This service manual provides instructions for servicing skid steer loaders and their engines. It details removing and installing the engine bedplate, which acts as the main strength component and maintains alignment of internal engine parts. The multi-step procedure requires cleaning and applying sealant to the bedplate and crankcase mating surfaces, installing bearing shells and bolts, and torquing bolts to specified values. Special tools like templates and torque wrenches are needed to correctly complete the installation.
Liebherr ta240 articulated truck service repair manualyhhjjkfkseme
The document is a technical manual that provides an overview of various systems for a piece of machinery. It includes sections on technical data, maintenance, drive groups, cooling systems, hydraulics, steering, brakes, electrical systems, axles, working equipment, cab features, lubrication and software/hardware options. The document encourages the reader to click on a link for the complete manual or download the PDF.
Liebherr ta230 articulated truck service repair manualyhhjjkfkseme
The document is a technical manual that provides an overview of various systems for a piece of machinery. It includes sections on technical data, maintenance, drive groups, cooling systems, hydraulics, steering, brakes, electrical systems, axles, working equipment, cab features, lubrication and software/hardware options. The document encourages the reader to click on a link for the complete manual or download the PDF.
Jcb js210, js230 excavator service repair manual (from 2453501 to 2453750)yhhjjkfkseme
This document is a service manual for excavator models JS210 and JS230 that contains instructions for maintenance and repair. It includes sections on machine components, safety procedures, descriptions of systems, and troubleshooting guides. Safety is emphasized, with warnings about operating or working on the machine without understanding the manual and ensuring proper training, protective equipment, and safety practices are followed.
Jcb js210, js230 excavator service repair manual (from 2453251 to 2453500)yhhjjkfkseme
This document is a service manual for excavators JS210 and JS230 that contains instructions for maintenance and repair. It begins with introductory information about safety, proper use of the manual, and an overview of the machine components. The bulk of the manual is dedicated to detailed sections for various machine systems providing part numbers, specifications, and repair procedures.
Jcb js130 excavator service repair manual sn 2397429 and upyhhjjkfkseme
The document provides service information for excavator tracks. It includes sections on track components, checking track condition, adjusting track tension, removing and installing tracks, and storing tracks. The main components described are the steel track chain, pins, bushes, links, and tensioning/idler wheel assembly. Instructions are given on inspecting wear of these parts and taking corrective actions such as adjusting tension or replacing worn components. Technical specifications are also included for measuring track pitch, bush diameter, and link height to assess wear.
Jcb js115 t3 excavator service repair manual sn 2397465 and upyhhjjkfkseme
The document provides service information for excavator tracks. It includes sections on track components, checking track condition, adjusting track tension, removing and installing tracks, and storing tracks. The main components described are the steel track chain, pins, bushes, links, and tensioning/idler wheel assembly. Instructions are given on inspecting wear of these parts and taking corrective actions such as adjusting, replacing, or turning the track pins and bushes. Technical specifications are also included for measuring track tension and wear limits of pins, bushes, and links.
Jcb 540 v180 telescopic handler service repair manual sn from 2460601 onwardsyhhjjkfkseme
This service manual provides instructions for servicing the loadall rough terrain variable reach truck. It contains sections on the machine systems including the engine, fuel system, cooling system, brake system, hydraulic system and electrical system. The section summarized focuses on servicing the engine valves and connecting rod big-end bearings. It provides removal and installation instructions, component identification diagrams, and technical specifications for the valves and instructions to check the big-end bearings for wear. Safety information is also provided to ensure the work is performed correctly.
Jcb 540 v140 telescopic handler service repair manual sn from 2902000 onwardsyhhjjkfkseme
This service manual provides instructions for servicing the Loadall rough terrain variable reach truck. It contains sections on the machine body and framework, operator station, engine, fuel and exhaust, cooling, brake, steering, hydraulic and electrical systems. The engine section provides technical specifications and instructions for servicing engine components like the valves, connecting rods, pistons, and more. Proper safety precautions and use of special tools are emphasized throughout.
Liebherr ta240 articulated truck service repair manualyhhjjkfkseme
The document is a technical manual that provides an overview of various systems for a piece of machinery. It includes sections on technical data, maintenance, drive groups, cooling systems, hydraulics, steering, brakes, electrical systems, axles, working equipment, cab features, lubrication and software/hardware options. The document encourages the reader to click on a link for the complete manual or download the PDF.
Liebherr ta230 articulated truck service repair manualyhhjjkfkseme
The document is a technical manual that provides an overview of various systems for a piece of machinery. It includes sections on technical data, maintenance, drive groups, cooling systems, hydraulics, steering, brakes, electrical systems, axles, working equipment, cab features, lubrication and software/hardware options. The document encourages the reader to click on a link for the complete manual or download the PDF.
Jcb js210, js230 excavator service repair manual (from 2453501 to 2453750)yhhjjkfkseme
This document is a service manual for excavator models JS210 and JS230 that contains instructions for maintenance and repair. It includes sections on machine components, safety procedures, descriptions of systems, and troubleshooting guides. Safety is emphasized, with warnings about operating or working on the machine without understanding the manual and ensuring proper training, protective equipment, and safety practices are followed.
Jcb js210, js230 excavator service repair manual (from 2453251 to 2453500)yhhjjkfkseme
This document is a service manual for excavators JS210 and JS230 that contains instructions for maintenance and repair. It begins with introductory information about safety, proper use of the manual, and an overview of the machine components. The bulk of the manual is dedicated to detailed sections for various machine systems providing part numbers, specifications, and repair procedures.
