This document contains a resume and profile for Harish Poojary, an Oracle database administrator. It outlines his objective to work for a progressive organization, provides details of his Oracle database administration experience over 6+ years including with Oracle 9i, 10g, 11g and Exadata. It also lists his technical skills, projects handled, and education and certification details.
Managing large chain of Hotels and ERP database comprises of core areas such as HRMS & PIP.HRMS (Human Resource Management System), which further includes areas such as Soft Joining, Promotion, Transfer, Confirmation, Leave Attendance and Exit, etc. PIP (Payroll Information Portal), wherein employees can view their individual Salary details, submit investment declaration, Reimbursement claim & CTC structuring, etc. Management of Large Chain of Hotels and ERP Database in AWS Cloud involves continuous monitoring with regards to the areas such as Performance of resource usages and optimization techniques relating to the use of PL/SQL. High Availability (HA) of data is accomplished through the Backup and Recovery mechanism and security of the data by Encryption & Decryption mechanism.
Overall 12 Years and 9+ of experience as an Oracle Database Administrator, my experience has scaled in providing client support, analysis, designing, development, testing, installation, migration, maintenance and administration for oracle databases, which included understanding the requirements, upgrades, performance tuning, backup & recovery, cloning and space management using ORACLE 11g, 10g, 9i performing the role of Oracle Database Administrator according to the set standards and timelines.
ORACLE DBA Online Training by Keylabstraining is a well defined course and trained by our Well Qualified Oracle DBA Professionals all over the World. Our course content designed as per the current IT industry requirement.
Course Content : http://www.keylabstraining.com/oracle/oracle-dba-online-training-hyderabad-bangalore
For more information email us : info@keylabstraining.com
Managing large chain of Hotels and ERP database comprises of core areas such as HRMS & PIP.HRMS (Human Resource Management System), which further includes areas such as Soft Joining, Promotion, Transfer, Confirmation, Leave Attendance and Exit, etc. PIP (Payroll Information Portal), wherein employees can view their individual Salary details, submit investment declaration, Reimbursement claim & CTC structuring, etc. Management of Large Chain of Hotels and ERP Database in AWS Cloud involves continuous monitoring with regards to the areas such as Performance of resource usages and optimization techniques relating to the use of PL/SQL. High Availability (HA) of data is accomplished through the Backup and Recovery mechanism and security of the data by Encryption & Decryption mechanism.
Overall 12 Years and 9+ of experience as an Oracle Database Administrator, my experience has scaled in providing client support, analysis, designing, development, testing, installation, migration, maintenance and administration for oracle databases, which included understanding the requirements, upgrades, performance tuning, backup & recovery, cloning and space management using ORACLE 11g, 10g, 9i performing the role of Oracle Database Administrator according to the set standards and timelines.
ORACLE DBA Online Training by Keylabstraining is a well defined course and trained by our Well Qualified Oracle DBA Professionals all over the World. Our course content designed as per the current IT industry requirement.
Course Content : http://www.keylabstraining.com/oracle/oracle-dba-online-training-hyderabad-bangalore
For more information email us : info@keylabstraining.com
1. Harish Poojary
E-Mail: harishpoojari@gmail.com~ Contact: +919769313757
Objective
My well-founded objective is to associate with a progressive organization that gives me scope to share my knowledge, enhance my
skills in accordance with the latesttrends, andbe a part of team thatdynamically works towards the growth of organization. To obtain
a challenging position in an organization that can utilize a creative mind, an enthusiastic thirst for knowledge and a desire to exceed
the expected standard of performance.
Well-versedwith databaseadministration and maintenance with Oracle 9i/10g/11g database administration skills such as database
creation, database configuration, backup and recovery, database export and import utilities.
A highly motivated, energeticindividual, anda team player with excellent analyticalandproblem solving, and interpersonal skills an
effective communicator with excellent relationshipmanagement skills coupled with demonstrated inter-personal and analytical skills
Abstract
Over 6+ years of hands on exposure in Analyzing, Designing and Administering Oracle Databases Supporting Oracle 9i & 10g,
11g.
Over 3+ years of experience in Exadata DMA.
Over 1+ years of experience in Golden Gate.
