This document is a site plan for a construction project showing: - Temporary fencing and barriers around the plot limits and basement extension area. - The road was changed to single-way due to the basement extension construction. - Locations of existing towers, toilets, dining areas, offices, and other structures on site. - Details of cabins being used as the main office, labor dining/rest, and dining/toilet areas. - The proposed 3-basement, ground+mezzanine, 7-typical floors and roof commercial/residential building.