KM5S LCD is a professional-grade display for electric PAS bikes. It has USB charging function giving full consideration to the needs of users experience when they ride. It has all our present functions to meet customers DIY needs and personalized requirements. It perfectly solved the water-proof problem with integrated key structure. It has metal frame appearance. It is widely recognized when it launched.
KM5S-U LDC Display products are made of PC plastic. This material ensures normal operation & robust mechanical performance in the temperature range of -20℃ to 60℃.
Model: KM5S-U LCD Display
Size: 88.75mm*50.3mm*47.9mm
Function: PAS Level; Speed; Trip/ODO; Headlight;
Walk/PAS Select/Error Alarm
Communication: UART Default/CAN
Holder: 22.2mm;25.4mm;31.8mm
Voltage: 24V/36V/31.8V
Certificate: CE/ROHS/IP65
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Facebook: https://www.facebook.com/KingMeterTech
Want to know new trends for your ebikes? Interested on what a new gift King-Meter could provide for you this year? Please kindly check our new e-Catalog. Here we prepared Integrated new LCD Display for your ebikes. Also, LED Display, PAS Sensor and Magnet disc is available.
KING-METER founded in 2004 is a professional enterprise, specialized in R&D, production and sales of displays, sensor and rental system for public E-bikes.
KING-METER is national grade High-tech enterprise. We own 96 patents and get many design awards. All the products are exported to Europe and own35% market share in Europe. All products have passed EN15194, CE, RoHs and REACH.
More Related Content
Similar to KM5S-U LCD Display CE Certification King-Meter Technology Co.,Ltd
Want to know new trends for your ebikes? Interested on what a new gift King-Meter could provide for you this year? Please kindly check our new e-Catalog. Here we prepared Integrated new LCD Display for your ebikes. Also, LED Display, PAS Sensor and Magnet disc is available.
KING-METER founded in 2004 is a professional enterprise, specialized in R&D, production and sales of displays, sensor and rental system for public E-bikes.
KING-METER is national grade High-tech enterprise. We own 96 patents and get many design awards. All the products are exported to Europe and own35% market share in Europe. All products have passed EN15194, CE, RoHs and REACH.
User Manual_KM5S-R LCD Display King-Meter Technology Co.,LtdCory KingMeter
KM5S-R LCD Display King-Meter Technology Co.,Ltd
Model: KM5S-R LCD Display
Size: 88.75mm*50.3mm*47.9mm
Communication: UART Default/CAN
Holder: 22.2mm;25.4mm;31.8mm
Voltage: 24V/36V/31.8V
Certificate: CE/ROHS/IP65
Function:
RFID radiofrequencies
Battery Indicator
Motor Power Ratio
Speed Display (including running speed, max speed and average speed)
Trip distance and total distance
Trip time display of single
Cruise control
Headlight On/Off
Error Code Indicator
Various Parameters Setting (like wheel size, speed -limited, battery level bar, PAS level, controller limited current, max speed, password enable, and so on.)
Recover Default Setting
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Facebook: https://www.facebook.com/KingMeterTech
KM5S-R LCD Display CE Certification King-Meter Technology Co.,LtdCory KingMeter
KM5S-R LCD Display King-Meter Technology Co.,Ltd
Model: KM5S-R LCD Display
Size: 88.75mm*50.3mm*47.9mm
Communication: UART Default/CAN
Holder: 22.2mm;25.4mm;31.8mm
Voltage: 24V/36V/31.8V
Certificate: CE/ROHS/IP65
Function:
RFID radiofrequencies
Battery Indicator
Motor Power Ratio
Speed Display (including running speed, max speed and average speed)
Trip distance and total distance
Trip time display of single
Cruise control
Headlight On/Off
Error Code Indicator
Various Parameters Setting (like wheel size, speed -limited, battery level bar, PAS level, controller limited current, max speed, password enable, and so on.)
Recover Default Setting
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Facebook: https://www.facebook.com/KingMeterTech
User Manual_ WH527 LCD Display_King-Meter Technology Co.,LtdCory KingMeter
WH527 LCD Display_King-Meter Technology Co.,Ltd
Model: WH527 LCD Display
Size: 77.60mm x 45.45mm x 49.90mm
Function: Speed; Trip; ODO; Mile/KM; Error Alarm
Communication: UART Default; CAN
Holder: 22.2mm;
Voltage: 24V/36V/48V
Certificate: CE/ROHS/IP65
WH527 LCD Display products are made of PC. Under the temperature of -20 to 60℃, the shell material can ensure normal usage and good mechanical performance.
WH527 LCD instrument is with a thin design, metal frame fashion and simple installation process. Integrated buttons effectively save the handlebar space, easy to operate and more secure. Electronic control system fault code text display, more intuitive. Built-in photosensitive device can automatically turn on and off lights.
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Facebook: https://www.facebook.com/KingMeterTech
User Manual_NOKEE-U LCD Display_King-Meter Technology Co.,LtdCory KingMeter
Model: Nokee-U LCD Display
Size: 96.7mm x 62.8mm x 29mm
Function: PAS level; Speed; Trip; ODO; Headlight; Walk; Mile/KM; Error Alarm
Communication: UART Default; CAN/LIN/CAN
Holder: 22.2mm; 25.4mm; 31.8mm
Voltage: 24V/36V/48V
Certificate: CE/ROHS/IP65
APPEARANCE:
Nokee is simple yet elegant, delicate yet robust. It has been ruggedized thanks to the use of frosted aviation grade aluminum and toughened glass, creating one of the largest yet thinnest LCD Displays on the market. With a form reminiscent of a luxury sports car. Nokee lends an air of sophistication that is unmatched today which makes it ideal for the European market.
KEY POINTS:
With a Mohs hardness of 7, the toughened glass screen is highly robust and scratch resistant. The shell is constructed out of aviation grade aluminum to provide optimum rigidity and oxidation resistance. Nokee is the first King-Meter display to be equipped with an electroluminescent backlight which allows the Nokee to be so thin, at only 6mm thick. Thanks to the use of a patented technology, the display can be safely used at night without the user becoming dazed.
