JLL REAL VALUE METHOD: CHANGE ORDERS
JLL’S VALUE PROPOSITION FOR CHANGE ORDERS
Given the increasing technical and management complexities of building development projects, it has become
clear that delivering consistent expertise in a manner that is transparent and measurable is a major challenge. The
JLL Real Value Method brings an updated value proposition to the change order management process which
reflects forward thinking and approaches that have become more common in product delivery in high-skilled,
knowledge-based industries including aerospace (at NASA), healthcare, and real estate project management.
These methods—especially those outlined by Atul Gawande, a Harvard Medical School surgeon and MacArthur
Foundation “genius prize” recipient, in his acclaimed text Checklist Manifesto—have been adapted to the best
practices, experience and knowledge of JLL to produce a guide for project managers on development projects with
high change order volume. The JLL method promises the following value proposition:
Offer demonstrable value (quantified value and/or tangible value)
Present audit-style review, explanations, and clarity that stand on their own
Understand source of change order and apply knowledge to minimize future changes
Calculate and confirm rates, hours, and material billings
Give client confidence in the change order review process and JLL interpretation of changes
Expedite change order review with use of checklists and automated calculation templates
STEP 1: VENDOR CONTRACT KNOWLEDGE
Before reviewing change orders for a vendor it is important to familiarize yourself with the key terms in the
contract documentation, particularly those terms that relate to changes, schedule, and scope. The traditional
review process involves simply becoming knowledgeable of the terms in this documentation. The problem with the
traditional method is that after review tens of change orders over several months, the recall of specific detailed
language often becomes hazy. Even frequent reference of the contract documentation leaves a high potential for
missing key language that could be useful in responding to change orders.
The JLL Real Value method, however, follows a check-list routine whereby the project managers prepare a
checklist of the most important contractual terms for a vendor typically involved in change order processing. This
check-list is categorized by terms relating to (1) changes, (2) schedule, and (3) scope. The likely contract documents
to source terms from include: the CM agreement, the 3A pages, Form 36 pages, specifications, and closing notes.
Noting the source and article number/letter of the term in the checklist is necessary. This checklist typically should
not be more than 3 pages total.
Once a project manager has put together a summary check-list of terms for a vendor, that sheet should be used to
review each change order. Any pertinent terms informing the decision on a change order should be cited in a sheet
attached to the final reviewed change order with Key References. Terms can quickly be copied and pasted from
the checklist to this final review sheet.
Jones Lang LaSalle | Real Value in a Changing World
2
BENEFITS
Less likelihood of project manager over-looking or forgetting relevant contract knowledge when reviewing a
change order.
The client has tangible documentation that demonstrates that project managers have in fact carefully
reviewed and considered specific contract terms.
Final change order decisions appear less arbitrary
It is much easier for project managers to negotiate change orders when they can immediately cite the contract
language that informed their decision-making process.
Figure 1: Example of COR review checklist
STEP 2: COMPLETE THE CHANGE ORDER REVIEW SHEET
Every change order should have a change order review sheet with audit-style findings, a short description and
explanation of the rationale behind the decision. The Change Order Review Sheet (1 page max) should have the
following sections:
Change Order proposed cost vs. JLL recommended cost after review
Notes:
Jones Lang LaSalle | Real Value in a Changing World
3
o A one-sentence opinion on JLL recommended value for the change order;
o A one-sentence description of the change order request;
o 2-4 sentence description of the rationale behind the decision-making process, citing the guiding
contractual sources or highlighting any discrepancies.
o A one-sentence note on whether the rates and calculations are correct (and citing any errors if they
exist).
Key References—Copy and pasted abridged terms from the contract terms checklist OR the actual contract
documents if the guiding contract source was atypical and not listed in the checklist.
Sign-off—signature of project manager approving the change order review
Figure 2: Example of Change Order Review Sheet
Jones Lang LaSalle | Real Value in a Changing World
4
STEP 3: CREATE AN AUTOMATED RATES AND CALCULATION SPREADSHEET FOR A VENDOR
To further expedite the review process and reduce potential calculation errors, prepare a spreadsheet with
correct rates which can be used to quickly check calculations for change orders. Attach this document to the
Change Order Review Sheet to back up findings. Additionally, daily construction reports or other project
documents used to review the number of labor hours and the change proposal request should be attached as
back-up documentation to the change proposal.
Figure 3: Change Proposal Calculation Template
In the end, the Change Order Review Sheet, the Calculation Template, and other supporting documentation are
attached to the change order document as tangible back-up documentation and support for the decision.

