iBuild™
  Empowering The Enterprise
Microsoft Dynamics NAV iBuild™
The Contracting & Property Development
      Industry Business Solution


Contact us:
     Email:    demo@ibuildcontractors.com
     MENA: +961-70655324, +961-3630630
     EU:       +357-25360900, +357-99287113
     Americas: +1-3109287750, +1-5148231020
Today’s Topics


              Construction Industry Insights
              Solution
                  Microsoft Dynamics NAV iBuild™
                  iBuild™ Deployment Options
              Return on Investment




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    2
CONSTRUCTION INDUSTRY INSIGHTS
Construction Industry Insights…

 GLOBAL MEGA-TRENDS                                  INDUSTRY CHALLENGES
       Market Shifts                                   Complex value chains and networks
       Consolidation                                   Material cost fluctuations that put
       Governance                                       margins at risk
       Technology                                      Change order management
                                                        Cyclical demand
                                                        Uneven cash flow and demand for
                                                         capital
                                                        Complex regulatory environment
                                                        Projects & services run rate
                                                        Automation of distribution workflow
                                                         and business processes
                                                        Multi-company accounting and
                                                         reporting
                                                        Economic downturn
                                                        Flexible



Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    4
Business Drivers - Address The Pressures Head-on
                     Invest in dependable technology that will help
                    increase productivity and connect your business

           Internal Reality                                                                   Today’s Demands

• Current business software                                                              • Need to increase
  is outdated and inflexible                                                               employee productivity
     – Does not provide clear                                                            • Need to streamline operations
       view of finances                                                                    and realize efficiencies
     – Customer and suppliers
                                                                   Anxiety
                                                                                         • Need better access to
       requesting new systems                                       Over
     – Employees doing all they
                                                                                           information and reporting
                                                                   Change                • Need to consolidate multiple
       can with existing systems
•     Can’t disrupt business                                                               systems and connect
                                                                                           departments
                                                     • Is it the right decision?
                                                                                         • Have outgrown
                                                     • Is it reliable, dependable,
                                                                                           current system
                                                       and secure?
                                                     • Will it last for the long term?

    Copyright 2012 © iBuild™. All Rights Reserved.
     ibuildcontractors.com | ibuilddevelopers.com                       5
SOLUTION
Microsoft Dynamics NAV
        iBuild™
What is Enterprise Resource Planning (ERP) !

 What is a ERP?
           An ERP is the heart of an organization helping people in every aspect of the business maximize
            efficiency connectivity and efficacy
           ERP provides executive management with the tools to have information live at their finger tips to
            make effective and informed business decisions
           An ERP implementation enables management to take control of every aspect of their business and
            identify pain points and bottle necks in order to focus their resources



                                                                   ERP
                                                                                                                                     Reporting
                                                             Resource   Sales and                                 Operations              &
     Financials          HR         Warehouse    Jobs & PM                          Administration   Purchasing
                                                             Planning   Marketing                                 • Manufacturing    Business
                                                                                                                  • Services        Intelligence
                                                                                                                  • eBusiness




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                           8
Microsoft Dynamics NAV iBuild

                                                 iBuild™
    Microsoft Dynamics NAV 2009
    is a business management role tailored
                                                               iBuild™
    solution that rapidly adapts around the
    way your organization does business,
    enabling your people to be effective and
    your business to be competitive.




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com              9
Microsoft Dynamics NAV

 Why Dynamics NAV

       Microsoft Dynamics NAV seamlessly
        integrates all aspects of an organization’s
        infrastructure to enhance productivity and
        maximize returns while maintaining a familiar
        and user friendly user interface. With the
        global backing of Microsoft and thousands of
        partners and solution providers providing
        add-ons, NAV has quickly developed to be a
        leading ERP for many verticals including
        manufacturing, construction, distribution and
        the professional services.


            More than 80,000+ customers
            More than 4,000 certified partners
            More than 2,000 add-on solutions
            More than 40 localized versions
            More than 1.5M+ Licensed Users
                                                             Microsoft Dynamics NAV integrates the enterprise



Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com           10
Microsoft Dynamics NAV
                 Winner of Mid-Market ERP solutions




                                                        Microsoft Dynamics NAV


                                                      Sage Office Line


                                                       SAP Business One

                                                                 Source: Research One




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    11
Microsoft Dynamics NAV iBuild™ - Familiarity
 Microsoft Familiar User Interface                    Fits with your systems




                       Fuels your                         Enables confident
                       business productivity              decision-making
Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    12
Microsoft Dynamics NAV iBuild™
                           Usability
   ROLE CENTRES