Jcb js130 excavator service repair manual sn 2397429 and upyhhjjkfkseme
The document provides service information for excavator tracks. It includes sections on track components, checking track condition, adjusting track tension, removing and installing tracks, and storing tracks. The main components described are the steel track chain, pins, bushes, links, and tensioning/idler wheel assembly. Instructions are given on inspecting wear of these parts and taking corrective actions such as adjusting tension or replacing worn components. Technical specifications are also included for measuring track pitch, bush diameter, and link height to assess wear.
Jcb js115 t3 excavator service repair manual sn 2397465 and upyhhjjkfkseme
The document provides service information for excavator tracks. It includes sections on track components, checking track condition, adjusting track tension, removing and installing tracks, and storing tracks. The main components described are the steel track chain, pins, bushes, links, and tensioning/idler wheel assembly. Instructions are given on inspecting wear of these parts and taking corrective actions such as adjusting, replacing, or turning the track pins and bushes. Technical specifications are also included for measuring track tension and wear limits of pins, bushes, and links.
Jcb 540 v180 telescopic handler service repair manual sn from 2460601 onwardsyhhjjkfkseme
This service manual provides instructions for servicing the loadall rough terrain variable reach truck. It contains sections on the machine systems including the engine, fuel system, cooling system, brake system, hydraulic system and electrical system. The section summarized focuses on servicing the engine valves and connecting rod big-end bearings. It provides removal and installation instructions, component identification diagrams, and technical specifications for the valves and instructions to check the big-end bearings for wear. Safety information is also provided to ensure the work is performed correctly.
Jcb 540 v140 telescopic handler service repair manual sn from 2902000 onwardsyhhjjkfkseme
This service manual provides instructions for servicing the Loadall rough terrain variable reach truck. It contains sections on the machine body and framework, operator station, engine, fuel and exhaust, cooling, brake, steering, hydraulic and electrical systems. The engine section provides technical specifications and instructions for servicing engine components like the valves, connecting rods, pistons, and more. Proper safety precautions and use of special tools are emphasized throughout.
Jcb 536 t70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, torque specifications, and other technical details needed for repair and maintenance.
Jcb 536 70 tier 4 telescopic handler service repair manual sn from 2336575 on...yhhjjkfkseme
The document provides instructions for servicing fuel injectors and related components on JCB Loadall vehicles. It begins with an introduction to fuel injectors and their purpose. The main sections include checking injector operation using leak-off tests, removing and installing individual injectors, removing and installing injector seals, and removing and installing the common fuel rail assembly. Torque specifications are provided for reinstalling components.
Jcb 536 70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems and components including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. Procedures are provided for maintenance, removal and installation of parts, and repair. Safety warnings are included throughout regarding working on and operating the machines.
Jcb 536 60 tier 4 telescopic handler service repair manual sn from 2902000 on...yhhjjkfkseme
The document provides instructions for servicing fuel injectors and related components on JCB Loadall vehicles. It begins with an introduction to fuel injectors and their purpose. The main sections include checking injector operation using leak-off tests, removing and installing individual injectors, removing and installing injector seals, and removing and installing the common fuel rail assembly. Torque specifications are provided for reinstalling components.
Jcb 536 60 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 535 t95 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, torque specifications, and other technical details needed for repair and maintenance.
Jcb 535 95 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 533 105 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems and components including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, specifications, and safety information.
Jcb 531 t70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 531 70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Liebherr r974 c 1011 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Liebherr r974 c 1010 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Jcb 9 tft dumper service repair manual sn from grm0011 to grm9989yhhjjkfkseme
This service manual provides instructions for servicing the components of a dumper vehicle, including the machine body and framework, operator station, engine, fuel and exhaust system, cooling system, brake system, steering system, driveline, hydraulic system, electrical system, fasteners and fixings, and consumable products. The document provides detailed removal and installation instructions for fuel system components like high pressure fuel pipes, low pressure fuel pipes, and injector bleed-off pipes. Safety precautions for working on the fuel system are emphasized.
Jcb 9 tft dumper service repair manual sn from frm7139 to frm8868yhhjjkfkseme
This service manual provides instructions for servicing the components of a dumper vehicle, including the machine body and framework, operator station, engine, fuel and exhaust system, cooling system, brake system, steering system, driveline, hydraulic system, electrical system, fasteners and fixings, and consumable products. The document provides detailed removal and installation instructions for fuel system components like high pressure fuel pipes, low pressure fuel pipes, and injector bleed-off pipes. Safety precautions for working on the fuel system are emphasized.
Jcb 5 cx wastemaster eco backhoe loader service repair manual sn from 2509500...yhhjjkfkseme
This service manual provides instructions for servicing the crankshaft on a backhoe loader. The crankshaft is a core component that connects the pistons to the flywheel. Key steps in servicing the crankshaft include cleaning the crankcase and bearings, checking crankshaft dimensions, installing new piston cooling jets, and carefully inserting the crankshaft while aligning the thrust washers and bearing shells. Thorough cleaning is emphasized to prevent blocked oil passages from causing engine failure.