FEATURES:
Installation: Clamped to the handlebar vertically
Display color: Inverted from what is shown
Wiring/Connectors: Two IP65 water resistant connectors
Display content: Current speed; Maximum speed; Average speed; Trip time; Trip distance; ODO; KM/H/MPH; PAS; Battery; Headlight; Error; Walk mode;
Screen Material: 1mm thick toughened glass
Shell Material: Frosted aluminum
Color: Black/Grey
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Facebook: https://www.facebook.com/KingMeterTech
User Manual_SW-LCD-U_King-Meter Technology Co.,LtdCory KingMeter
Model: SW-LCD-U
Size: 103.87mm × 61.45mm × 53.60mm
Function: PAS Level; Speed; Trip / ODO; Headlight; Walk; Mile / KM / Error Alarm
Communication: UART Default / CAN
Holder: 22.2mm; 25.4mm; 31.8mm
Voltage: 24V / 36V / 48V
Certificate: CE / ROHS / IP65
SW-LCD housing material: PC. Housing color is white or black. Working temperature scope: -20℃—+60℃, and the shell material can ensure normal use and good mechanical performance of the products.
SW-LCD-U retains the classic unique keys, large LCD display and excellent visibility. Product shell uses piano paint technology with comfortable appearance and great texture. Greatly enhance the vehicle's assembly effect. With USB charging function, SW LCD can meet the mobile electronic devices onboard use.
Attention for Using: Ride your bike in a safe way. Don’t hit or knock the display. Keep away from the bad environments when use, such as downpour, large snowflakes and solarization. Try not to use in under-voltage condition. The screen will get dark along with the temperature reduction when temperature below -10℃. The screen will return to normal when the temperature rises again.
Quality Warranty and Coverage: We are not responsible for the scratched or broken shell after the products are delivered out of the factory. We don’t repair scratched or broken lead wires.
The LCD display function warranty: 24 months from the delivery time of the display out of the factory.
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
User manual sw lcd-king-meter technology co.,ltdCory KingMeter
SW-LCD housing material: PC. And the color of housing is white or black. Working temperature scope: -20℃—+60℃, the shell material can ensure normal use and good mechanical performance of the products.
Preset and Default Items: SW-LCD user settings include: wheel diameter(18-28inch); max speed; LCD backlight contrast; choice of display unit. 3.2.
Display Figures: Display content: battery capacity, motor power ratio, riding speed, riding distance, power, PUSH cruise control, and error code display of the electronic control system.
Button Definition: SW-LCD is equipped with special 30-button unit. This operating button is suit for both L/R hand.
Attention for Using: Ride your bike in a safe way. Don’t hit or knock the display. Keep away from the bad environments when use, such as downpour, large snowflakes and solarization. Try not to use in under-voltage condition. The screen will get dark along with the temperature reduction when temperature below -10℃. The screen will return to normal when the temperature rises again.
Quality Warranty and Coverage: We are not responsible for the scratched or broken shell after the products are delivered out of the factory. We don’t repair scratched or broken lead wires.
The LCD display function warranty: 24 months from the delivery time of the display out of the factory.
Visit us by:
Website: https://www.king-meter.com
LinkedIn: https://www.linkedin.com/company/kingmeter
Brief Introduction & Growth of KING-METER
KING-METER founded in 2004 is a professional enterprise, specialized in R&D, production and sales of displays, sensor and rental system for public E-bikes. We are located in Tianjin, China.
KING-METER is national grade High-tech enterprise. We own 96 patents and get many design awards. All the products are exported to Europe and own35% market share in Europe. All products have passed EN15194, CE, RoHs and REACH.
KING-METER passes ISO9001 and ISO14001 certification. We have introduced a series of testing equipment, including vibration test bench, high low temperature test box, salt spray testing machine, pull out testing bench, key fatigue tester and so on.
We provide ODM service which creates a custom design, built to your specification. We look forward to long and mutually profitable partnership with you.
KING-METER TECHNOLOGY CO.,LTD.
ADD:No.15 Chenchang Rd.,Beichen District,300134 Tianjin,China
www.king-meter.com
Akshay Ram on Adobe's Creative Strategy and Execution, the Present and Future...Neil Horowitz
On episode 271 of the Digital and Social Media Sports Podcast, Neil chatted with Akshay Ram, Product Manager for Adobe, who also has a lot of knowledge and insight into sports creative.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
Spain vs Croatia Date, venue and match preview ahead of Euro Cup clash as Mod...Eticketing.co
We offer Euro Cup Tickets to admirers who can get Spain vs Croatia Tickets through our trusted online ticketing marketplace. Eticketing.co is the most reliable source for booking Euro Cup Final Tickets. Sign up for the latest Euro Cup Germany Ticket alert.
Albania vs Spain Euro Cup 2024 Very Close Armando Broja Optimistic Albania Wi...Eticketing.co
Euro Cup 2024 fans worldwide can book Albania vs Spain Tickets from our online platform www.eticketing.co. Fans can book Euro Cup Germany Tickets on our website at discounted prices.
Ukraine Euro Cup 2024 Squad Sergiy Rebrov's Selections and Prospects.docxEuro Cup 2024 Tickets
After securing their spot through the playoff route, Ukraine is gearing up for their fourth consecutive European Championship. Ukraine first qualified as hosts in 2012, but in 2016
Euro Cup fans worldwide can book Euro 2024 Tickets from our online platform www.worldwideticketsandhospitality. Fans can book Ukraine Vs Belgium Tickets on our website at discounted prices.
Euro Cup international supporters can book Euro 2024 Tickets from our online platform Worldwideticketsandhospitality.com. Followers can book Portugal Vs Czechia Tickets on our website at sale prices.
Euro Cup international supporters can book Euro 2024 Tickets from our online platform Worldwideticketsandhospitality.com. Followers can book Turkey Vs Portugal Tickets on our website at sale prices.
Narrated Business Proposal for the Philadelphia Eaglescamrynascott12
Slide 1:
Welcome, and thank you for joining me today. We will explore a strategic proposal to enhance parking and traffic management at Lincoln Financial Field, aiming to improve the overall fan experience and operational efficiency. This comprehensive plan addresses existing challenges and leverages innovative solutions to create a smoother and more enjoyable experience for our fans.