Installing and Configuring Oracle9i/10g/11g Database on Windows environment and Creating Oracle Database manually.
Profound Understanding Oracle 9i/10g Architecture and Manually creation of databases
Sound knowledge of upgrading 9i to 10g, 10g to 11g.
Efficient in building catalog database for RMAN repository.
Configuring and Managing different type of Oracle Backup (consistent andInconsistent), like Cold Backup and Hot Backup, User
Managed Manual Backups, etc.
Creating Recovery Catalog Database in RMAN (RecoveryManager) for storing Backupandfor performing Restore and Recovery
operation of Database.
Wellversed with the usage of Oracle Export / Import feature to be used at Database / Schema / Tablespace and Tables level.
Configuring Oracle Database on ARCHIVE LOG mode.
Configure Oracle Database in Dedicated and Shared Server environment.
Creating Oracle Control File, Oracle Parameter Filein case of Database / file corruption.
Configuring and managing Oracle network files like TnsNames, Listener and SQLnet files.
Well versed with Oracle “Instance” functionality and its various Parameters.
Putting Oracle Database into Read only / Read Write / Offline / Online and Backup mode for various maintenance purposes.
Creating andManaging Database Users and their space management, Database access and their Passwords/Privileges/Roles
definition using SQL commands.
Wellversedwith creating Oracle Dictionary Managed/Locally ManagedTablespace. Configuring initialization parameters related
to the memory andI/O andManaging Storage Allocation andMinimizing Fragmentation andDiskContention to reduce response
time.
Cloning of various databases using various methods including create control file, RMAN.
Confident about using Explain plan, TKprof, Autotrace andidentifying the Execution plan and tune queries, using indexes, hints
etc. Also used Data Dictionary views, STATSPACK, AWR and ADDM for performance monitoring.
Recovery using Flashback Query, Flashback version Query and Flashback Transaction Query.
2. Expertise in Expdp/Impdp
Sound knowledge of Data Guard.
Conceptualknowledge of RAC – RAC Configuration andadding nodes into existing RAC environment.
Immense experience in Oracle Database Installation, Applying the Patch set, Upgradation, configuration of various setup,
Migration, Uninstallation, ASM, RAC, troubleshooting, user / RMAN Backup strategies, supporting 24x7 critical systems,
maintenance andadministration of Oracle databases and database cloning for application testing, user creation / management.
Strong skills in technologies like RAC, ASM and RMAN administration.
Domain expertise at:
a) Up-gradation of production databases from 9i to 10g, 10g to 11g (standalone & RAC)configuring & maintaining physical
standby databases.
b) Migration of production database from non ASM to ASM.
c) Building standby (standalone & RAC) on 10g and 11g.
d) Installation and configuration of Oracle 9i, 10g, 11g in UNIX and Windows platforms.
e) Migration of production database from parisc UNIX toitanium UNIX.
f) Cascade standby database configuration.
g) Superdome Migration.
Extensively hands-on experience in oracle utilities viz. AWR, DATAPUMP, Oracle Enterprise Manager.
Expertise at the entire life cycle of the project, integration &implementation of projects / products, database creation, mo deling and
capacity planning.
Excellent skills in database administration, backupandrecoveryactivities, patching andtroubleshooting. Strong problem solving
& technical skills.
Knowledge about EXADATA and Goldengate.
Competency Matrix
Technical:
Operating Systems : UNIX, LINUX& Windows
Databases : Oracle 9i, 10g& 11g, EXADATA, Goldengate
Tools : OEM, DBCA, TOAD, EXP/IMP, RMAN, TKPROF/EXPLAI N
PLAN/STATSPACK, ADDM, ASMM, AWR, DATAPUMP& ADRCI, HP-OPENVIEW, HP-SM, HP-OM,
IBM Clear Quest,Foglight, HP-Data Protector
Languages : SQL& Shell Scripting
Functional:
Databases Analyzing, Designing &Administering
Installation andConfiguration (Standalone &RAC)
Standby creation (standalone &RAC)
Database Creation
Database upgradation
Capacity Planning
Cascade standby databaseconfiguration
RAC Datagaurd
Backup / RecoveryStrategies
Performance Monitoring
Zero data loss proof of concept for disaster recoveryscenario
Requirements Analysis
Project Progress Reporting
3. Employment Scan
Since Mar’10 to Jan’14 with HP (IT Source PVT Ltd), Mumbai as Database Administrator L2
Client : BankofBaroda (Core-Banking)
Technologies: Fincale, Oracle, Exadata, Golden Gate
Job Role:
Dedicated resource to resolve the severity 1 issue on RAC and Standalone database.