Jcb 4 cx backhoe loader service repair manual sn from 2509500 and upyhhjjkfkseme
This service manual provides instructions for servicing the crankshaft on a backhoe loader. The crankshaft is a core component that connects the pistons to the transmission. The summary is:
The document outlines procedures for removing, checking, and installing the crankshaft. Key steps include cleaning the engine, removing other components like the flywheel and camshaft, and carefully lifting out the crankshaft. Technicians must check the crankshaft journals and oil ways for wear or debris and replace the main bearing shells. Proper installation requires cleaning surfaces, aligning the oil holes, and installing thrust washers in their correct positions. Following the outlined procedures helps ensure the cranksha
Jcb 3 cx compact backhoe loader service repair manual (sn from 2454201 and up)yhhjjkfkseme
This service manual provides instructions for removing and installing the bedplate on a 3CX Compact backhoe loader engine. The summary removes the bedplate by removing 17 peripheral bolts and 10 main bearing bolts, then separating the bedplate from the crankcase using lifting equipment. Proper cleaning of mating surfaces is required before installing the bedplate by applying an anaerobic sealant and tightening the bolts to the specified torques within 15 minutes for the sealant to cure correctly.
Liebherr r974 c 449 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Jcb 3 cx backhoe loader service repair manual sn from 2509500 and upyhhjjkfkseme
This service manual section provides information on servicing the crankshaft and related components on a backhoe loader. It includes identification of parts, technical specifications, operation descriptions, removal and installation instructions, and check/inspection procedures. Proper cleaning and installation of the crankshaft oil seal is critical to prevent oil leakage. Removal and installation of the crankshaft requires carefully following all steps while ensuring components remain clean and undamaged.
Caterpillar cat th514 c telehandler operator and maintenance manualyhhjjkfkseme
This document provides an operation and maintenance manual for several models of telehandlers. It contains important safety information and instructions for operation, maintenance, and emergency procedures. Sections include pre-operation inspection, controls and indicators, operation, attachments/hitches, emergency procedures, maintenance schedules, and specifications. Operators must read the entire manual before operating the machine.
Jcb 536 t70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, torque specifications, and other technical details needed for repair and maintenance.
Jcb 536 70 tier 4 telescopic handler service repair manual sn from 2336575 on...yhhjjkfkseme
The document provides instructions for servicing fuel injectors and related components on JCB Loadall vehicles. It begins with an introduction to fuel injectors and their purpose. The main sections include checking injector operation using leak-off tests, removing and installing individual injectors, removing and installing injector seals, and removing and installing the common fuel rail assembly. Torque specifications are provided for reinstalling components.
Jcb 536 70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems and components including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. Procedures are provided for maintenance, removal and installation of parts, and repair. Safety warnings are included throughout regarding working on and operating the machines.
Jcb 536 60 tier 4 telescopic handler service repair manual sn from 2902000 on...yhhjjkfkseme
The document provides instructions for servicing fuel injectors and related components on JCB Loadall vehicles. It begins with an introduction to fuel injectors and their purpose. The main sections include checking injector operation using leak-off tests, removing and installing individual injectors, removing and installing injector seals, and removing and installing the common fuel rail assembly. Torque specifications are provided for reinstalling components.
Jcb 536 60 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 535 t95 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, torque specifications, and other technical details needed for repair and maintenance.
Jcb 535 95 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 533 105 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides instructions for servicing Loadall rough terrain variable reach trucks. It contains sections on machine systems and components including the engine, fuel system, cooling system, brakes, hydraulics, and electrical systems. The manual provides removal and installation instructions, specifications, and safety information.
Jcb 531 t70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Jcb 531 70 telescopic handler service repair manual sn 2336575 and upyhhjjkfkseme
This service manual provides information for servicing and repairing Loadall rough terrain variable reach trucks. It contains instructions for machine components, attachments, body and framework, operator station, heating and air conditioning, engine, fuel and exhaust systems, cooling system, brake system, steering system, driveline, hydraulic system, and electrical system. The manual instructs technicians on removal and installation of components like the engine, and provides torque specifications and other technical details.
Liebherr r974 c 1011 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Liebherr r974 c 1010 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Jcb 9 tft dumper service repair manual sn from grm0011 to grm9989yhhjjkfkseme
This service manual provides instructions for servicing the components of a dumper vehicle, including the machine body and framework, operator station, engine, fuel and exhaust system, cooling system, brake system, steering system, driveline, hydraulic system, electrical system, fasteners and fixings, and consumable products. The document provides detailed removal and installation instructions for fuel system components like high pressure fuel pipes, low pressure fuel pipes, and injector bleed-off pipes. Safety precautions for working on the fuel system are emphasized.
Jcb 9 tft dumper service repair manual sn from frm7139 to frm8868yhhjjkfkseme
This service manual provides instructions for servicing the components of a dumper vehicle, including the machine body and framework, operator station, engine, fuel and exhaust system, cooling system, brake system, steering system, driveline, hydraulic system, electrical system, fasteners and fixings, and consumable products. The document provides detailed removal and installation instructions for fuel system components like high pressure fuel pipes, low pressure fuel pipes, and injector bleed-off pipes. Safety precautions for working on the fuel system are emphasized.
Jcb 5 cx wastemaster eco backhoe loader service repair manual sn from 2509500...yhhjjkfkseme
This service manual provides instructions for servicing the crankshaft on a backhoe loader. The crankshaft is a core component that connects the pistons to the flywheel. Key steps in servicing the crankshaft include cleaning the crankcase and bearings, checking crankshaft dimensions, installing new piston cooling jets, and carefully inserting the crankshaft while aligning the thrust washers and bearing shells. Thorough cleaning is emphasized to prevent blocked oil passages from causing engine failure.