    Direct integration with
     Outlook
    Task queues
    Clear navigation panel
    Intuitive workflow
    Short training cycles
    Interface inline with other
     familiar Microsoft products
    Role Centers are highly and
     easily customizable for every
     role:
                 Marketing
                 Sales
                 Warehouse
                 Administration
                 Executive
                 Financial


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    13
Dynamics NAV Add-On Solutions - Overview
 What Are NAV Add-on Solutions?
           NAV add-on solutions provide prepackaged plug and play solutions that sit within the
            Dynamics NAV platform providing users with additional functionality.
           Add-on providers leverage global channel partners to deliver and support their solution in their
            respective regions
           The benefits of the NAV add-on solutions are:
                 Vertical/Solution based modules based on industry expertise
                 Faster deployment time
                 Cost savings to the end client
                 Leverage global client base for enhancement and features
                 Benefit from the core NAV platform’s flexibility and stability while capitalizing on best
                  of breed add-on solutions from various global vendors
                 Upgrade paths managed by the add-on providers
                 Partner based local support               Certified Partner
                                                                                                Provider B   Provider C


                                                                                     Contractor & Developer   Add-on 3   Add-on 4   +
                                                                                                     Dynamics NAV
                                                                                                 Client NAV Package

Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                                   14
Types of Dynamics NAV Add-On Solutions
Vertical Based Solutions                                               Horizontal Based Solutions
         Our Dynamics NAV Vertical based add-                             Our Dynamics NAV Horizontal based add-on
          on solutions provide prepackaged plug                             solutions provide prepackaged plug and play
          and play industry solutions provides the                          functionalities that can apply to any industry to
          business and users with all the required                          enable our clients with faster time to market and a
          functionalities out of the box and ready                          more cost effective ERP rollout with out the need
          for roll out.                                                     for long and expensive product customizations.



   VERTICAL                         Shipping & Maritime               HORIZONTAL              Analytics & Business Intelligence
  SOLUTIONS                         Construction & Contracting        SOLUTIONS               Customer Relationship Mgt.
                                    Property Development                                      E-commerce
                                    Beverage Manufacturing                                    Field Services Management
                                    Financial Services                                        Manufacturing
                                    Retail Management                                         Portals
                                    Government                                                Project Management
                                    Professional Services                                     Document Management
                                    Wholesale & Distribution                                  Online Time Entry & Management
                                    Oil, Gas & Energy                                         Request for Quotes Management
                                    … many others….                                           Vendor Evaluations



Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                     15
iBuild™ Add-on Solution

iBuild™ is a “Ready For Roll-Out”
add-on solution to Microsoft Dynamics
NAV pre-configured & customized for                         Warehouse       Financial
the Construction & Property                                   Mgt.            Mgt.
Development industry called “iBuild™”.

iBuild provides a foundation for Property
Developers extended to contractors
utilizing an integrated solution with
advanced business intelligence.                  Procurement &                           Sales &
                                                     RFQ                                Marketing
The benefits of iBuild include:
  Automate and streamline operations
  Minimize data entry
  Minimize costs                                   Supply Chain                    HR &
  Reduce waste                                        Mgt.                       Recruiting
  Improve purchasing power
  Improve percentage to Budget                                    Estimating,
  Maximize project wins                                           Tendering &
  Estimate more accurately and                                      Project
   efficiently                                                     Management
  Track projects at live at all times

Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com        16
iBuild™
                      Contractors


                                                            Financials                                                               Maintenance &
     • Campaign Mgt.                                       Management                       • Orders & Contracts Mgmt.                Plant Mgmt.
     • contcat Mgt.                                                                         • Planning & Execution
     • Interactions                                • Multi-Company                          • Goods Holding                    • Contracts Mgmt.
     • Notifications                                 Accounting                             • Inventory                        • Planning & Dispatching
     • Sales Lifecyle Mgt.                         • GL/COA                                 • History                          • Order Processing
                                                   • Receivables / Payables                                                    • History
                                                   • Fixed Assets
                  Sales &                          • Inventory                                      Warehouse
                 Marketing                                                                          Management




                                       Resource                                                                 Project
• Templates                           Management                                                              Management             • Vendor Evaluation
                                                                   • RFQ & Vender Eval
• Quotes                                                                                                                             • Incident
                                • Contracts                        • Order Processing                 • Jobs (Templates)               Management
• Resources
                                • Resource/Groups                  • Inventory & Costing              • Resources                    • Process Enablement
• Reports
                                  & Capacity                       • Analysis & Reporting             • Reports
                                • Reports                          • History                          • Time Registration
    Estimating                  • History                                     Purchasing              • MS Project & Portals                Quality Control




  Copyright 2012 © iBuild™. All Rights Reserved.
   ibuildcontractors.com | ibuilddevelopers.com                                     17
iBuild™
                    Developers