More Related Content

What's hot

Training _ZK _Rev3_Final
Training _ZK _Rev3_FinalTraining _ZK _Rev3_Final
Training _ZK _Rev3_FinalZiad Khleif
 
Control procurement
Control procurement Control procurement
Control procurement Shereef Sabri
 
Project Management Definitions
Project Management DefinitionsProject Management Definitions
Project Management DefinitionsTURKI , PMP
 
Project Controls Processes
Project Controls ProcessesProject Controls Processes
Project Controls ProcessesPMA Consultants
 
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...Lisa Dehner
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntPMA Consultants
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012 Skript
 
Operations & engineering presentation to sales meeting
Operations & engineering presentation to sales meetingOperations & engineering presentation to sales meeting
Operations & engineering presentation to sales meetingmiketcampbell
 
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscmCSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscmEst
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsPMA Consultants
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan templateVivek Srivastava
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0Aditya Pandey
 
Project Management 2nd assignment
Project Management 2nd assignmentProject Management 2nd assignment
Project Management 2nd assignmentDanish Saqi
 

What's hot (20)

Project controls outlined
Project controls outlinedProject controls outlined
Project controls outlined
 
Changes in construction
Changes in constructionChanges in construction
Changes in construction
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
Training _ZK _Rev3_Final
Training _ZK _Rev3_FinalTraining _ZK _Rev3_Final
Training _ZK _Rev3_Final
 
Control procurement
Control procurement Control procurement
Control procurement
 
Tiffany
TiffanyTiffany
Tiffany
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Project Management Definitions
Project Management DefinitionsProject Management Definitions
Project Management Definitions
 
Project Controls Processes
Project Controls ProcessesProject Controls Processes
Project Controls Processes
 
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...VERTEX Construction Claim Visuals  - AACE Northeast Total Cost Management Sym...
VERTEX Construction Claim Visuals - AACE Northeast Total Cost Management Sym...
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons Learnt
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Operations & engineering presentation to sales meeting
Operations & engineering presentation to sales meetingOperations & engineering presentation to sales meeting
Operations & engineering presentation to sales meeting
 
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscmCSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project Controls
 
Cost management-plan template
Cost management-plan templateCost management-plan template
Cost management-plan template
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
Project Management 2nd assignment
Project Management 2nd assignmentProject Management 2nd assignment
Project Management 2nd assignment
 

Similar to JLL Change Order process

Fme procurement-plan-template
Fme procurement-plan-templateFme procurement-plan-template
Fme procurement-plan-templateMuhlis Çevik
 
PJM6125 Project Evaluation Change Control ProcessOverview and.docx
PJM6125 Project Evaluation Change Control ProcessOverview and.docxPJM6125 Project Evaluation Change Control ProcessOverview and.docx
PJM6125 Project Evaluation Change Control ProcessOverview and.docxstilliegeorgiana
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projectsSomashekar S.M
 
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThe Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThomas Tanel
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916George Wilkinson
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARYSoumya De
 
Рынок труда
Рынок трудаРынок труда
Рынок трудаEvgeniya
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTAlessandro Rinaldi
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Exampleharoldtaylor1113
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paperMuhammad Umar
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
The ultimate guide to cost management
The ultimate guide to cost managementThe ultimate guide to cost management
The ultimate guide to cost managementTim Kalbitzer
 
Eng hani saad - pmp course
Eng hani saad - pmp courseEng hani saad - pmp course
Eng hani saad - pmp courseHani Saad
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course LeaCicelyBourqueju
 
Project Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docxProject Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docxwoodruffeloisa
 
Contract management plan (4156v2)
Contract management plan (4156v2)Contract management plan (4156v2)
Contract management plan (4156v2)SPeters13
 

Similar to JLL Change Order process (20)

Change control and variations
Change control and variationsChange control and variations
Change control and variations
 
Fme procurement-plan-template
Fme procurement-plan-templateFme procurement-plan-template
Fme procurement-plan-template
 
PJM6125 Project Evaluation Change Control ProcessOverview and.docx
PJM6125 Project Evaluation Change Control ProcessOverview and.docxPJM6125 Project Evaluation Change Control ProcessOverview and.docx
PJM6125 Project Evaluation Change Control ProcessOverview and.docx
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projects
 
ECM BY KP - Copy
ECM BY KP - CopyECM BY KP - Copy
ECM BY KP - Copy
 
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThe Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARY
 
Рынок труда
Рынок трудаРынок труда
Рынок труда
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Example
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paper
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
Ch05
Ch05Ch05
Ch05
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
The ultimate guide to cost management
The ultimate guide to cost managementThe ultimate guide to cost management
The ultimate guide to cost management
 
Eng hani saad - pmp course
Eng hani saad - pmp courseEng hani saad - pmp course
Eng hani saad - pmp course
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course Lea
 
