                                 Working in the Construction Field

       The Contractor/Construction career field has been a vital part in the development of

infrastructure in cities and towns across the world all throughout history. The contractor is

responsible for supervising the construction project and seeing that everything gets done as the

owner wants in the appropriate time frame while staying at or under the budget if possible.

Though some do most people don’t start out as a construction manager, many get their start as a

construction tradesperson so they can get on the job training. The construction field is always

going to be a big part of any society, and requires time and training to make it to different

positions in the construction field.

       Someone that wants to be a construction manager doesn’t usually start out as a

construction manager. Many get their start working for a construction manager as a construction

tradesperson. Here they would work on the job constructing the buildings with the team and

getting experience on the job site. In order to work in the construction field, one needs to possess

a number of skills. A few attributes that are important to have to be a construction tradesperson

are to have good communication skills and work well as part of a team (Construction

Tradesperson). These skills are important because while on the job site one might be having to

shout out measurements to the other workers or just communicating about the build in general

and needs to be comfortable doing so. Along with that one needs to be physically fit and have

good hand-eye coordination (Construction Tradesperson). Almost always will someone working
Haynes 2


in the construction field be working outside in the weather, sometimes year-round, so it will be

essential that they are fit enough to work all day and be able to perform the tasks at hand. To

perform these tasks it is important that one also has the appropriate training.

       One of the best methods of training for the construction field is to get on the job training.

Occasionally a High School Diploma is all that is required to get into the field but more often

than not a construction license is required. An apprenticeship program or a tech college is great

means of learning about the field and getting prepared with all the necessary information to

become a construction tradesperson (Construction Tradesperson). With a career field such as

this, it would be very useful to get all the experience and knowledge possible so that one can be

ready for what the construction field throws at them. Schooling and on the job training will

familiarize one with the kind of tasks one would expect working on the job.

       Construction tradespersons or carpenters perform a wide range of tasks while on the job

depending on their branch of construction/carpentry. Construction or carpentry, work can be

divided into two categories—rough carpentry and finish carpentry. Rough carpenters often work

outdoors where they begin projects using unfinished wood and other building materials. They

frame houses, build scaffolding, and make forms to be filled with concrete. Forms are used to

mold concrete for bridges, highways, and house foundations. Finish carpenters include those

who cut and fit doors, windows, and interior molding. They also build and install cabinets, lay

hardwood floors, and panel rooms (Carpenter). A construction worker needs to be comfortable

working with power tools and possess an understanding of how to read blueprints because these

tasks make up much of what one would do in this field. Once one gets lots of experience in

working as a construction tradesperson they will be more than ready to begin training to be the

head of crew as a construction manager.
Haynes 3


       Typically once one gets lots of experience as a construction tradesperson they will begin

the proper training needed to become a construction manager. In order to become a construction

manager or contractor, it is almost required that one goes to college. While a bachelor’s degree in

civil engineering or a related field is often required, some do though enter the field after years of

experience in one of the construction trades, while others have an associate degree in

construction management or civil engineering technology (Construction Manager). Going to

college is important because all the skills and knowledge needed to be a contractor can’t be

learned on the job. Much of it requires taking programs to learn it. Many colleges and

universities offer 4-year degree programs in construction management, construction science, and

construction engineering. These programs include courses in project control and development,

site planning, design, and construction methods and materials. Business and financial

management programs are needed because being a contractor is a business that one needs to

know how to run (College Grad-Construction). One also needs to know building codes and

standards as well as inspection procedures to see that the structures get built correctly.

Contractors are the head of the building crew and it is important that they have the appropriate

training to manage the crew and have a successful business. Through these programs one can

acquire attributes and abilities that will be very helpful as a contractor.

       Contractors need to possess certain attributes and abilities to be able to perform their job

at the highest level. Some abilities come natural to people while others can be picked up through

training and schooling. The typical contractor needs to have good communication skills and

work well as part of a team (Construction Manager). These are important because the contractor

is the head of the crew and needs to be able to communicate with his workers and see that the

structure gets built properly. Other abilities are being detail-oriented and organized, as well as
Haynes 4


encompassing problem-solving skills (Construction Manager). Organization is very important

because the contractor is in charge of blue-prints and many documents pertaining to the job and

it’s vital to not lose them. Contractors need to have good problem-solving skills because more

often than not they will run into a problem with the design of the structure and they need to be

able to come up with a quick solution so that not too much time is lost, while keeping the

integrity of the design. Once a contractor harnesses these attributes, they will be more than ready

to perform their everyday tasks while on the job.