                                                          Financials                                                         Vendor
   • Campaign Mgt.                                       Management                • BOQ Data Load                         Management
   • contcat Mgt.                                                                  • Request For Quote &
   • Interactions                                • Multi-Company                     Comparison Analysis
   • Notifications                                 Accounting                      • Trade Breakdown                • Quotes Mgt.
   • Sales Lifecyle Mgt.                         • GL/COA                          • Reports                        • Orders & Contracts Mgmt.
                                                 • Receivables / Payables          • History                        • Vender Evaluation
                                                 • Fixed Assets                                                     • Reports & History
               Sales &                           • Inventory                                  BOQ
              Marketing                                                                     Estimation




                                                             Project                                                        Maintenance
   • RFQ & Vender Evaluations
                                                           Management                  • Orders & Contracts Mgmt.           & Services
                                                                                       • Planning & Execution
   • Planning & Order Processing                                                                                    • Contracts Mgmt.
                                                 • Jobs Mgt.                           • Goods Holding
   • Inventory & Costing                                                                                            • Planning & Dispatching
                                                 • Consumption & Certified             • Inventory
   • Analysis & Reporting                                                                                           • Order Processing
                                                   Work Mgt.                           • History
   • History                                                                                                        • History
                                                 • Budgets & Forecasts Mgt.
                                                 • Reports
                Purchasing                                                                     Warehouse
                                                                                               Management


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                                 18
MODULES
Estimations & Tendering
     Accelerated estimates assembly, using pre-defined templates
     Estimates traceability and integration with Project Management, and resource planning
     Detailed view of bill-item breakdown
     Customizable views to help companies leverage their existing best practices
     Enhanced estimate accuracy




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com       20
Project and Resource Management
    Fully integrated and automated Project Management minimizes efforts and data entry and maximizes
     accuracy and success
    Convert an Estimate to a Project with a click of a button
    Track and compare project costs vs. estimates
    Fully integrated with all other aspects of the business
    Generate change orders for variations




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com     21
Financial Management, Payroll & Advanced HR
     The fully integrated system enables executive management and financial controllers to have full real
      time access into every aspect of the company and its ongoing projects
     NAV also provides a lot of flexibility to financial controllers to effectively manage cash-flow across
      single and multiple projects and companies
     Employee Payroll and Portals




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com         22
Purchasing and Warehousing
     Optimize planning & order processing
     Manage inventory and track deliveries across various warehouses and construction sites
     Fully connected with estimations and project management
     Request for Quote (RFQ) - Multi vendor and item RFQ with One Click of a button to a multi-
      language quote generator.
     Quote comparison with hierarchical approvals for purchasing and requisitions




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com     23
Services and Contract Management
     Link customer options and selections with contracts
     Create, track, and update contracts easily
     Audit ability of changes to the contract
     Integrates with Project Controller, ensuring financial integrity & eliminating double-entry
     Minimizes costly expenses that never get billed
     Minimizes disputes between owners, architects and the contractor




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com         24
Quality Control
     Vendor Evaluation
     Incident Management (SharePoint)
     Process Enablement




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    25
Customer Service
     Provide 24/7 service
     Differentiate your business from the competition
     Provide fast, informed answers to customer questions
     Update stakeholders on project status with Web portals




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com      26
Collaboration & Mobile
                                                      Dynamics NAV 2009 Mobile & Internet
                                                      Collaboration Platform
                                                             Site managers access information in real time
                                                             Centralized Collaboration
                                                             Global Access - Internet & Mobile Platforms
                                                             Customizable & Integrated into Dynamics NAV 2009
                                                             Manage Diverse Content
                                                             Manage Information With Rights And Policies
                                                             Efficiently Manage Multiple Client & Vendor Portals
                                                             Streamline Business Process
                                                             Shared workspaces and document versioning
                                                             Wikis and blogs
                                                             Calendaring
                                                             RSS & email updates
                                                             & lots more – all in one software package
                                                             Technology - Microsoft SharePoint




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    27
Business Intelligence, Analytics and Planning
       Maximize executive insight and monitor key performance indicators (KPIs) to respond quickly to
        new opportunities
       Achieve insight
       Capture trends
       Respond quickly to new opportunities or shifts in the market
       Guide business growth




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com       28
Unique Architecture

                                                     Integrated Development Environment       Database
               GUI (Windows)

Employees


                 Commerce                                                                  Microsoft Dynamics
                 Portal                                                                    Database Server

Customers                              Application
and Business                           Server
Partners
                                                                                             Microsoft SQL
                                                                                             Server
                                                               Worldwide Generic Objects

                                                               Country-specific Objects
External
                                                              Customer-specific Objects
Applications
                                                               iBuild™ Solutions Objects