Jcb 4 cx backhoe loader service repair manual sn from 2509500 and upyhhjjkfkseme
This service manual provides instructions for servicing the crankshaft on a backhoe loader. The crankshaft is a core component that connects the pistons to the transmission. The summary is:
The document outlines procedures for removing, checking, and installing the crankshaft. Key steps include cleaning the engine, removing other components like the flywheel and camshaft, and carefully lifting out the crankshaft. Technicians must check the crankshaft journals and oil ways for wear or debris and replace the main bearing shells. Proper installation requires cleaning surfaces, aligning the oil holes, and installing thrust washers in their correct positions. Following the outlined procedures helps ensure the cranksha
Jcb 3 cx compact backhoe loader service repair manual (sn from 2454201 and up)yhhjjkfkseme
This service manual provides instructions for removing and installing the bedplate on a 3CX Compact backhoe loader engine. The summary removes the bedplate by removing 17 peripheral bolts and 10 main bearing bolts, then separating the bedplate from the crankcase using lifting equipment. Proper cleaning of mating surfaces is required before installing the bedplate by applying an anaerobic sealant and tightening the bolts to the specified torques within 15 minutes for the sealant to cure correctly.
Liebherr r974 c 449 hydraulic excavator service repair manualyhhjjkfkseme
The document is a service manual that provides technical information for maintenance and repair of Liebherr hydraulic excavators. It contains sections on the engine, hydraulic and electrical systems, undercarriage, and other components. Symbols are used to indicate dangers, warnings, and important notes. The manual is intended to assist customer support and training, but does not replace proper technical qualifications or training.
Jcb 3 cx backhoe loader service repair manual sn from 2509500 and upyhhjjkfkseme
This service manual section provides information on servicing the crankshaft and related components on a backhoe loader. It includes identification of parts, technical specifications, operation descriptions, removal and installation instructions, and check/inspection procedures. Proper cleaning and installation of the crankshaft oil seal is critical to prevent oil leakage. Removal and installation of the crankshaft requires carefully following all steps while ensuring components remain clean and undamaged.
Caterpillar cat th514 c telehandler operator and maintenance manualyhhjjkfkseme
This document provides an operation and maintenance manual for several models of telehandlers. It contains important safety information and instructions for operation, maintenance, and emergency procedures. Sections include pre-operation inspection, controls and indicators, operation, attachments/hitches, emergency procedures, maintenance schedules, and specifications. Operators must read the entire manual before operating the machine.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. 15 - Engine
09 - Bedplate
00 - General
15 - 67 9813/7450-2 15 - 67
00 - General
Introduction .................................................... 15-67
Remove and Install ....................................... 15-68
Introduction
The bedplate acts as the main strength component
of the engine. it maintains the correct alignment and
supports the weight of the internal components.
Figure 145.
1
2
1 Bedplate
2 Crankcase
3. 15 - Engine
09 - Bedplate
00 - General
15 - 68 9813/7450-2 15 - 68
Remove and Install
Special Tools
Description Part No. Qty.
Template for Sealant
Bedplate to Crankcase
(4 Cyl)
892/12356 1
Torque Wrench
(10-100Nm)
993/70111 1
Consumables
Description Part No. Size
Cleaner/Degreaser
- General purpose
solvent based parts
cleaner
4104/1557 0.4L
CAUTION This component is heavy. It must only
be removed or handled using a suitable lifting
method and device.
Before Removal
1. This procedure requires service parts. Make
sure you have obtained the correct service parts
before you start, refer to Parts Catalogue.
2. Make sure that the engine is safe to work on. If
the engine has been running, let it cool before
you start the service work.
3. Remove the engine, refer to (PIL 15-00).
4. Remove the drive belt, refer to (PIL 15-18).
5. Remove the crankshaft pulley, refer to (PIL
15-12).
6. Remove the oil sump, refer to (PIL 15-45).
7. Disconnect and remove the fuel pipes from the
injectors, refer to (PIL 18-96).
8. Remove the rocker cover, refer to (PIL 15-42).
9. Remove the fuel injectors, refer to (PIL 18-18).
10. Remove the rocker assembly including the push
rods, refer to (PIL 15-42).
11. It is not necessary to remove the cylinder head
assembly to remove the crankshaft. If however
the cylinder head needs to be removed for other
reasons (for piston and connecting rod removal
for example) remove it now, refer to (PIL 15-06).
12. Remove the fuel injection pump, refer to (PIL
18-18).
13. Remove the starter motor, refer to (PIL 15-75).
14. Remove the high duty PTO (Power Take-Off)
device (if installed).
15. Position the engine upside down in a suitable jig
or fixture, supported at the front of the cylinder
block.
16. Remove the flywheel, refer to (PIL 15-54).
17. Remove the flywheel housing, refer to (PIL
15-54).
18. Remove the fuel injection pump drive gear, refer
to (PIL 15-51).
19. Remove the oil pump, refer to (PIL 15-60).
20. Remove the high duty PTO idler drive gear (if
installed), refer to (PIL 15-51).
21. Remove the crankshaft drive gear, refer to (PIL
15-51).
22. Remove the camshaft, refer to (PIL 15-15).
23. Remove the rear timing case, refer to (PIL
15-51).
24. If the pistons and connecting rods have not been
removed, undo and remove the main bearing
caps, refer to (PIL 15-12).
5. 15 - Engine
09 - Bedplate
00 - General
15 - 70 9813/7450-2 15 - 70
Remove
1. Remove the bedplate peripheral bolts.
2. Progressively remove the main bearing bolts in
reverse order starting at bolt 10. The bolts MUST
NOT be re-used. Discard the bolts.