Slide 2:
Picture this: It’s a crisp fall afternoon, driving towards Lincoln Financial Field. The atmosphere is electric—tailgaters grilling, fans in Eagles jerseys creating a sea of green and white. The air buzzes with camaraderie and anticipation. You park, join the throng, and make your way to your seat. The stadium roars as the Eagles take the field, sending chills down your spine. Each play is a thrilling dance of strategy and skill. This is what being an Eagles fan is all about—the joy, the pride, and the shared experience.
Slide 3:
But now, the day is marred by frustration. The excitement wanes as you struggle to find a parking spot. The congestion is overwhelming, and tempers flare. The delays mean you miss the pre-game excitement, the tailgate camaraderie, and even the opening kick-off. After the game, the joy of victory or the shared solace of defeat is overshadowed by the stress of navigating out of the parking lot. The gridlock, honking horns, and endless waiting drain the energy and joy from what should have been an unforgettable experience.
Our proposal aims to eliminate these frustrations, ensuring that from arrival to departure, your experience is extraordinary. Efficient parking and smooth traffic flow are key to maintaining the high spirits and excitement that make game days special.
Slide 4:
The Philadelphia Eagles are not just a premier NFL team; they are an integral part of the community, hosting games, concerts, and various events at Lincoln Financial Field. Our state-of-the-art stadium is designed to provide a world-class experience for every attendee. Whether it's the thrill of game day, the excitement of a live concert, or the camaraderie of community events, we pride ourselves on delivering a fan-first experience and maintaining operational excellence across all our activities. Our commitment to our fans and community is unwavering, and we continuously strive to enhance every aspect of their experience, ensuring they leave with unforgettable memories.
Slide 5:
Recent trends show an increasing demand for efficient event logistics. Our customer feedback has consistently highlighted frustrations with parking and traffic. Surveys indicate that a significant number of fans are dissatisfied with the current parking situation. Comparisons with other venues like Citizens Bank Park and Wells Fargo Center reveal that we lag in terms of parking efficiency and convenience. These insights underscore the urgent need for innovation to meet and exceed fan expectations.
Slide 6:
As we delve into the intricacies of our operations, one glaring issue emer
Spain vs Italy Spain at Euro Cup 2024 Group, Fixtures, Players to Watch and M...Eticketing.co
Euro Cup 2024 fans worldwide can book Spain vs Italy Tickets from our online platform www.eticketing.co. Fans can book Euro Cup Germany Tickets on our website at discounted prices.
Belgium vs Slovakia Belgium announce provisional squad for Euro Cup 2024 Thib...Eticketing.co
Euro 2024 fans worldwide can book Belgium vs Slovakia Tickets from our online platform www.eticketing.co. Fans can book Euro Cup Germany Tickets on our website at discounted prices.
Turkey's Euro 2024 Squad Overview and Transfer Speculation.docxEuro Cup 2024 Tickets
Vincenzo Montella has announced a preliminary 35-man squad for Turkey ahead of the UEFA Euro 2024, which includes three Serie A players, Hakan Calhanoglu, Kenan Yildiz, and Zeki Celik
Euro Cup fans worldwide can book Euro 2024 Tickets from our online platform www.worldwideticketsandhospitality. Fans can book Spain Vs Croatia Tickets on our website at discounted prices.
Euro Cup fans worldwide can book Euro 2024 Tickets from our online platform www.worldwideticketsandhospitality. Fans can book Poland Vs Austria Tickets on our website at discounted prices.
Euro Cup fans worldwide can book Euro 2024 Tickets from our online platform www.worldwideticketsandhospitality. Fans can book Belgium Vs Romania Tickets on our website at discounted prices.
Euro Cup fans worldwide can book Euro 2024 Tickets from our online platform www.worldwideticketsandhospitality. Fans can book Croatia Vs Italy Tickets on our website at discounted prices.
Turkey vs Georgia Tickets: Turkey's Road to Glory and Building Momentum for U...Eticketing.co
Euro Cup Germany fans worldwide can book Euro 2024 Tickets from our online platform www.eticketing.co.Fans can book Euro Cup 2024 Tickets on our website at discounted prices.
Turkey vs Georgia Tickets: Turkey's Road to Glory and Building Momentum for U...
KM5S-U LCD Display CE Certification King-Meter Technology Co.,Ltd
1. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 1 of 40
EMC COMPLANCE TEST REPORT
FOR
DISPLAY
Trade Name
Model Number
Report Number
Date
Regulations
: KING-METER
: KM5S-LCD
: GSI130103033001
: January 10, 2013
: See below
Standards Results (Pass/Fail)
EN 55022: 2010
EN 61000-3-2: 2006+A2: 2009
EN 61000-3-3: 2008
PASS
N/A
N/A
EN 55024: 2010
(EN 61000-4-2: 2009,
EN 61000-4-3: 2006+A1:2009,
EN 61000-4-4: 2004+A1: 2010,
EN 61000-4-5: 2006,
EN 61000-4-6: 2009,
EN 61000-4-8: 2010,
EN 61000-4-11: 2004)
PASS
PASS
PASS
PASS
PASS
N/A
N/A
Issued to:
KING-METER ELECTRIC CO., LTD
11 HONGLIANG ROAD, HONGLIANG INDUSTRIAL ZONE, DONGLI DISTRICT,
TIANJIN, CHINA
Issued by:
SHENZHEN GSI Technology CO., LTD.
ROOM 616, XIANKEJIDIAN BUILDING, BAGUASI ROAD, SHENZHEN, CHINA
TEL: 86-755-25844177
FAX: 86-755-25844877
Note: This report shall not be reproduced except in full, without the written approval of
GSI Technology Co., Ltd. This document may be altered or revised by GSI Technology Co.,
Ltd. Personnel only, and shall be noted in the revision section of the document.
2. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 2 of 40
TABLE OF CONTENT
Test Report Declaration Page
1. GENERAL INFORMATION ...................................................................................................................... 5
1.1 Description of Device (EUT).............................................................................................................. 5
1.2 Test Facility ......................................................................................................................................... 6
2. TEST INSTRUMENT USED...................................................................................................................... 7
2.1 For Conducted Emission Test............................................................................................................ 7
2.2 For Radiated Emission Measurement .............................................................................................. 7
2.3 For Harmonic & Flicker Test ............................................................................................................ 7
2.4 For Electrostatic Discharge Immunity Test...................................................................................... 7
2.5 For RF EM Field Test......................................................................................................................... 8
2.6 For Electrical Fast Transient /Burst Immunity Test ....................................................................... 8
2.7 For Surge Immunity Test................................................................................................................... 8
2.8 For Injected Current Susceptibility Test .......................................................................................... 8
2.9 For Voltage Dips and Interruptions Test .......................................................................................... 9
3. POWER LINE CONDUCTED EMISSION TEST.................................................................................... 10
3.1 Block Diagram of Test Setup ........................................................................................................... 10
3.2 Test Standard .................................................................................................................................... 10
3.3 Power Line Conducted Emission Limit.......................................................................................... 10
3.4 EUT Configuration on Test.............................................................................................................. 10
3.5 Operating Condition of EUT........................................................................................................... 10
3.6 Test Procedure .................................................................................................................................. 10
3.7 Power Line Conducted Emission Test Results ................................................................................11
4. RADIATED EMISSION MEASUREMENT ............................................................................................ 12
4.1 Block Diagram of Test...................................................................................................................... 12
4.2 Radiated Emission Limit ................................................................................................................. 12
4.3 EUT Configuration on Measurement ............................................................................................. 12
4.4 Operating Condition of EUT........................................................................................................... 13
4.5. Test Procedure ................................................................................................................................. 13
4.6 Radiated Emission Noise Measurement Result ............................................................................. 13
5. ELECTROSTATIC DISCHARGE IMMUNITY TEST ............................................................................ 14
5.1 Block Diagram of Test Setup ........................................................................................................... 14
5.2 Test Standard .................................................................................................................................... 14
5.3 Severity Levels and Performance Criterion................................................................................... 14
5.4 EUT Configuration........................................................................................................................... 14
5.5 Operating Condition of EUT........................................................................................................... 14
5.6 Test Procedure .................................................................................................................................. 15
5.7 Test Results........................................................................................................................................ 15
6. RF EM FIELD TEST................................................................................................................................. 17
6.1 Block Diagram of Test Setup ........................................................................................................... 17
6.2 Test Standard .................................................................................................................................... 17
6.3 Severity Levels and Performance Criterion................................................................................... 17
6.4 EUT Configuration........................................................................................................................... 17
6.5 Operating Condition of EUT........................................................................................................... 17
6.6 Test Procedure .................................................................................................................................. 17
6.7 Test Results........................................................................................................................................ 17
7. ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST............................................................ 17
7.1 Block Diagram of Test Setup ........................................................................................................... 17
7.2 Test Standard .................................................................................................................................... 17
7.3 Severity Levels and Performance Criterion................................................................................... 17
7.4 EUT Configuration........................................................................................................................... 17
3. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 3 of 40
7.5 Operating Condition of EUT........................................................................................................... 17
7.6 Test Procedure .................................................................................................................................. 17
7.7 Test Result ......................................................................................................................................... 17
8. SURGE IMMUNITY TEST ...................................................................................................................... 17
8.1 Block Diagram of Test Setup ........................................................................................................... 17
8.2 Test Standard .................................................................................................................................... 17
8.3 Severity Levels and Performance Criterion................................................................................... 17
8.4 EUT Configuration........................................................................................................................... 17
8.5 Operating Condition of EUT........................................................................................................... 17
8.6 Test Procedure .................................................................................................................................. 17
8.7 Test Result ......................................................................................................................................... 17
9. INJECTED CURRENTS SUSCEPTIBILITY TEST ................................................................................ 17
9.1 Block Diagram of Test Setup ........................................................................................................... 17
9.2 Test Standard .................................................................................................................................... 17
9.3 Severity Levels and Performance Criterion................................................................................... 17
9.4 EUT Configuration........................................................................................................................... 17
9.5 Operating Condition of EUT........................................................................................................... 17
9.6 Test Procedure .................................................................................................................................. 17
9.7Test Results......................................................................................................................................... 17
10.MAGNETIC FIELD SUSCEPTIBILITY TEST ...................................................................................... 17
10.1 Block Diagram of Test.................................................................................................................... 17
10.2 Test Standard .................................................................................................................................. 17
10.3 Severity Levels and Performance Criterion................................................................................. 17
10.4 EUT Configuration on Test............................................................................................................ 17
10.5 Test Procedure ................................................................................................................................ 17
10.6 Test Results...................................................................................................................................... 17
APPENDIX I (2 pages)
APPENDIX II (2 pages)
APPENDIX III (PHOTOS OF EUT) (3 pages)
4. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 4 of 40
TEST REPORT DESCRIPTION
Equipment Under Test
Trade Name
Model Number
Applicant
Address
Manufacturer
Address
Technical Standards
: DISPLAY
: KING-METER
: KM5S-LCD
: KING-METER ELECTRIC CO., LTD
: 11 HONGLIANG ROAD, HONGLIANG INDUSTRIAL ZONE,
DONGLI DISTRICT, TIANJIN, CHINA
: KING-METER ELECTRIC CO., LTD
: 11 HONGLIANG ROAD, HONGLIANG INDUSTRIAL ZONE,
DONGLI DISTRICT, TIANJIN, CHINA
: EN 55022: 2010
EN 55024: 2010
(EN 61000-4-2: 2009, EN 61000-4-3: 2006+A1:2009, EN 61000-4-4:
2004+A1: 2010, EN 61000-4-5: 2006, EN 61000-4-6: 2009)
Report Number
Date of Test
Deviation
Condition of Test Sample
: GSI130103033001
: January 03, 2013 to January 10, 2013
: None
: Normal
The product described above is tested by Shenzhen Emtek Co., Ltd. The measurement results are contained in
this test report and Shenzhen Emtek Co., Ltd assume full responsibility for the accuracy of the test results.
