Gauri Dutt BY MUKUL TYAGI.pptxCASE STYDY Lalman Shukla v Gauri Dutt BY MUKUL TYAGI.pptx
CASE STYDY Lalman Shukla v Gauri Dutt BY MUKUL TYAGI.pptx
 
Dabholkar-matter-Judgement-1.pdfrefp;sdPp;
Dabholkar-matter-Judgement-1.pdfrefp;sdPp;Dabholkar-matter-Judgement-1.pdfrefp;sdPp;
Dabholkar-matter-Judgement-1.pdfrefp;sdPp;
 
Mischief Rule of Interpretation of statutes
Mischief Rule of Interpretation of statutesMischief Rule of Interpretation of statutes
Mischief Rule of Interpretation of statutes
 
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
一比一原版(Columbia毕业证书)哥伦比亚大学毕业证原件一模一样
 
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
一比一原版(MSU毕业证书)密苏里州立大学毕业证成绩单原件一模一样
 
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
买(rice毕业证书)莱斯大学毕业证本科文凭证书原版质量
 
Law of succession-Notes for students studying law
Law of succession-Notes for students studying lawLaw of succession-Notes for students studying law
Law of succession-Notes for students studying law
 
Respondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docxRespondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docx
 
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoiEmbed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
 
TTD - PPT on social stock exchange.pptx Presentation
TTD - PPT on social stock exchange.pptx PresentationTTD - PPT on social stock exchange.pptx Presentation
TTD - PPT on social stock exchange.pptx Presentation
 
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdklEmbed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
 