  Copyright 2012 © iBuild™. All Rights Reserved.
   ibuildcontractors.com | ibuilddevelopers.com                29
iBuild™ Dynamics NAV ERP Deployment Options
                                                        On Premise              On Demand
                                                            Customer               Customer
                                                               User                      User

  The Advanced capabilities of Microsoft
  Dynamics NAV facilitates the options for
  clients to install & run NAV at their own
  facilities or have it hosted in a professional          Software Services
  data center in the USA or Europe (Cloud).                 Software &
                                                               Data             Pay as     Software
                                                                                you go     Services
  We offer iBuild™ in two flavors: On-
  Premise & On-Demand (Hosted) in our in
  professional data centers in the USA or                                          Software &
  Europe (Cloud).                                                                     Data
                                                          Software Licenses
                                                        and Operational Costs



                                                            Software
                                                             Vendor                 Xenatus
                                                                                     Global


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com      30
OUR ERP IN THE CLOUD
Copyright 2011 © Xenatus Global. All Rights Reserved.
               www.xenatusglobal.com                    31
What is an ERP in The Cloud?
                                                           On Premise              On Demand
         On Premise Means Servers and                         Customer               Customer

          Applications are Required Onsite                        User                      User

          to:
                   Operate your ERP
                   Back-up and Maintain your data
                                                             Software Services
                   Secure your infrastructure                 Software &
                                                                  Data             Pay as     Software
                                                                                   you go     Services



         On Demand (Cloud) Means Onsite
          Servers for ERP are Not required:                                           Software &
                                                                                         Data
                                                             Software Licenses
                   Your software vendor hosts your        and Operational Costs

                    ERP
                   Your SW vendor secures the ERP             Software
                                                                Vendor                 Xenatus
                   Your SW vendor backs-up your                                        Global
                    data
Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com         32
Facts on ERP in our Cloud?

              Datacentres Based in US &
               Europe
              2 datacentres; more than 1500              SAS-70 is today the world
                                                        leading auditing standard for
               servers                                Service Providers that found its
                                                           origin in supporting SOX
              Overseeing over 50TB of                 compliancy in the US. SAS 70
               critical customer data                       is an auditing standard
                                                             designed to enable an
              Serving over 1 million end-            independent auditor to evaluate
                                                          and issue an opinion on a
               users in 55 countries                   service organization's controls.
                                                             With a SAS-70 type II
              Dedicated Engineers                           certificate the provider
                                                       demonstrates that it has taken
               supporting platform and                  measures to prevent adverse
                                                          effects on customers data
               infrastructure                           caused by flawed processes
                                                                and IT systems.


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com    33
Advantages of ERP in Our Cloud?
         Security                                         Flexibility
                   SAS70 Type II                               Increase users overnight
                   Audits and Penetration tests                Cease services within 30 day notice
                   Security Professionals                      Expand system capacity overnight
                   ISO27001                                    Global Accessibility
                   SOX compliant                          Time to Market
         Back-up                                               48 Hours
                   Managed Back-ups                       Total Cost of Ownership
                   Rolling Image Back-ups                      Operational Costs vs. Capital
         Reliable Up-Time                                       Expenditure
                   99.95% Guaranteed Uptime                    Lower Cost of Entry
         Maintenance                                           No Hardware or HR Costs
            Worry free upgrades, hardware,
                                                           Support
              software, security and back-up                    Outsourced based on SLA
                                                                24/7

Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com      34
Return on
Investment
iBuild™ – Return on Investment

   Why is it important to think in terms of ROI?

         Software is an Investment
         Resources’ Time is Valuable
         Important to identify inefficient Business Processes
          Important to identify Margin Enhancement Opportunities


                                                                              ?
   


                                                    8
                                                    6
                                                    4
                                                    2
                                                    0
                                                 Initial 1    2     3     4   5
                                                    -2
                                                 Investment        Year
Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com           36
iBuild™
       Benefits Across the Organization
Materials and Vendor                                                                 Risk Mitigation & Revenue
Management                                                                           Enhancement
      Price Reduction via Vendor                           Purchasing                  More Accurate Estimation
       Tracking and Evaluation                                                          Enhanced Sales
      On-time Delivery, Less Downtime                                                  Less ‘Risk’ Inventory and Resources
      Increased Bulk Buying                                                            Better Delivery
      Increased Bulk Discounts
                                                                 ROI


                                                 Operations                  Sales




                                                  Operational Efficiency Improvement
                                                     More Efficient Project Management
                                                     Less Problem Management
                                                     Increased Resource Billability
                                                     Increased Productivity of Expert Workforce

Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                       37
5 Year iBuild ROI Results
           Results from Actual Client Implementation, Normalized for a Turnover of €50,000,000