Also, this report shows that the EUT (Equipment Under Test) technically complies with the council the EMC
Directive 2004/108/EC requirements.
The test report is valid for above tested sample only and shall not be reproduced in part without written
approval of Shenzhen GSI Technology Co., Ltd.
Prepared by :
(John)
Approved & Authorized Signer:
(Morris)
5. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 5 of 40
1. GENERAL INFORMATION
1.1 Description of Device (EUT)
Applicant
Manufacturer
Report Number
Date of Test
Equipment under Test
Model Number
Power Supply
Test Voltage
Type of Test
Technical Standards
: KING-METER ELECTRIC CO., LTD
: KING-METER ELECTRIC CO., LTD
: GSI130103033001
: January 03, 2013 to January 10, 2013
: DISPLAY
: KM5S-LCD
: DC 36V
: DC 36V
: EMC Directive 2004/108/EC for CE Marking
: EN 55022: 2010
EN 55024: 2010
(EN 61000-4-2: 2009, EN 61000-4-3: 2006+A1:2009, EN 61000-4-4:
2004+A1: 2010, EN 61000-4-5: 2006, EN 61000-4-6: 2009)
Frequency Range
(EN55022)
Test Site
: 150 kHz to 30MHz for Line Conducted Test
30MHz to 1000MHz for Radiated Emission Measurement.
: Shenzhen Emtek Co., Ltd
Bldg. 69, Majialong, Taipinyang Industry Zone, Nanshan District,
Shenzhen, Guandong
6. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 6 of 40
1.2 Test Facility
Description: There is one 3m semi-anechoic chamber(966) test sites and one line
conducted labs for final test.
There is one 3m semi-anechoic and the Line Conducted labs are
constructed and calibrated to meet the FCC requirements in
documents ANSI C63.4: 2009 and EN 55022 requirements.
Site Filing: A site description is on file with the Federal Communications
Commission, 7435 Oakland Mills Road, Columbia, MD 21046.
Site Accreditation: Accredited by CNAS, 2012
Accredited by TUV. 2012
Instrument Tolerance: All measuring equipment is in accord with ANSI C63.4 and
EN55022 requirements that meet industry regulatory agency and
accreditation agency requirement.
Ground Plane: Two conductive reference ground planes were used during the Line Conducted
Emission, one in vertical and the other in horizontal. The dimensions of these ground planes are
as below. The vertical ground plane was placed distancing 40 cm to the rear of the wooden test
table on where the EUT and the support equipment were placed during test. The horizontal
ground plane projected 50 cm beyond the footprint of the EUT system and distanced 80 cm to the
wooden test table. For Radiated Emission Test, one horizontal conductive ground plane extended
at least 1m beyond the periphery of the EUT and the largest measuring antenna, and covered the
entire area between the EUT and the antenna. It has no holes or gaps having longitudinal
dimensions larger than one-tenth of a wavelength at the highest frequency of measurement up to
1GHz.
7. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 7 of 40
2. TEST INSTRUMENT USED
2.1 For Conducted Emission Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 EMI Test Receiver
ROHDE&
SCHWARZ
ESCS30 100343 11-8-2012 11-8-2013
2 LISN AFJ LS16 16010222119 11-8-2012 11-8-2013
2.2 For Radiated Emission Measurement
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 Spectrum Analyzer ANRITSU MS2661C 6200140915 11-8-2012 11-8-2013
2 Test Receiver Rohde & Schwarz ESCS30 828985/018 11-8-2012 11-8-2013
3 Bilog Antenna Schwarzbeck VULB9163 142 11-8-2012 11-8-2013
4 50 Coaxial Switch Anritsu Corp MP59B 6100237248 11-8-2012 11-8-2013
5 Cable Schwarzbeck
AK9513(1
m)
CR RX2 11-8-2012 11-8-2013
6 Spectrum Analyzer ANRITSU MS2661C 6200140915 11-8-2012 11-8-2013
7 Test Receiver Rohde & Schwarz ESCS30 828985/018 11-8-2012 11-8-2013
2.3 For Harmonic & Flicker Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1
Power Frequency
System
HAEFELY PHF555 080419-03 11-8-2012 11-8-2013
2.4 For Electrostatic Discharge Immunity Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1
HAEFELY ESD
TESTER
EM Test PESD 1600 302105 11-8-2012 11-8-2013
8. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 8 of 40
2.5 For RF EM Field Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 Signal Generator Maconi 2022D 119246/003 11-8-2012 11-8-2013
2 Power Amplifier M2S
A00181/
1000
9801-112 11-8-2012 11-8-2013
3 Power Amplifier M2S
AC8113
/800-25
0A
9801-179 11-8-2012 11-8-2013
4 Power Antenna SCHAFFNER
CBL614
0A
1240 11-8-2012 11-8-2013
2.6 For Electrical Fast Transient /Burst Immunity Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1
Fast
Transients/Burst
Generator
SCHAFFNER
Modula
6000
34354 11-8-2012 11-8-2013
2.7 For Surge Immunity Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 Surge Tester HAEFELY
PSURGE4.
1
080107-04 11-8-2012 11-8-2013
2.8 For Injected Current Susceptibility Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 Simulator EMTEST CWS500C 0900-12 11-8-2012 11-8-2013
2 CDN EMTEST CDN-M2 5100100100 11-8-2012 11-8-2013
3 CDN EMTEST CDN-M3 0900-11 11-8-2012 11-8-2013
4 Injection Clamp EMTEST
F-2031-23
MM
368 11-8-2012 11-8-2013
5 Attenuator EMTEST ATT6 0010222A 11-8-2012 11-8-2013
9. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 9 of 40
2.9 For Voltage Dips and Interruptions Test
Item Test Equipment Manufacturer Model No Serial NO. Cal.Date Due bate
1 Dips Tester HAEFELY Pline1610 083732-12 11-8-2012 11-8-2013
10. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 10 of 40
3. POWER LINE CONDUCTED EMISSION TEST
3.1 Block Diagram of Test Setup
3.2 Test Standard
EN 55022: 2010
3.3 Power Line Conducted Emission Limit
Limits dB(μV)Frequency
MHz Quasi-peak Level Average Level
0.15 ~ 0.50 66 ~ 56* 56 ~ 46*
0.50 ~ 5.00 56 46
5.00 ~ 30.00 60 50
Notes: 1. *Decreasing linearly with logarithm of frequency.