3. Install the four temporary lifting bolts. Carefully
separate the bedplate from the crankcase. Use
suitable lifting equipment (if the bedplate is lifted
manually, two people will be required). DO NOT
use a lever to separate the bedplate.
4. Remove and discard the O-ring.
5. Carefully remove the upper bearing shells from
the bedplate, remove the bedplate.
Figure 147.
18
18
18
18
18
T6
T6
T6
18
12
T6
P3
13
11
A (T5)
V
YY P2
51
9
4
8
3
7
62
10
T4
T4
W
P2
B (T5)
Y Y P2
X
1-10 Main bearing bolts 11 Bedplate peripheral bolts (x16)
12 Bedplate 13 Crankcase
18 Lower bearing shells (x5) A Left side template
B Right side template T3 Angle Gauge (obtain locally)
6. 15 - Engine
09 - Bedplate
00 - General
15 - 71 9813/7450-2 15 - 71
T4 Guide pins (x2 obtain locally) T5 Sealant template
T6 Lifting bolts (x4 obtain locally) V Sealant template portion for removal
W Bearing tab X Rear main bearing
Y Bearing location tab P2 Anaerobic sealant
P3 O-ring
7. 15 - Engine
09 - Bedplate
00 - General
15 - 72 9813/7450-2 15 - 72
Before Installation
1. Clean off all traces of the old sealant compound
from the crankcase and bedplate mating faces.
2. Use a suitable degreasing agent to carefully
clean the main bearing saddles in the bedplate
and crankcase. Take care not to block the oil
ways or the piston cooling jets.
Consumable: Cleaner/Degreaser - General
purpose solvent based parts cleaner
Important: Anaerobic sealant will not start to cure
whilst it is open to the atmosphere, however when
air is excluded (for instance when the two parts are
put together) it will immediately start to harden. Make
sure that all the necessary tools, bolts etc. are readily
available prior to assembling the components. The
parts must be installed and tightened to the correct
torque value within 5 minutes (with a maximum
permissible time of 15 minutes).
Important: BEFORE installing the bedplate: DO NOT
rotate the crankshaft. Make sure that the upper main
bearing shells are flush with the bottom face of the
crankcase.
Install
1. The installation procedure is the opposite of the
removal procedure. Additionally do the following
steps.
2. Make sure that all items are clean and free from
damage and corrosion.
3. Install the two guide pins T4 to the crankcase
bedplate fixing holes as shown.
4. Install the four lifting bolts T6 to the bedplate as
shown.
5. Install a new O-ring at the bedplate.
6. Use a suitable degreasing agent to clean both
sides of the lower bearing shells. Assemble the
lower bearing shells into the bedplate. Lubricate
the lower bearing shells with clean engine oil.
Note: Make sure that the location tab W engages
in the slot as shown.
Consumable: Cleaner/Degreaser - General
purpose solvent based parts cleaner
7. Note: The sealant template T5 is used on
the crankcase, NOT the bedplate. The sealant
template T5 comprises of two pieces, A and B.
Modify the template A by removing portion V.
Special Tool: Template for Sealant Bedplate to
Crankcase (4 Cyl) (Qty.: 1)
8. Locate the holes in the templates A and B using
four fixing bolts at positions Y. Use the templates
as a guide apply beads of sealant P2 around the
crankcase/bedplate mating face as shown to the
dimension specified.
Length/Dimension/Distance: 1.5mm
9. Remove the four fixing bolts at positions Y.
Remove the templates A and B, make sure
you do not smudge the sealant. Discard the
templates.
10. Add beads of sealant P2 around the four bolt
holes at positions Y, so as to join the sealant
beads as shown at X.
11. Make sure that the location guide pins T4 are in
position in the crankcase. Assemble the bedplate
to the crankcase use the alignment guide pins.
12. Note: The bedplate is heavy. Two people will
be required to lift and rotate the bedplate safely
on to the crankcase. Install new main bearing
bolts 1-10. Tighten the bolts to the correct torque
value in pairs, starting in the centre and working
outwards (in sequence 1-10) to the 1st stage pre-
torque.
Special Tool: Torque Wrench (10-100Nm) (Qty.:
1)
13. Install the bedplate peripheral bolts. Tighten the
bolts to the correct torque value.
14. After installation and tightening the bedplate
peripheral bolts, further tighten the main bearing
bolts in pairs, starting in the centre and working
outwards (in sequence 1-10) to the 2nd stage
pre-torque.
15. Finally, angle tighten the main bearing bolts in
pairs, starting in the centre and working outwards
(in sequence 1-10) for the final stage torque. Use
the torque and angle method, refer to Fasteners
and Fixings, General, Introduction (PIL 72-00).
Important: If the parts have not been tightened to the
correct torque value within the maximum 15 minute
time period, then the parts must be separated,
thoroughly cleaned and fresh sealant applied.
After Installation
1. Check that the crankshaft can be freely rotated
by hand. Remove the bedplate lifting bolts T6.
2. Carry out the procedures listed, Before removal
in reverse order.
Table 54. Torque Table
Item Torque Value
1-10 (1st Stage) 50N·m
1-10 (2nd Stage) 115N·m
8. 15 - Engine
12 - Crankshaft
00 - General
15 - 76 9813/7450-2 15 - 76
Technical Data
Table 55.