           Material & Vendor Management                                              Operational Efficiency
                                                                                        Improvement
   € 350,000
   € 300,000                                                             € 400,000
   € 250,000
                                                                         € 300,000
   € 200,000
   € 150,000                                                             € 200,000
   € 100,000
                                                                         € 100,000
    € 50,000
         €-                                                                   €-
                   Year 1 Year 2 Year 3 Year 4 Year 5                                 Year 1 Year 2 Year 3 Year 4 Year 5



                Risk Mitigation & Revenue                                            Total ROI as % of Annual
                      Enhancement                                                            Turnover

  € 1,200,000                                                              4.00%
  € 1,000,000
                                                                           3.00%
    € 800,000
    € 600,000                                                              2.00%
    € 400,000
    € 200,000                                                              1.00%
           €-
                                                                           0.00%
                    Year 1     Year 2    Year 3   Year 4   Year 5
                                                                                     Year 1   Year 2   Year 3   Year 4   Year 5


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com                       38
iBuild™ – NPV Chart

Net Present Value
      Normalized Turnover €50,000,000
      Normalized SW Implementation €75,000
      Interest Rate 5%
      Full Return in 13 months post go-live




                                          Go Live   Yr 1        Yr 2   Yr 3   Yr 4


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com              39
iBuild™ – Intangible Benefits
 Materials and Vendor Management

        Structured Work place
                 Easier to bring in New Employees and get them Productive
        Centralized Information provides for Better Business Intelligence
                 More Focus on Profit Drivers
        Management able to Focus on Revenue Drivers and Pre-empt Problems Before they Happen
        Improved Delivery and Customer Satisfaction
        Improved Management Morale and Control
        Improved Employee Morale
        Reduced Risk
                 Cash-flow
                 Inventory levels
                 Attrition
        Reduced Human Errors
        Constantly up to Date on global Best Practices


Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com               40
iBuild™ – ROI Consultancy
        We offer ROI Consultancy as a service to any company interested in iBuild™
        We provide a detailed analysis on the company’s potential ROI
        The service is complementary to iBuild™ clients
        $5,000 for Potential iBuild™ clients – Amount deductible from their iBuild™ Implementation




Copyright 2012 © iBuild™. All Rights Reserved.
 ibuildcontractors.com | ibuilddevelopers.com       41
Thank You

