This document provides a summary of connection technology products from ifm electronic including sockets in various configurations for industrial applications. It lists over 50 different socket types with details on cable type, wire specification, material, voltage rating, temperature rating, protection rating, included LEDs, and part number. The sockets cover common industrial connector types like M8, M12, and come in options for different environments from hygienic to hazardous areas.