       Construction managers coordinate and supervise the construction process from the

conceptual development stage through final construction, making sure that the project gets

completed on time and within budget (Construction Managers-BLS). Some of the core tasks that

contractors perform during the beginning process of a build are meeting with clients, architects,

and engineers to plan the build and create a schedule (Construction Manager). The contractor

needs to meet with these people because the contractor is going to be the one in charge of the

construction of the structure and ultimately the finishing of it, so they need to make sure the

blueprints for the structure meet code and that the contractor’s crew will be able to finish the

project within schedule. Finally the contractor will calculate materials and labor needed for the

build, create a budget, and then track spending. The contractor will buy construction materials,

arrange equipment rentals, hire trades-people and lastly supervise the jobsite to ensure work is

being done right and to keep everyone on schedule (Construction Manager). Therefore the

contractor has a ton of responsibility on them from the beginning to the end of the job.

       Multiple factors can play into how much money a contractor makes. Most contractors

earn between $50,000 and $150,000 a year with a median of $84,000 a year. The salary of

contractors depends on how much experience they have, how many projects they have at a time,
Haynes 5


the size of those projects and how well the economy is doing (Construction Managers). The

location of the projects can also affect the salary of contractors because if one is building in more

expensive areas of the country they can ultimately make more money off the builds. Therefore

the salary of contractors depends greatly on multiple scenarios, mainly though the economy and

how high the demand is for contractors.

       The employment opportunities for contractors through 2014 are excellent because the

number of job openings will exceed the number of qualified individuals seeking to enter the

construction field (College Grad-Construction). The construction of 1,000 single-family homes

generates 2,448 jobs in construction and construction-related industries and as the economy gets

better the demand for more homes will go up increasing the need for workers and thus creating

jobs (About the Home). Therefore someone looking for a career in the construction field as a

contractor should not be apprehensive about it because the job outlook for the future looks good.

       Anytime someone goes outside they are sure to see the work of a construction worker

somewhere around them. Construction is one of the most important parts of the development of

cities and towns across the world. Homes and buildings everywhere would be almost non-

existent without construction and the construction workers. With the many opportunities in the

construction field and the great out-look for it, the construction field is a very important aspect of

infrastructure and will always be the reason for the structures everyone sees each day.
Haynes 6


                                          Works Cited

“About the Home Building Industry.” Home Builders Institute. N.p., 2006. Web. 16 Sept. 2011.

       <http://www.hbi.org/page.cfm?pageID=54>

“Carpenter.” 2007. Career Information Center. 9th ed. Vol. 4. N.p.: n.p., n.d. 34-36. 13 vols.

       Gale Virtual Reference Library. Web. 16 Sept. 2011. <http://go.galegroup.com/ps/

       i.do?&id=GALE%7CCX2586800273&v=2.1&u=cant48040&it=r&p=GVRL&sw=w>

“Construction Manager.” Career Cruising. N.p., n.d. Web. 15 Sept. 2011.

       <http://www.careercruising.com/Careers/JobDetails.aspx?LoginID=948d6e06-d292-

       4220-8fe3-3c538fae4536-&OccNumber=65&Language=English>

“Construction Managers.” College Grad. N.p., 2011. Web. 16 Sept. 2011.

       <http://www.collegegrad.com/careers/manag06.shtml>

“Construction Managers.” Occupational Outlook Handbook. 2010-2011 Edition ed. N.p.: n.p.,

       n.d. N. pag. Bureau of Labor Statistics. Web. 15 Sept. 2011. <http://www.bls.gov/oco/

       ocos005.htm>

“Construction Tradesperson.” Career Cruising. N.p., n.d. Web. 16 Sept. 2011.