iBuild

  • 1.
    iBuild™ EmpoweringThe Enterprise Microsoft Dynamics NAV iBuild™ The Contracting & Property Development Industry Business Solution Contact us: Email: demo@ibuildcontractors.com MENA: +961-70655324, +961-3630630 EU: +357-25360900, +357-99287113 Americas: +1-3109287750, +1-5148231020
  • 2.
    Today’s Topics  Construction Industry Insights  Solution  Microsoft Dynamics NAV iBuild™  iBuild™ Deployment Options  Return on Investment Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 2
  • 3.
  • 4.
    Construction Industry Insights… GLOBAL MEGA-TRENDS INDUSTRY CHALLENGES  Market Shifts  Complex value chains and networks  Consolidation  Material cost fluctuations that put  Governance margins at risk  Technology  Change order management  Cyclical demand  Uneven cash flow and demand for capital  Complex regulatory environment  Projects & services run rate  Automation of distribution workflow and business processes  Multi-company accounting and reporting  Economic downturn  Flexible Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 4
  • 5.
    Business Drivers -Address The Pressures Head-on Invest in dependable technology that will help increase productivity and connect your business Internal Reality Today’s Demands • Current business software • Need to increase is outdated and inflexible employee productivity – Does not provide clear • Need to streamline operations view of finances and realize efficiencies – Customer and suppliers Anxiety • Need better access to requesting new systems Over – Employees doing all they information and reporting Change • Need to consolidate multiple can with existing systems • Can’t disrupt business systems and connect departments • Is it the right decision? • Have outgrown • Is it reliable, dependable, current system and secure? • Will it last for the long term? Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 5
  • 6.
  • 7.
  • 8.
    What is EnterpriseResource Planning (ERP) ! What is a ERP?  An ERP is the heart of an organization helping people in every aspect of the business maximize efficiency connectivity and efficacy  ERP provides executive management with the tools to have information live at their finger tips to make effective and informed business decisions  An ERP implementation enables management to take control of every aspect of their business and identify pain points and bottle necks in order to focus their resources ERP Reporting Resource Sales and Operations & Financials HR Warehouse Jobs & PM Administration Purchasing Planning Marketing • Manufacturing Business • Services Intelligence • eBusiness Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 8
  • 9.
    Microsoft Dynamics NAViBuild iBuild™ Microsoft Dynamics NAV 2009 is a business management role tailored iBuild™ solution that rapidly adapts around the way your organization does business, enabling your people to be effective and your business to be competitive. Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 9
  • 10.
    Microsoft Dynamics NAV Why Dynamics NAV  Microsoft Dynamics NAV seamlessly integrates all aspects of an organization’s infrastructure to enhance productivity and maximize returns while maintaining a familiar and user friendly user interface. With the global backing of Microsoft and thousands of partners and solution providers providing add-ons, NAV has quickly developed to be a leading ERP for many verticals including manufacturing, construction, distribution and the professional services. More than 80,000+ customers More than 4,000 certified partners More than 2,000 add-on solutions More than 40 localized versions More than 1.5M+ Licensed Users Microsoft Dynamics NAV integrates the enterprise Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 10
  • 11.
    Microsoft Dynamics NAV Winner of Mid-Market ERP solutions Microsoft Dynamics NAV Sage Office Line SAP Business One Source: Research One Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 11
  • 12.
    Microsoft Dynamics NAViBuild™ - Familiarity Microsoft Familiar User Interface Fits with your systems Fuels your Enables confident business productivity decision-making Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 12
  • 13.
    Microsoft Dynamics NAViBuild™ Usability ROLE CENTRES  Direct integration with Outlook  Task queues  Clear navigation panel  Intuitive workflow  Short training cycles  Interface inline with other familiar Microsoft products  Role Centers are highly and easily customizable for every role:  Marketing  Sales  Warehouse  Administration  Executive  Financial Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 13
  • 14.
    Dynamics NAV Add-OnSolutions - Overview What Are NAV Add-on Solutions?  NAV add-on solutions provide prepackaged plug and play solutions that sit within the Dynamics NAV platform providing users with additional functionality.  Add-on providers leverage global channel partners to deliver and support their solution in their respective regions  The benefits of the NAV add-on solutions are:  Vertical/Solution based modules based on industry expertise  Faster deployment time  Cost savings to the end client  Leverage global client base for enhancement and features  Benefit from the core NAV platform’s flexibility and stability while capitalizing on best of breed add-on solutions from various global vendors  Upgrade paths managed by the add-on providers  Partner based local support Certified Partner Provider B Provider C Contractor & Developer Add-on 3 Add-on 4 + Dynamics NAV Client NAV Package Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 14
  • 15.
    Types of DynamicsNAV Add-On Solutions Vertical Based Solutions Horizontal Based Solutions  Our Dynamics NAV Vertical based add-  Our Dynamics NAV Horizontal based add-on on solutions provide prepackaged plug solutions provide prepackaged plug and play and play industry solutions provides the functionalities that can apply to any industry to business and users with all the required enable our clients with faster time to market and a functionalities out of the box and ready more cost effective ERP rollout with out the need for roll out. for long and expensive product customizations. VERTICAL  Shipping & Maritime HORIZONTAL  Analytics & Business Intelligence SOLUTIONS  Construction & Contracting SOLUTIONS  Customer Relationship Mgt.  Property Development  E-commerce  Beverage Manufacturing  Field Services Management  Financial Services  Manufacturing  Retail Management  Portals  Government  Project Management  Professional Services  Document Management  Wholesale & Distribution  Online Time Entry & Management  Oil, Gas & Energy  Request for Quotes Management  … many others….  Vendor Evaluations Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 15