Project Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docxProject Management Plan TemplateThis Project Management Plan.docx
Project Management Plan TemplateThis Project Management Plan.docx
 
Contract management plan (4156v2)
Contract management plan (4156v2)Contract management plan (4156v2)
Contract management plan (4156v2)
 

JLL Change Order process

  • 1. Jones Lang LaSalle | Real Value in a Changing World 1 JLL REAL VALUE METHOD: CHANGE ORDERS JLL’S VALUE PROPOSITION FOR CHANGE ORDERS Given the increasing technical and management complexities of building development projects, it has become clear that delivering consistent expertise in a manner that is transparent and measurable is a major challenge. The JLL Real Value Method brings an updated value proposition to the change order management process which reflects forward thinking and approaches that have become more common in product delivery in high-skilled, knowledge-based industries including aerospace (at NASA), healthcare, and real estate project management. These methods—especially those outlined by Atul Gawande, a Harvard Medical School surgeon and MacArthur Foundation “genius prize” recipient, in his acclaimed text Checklist Manifesto—have been adapted to the best practices, experience and knowledge of JLL to produce a guide for project managers on development projects with high change order volume. The JLL method promises the following value proposition: Offer demonstrable value (quantified value and/or tangible value) Present audit-style review, explanations, and clarity that stand on their own Understand source of change order and apply knowledge to minimize future changes Calculate and confirm rates, hours, and material billings Give client confidence in the change order review process and JLL interpretation of changes Expedite change order review with use of checklists and automated calculation templates STEP 1: VENDOR CONTRACT KNOWLEDGE Before reviewing change orders for a vendor it is important to familiarize yourself with the key terms in the contract documentation, particularly those terms that relate to changes, schedule, and scope. The traditional review process involves simply becoming knowledgeable of the terms in this documentation. The problem with the traditional method is that after review tens of change orders over several months, the recall of specific detailed language often becomes hazy. Even frequent reference of the contract documentation leaves a high potential for missing key language that could be useful in responding to change orders. The JLL Real Value method, however, follows a check-list routine whereby the project managers prepare a checklist of the most important contractual terms for a vendor typically involved in change order processing. This check-list is categorized by terms relating to (1) changes, (2) schedule, and (3) scope. The likely contract documents to source terms from include: the CM agreement, the 3A pages, Form 36 pages, specifications, and closing notes. Noting the source and article number/letter of the term in the checklist is necessary. This checklist typically should not be more than 3 pages total. Once a project manager has put together a summary check-list of terms for a vendor, that sheet should be used to review each change order. Any pertinent terms informing the decision on a change order should be cited in a sheet attached to the final reviewed change order with Key References. Terms can quickly be copied and pasted from the checklist to this final review sheet.
  • 2. Jones Lang LaSalle | Real Value in a Changing World 2 BENEFITS Less likelihood of project manager over-looking or forgetting relevant contract knowledge when reviewing a change order. The client has tangible documentation that demonstrates that project managers have in fact carefully reviewed and considered specific contract terms. Final change order decisions appear less arbitrary It is much easier for project managers to negotiate change orders when they can immediately cite the contract language that informed their decision-making process. Figure 1: Example of COR review checklist STEP 2: COMPLETE THE CHANGE ORDER REVIEW SHEET Every change order should have a change order review sheet with audit-style findings, a short description and explanation of the rationale behind the decision. The Change Order Review Sheet (1 page max) should have the following sections: Change Order proposed cost vs. JLL recommended cost after review Notes:
  • 3. Jones Lang LaSalle | Real Value in a Changing World 3 o A one-sentence opinion on JLL recommended value for the change order; o A one-sentence description of the change order request; o 2-4 sentence description of the rationale behind the decision-making process, citing the guiding contractual sources or highlighting any discrepancies. o A one-sentence note on whether the rates and calculations are correct (and citing any errors if they exist). Key References—Copy and pasted abridged terms from the contract terms checklist OR the actual contract documents if the guiding contract source was atypical and not listed in the checklist. Sign-off—signature of project manager approving the change order review Figure 2: Example of Change Order Review Sheet
  • 4. Jones Lang LaSalle | Real Value in a Changing World 4 STEP 3: CREATE AN AUTOMATED RATES AND CALCULATION SPREADSHEET FOR A VENDOR To further expedite the review process and reduce potential calculation errors, prepare a spreadsheet with correct rates which can be used to quickly check calculations for change orders. Attach this document to the Change Order Review Sheet to back up findings. Additionally, daily construction reports or other project documents used to review the number of labor hours and the change proposal request should be attached as back-up documentation to the change proposal. Figure 3: Change Proposal Calculation Template In the end, the Change Order Review Sheet, the Calculation Template, and other supporting documentation are attached to the change order document as tangible back-up documentation and support for the decision.