2. The lower limit shall apply at the transition frequencies.
3.4 EUT Configuration on Test
The equipments are installed on conducted emission test to meet EN 55022 requirement and operating
in a manner which tends to maximize its emission characteristics in a normal application.
3.5 Operating Condition of EUT
3.5.1 Setup the EUT and simulators as shown in Section 3.1.
3.5.2 Turn on the power of all equipments.
3.5.3 Let the EUT work in test mode and test it.
3.6 Test Procedure
The EUT is put on the ground and connected to the DC mains through a Artificial Mains Network
(AMN). This provided a 50ohm coupling impedance for the tested equipments. Both sides of AC line
are checked to find out the maximum conducted emission levels according to the EN55022
regulations during conducted emission test.
The bandwidth of the test receiver is set at 9KHz.
The frequency range from 150 KHz to 30 MHz is investigated.
The test results are listed in Section 3.7 and the scanning waveforms of the test mode are attached
within Appendix I.
DC Mains
L.I.S.N
Test Receiver
EUT
11. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 11 of 40
3.7 Power Line Conducted Emission Test Results
PASS.
The frequency range 150KHz to 30MHz is investigated.
Please refer to Appendix I.
12. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 12 of 40
4. RADIATED EMISSION MEASUREMENT
4.1 Block Diagram of Test
4.1.1 Block diagram of connection between the EUT and simulators
DC Mains
4.1.2 Anechoic Chamber Test Setup Diagram
4.2 Radiated Emission Limit
Limits:
All emanations from a class B device or system, including any network of conductors and apparatus
connected thereto, shall not exceed the level of field strengths specified below:
FREQUENCY DISTANCE FIELD STRENGTHS LIMIT
(MHz) (Meters) (dBμV/m)
30 ~ 230 3 40
230 ~ 1000 3 47
Note: (1) The smaller limit shall apply at the combination point between two frequency bands.
(2) Distance refers to the distance in meters between the measuring instrument antenna and
the closed point of any part of the EUT.
4.3 EUT Configuration on Measurement
The equipments are installed on Radiated Emission Measurement to meet the commission
requirements and operating regulations in a manner which tends to maximize its emission
characteristics in normal application.
1m to 4m
Spectrum
Analyzer
EUT
3m
0.8m
Turntable
Coaxial CableGround Plane
EUT
13. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 13 of 40
4.4 Operating Condition of EUT
4.4.1 Setup the EUT as shown in Section 4.1.
4.4.2 Let the EUT work in test mode and measure it.
4.5. Test Procedure
EUT and its simulators are placed on a turntable, which is 0.8 meter high above ground. The
turntable can rotate 360 degrees to determine the position of the maximum emission level. EUT is
set 3.0 meters away from the receiving antenna, which is mounted on a antenna tower. The antenna
can be moved up and down between 1.0 meter and 4 meters to find out the maximum emission level.
Broadband antenna (calibrated bilog antenna) is used as receiving antenna. Both horizontal and
vertical polarization of the antenna is set on measurement. In order to find the maximum emission
levels, all of the interface cables must be manipulated according to ANSI C63.4 on radiated
emission measurement.
The bandwidth of the EMI test receiver is set at 120KHz.
The frequency range from 30MHz to 1000MHz is checked.
All the test modes are tested and all the scanning waveforms are attached in Appendix II.
4.6 Radiated Emission Noise Measurement Result
PASS.
The frequency range from 30MHz to 1000MHz is investigated.
Please reference to Appendix II.
14. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 14 of 40
5. ELECTROSTATIC DISCHARGE IMMUNITY TEST
5.1 Block Diagram of Test Setup
5.1.1 Block Diagram of the EUT and the simulators
DC Mains
5.1.2 Test Setup
5.2 Test Standard
EN 55024: 2010,
(EN 61000-4-2: 2009 Severity Level: 3 / Air Discharge: ±8KV
Level: 2 / Contact Discharge: ±4KV)
5.3 Severity Levels and Performance Criterion
5.3.1 Severity level
Level Test Voltage
Contact Discharge (KV)
Test Voltage
Air Discharge (KV)
1. ±2 ±2
2. ±4 ±4
3. ±6 ±8
4. ±8 ±15
X Special Special
5.3.2 Performance criterion: B
5.4 EUT Configuration
The configurations of EUT is listed in Section 3.4.
5.5 Operating Condition of EUT
Same as conducted emission measurement, which is listed in Section 3.5 except the test set up was
replaced by Section 7.1.
EUT
AC Mains
ESD
Tester
0.8 m
EUT
15. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 15 of 40
5.6 Test Procedure
5.6.1 Air Discharge:
This test is done on a non-conductive surface. The round discharge tip of the discharge
electrode shall be approached as fast as possible to touch the EUT. After each discharge, the
discharge electrode shall be removed from the EUT. The generator is then re-triggered for a
new single discharge and repeated 10 times for each pre-selected test point. This procedure
shall be repeated until all the air discharge completed.
5.6.2 Contact Discharge:
All the procedure shall be same as Section 5.6.1. Except that the tip of the
discharge electrode shall touch the EUT before the discharge switch is operated.
5.6.3 Indirect discharge for horizontal coupling plane
At least 10 single discharges (in the most sensitive polarity) shall be applied at the front edge
of each HCP opposite the center point of each unit (if applicable) of the EUT and 0.1m from
the front of the EUT. The long axis of the discharge electrode shall be in the plane of the HCP
and perpendicular to its front edge during the discharge.
5.6.4 Indirect discharge for vertical coupling plane
At least 10 single discharges (in the most sensitive polarity) shall be applied to the center of
one vertical edge of the coupling plane. The coupling plane, of dimensions 0.5m X 0.5m, is
placed parallel to, and positioned at a distance of 0.1m from the EUT. Discharges shall be
applied to the coupling plane, with this plane in sufficient different positions that the four
faces of the EUT are completely illuminated.
5.7 Test Results
PASS.
Please refer to the following pages.
16. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 16 of 40
ELECTROSTATIC DISCHARGE TEST RESULTS
EUT : DISPLAY
Model Number : KM5S-LCD
Temperature : 25℃ Humidity : 50%
Air Discharge: ± 8KV
Contact Discharge: ± 4KV # For each point positive 10 times and negative 10 times discharge
Location
Kind
A-Air Discharge
C-Contact Discharge
Result
Metal shell C PASS
Screws C PASS
Ports C PASS
HCP C PASS
VCP of the front C PASS
VCP of the rear C PASS
VCP of the left C PASS
VCP of the right C PASS
Note:
Discharge should be considered on Contact and Air and Horizontal Coupling Plane (HCP) and Vertical
Coupling Plane (VCP).
17. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 17 of 40
6. RF EM FIELD TEST
6.1 Block Diagram of Test Setup
6.1.1 Block Diagram of the EUT and the simulators
DC Mains
6.1.2 R/S Test Setup
6.2 Test Standard
EN 55024: 2010 (EN 61000-4-3: 2006+A1: 2009, Severity Level: 2, 3V / m)
0.8m
Signal
Generator
EUT Monitoring by
using a camera
Control Room
7x4x3Chamber
EUT & Support
Units
PC Controller to
control S.G. & PA as
well as forward power
3 meter
1.5 meter
Power
Amplifier
EUT
18. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 18 of 40
6.3 Severity Levels and Performance Criterion
6.3.1 Severity level
Level Field Strength V/m
1 1
2 3
3 10
X Special
6.3.2 Performance criterion: A
6.4 EUT Configuration
The configurations of EUT are listed in Section 3.4.
6.5 Operating Condition of EUT
6.5.1 Setup the EUT as shown in Section 6.1.
6.5.2 Turn on the power of all equipments.
6.5.3 Let the EUT work in test modes and measure it.
6.6 Test Procedure
The EUT and its simulators are placed on a turn table which is 0.8 meter above ground. EUT is set 3
meter away from the transmitting antenna which is mounted on an antenna tower. Both horizontal
and vertical polarization of the antenna are set on test. Each of the four sides of EUT must be faced
this transmitting antenna and measured individually.
All the scanning conditions are as follows:
Condition of Test Remarks
----------------------------------------- ----------------------------------------
1. Fielded Strength 3 V/m (Severity Level 2)
2. Radiated Signal Modulated
3. Scanning Frequency 80 - 1000 MHz
4. Dwell time of radiated 0.0015 decade/s
5. Waiting Time 1 Sec.
6.7 Test Results
PASS.
Please refer to the following page.
19. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 19 of 40
RF EM FIELD TEST RESULTS
EUT : DISPLAY
Model Number : KM5S-LCD
Temperature : 25℃ Humidity : 50%
Modulation: AM 1KHz 80%
Frequency Rang: 80-1000MHz
Steps 1 %
Horizontal Vertical
Front PASS PASS
Right PASS PASS
Rear PASS PASS
Left PASS PASS
Note:
20. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 20 of 40
7. ELECTRICAL FAST TRANSIENT/BURST IMMUNITY
TEST
7.1 Block Diagram of Test Setup
7.1.1 Block Diagram of the EUT
DC Mains
7.1.2 Block Diagram of the AC Mains
7.2 Test Standard
EN 55024: 2010 (EN 61000-4-4: 2004+A1: 2010, Severity Level, Level 2: 1KV )
7.3 Severity Levels and Performance Criterion
7.3.1 Severity level
7.3.2 Performance criterion: B
7.4 EUT Configuration
The configurations of EUT are listed in Section 3.4.
7.5 Operating Condition of EUT
7.5.1 Setup the EUT as shown in Section 7.1.
7.5.2 Turn on the power of all equipments.
7.5.3 Let the EUT work in test modes and measure it.
Open Circuit Output Test Voltage ± 10%
Level On Power Supply Lines On I/O (Input/Output) Signal data
and control lines
1 0.50 KV 0.25 KV
2 1.00KV 0.50 KV
3 2.00KV 1.00KV
4 4.00KV 2.00 KV
X Special Special
0.1m DC Mains
EUT EFT/B Tester
EUT
21. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 21 of 40
7.6 Test Procedure
The EUT is put on the table which is 0.8 meter high above the ground. This reference ground plane
shall project beyond the EUT by at least 0.1m on all sides and the minimum distance between EUT
and all other conductive structure, except the ground plane beneath the EUT, shall be more than
0.5m.
7.6.1 For input and output AC power ports:
It’s unnecessary to test.
7.6.2 For signal lines ports:
It’s unnecessary to test.
7.6.3 For DC ports:
The EUT is connected to the power mains by using a coupling device which couples the EFT
interference signal to DC power lines. Both polarities of the test voltage should be applied
during compliance test and the duration of the test is 2 mins.
7.7 Test Result
PASS.
Please refer to the following pages
22. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 22 of 40
ELECTRICAL FAST TRANSIENT/BURST TEST RESULTS
Standard : EN 61000-4-4 Result : PASS / FAIL
EUT : DISPLAY
Model Number : KM5S-LCD
Temperature : 25℃ Humidity: 50%
Line : DC Mains Line : Signal line
Coupling : Direct Coupling : Capacitive
Test Time : 120s
Line Test Voltage Result(+) Result(-)
L
N
PE
L、N
L、PE
N、PE
L、N、PE
Signal line
DC line 1KV PASS PASS
Note:
23. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 23 of 40
8. SURGE IMMUNITY TEST
8.1 Block Diagram of Test Setup
8.1.1 Block Diagram of the EUT
DC Mains
8.1.2 Surge Test Setup
8.2 Test Standard
EN 55024: 2010 (EN 61000-4-5: 2006)
Severity Level: Line to Line: Level 1, 0.5KV
8.3 Severity Levels and Performance Criterion
8.3.1 Severity level
Severity Level Open-Circuit Test Voltage
KV
1
2
3
4
*
0.5
1.0
2.0
4.0
Special
8.3.2 Performance criterion: B
8.4 EUT Configuration
The configuration of EUT is listed in Section 3.3.