Main bearing journal diameter (x4)
- min 87.98mm
- max 88mm
Main rear bearing journal diameter (x1)
- min 99.98mm
- max 100mm
Connecting rod bearing journal diameter
- min 72.98mm
- max 73mm
Maximum wear and ovality on journals
(1)
Crankshaft induction hardness 55 HRc min on surface
Thrust washer width
- min 2.44mm
- max 2.5mm
Crankshaft end float
- min 0.05mm
- max 0.28mm
(1) No visible damage/wear or marks
9. 15 - Engine
12 - Crankshaft
00 - General
15 - 77 9813/7450-2 15 - 77
Component Identification
Figure 148.
B
A
A Crankcase
B Crankshaft
10. 15 - Engine
12 - Crankshaft
00 - General
15 - 78 9813/7450-2 15 - 78
Operation
Lubrication
Oil is fed from the main gallery via five drillings, one
to each of the main bearings. A groove around the
diameter of the upper main bearing shell allows oil
transfer to cross drillings in the crankshaft to feed
each of the big end bearings. Crankshaft gear is
'splash' lubricated. Front and rear crankshaft oil seals
prevent oil leakage from, and dirt ingress to, the
engine.
Figure 149.
1 Main gallery 2 Drillings (x5)
3 Main bearings 4 Big end bearings
5 Cross drillings 6 Crankshaft gear
7 Crankshaft oil seal 8 Crankshaft oil seal
11. 15 - Engine
12 - Crankshaft
00 - General
15 - 79 9813/7450-2 15 - 79
Check (Condition)
1. Check the main bearing surfaces for damage and
excessive wear.
Figure 150.
A
A Main bearing shells
2. Measure the crankshaft diameters to confirm
they are within service limits, refer to Technical
Data (PIL 15-12).
Figure 151.
B
B Crankshaft
3. Check that the oil-way cross drillings in the
crankshaft are clear and free from debris.
Blocked or restricted oil-ways will cause oil
starvation at the big end bearings.
4. Check that the piston cooling J-jets are clear. If
the J-jets cannot be cleared remove the fixing
screws. Remove theJ-jets and discard them.
5. Install new J-jets.
Figure 152.
D
C
C J-jets
D Fixing screws
12. 15 - Engine
12 - Crankshaft
00 - General
15 - 80 9813/7450-2 15 - 80
Remove and Install
Consumables
Description Part No. Size
Cleaner/Degreaser
- General purpose
solvent based parts
cleaner
4104/1557 0.4L
CAUTION This component is heavy. It must only
be removed or handled using a suitable lifting
method and device.
Before Removal
1. This procedure requires service parts. Make
sure you have obtained the correct service parts
before you start, refer to Parts Catalogue.
2. Make sure that the engine is safe to work on. If
the engine has been running, let it cool before
you start the service work.
3. Remove the engine, refer to (PIL 15-00).
4. Remove the drive belt, refer to (PIL 15-18).
5. Remove the crankshaft pulley, refer to (PIL
15-12).
6. Remove the oil sump, refer to (PIL 15-45).
7. Disconnect and remove the fuel pipes from the
injectors, refer to (PIL 18-96).
8. Remove the rocker cover, refer to (PIL 15-42).
9. Remove the fuel injectors, refer to (PIL 18-18).
10. Remove the rocker assembly including the push
rods, refer to (PIL 15-42).
11. It is not necessary to remove the cylinder head
assembly to remove the crankshaft. If however
the cylinder head needs to be removed for other
reasons (for piston and connecting rod removal
for example) remove it now, refer to (PIL 15-06).
12. Remove the fuel injection pump, refer to (PIL
18-18).
13. Remove the starter motor, refer to (PIL 15-75).
14. Remove the high duty PTO device (if installed).
15. Position the engine upside down in a suitable jig
or fixture, supported at the front of the cylinder
block.
16. Remove the flywheel, refer to (PIL 15-54).
17. Remove the flywheel housing, refer to (PIL
15-54).
18. Remove the fuel injection pump drive gear, refer
to (PIL 15-51).
19. Remove the oil pump, refer to (PIL 15-60).
20. Remove the high duty PTO idler drive gear (if
installed), refer to (PIL 15-51).
21. Remove the crankshaft drive gear, refer to (PIL
15-51).
22. Remove the camshaft, refer to (PIL 15-15).
23. Remove the rear timing case, refer to (PIL
15-51).
24. If the pistons and connecting rods have not been
removed, undo and remove the main bearing
caps, refer to (PIL 15-12).
25. Remove the bedplate, refer to (PIL 15-09).
Remove
1. Remove the thrust washers between the
crankshaft and crankcase rear main bearing.
13. 15 - Engine
12 - Crankshaft
00 - General
15 - 81 9813/7450-2 15 - 81
Figure 153.
C
B
A
A
A Thrust Washers B Crankshaft
C Rear main bearing
2. Put labels on the thrust washers to make sure
that they are installed in the correct positions
during assembly.
3. Use suitable lifting equipment to carefully lift the
crankshaft from the crankcase (if the crankshaft
is lifted manually, two people will be required).
4. Carefully lift out the bearing shells.
Figure 154.
D
D Main bearing shells
5. It is recommended that the bearing shells are
replaced. If however they are to be used again,
put label on the shells to make sure that they
are installed in their original positions during
assembly.
6. Inspect the crankshaft and main bearings etc.
for damage and excessive wear. Refer to Check
Condition (PIL 15-12).
Before Installation
1. Clean off all traces of the old sealant compound
from the crankcase and bedplate mating faces.