       <http://www.careercruising.com/Careers/JobDetails.aspx?LoginID=5cc13f4d-4c44-

       49d9-8fa5-51b198aed67b-&OccNumber=113&field=AtaGlance>

Jonathan's Senior Project Research Paper

  • 1.
    Haynes 1 Jonathan Haynes Ms.Tillery British Literature 28 October 2011 Working in the Construction Field The Contractor/Construction career field has been a vital part in the development of infrastructure in cities and towns across the world all throughout history. The contractor is responsible for supervising the construction project and seeing that everything gets done as the owner wants in the appropriate time frame while staying at or under the budget if possible. Though some do most people don’t start out as a construction manager, many get their start as a construction tradesperson so they can get on the job training. The construction field is always going to be a big part of any society, and requires time and training to make it to different positions in the construction field. Someone that wants to be a construction manager doesn’t usually start out as a construction manager. Many get their start working for a construction manager as a construction tradesperson. Here they would work on the job constructing the buildings with the team and getting experience on the job site. In order to work in the construction field, one needs to possess a number of skills. A few attributes that are important to have to be a construction tradesperson are to have good communication skills and work well as part of a team (Construction Tradesperson). These skills are important because while on the job site one might be having to shout out measurements to the other workers or just communicating about the build in general and needs to be comfortable doing so. Along with that one needs to be physically fit and have good hand-eye coordination (Construction Tradesperson). Almost always will someone working
  • 2.
    Haynes 2 in theconstruction field be working outside in the weather, sometimes year-round, so it will be essential that they are fit enough to work all day and be able to perform the tasks at hand. To perform these tasks it is important that one also has the appropriate training. One of the best methods of training for the construction field is to get on the job training. Occasionally a High School Diploma is all that is required to get into the field but more often than not a construction license is required. An apprenticeship program or a tech college is great means of learning about the field and getting prepared with all the necessary information to become a construction tradesperson (Construction Tradesperson). With a career field such as this, it would be very useful to get all the experience and knowledge possible so that one can be ready for what the construction field throws at them. Schooling and on the job training will familiarize one with the kind of tasks one would expect working on the job. Construction tradespersons or carpenters perform a wide range of tasks while on the job depending on their branch of construction/carpentry. Construction or carpentry, work can be divided into two categories—rough carpentry and finish carpentry. Rough carpenters often work outdoors where they begin projects using unfinished wood and other building materials. They frame houses, build scaffolding, and make forms to be filled with concrete. Forms are used to mold concrete for bridges, highways, and house foundations. Finish carpenters include those who cut and fit doors, windows, and interior molding. They also build and install cabinets, lay hardwood floors, and panel rooms (Carpenter). A construction worker needs to be comfortable working with power tools and possess an understanding of how to read blueprints because these tasks make up much of what one would do in this field. Once one gets lots of experience in working as a construction tradesperson they will be more than ready to begin training to be the head of crew as a construction manager.
  • 3.
    Haynes 3 Typically once one gets lots of experience as a construction tradesperson they will begin the proper training needed to become a construction manager. In order to become a construction manager or contractor, it is almost required that one goes to college. While a bachelor’s degree in civil engineering or a related field is often required, some do though enter the field after years of experience in one of the construction trades, while others have an associate degree in construction management or civil engineering technology (Construction Manager). Going to college is important because all the skills and knowledge needed to be a contractor can’t be learned on the job. Much of it requires taking programs to learn it. Many colleges and universities offer 4-year degree programs in construction management, construction science, and construction engineering. These programs include courses in project control and development, site planning, design, and construction methods and materials. Business and financial management programs are needed because being a contractor is a business that one needs to know how to run (College Grad-Construction). One also needs to know building codes and standards as well as inspection procedures to see that the structures get built correctly. Contractors are the head of the building crew and it is important that they have the appropriate training to manage the crew and have a successful business. Through these programs one can acquire attributes and abilities that will be very helpful as a contractor. Contractors need to possess certain attributes and abilities to be able to perform their job at the highest level. Some abilities come natural to people while others can be picked up through training and schooling. The typical contractor needs to have good communication skills and work well as part of a team (Construction Manager). These are important because the contractor is the head of the crew and needs to be able to communicate with his workers and see that the structure gets built properly. Other abilities are being detail-oriented and organized, as well as