Lawyers in Brampton Ontario

  • 1. The Ontario Municipal Board (the “OMB”) is continued under the name Local Planning Appeal Tribunal (the “Tribunal”), and any reference to the Ontario Municipal Board or Board in any publication of the Tribunal is deemed to be a reference to the Tribunal. PROCEEDING COMMENCED UNDER subsection 34(11) of the Planning Act, R.S.O. 1990, c. P.13, as amended Applicant and Appellant: Unipetro Investments Inc. Subject: Application to amend Zoning By-law No. 270-2004 - Neglect of the City of Brampton to make a decision Existing Zoning: “Agricultural - A”, “Residential Estate Two - RE2” and “Floodplain (F)” Proposed Zoning: “Office Commercial - OC Special Sections” Purpose: To permit the development of office, retail and hotel uses Property Address/Description: 7929 Mississauga Road Municipality: City of Brampton Municipality File No.: T04W15.027 OMB Case No.: PL171373 OMB File No.: PL171373 OMB Case Name: Unipetro Investment Inc. v. Brampton (City) APPEARANCES: Parties Counsel/Representative* Unipetro Investments Inc. Michael Melling, Hannah Bahmanpour City of Brampton Matthew Rea Regional Municipality of Peel Rachel Godley Local Planning Appeal Tribunal Tribunal d’appel de l’aménagement local ISSUE DATE: June 05, 2019 CASE NO(S).: PL171373 Heard: February 6, 2019 in Brampton, Ontario 2019 CanLII 52911 (ON LPAT)
  • 2. 2 PL171373 Metrus Central Properties Limited Aaron Kurts 2438284 Ontario Inc. Harinder Gahir Credit Valley Conservation Authority Dorothy Di Berto* DECISION DELIVERED BY ANNE MILCHBERG AND ORDER OF THE TRIBUNAL [1] This was the first Pre-hearing Conference (“PHC”) on an appeal under Section 34(11) of the Planning Act (“Act”) by Unipetro Investments Inc. (“Applicant”; “Appellant”; “Unipetro”). The City of Brampton (“City”) had failed to make a decision on a Zoning By- law Amendment (“ZBA”) application within the time frame specified in the Act. [2] The subject lands are located at 7929 Mississauga Road, and have a site area of 6.69 hectares. Proposed is a ZBA to permit approximately 10,400 square metres (“m2 ”) of retail uses; a six-storey, 8,400 m2 hotel and conference centre; and 17,668 m2 of office space. The overall development is proposed to be phased. [3] The subject lands are designated as “Office and “Open Space” in the City’s Official Plan (“OP”), and are within Sub-Area 40-2 of the Bram West Secondary Plan (“Secondary Plan”). [4] On consent of Unipetro and the City, the Tribunal granted requested Party status to the Regional Municipality of Peel (“Region”), Metrus Central Properties Limited (“Metrus”), 2438284 Ontario Inc. (“2438284”), and the Credit Valley Conservation Authority (“CVCA”). [5] The Region advised the Tribunal that it may have an issue with the proposed access on Steeles Avenue West, and possibly on Mississauga Road as well. They are both Regional roads. At the time of this PHC, Regional planning staff had not yet completed their review of the proposed development; therefore, their concerns were still at a formative stage. 2019 CanLII 52911 (ON LPAT)
  • 3. 3 PL171373 [6] The CVC’s concerns and interests relate to natural heritage and natural hazards, as the planned site access on Mississauga Road will cross a watercourse regulated by the CVC. [7] 2438284 owns a small piece of property adjacent to the subject lands, and is interested in obtaining an arrangement whereby there is shared access from its site and the subject lands to Steeles Avenue West. [8] Counsel for 2438284 has indicated that they do not intend to call witnesses at the hearing, and would only make a case through cross-examining the witnesses of the other Parties if Unipetro’s internal road plans change in a way that do not meet 2438284’s interests. [9] Metrus owns property abutting the subject lands to the east. Counsel for Metrus advised the Tribunal that Metrus and the Appellant are contemplating a shared access route to Steeles Avenue West, to be located on their shared side lot line. Metrus does not intend to raise issues or call witnesses at a contested hearing unless the planned access road is impacted, and requested that it ought not to be subject to a requirement to provide an issues list. The other Parties did not object to this. PROCEDURAL ORDER (“PO”) [10] In providing a draft of the PO to the Tribunal at the PHC, the City and the Appellant asked the Tribunal to rule on two disputes that they were unable to resolve in the draft. [11] One dispute pertained to whether or not the Parties should be ordered by the Tribunal to prepare a Joint Document Book in advance of the hearing and to cost-share in its productions. The Appellant has asked for a Joint Document Book and cost sharing; the City is opposed to this request, as the Tribunal’s Rules of Practice and Procedure do not require the production of a Joint Document Book. 2019 CanLII 52911 (ON LPAT)
  • 4. 4 PL171373 [12] While a Joint Document Book is a convenience for the Tribunal and saves on paper and printing costs, the Tribunal does not consider it to be a requirement in this matter, and is unwilling to force the City to involuntarily participate in what is typically a voluntary, consensual exercise undertaken by Parties. The Parties are welcome to cooperate on the production of a Joint Document Book if they wish. [13] The other dispute between the Appellant and the City pertained to whether it was appropriate for the City to keep in its Issues List the qualifying words “including but not limited to” before enumerating the policy sections which it deems to be at issue in the City’s OP and in the Secondary Plan. The Appellant considers the language “including but not limited to” to be too open-ended, which does not give the Appellant certainty regarding the scope of the City’s issues. At the same time, the Tribunal surmises that the City wants the flexibility to add more OP and Secondary Plan sections to the list if the need arises. Given that the hearing is not scheduled to begin until July, 2020, it is indeed possible that changes in scope could be sought. [14] The Tribunal finds for the Appellant, which needs certainty and finiteness to the issues in order to prepare for the hearing. At the same time, as the hearing is not scheduled to begin until July, 2020, the Tribunal has time to consider requests from the City, on consent of the other Parties, to amend the lists of OP and Secondary Plan policies cited in its Issues List. Likewise, other Parties may request amendments to their Issues Lists on consent. Should the Parties not agree on changes in scope, they should bring Motions forward by no later than Friday, May 1, 2020. [15] The finalized PO for the contested hearing is Attachment 1 to this Decision, and its content reflects the Tribunal’s findings noted above. [16] The Tribunal orders a hearing of 15 days duration, commencing Monday, July 6, 2020 at 10 a.m. at: West Tower WT-2A Training Room (2nd Floor) 41 George Street South Brampton, ON L6Y 2E1 2019 CanLII 52911 (ON LPAT)
  • 5. 5 PL171373 [17] This Member is not seized. [18] No further notice is required. “Anne Milchberg” ANNE MILCHBERG MEMBER If there is an attachment referred to in this document, please visit www.elto.gov.on.ca to view the attachment in PDF format. Local Planning Appeal Tribunal A constituent tribunal of Tribunals Ontario - Environment and Land Division Website: www.elto.gov.on.ca Telephone: 416-212-6349 Toll Free: 1-866-448-2248 2019 CanLII 52911 (ON LPAT)