  • 16.
    iBuild™ Add-on Solution iBuild™is a “Ready For Roll-Out” add-on solution to Microsoft Dynamics NAV pre-configured & customized for Warehouse Financial the Construction & Property Mgt. Mgt. Development industry called “iBuild™”. iBuild provides a foundation for Property Developers extended to contractors utilizing an integrated solution with advanced business intelligence. Procurement & Sales & RFQ Marketing The benefits of iBuild include:  Automate and streamline operations  Minimize data entry  Minimize costs Supply Chain HR &  Reduce waste Mgt. Recruiting  Improve purchasing power  Improve percentage to Budget Estimating,  Maximize project wins Tendering &  Estimate more accurately and Project efficiently Management  Track projects at live at all times Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 16
  • 17.
    iBuild™ Contractors Financials Maintenance & • Campaign Mgt. Management • Orders & Contracts Mgmt. Plant Mgmt. • contcat Mgt. • Planning & Execution • Interactions • Multi-Company • Goods Holding • Contracts Mgmt. • Notifications Accounting • Inventory • Planning & Dispatching • Sales Lifecyle Mgt. • GL/COA • History • Order Processing • Receivables / Payables • History • Fixed Assets Sales & • Inventory Warehouse Marketing Management Resource Project • Templates Management Management • Vendor Evaluation • RFQ & Vender Eval • Quotes • Incident • Contracts • Order Processing • Jobs (Templates) Management • Resources • Resource/Groups • Inventory & Costing • Resources • Process Enablement • Reports & Capacity • Analysis & Reporting • Reports • Reports • History • Time Registration Estimating • History Purchasing • MS Project & Portals Quality Control Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 17
  • 18.
    iBuild™ Developers Financials Vendor • Campaign Mgt. Management • BOQ Data Load Management • contcat Mgt. • Request For Quote & • Interactions • Multi-Company Comparison Analysis • Notifications Accounting • Trade Breakdown • Quotes Mgt. • Sales Lifecyle Mgt. • GL/COA • Reports • Orders & Contracts Mgmt. • Receivables / Payables • History • Vender Evaluation • Fixed Assets • Reports & History Sales & • Inventory BOQ Marketing Estimation Project Maintenance • RFQ & Vender Evaluations Management • Orders & Contracts Mgmt. & Services • Planning & Execution • Planning & Order Processing • Contracts Mgmt. • Jobs Mgt. • Goods Holding • Inventory & Costing • Planning & Dispatching • Consumption & Certified • Inventory • Analysis & Reporting • Order Processing Work Mgt. • History • History • History • Budgets & Forecasts Mgt. • Reports Purchasing Warehouse Management Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 18
  • 19.
  • 20.
    Estimations & Tendering  Accelerated estimates assembly, using pre-defined templates  Estimates traceability and integration with Project Management, and resource planning  Detailed view of bill-item breakdown  Customizable views to help companies leverage their existing best practices  Enhanced estimate accuracy Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 20
  • 21.
    Project and ResourceManagement  Fully integrated and automated Project Management minimizes efforts and data entry and maximizes accuracy and success  Convert an Estimate to a Project with a click of a button  Track and compare project costs vs. estimates  Fully integrated with all other aspects of the business  Generate change orders for variations Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 21
  • 22.
    Financial Management, Payroll& Advanced HR  The fully integrated system enables executive management and financial controllers to have full real time access into every aspect of the company and its ongoing projects  NAV also provides a lot of flexibility to financial controllers to effectively manage cash-flow across single and multiple projects and companies  Employee Payroll and Portals Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 22
  • 23.
    Purchasing and Warehousing  Optimize planning & order processing  Manage inventory and track deliveries across various warehouses and construction sites  Fully connected with estimations and project management  Request for Quote (RFQ) - Multi vendor and item RFQ with One Click of a button to a multi- language quote generator.  Quote comparison with hierarchical approvals for purchasing and requisitions Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 23
  • 24.
    Services and ContractManagement  Link customer options and selections with contracts  Create, track, and update contracts easily  Audit ability of changes to the contract  Integrates with Project Controller, ensuring financial integrity & eliminating double-entry  Minimizes costly expenses that never get billed  Minimizes disputes between owners, architects and the contractor Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 24
  • 25.
    Quality Control  Vendor Evaluation  Incident Management (SharePoint)  Process Enablement Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 25
  • 26.
    Customer Service  Provide 24/7 service  Differentiate your business from the competition  Provide fast, informed answers to customer questions  Update stakeholders on project status with Web portals Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 26
  • 27.
    Collaboration & Mobile Dynamics NAV 2009 Mobile & Internet Collaboration Platform  Site managers access information in real time  Centralized Collaboration  Global Access - Internet & Mobile Platforms  Customizable & Integrated into Dynamics NAV 2009  Manage Diverse Content  Manage Information With Rights And Policies  Efficiently Manage Multiple Client & Vendor Portals  Streamline Business Process  Shared workspaces and document versioning  Wikis and blogs  Calendaring  RSS & email updates  & lots more – all in one software package  Technology - Microsoft SharePoint Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 27
  • 28.