  • 4.
    Haynes 4 encompassing problem-solvingskills (Construction Manager). Organization is very important because the contractor is in charge of blue-prints and many documents pertaining to the job and it’s vital to not lose them. Contractors need to have good problem-solving skills because more often than not they will run into a problem with the design of the structure and they need to be able to come up with a quick solution so that not too much time is lost, while keeping the integrity of the design. Once a contractor harnesses these attributes, they will be more than ready to perform their everyday tasks while on the job. Construction managers coordinate and supervise the construction process from the conceptual development stage through final construction, making sure that the project gets completed on time and within budget (Construction Managers-BLS). Some of the core tasks that contractors perform during the beginning process of a build are meeting with clients, architects, and engineers to plan the build and create a schedule (Construction Manager). The contractor needs to meet with these people because the contractor is going to be the one in charge of the construction of the structure and ultimately the finishing of it, so they need to make sure the blueprints for the structure meet code and that the contractor’s crew will be able to finish the project within schedule. Finally the contractor will calculate materials and labor needed for the build, create a budget, and then track spending. The contractor will buy construction materials, arrange equipment rentals, hire trades-people and lastly supervise the jobsite to ensure work is being done right and to keep everyone on schedule (Construction Manager). Therefore the contractor has a ton of responsibility on them from the beginning to the end of the job. Multiple factors can play into how much money a contractor makes. Most contractors earn between $50,000 and $150,000 a year with a median of $84,000 a year. The salary of contractors depends on how much experience they have, how many projects they have at a time,
  • 5.
    Haynes 5 the sizeof those projects and how well the economy is doing (Construction Managers). The location of the projects can also affect the salary of contractors because if one is building in more expensive areas of the country they can ultimately make more money off the builds. Therefore the salary of contractors depends greatly on multiple scenarios, mainly though the economy and how high the demand is for contractors. The employment opportunities for contractors through 2014 are excellent because the number of job openings will exceed the number of qualified individuals seeking to enter the construction field (College Grad-Construction). The construction of 1,000 single-family homes generates 2,448 jobs in construction and construction-related industries and as the economy gets better the demand for more homes will go up increasing the need for workers and thus creating jobs (About the Home). Therefore someone looking for a career in the construction field as a contractor should not be apprehensive about it because the job outlook for the future looks good. Anytime someone goes outside they are sure to see the work of a construction worker somewhere around them. Construction is one of the most important parts of the development of cities and towns across the world. Homes and buildings everywhere would be almost non- existent without construction and the construction workers. With the many opportunities in the construction field and the great out-look for it, the construction field is a very important aspect of infrastructure and will always be the reason for the structures everyone sees each day.
  • 6.
    Haynes 6 Works Cited “About the Home Building Industry.” Home Builders Institute. N.p., 2006. Web. 16 Sept. 2011. <http://www.hbi.org/page.cfm?pageID=54> “Carpenter.” 2007. Career Information Center. 9th ed. Vol. 4. N.p.: n.p., n.d. 34-36. 13 vols. Gale Virtual Reference Library. Web. 16 Sept. 2011. <http://go.galegroup.com/ps/ i.do?&id=GALE%7CCX2586800273&v=2.1&u=cant48040&it=r&p=GVRL&sw=w> “Construction Manager.” Career Cruising. N.p., n.d. Web. 15 Sept. 2011. <http://www.careercruising.com/Careers/JobDetails.aspx?LoginID=948d6e06-d292- 4220-8fe3-3c538fae4536-&OccNumber=65&Language=English> “Construction Managers.” College Grad. N.p., 2011. Web. 16 Sept. 2011. <http://www.collegegrad.com/careers/manag06.shtml> “Construction Managers.” Occupational Outlook Handbook. 2010-2011 Edition ed. N.p.: n.p., n.d. N. pag. Bureau of Labor Statistics. Web. 15 Sept. 2011. <http://www.bls.gov/oco/ ocos005.htm> “Construction Tradesperson.” Career Cruising. N.p., n.d. Web. 16 Sept. 2011. <http://www.careercruising.com/Careers/JobDetails.aspx?LoginID=5cc13f4d-4c44- 49d9-8fa5-51b198aed67b-&OccNumber=113&field=AtaGlance>