Maintaining documentation for all new activities and mentoring new team members on various functional aspects.
Successfully workedwith the CBS application development teamandplayeda key role in providing them support in SQL tuning.
Providing database administration support for multiple production, staging, development, and test environments.
Managing Full Exadata Servers (X2-2) for DWH database, Real Application cluster (10g/11gr2) for Core banking and KM, ATM,
ATMPOS, Informatica-DWH & HRMS databases, and Business Critical Oracle (9i/10g/11g) Databases.
Co-ordination with Oracle Support Consultant in addressing criticalhardware / software issues on Exada ta and others machines.
Single point of contact for first level escalation from L1 and L2.
Major Role in Planning and implementing of all the major activities.
Good troubleshooting skills on RAC and ASM.
Monitoring alert logs, trace files, free spaces de ficit, untidiness of database objects, on timely monitoring &managing the databases
using by writing and using shell scripts which are run through crontab.
Maintaining standby & DR databases to keep it in sync with primary database.
Responsible for refreshing of development/testing databases with latest production data for application testing through import or
export or by cloning.
Installing the oracle software &creating databases, upgrade & migration of Oracle databases and working with the end users in
solving their problems.
Database creation & capacity planning as per user requirement.
Configure Flashback on Primary and secondary database.
Configuring and integrating the database with oracle Failsafe on Windows platforms.
Cloning of the database using RMAN and Cold backup.
Configure RMAN backup on HP DataProtector.
Installation of oracle RAC 10g/11g software on different platform.
Experience on Block Change Tracking and Flashback Data Archive (FBDA).
Deinstallclusterware in RAC. Service configuration and deconfiguration in RAC.
Creating database for Production/Quality/Development.
DatabaseUpgradation.
Creating the Clone of database.
Creating new users and manage roles and privileges.
Creation of Database Objects as per the Requirement.
Managing Import/Export Depending up on Requirement.
Managing Rollback Segments, Redo logs, Control files, and Tablespaces.
Auditing On users, Lock Management and space management.
Monitoring Users, tablespaces, rollback segments.
Taking Hot/Cold Backups of database using RMAN.
Backup of initialization / configuration files, Control files, Password files and archived log files.
Testing Recovery Strategies by Simulating Database Crashes on Development Systems.
Patch Administration, Applying Patches as per requirement.
4. Employment Scan
Since Jan’14 to Aug’14 with L&T InfoTech, Mumbai as Senior System Engineer A-1-2
Client : Marsh (US Client: Insurance Based Company)
Job Role:
Installing the oracle software & creating databases and deploying scripts as per Marsh standards.
Applying latest April 2014 PSU patch on Grid and database binaries.
Performing approved CO, schema level refresh at scheduled time.
Configured Physical Standby database in oracle 10g and 11g. Resolved Archive GAP on DR using Rman Incremental Backup.
Logical backup using exp-imp or expdp-impdp and resolving issue on logical backup.
Taking action on mail alerts related to various space issue, failed rman backup, locking issue.
Restoring and testing of quarterly rman backup from tape as per the ticket.
User Management, Creating Roles and Assigning Privileges.
Creation of Application User andSchemas on UAT, Dev, Training and on Production Databases server as per the Instructions.
Scheduled cleanup maintenance job for audit, trace, Listener and Alert log file for databases.
Database cloning using Rman backup.
Activated Physical Standby database on 11g for Testing.
Employment Scan
Since Sep’14 to Sep’16 with HPE (Harjai Computers Private Ltd), Mumbai as Database Administrator L2
Client : BankofBaroda (Core-Banking)
Technologies: Fincale, Oracle, Exadata, Golden Gate
Job Role:
Managing Full Exadata Servers (X2-2) for DWH database, RealApplication cluster (11gr2) for Core banking, KM, ATM, ATMPOS,
Informatica-DWH & HRMS databases, and Business Critical Oracle (9i/10g/11g) Databases.