2. Use a suitable degreasing agent to carefully
clean the main bearing saddles in the bedplate
and crankcase. Take care not to block the oil
ways or the piston cooling jets.
Consumable: Cleaner/Degreaser - General
purpose solvent based parts cleaner
Important: Cleanliness is of the utmost importance.
Blocked oil-ways or oil jets will cause engine failure.
Before you install the crankshaft make sure that ALL
oil-ways and jets are clear and free from debris.
Install
1. The installation procedure is the opposite of the
removal procedure. Additionally do the following
steps.
2. Make sure that all items are clean and free from
damage and corrosion.
3. If removed or a new crankcase is being installed
then install cooling J jets as follows:
14. 15 - Engine
12 - Crankshaft
00 - General
15 - 82 9813/7450-2 15 - 82
Figure 155.
F
E
E J jets (x4)
F Fixing screws
3.1. Insert the cooling jets into the crankcase.
3.2. Note: There are different types of cooling
jets installed depending on the engine
application. The jets are colour coded.
3.3. Be sure to install the correct jets. Refer to
the relevant parts catalogue for the correct
cooling jet identification.
3.4. Tighten the retaining screws to the correct
torque value.
4. Install the upper bearing shells as follows:
Figure 156.
D
G
D Main bearing shells
G Bearing location tab
4.1. Use a suitable degreasing agent to make
sure that the surface of the upper bearing
shells are clean.
Consumable: Cleaner/Degreaser - General
purpose solvent based parts cleaner
4.2. Assemble the bearing shells into the
crankcase bearing saddles. Make sure that
the location tab engages into the slot as
shown.
4.3. Important: Make sure that the oil-way holes
in the bearing saddles align with the holes
in the bearing shell. If the holes are even
partially misaligned the piston cooling oil jet
will be restricted, causing the engine to fail.
4.4. Lubricate the upper bearing shells with
clean engine oil.
5. Use suitable lifting equipment (if the crankshaft
is lifted manually, two people will be required), to
carefully lower the crankshaft into the crankcase.
DO NOT rotate the crankshaft, the bearing shells
can become dislodged, refer to step 4.
6. Install the thrust washers as follows:
15. 15 - Engine
12 - Crankshaft
00 - General
15 - 83 9813/7450-2 15 - 83
Figure 157.
C
B
A
A
A
H
A Thrust washers B Crankshaft
C Rear main bearing H Oil slot - thrust washers
6.1. Slide the thrust washers between the
crankshaft and the crankcase rear main
bearing.
6.2. Make sure that they are installed in the
correct positions, with the two slots facing
outwards from the bearing saddle.
6.3. If necessary, push the crankshaft forward
and then backwards to obtain clearance to
install the thrust washers.
6.4. DO NOT rotate the crankshaft, the bearing
shells can become dislodged, refer to step
4.
7. Check that the crankshaft end float is within
service limits, refer to Technical Data (PIL 15-12).
Table 56. Torque Values
Item Nm
F 24
16. 15 - Engine
12 - Crankshaft
03 - Main Bearing
15 - 84 9813/7450-2 15 - 84
03 - Main Bearing
Introduction .................................................... 15-84
Check (Condition) .......................................... 15-85
Remove and Install ....................................... 15-85
Introduction
In a piston engine, the main bearings are the
bearings on which the crankshaft rotates.
The bearings hold the crankshaft in place and
prevent the forces created by the piston and
transmitted to the crankshaft by the connecting rods
from dislodging the crankshaft, instead forcing the
crank to convert the reciprocating movement into
rotation.
Figure 158.
A
B
A Main bearing
B Crankshaft
17. 15 - Engine
12 - Crankshaft
03 - Main Bearing
15 - 85 9813/7450-2 15 - 85
Check (Condition)
(For: JCB Tier 4i /T4F <55kW Engine 4
Cyl)
1. Check the bearing shell surfaces for signs of
damage and excessive wear.
2. Measure the crank pin diameters to confirm they
are within service limits.
Refer to: PIL 15-12-00.
3. Renew any parts that are worn or not within the
specified tolerances.
Remove and Install
(For: JCB Tier 4i /T4F <55kW Engine 4
Cyl)
Special Tools
Description Part No. Qty.
Torque Wrench
(10-100Nm)
993/70111 1
Before Removal
This procedure requires service parts. Make sure
you have obtained the correct service parts before
you start. Refer to Parts Catalogue.
1. Make the machine safe.
Refer to: PIL 01-03.
2. Make sure that the engine is safe to work on. If
the engine has been running, let it cool before
you start the service work.
3. Remove the engine from the machine.
Refer to: PIL 15-00-00.
4. Disconnect and remove the fuel pipes from the
injectors.
Refer to: PIL 18-96-00.
5. Remove the rocker cover.
Refer to: PIL 15-42-06.
6. Remove the fuel injectors.
Refer to: PIL 18-18-03.
7. Drain the oil from the engine.
Refer to: PIL 15-21-00.
8. Remove the oil sump.
Refer to: PIL 15-45-00.
9. Position the engine upside down in a suitable jig
or fixture, supported at the front of the crankcase.
The connecting rod and the big-end bearing cap
have been fracture split and must be kept together
as a set. Care must be taken to avoid contamination
and or damage to the fracture split surfaces.
Remove
1. It is recommended that the big-end bearing caps
are removed in pairs, cylinders 1 and 4 and
cylinders 2 and 3. Rotate the crankshaft so that
the big-end bearing caps on cylinders 2 and 3 are
positioned as shown.