    Business Intelligence, Analyticsand Planning  Maximize executive insight and monitor key performance indicators (KPIs) to respond quickly to new opportunities  Achieve insight  Capture trends  Respond quickly to new opportunities or shifts in the market  Guide business growth Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 28
  • 29.
    Unique Architecture Integrated Development Environment Database GUI (Windows) Employees Commerce Microsoft Dynamics Portal Database Server Customers Application and Business Server Partners Microsoft SQL Server Worldwide Generic Objects Country-specific Objects External Customer-specific Objects Applications iBuild™ Solutions Objects Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 29
  • 30.
    iBuild™ Dynamics NAVERP Deployment Options On Premise On Demand Customer Customer User User The Advanced capabilities of Microsoft Dynamics NAV facilitates the options for clients to install & run NAV at their own facilities or have it hosted in a professional Software Services data center in the USA or Europe (Cloud). Software & Data Pay as Software you go Services We offer iBuild™ in two flavors: On- Premise & On-Demand (Hosted) in our in professional data centers in the USA or Software & Europe (Cloud). Data Software Licenses and Operational Costs Software Vendor Xenatus Global Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 30
  • 31.
    OUR ERP INTHE CLOUD Copyright 2011 © Xenatus Global. All Rights Reserved. www.xenatusglobal.com 31
  • 32.
    What is anERP in The Cloud? On Premise On Demand  On Premise Means Servers and Customer Customer Applications are Required Onsite User User to:  Operate your ERP  Back-up and Maintain your data Software Services  Secure your infrastructure Software & Data Pay as Software you go Services  On Demand (Cloud) Means Onsite Servers for ERP are Not required: Software & Data Software Licenses  Your software vendor hosts your and Operational Costs ERP  Your SW vendor secures the ERP Software Vendor Xenatus  Your SW vendor backs-up your Global data Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 32
  • 33.
    Facts on ERPin our Cloud?  Datacentres Based in US & Europe  2 datacentres; more than 1500 SAS-70 is today the world leading auditing standard for servers Service Providers that found its origin in supporting SOX  Overseeing over 50TB of compliancy in the US. SAS 70 critical customer data is an auditing standard designed to enable an  Serving over 1 million end- independent auditor to evaluate and issue an opinion on a users in 55 countries service organization's controls. With a SAS-70 type II  Dedicated Engineers certificate the provider demonstrates that it has taken supporting platform and measures to prevent adverse effects on customers data infrastructure caused by flawed processes and IT systems. Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 33
  • 34.
    Advantages of ERPin Our Cloud?  Security  Flexibility  SAS70 Type II  Increase users overnight  Audits and Penetration tests  Cease services within 30 day notice  Security Professionals  Expand system capacity overnight  ISO27001  Global Accessibility  SOX compliant  Time to Market  Back-up  48 Hours  Managed Back-ups  Total Cost of Ownership  Rolling Image Back-ups  Operational Costs vs. Capital  Reliable Up-Time Expenditure  99.95% Guaranteed Uptime  Lower Cost of Entry  Maintenance  No Hardware or HR Costs  Worry free upgrades, hardware,  Support software, security and back-up  Outsourced based on SLA  24/7 Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 34
  • 35.
  • 36.
    iBuild™ – Returnon Investment Why is it important to think in terms of ROI?  Software is an Investment  Resources’ Time is Valuable  Important to identify inefficient Business Processes Important to identify Margin Enhancement Opportunities ?  8 6 4 2 0 Initial 1 2 3 4 5 -2 Investment Year Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 36
  • 37.
    iBuild™ Benefits Across the Organization Materials and Vendor Risk Mitigation & Revenue Management Enhancement  Price Reduction via Vendor Purchasing  More Accurate Estimation Tracking and Evaluation  Enhanced Sales  On-time Delivery, Less Downtime  Less ‘Risk’ Inventory and Resources  Increased Bulk Buying  Better Delivery  Increased Bulk Discounts ROI Operations Sales Operational Efficiency Improvement  More Efficient Project Management  Less Problem Management  Increased Resource Billability  Increased Productivity of Expert Workforce Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 37
  • 38.
    5 Year iBuildROI Results  Results from Actual Client Implementation, Normalized for a Turnover of €50,000,000 Material & Vendor Management Operational Efficiency Improvement € 350,000 € 300,000 € 400,000 € 250,000 € 300,000 € 200,000 € 150,000 € 200,000 € 100,000 € 100,000 € 50,000 €- €- Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Risk Mitigation & Revenue Total ROI as % of Annual Enhancement Turnover € 1,200,000 4.00% € 1,000,000 3.00% € 800,000 € 600,000 2.00% € 400,000 € 200,000 1.00% €- 0.00% Year 1 Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year 5 Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 38
  • 39.
    iBuild™ – NPVChart Net Present Value  Normalized Turnover €50,000,000  Normalized SW Implementation €75,000  Interest Rate 5%  Full Return in 13 months post go-live Go Live Yr 1 Yr 2 Yr 3 Yr 4 Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 39
  • 40.
    iBuild™ – IntangibleBenefits Materials and Vendor Management  Structured Work place  Easier to bring in New Employees and get them Productive  Centralized Information provides for Better Business Intelligence  More Focus on Profit Drivers  Management able to Focus on Revenue Drivers and Pre-empt Problems Before they Happen  Improved Delivery and Customer Satisfaction  Improved Management Morale and Control  Improved Employee Morale  Reduced Risk  Cash-flow  Inventory levels  Attrition  Reduced Human Errors  Constantly up to Date on global Best Practices Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 40
  • 41.
    iBuild™ – ROIConsultancy  We offer ROI Consultancy as a service to any company interested in iBuild™  We provide a detailed analysis on the company’s potential ROI  The service is complementary to iBuild™ clients  $5,000 for Potential iBuild™ clients – Amount deductible from their iBuild™ Implementation Copyright 2012 © iBuild™. All Rights Reserved. ibuildcontractors.com | ibuilddevelopers.com 41
  • 42.