0.8 m AC Mains
EUT
DC Mains
Surge Tester
EUT
24. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 24 of 40
8.5 Operating Condition of EUT
8.5.1 Setup the EUT as shown in Section 8.1.
8.5.2 Turn on the power of all equipments.
8.5.3 Let the EUT work in test mode and measure it.
8.6 Test Procedure
8.6.1 Set up the EUT and test generator as shown on Section 8.1.2.
8.6.2 For line to line coupling mode, provide a 0.5 KV 1.2/50us voltage surge
(at open-circuit condition) and 8/20us current surge to EUT selected points.
8.6.3 At least 5 positive and 5 negative (polarity) tests with a maximum 1/min repetition rate are
conducted during test.
8.6.4 Different phase angles are done individually.
8.6.5 Record the EUT operating situation during compliance test and decide the EUT immunity
criterion for above each test.
8.7 Test Result
PASS.
Please refer to the following page.
25. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 25 of 40
SURGE IMMUNITY TEST RESULT
EUT : DISPLAY
Model Number : KM5S-LCD
Temperature : 22℃ Humidity : 50%
Location Polarity Phase Angle Number of
Pulse
Pulse Voltage (KV) Result
Line+ to Line- + 0o
5 0.5 PASS
- 0o
5 0.5 PASS
L-PE
N-PE
Remark: Test Equipment :
Surge Tester Psurge4.1
26. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 26 of 40
9. INJECTED CURRENTS SUSCEPTIBILITY TEST
9.1 Block Diagram of Test Setup
9.1.1 Block Diagram of the EUT
9.1.2 Block Diagram of Test Setup
9.2 Test Standard
EN 55024: 2010
(EN 61000-4-6: 2009, Severity Level: Level 2, 3V (rms), (0.15MHz ~ 80MHz)
9.3 Severity Levels and Performance Criterion
9.3.1 Severity level
9.3.2 Performance criterion: A
9.4 EUT Configuration
The configuration of EUT is listed in Section 3.3.
Level Field Strength V
1 1
2 3
3 10
X Special
Ground Reference Support
EUT
CDN DC Mains
Signal
Generator
Power
Amplifier
0.1 m
DC Mains
EUT
27. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 27 of 40
9.5 Operating Condition of EUT
9.5.1 Setup the EUT as shown in Section 9.1.
9.5.2 Turn on the power of all equipments.
9.5.3 Let the EUT work in test mode and measure it.
9.6 Test Procedure
9.6.1 Set up the EUT, CDN and test generators as shown on Section 9.1.2.
9.6.2 Let the EUT work in test mode and measure it.
9.6.3 The EUT are placed on an insulating support 0.1m high above a ground reference plane.
CDN (coupling and decoupling device) is placed on the ground plane about 0.3m from
EUT. Cables between CDN and EUT are as short as possible, and their height above the
ground reference plane shall be between 30 and 50 mm (where possible).
9.6.4 The disturbance signal described below is injected to EUT through CDN.
9.6.5 The EUT operates within its operational mode(s) under intended climatic conditions after
power on.
9.6.6 The frequency range is swept from 150KHz to80MHz using 3V signal level, and with the
disturbance signal 80% amplitude modulated with a 1KHz sine wave.
9.6.7 The rate of sweep shall not exceed 1.5*10-3decades/s. Where the frequency is swept
incrementally, the step size shall not exceed 1% of the start and thereafter 1% of the
preceding frequency value.
9.6.8 Recording the EUT operating situation during compliance testing and decide the EUT
immunity criterion.
9.7Test Results
PASS.
Please refer to the following page.
28. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 28 of 40
INJECTED CURRENTS SUSCEPTIBILITY TEST RESULTS
EUT : DISPLAY
Model Number : KM5S-LCD
Temperature : 22℃ Humidity : 50%
Frequency Range
(MHz)
Injected Position Strength
(Unmodulated)
Criterion Result
0.15 ~ 80 DC Mains 3V A PASS
Test Mode:
Frequency Range
(MHz)
Injected Position Strength
(Unmodulated)
Criterion Result
Remark : 1. Modulation Signal:1KHz 80% AM
Measurement Equipment :
Simulator: CWS 500 (SWITZERLAND EMTEST)
CDN : CDN-M2 (SWITZERLAND EMTEST)
CDN-M3 (SWITZERLAND EMTEST)
Note:
29. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 29 of 40
10.MAGNETIC FIELD SUSCEPTIBILITY TEST
10.1 Block Diagram of Test
10.1.1 Block diagram of test setup
10.1.2 Magnetic field test setup
10.2 Test Standard
EN 55024: 2010 (EN 61000-4-8: 2010, Severity Level: Level 1, 1A / m)
10.3 Severity Levels and Performance Criterion
10.3.1 Severity Levels
Level Field Strength A/m
1 1
2 3
3 10
4 30
5 100
X Special
10.3.2 Performance Criterion: A
10.4 EUT Configuration on Test
The configuration of the EUT is same as Section 3.3.
Ground Reference Support
EUT
AC Mains0.1 m
Magnetic Field
Tester
AC
Transformer
Wood
Induction Coil
DC Mains
EUT
30. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 30 of 40
10.5 Test Procedure
The EUT is placed in the middle of a induction coil (1*1m), under which is a 1*1*0.1m (high)
table, this small table is also placed on a larger table, 0.8 m above the ground. The X, Y and Z
polarization of the induction coil is set on test, so that each side of the EUT is affected by the
magnetic field. Also can reach the same aim by change the position of the EUT.
10.6 Test Results
Note: Not applicant, because no any component can be influenced by power magnetic field.
31. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 31 of 40
APPENDIX I
32. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 32 of 40
Test Mode: On
33. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 33 of 40
Test Mode: On
34. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 34 of 40
APPENDIX II
35. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 35 of 40
Test Mode: On
36. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 36 of 40
Test Mode: On
37. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 37 of 40
APPENDIX III
(PHOTOS OF EUT)
38. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 38 of 40
39. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 39 of 40
40. Shenzhen GSI Technology Co., Ltd
Report No: GSI130103033001 Date of Issue: January 10, 2013
Page 40 of 40