18. 15 - Engine
12 - Crankshaft
03 - Main Bearing
15 - 86 9813/7450-2 15 - 86
2. Remove the bolts and lift off the big-end bearing
caps from the connecting rods. The bolts must
not be re-used, discard the bolts.
Figure 159.
X
1 2
1 Big-end bearing caps
2 Big-end bearing cap bolts
X Cast notch
2.1. Make sure that the tool is kept in inline
with the bolt to avoid damaging the screw
thread.
3. Lift out the bearing shells from the bearing caps.
Carefully rotate the crank to disengage from the
connecting rods and get access to the upper
bearing shells. Lift out the upper bearing shells.
It is recommended that the bearing shells are
renewed. If they are to be reused, label the
bearing shells to make sure that they are installed
in their original positions on assembly.
Figure 160.
4
3
Z
1
2
6
5
1 Big-end bearing cap
2 Bolts
3 Connecting rod
4 Piston
5 Piston rings
6 Big end bearing shells
Z Fracture split surfaces
4. Carefully rotate the crankshaft to position the big-
end bearing caps of cylinders 1 and 4. Make
sure that the crank does not foul the connecting
rods of cylinders 2 and 3. Remove the bearing
caps and bearing shells as described in previous
steps.
5. Inspect the big-end bearings for signs of damage
and excessive wear.
Install
1. The installation procedure is the opposite of the
removal procedure. Additionally do the following
steps.
2. Make sure that all items are clean and free from
damage and corrosion.
3. Install the upper bearing shell to the connecting
rod. Lubricate the bearing shell with clean engine
oil.
4. Install the lower bearing shell to the big-end
bearing cap. Lubricate the bearing shell with
19. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
20. 15 - Engine
12 - Crankshaft
03 - Main Bearing
15 - 87 9813/7450-2 15 - 87
clean engine oil. Install the big-end bearing cap
to the connecting rod. Make sure that the cast
notch on the bearing cap faces to the front of the
engine. Use compressed air to clean the fracture
surfaces before assembly.
5. Install new big end bearing cap bolts. Tighten the
new bolts in three stages to the correct torque
value.
Special Tool: Torque Wrench (10-100Nm) (Qty.:
1)
5.1. Make sure that the tool is kept in inline
with the bolt to avoid damaging the screw
thread.
5.2. The bolts are tightened using a torque and
angle method.
Refer to: PIL 72-00-00.
Figure 161.
0° +90°
Y
Figure 162.
T3
T3 Angle gauge (obtain locally)
After Installation
1. The after installation procedure is the opposite of
the before removal procedure.
Table 57. Torque Table
Item Torque Value
(Nm)
Angle (de-
grees)
2 (1st Stage) 35
2 (2nd Stage) 65
2 (Final Stage) 90
21. 15 - Engine
12 - Crankshaft
06 - Front Oil Seal
15 - 88 9813/7450-2 15 - 88
06 - Front Oil Seal
Remove and Install
(For: JCB Tier 4i /T4F <55kW Engine 4
Cyl)
Special Tools
Description Part No. Qty.
Crankshaft Front Oil
Seal Installation Tool
892/01157 1
Before Removal
1. This procedure requires service parts. Make
sure you have obtained the correct service parts
before you start, refer to Parts Catalogue.
2. Make sure that the engine is safe to work on. If
the engine has been running, let it cool before
you start the service work.
3. Get access to the engine.
4. Remove the drive belt, refer to (PIL 15-18).
5. Remove the crankshaft pulley, refer to (PIL
15-12-12).
Remove
1. Use a suitable lever behind the lip of the
seal, carefully prise out the oil seal from the
counterbore in the crankcase. Take care not
to scratch or damage the counterbore or the
crankshaft hub. Damaged or dirty sealing faces
will cause the oil seal to fail.
Figure 163.
C
A
B
A Crankshaft oil seal
B Crankcase
C Crankshaft hub
Install
1. Make sure that the counterbore and the
crankshaft hub are clean and free from damage
and corrosion. Use a suitable degreasing agent
to clean all traces of oil and grease from the
counterbore. Important: The oil seal has a special
coating and MUST be installed dry without
lubricant.
2. Dismantle the seal installation tool. Bolt the
centre body to the crankshaft hub, using the
bolts. Refer to Figure 164.
Special Tool: Crankshaft Front Oil Seal
Installation Tool (Qty.: 1)
3. Install the oil seal on to the centre body. Make
sure that the seal is installed the correct way
around. Assemble the outer sleeve on to the
centre body and install the screw. Refer to Figure
164.
22. 15 - Engine
12 - Crankshaft
06 - Front Oil Seal
15 - 89 9813/7450-2 15 - 89
Figure 164.
F D
G
H
B
G
F
C
A
E
A Crankshaft oil seal B Crankcase
C Crankshaft hub D Seal installation tool
E Fixing bolts (x3) F Centre body
G Outer sleeve H Screw
4. Turn the screw to push the seal squarely into
the counterbore until the outer sleeve comes
up against the front edge of the counterbore.
When correctly installed, the front face of the seal
should be flush with the edge of the counterbore
within the specified tolerance. Refer to Figure
165.
Dimension: -0.5 -0/+0.5mm
Figure 165.
B
G
F
C
A
A Crankshaft oil seal
B Crankcase
C Crankshaft hub
F Centre body
G Outer sleeve
5. Remove the seal installation tool.