Major Role in Planning and implementing of all the major activities.
Providing database administration support for multiple production, staging, development, and test environments.
Maintaining documentation for all new activities and mentoring new team members on various functional aspects.
Single point of contact for first level escalation from L1 and L2.
DB Migration Approach and Lead implementation.
Co-ordination with Oracle Support Consultant in addressing criticalhardware / software issues on Exadata and others machines.
Applying latest PSU patch on Grid and database binaries.
Configured DBFS filesystem for OFSAA Quarter Rack Exadata Systems.
Mounting NFS filesystem in Full Rack Exadata Box.
Troubleshooting DBFS for Exadata Systems.
Migration of OCR and Voting Disk in RAC.
Upgraded Intl CBS Database from 10.2.0.4 to 11.2.0.4.
Active Support in Superdome Migration of Core Banking Database Server and App server.
Configured failsafe 4.1 on windows 2013 TND server.
Configured standby database for Exadata OFSAA Quarter RAC database.
5. Employment Scan
Since Sep’16 with DATAVAIL, Mumbai as Oracle DBA Tier-2
Client : Multiple US clients
Technologies: Oracle, OEM 12c
Job Role: Remote DBA services management.
Academia
BE IT in 2009, Mumbai University.
Professional Certifications
Oracle Certified Professional (OCP) Oracle 9i DBA.
Oracle Certified Associate (OCA) Oracle 9i DBA.
Professional Trainings Attended
Oracle 9i Database Administration & Linux Administration,SQL Star International, Mumbai.
HP FTP Yuva training program on HP-UX & Oracle.
Oracle 11g Real Application Clusters and Grid Infrastructure.
Oracle Exadata Database Machine Administration Workshop.
Personal Dossier
Date of Birth : 13st Jun 1985
Address : A/502, Leo groupHsg, So, Sps Marg, Near ParagVidyalaya, Bhandup(W), Mumbai-400078.
Annexureof Projects Handled
Migrating Production database from Non ASM to ASM.
O/S-HP-UX
Architecture- 64 bit
Database - 10.2.0.5
Database Size - 10 TB
Migrating Standalone database to RAC database.
O/S-HP-UX
Architecture- 64 bit
Database - 10.2.0.5
Database Size - 10 TB
Clusterware- 10.2.0.5
Storage - ASM
6. Upgradation of Clusterware& RAC database from 10g 64 bit to 11g 64 bit:
O/S-HP-UX
Architecture- 64 bit
Database - 10.2.0.5 to 11.2.0.3
Clusterware- 10.2.0.5 to 11.2.0.3
Database Size - 13 TB
Migration of database from HP-UX Parisc to Itanium: Oracle 10g UNIX Parisc 64 bit production database upgraded into UNIX
Itanium 64 bit..
O/S-HP-UX Parisc64 bit, Itanium 64 bit.
Architecture -64 Bit
Database–10.2.0.4
Zero data loss proof of concept for disaster recovery scenario.
O/S-HP-UX
Architecture- 64 bit
Database - 10.2.0.5
Database Size - 10 TB
Clusterware- 10.2.0.5
Storage - ASM
Near DR setup for Disaster recovery scenario by syncing Business Copy of archives and redo ASM filesystem from primary vol.
O/S-HP-UX
Architecture- 64 bit
Database -11.2.0.3
Database Size- 22 TB
Clusterware- Standalone 11.2.0.3
Storage - ASM
Configuration of Fresh 11g 2 Node RAC database for Base 24 Application.
O/S-HP-UX
Architecture- 64 bit
Database - 11.2.0.3
Clusterware- 11.2.0.3
Database Size - 200Gb
Testing ADG backup Restoration of CBS database in TND server for POC.
O/S-HP-UX
Architecture- 64 bit
Database -11.2.0.3
Database Size- 22 TB
Clusterware- Standalone 11.2.0.3
Storage – ASM
Old Superdome to New Superdome Migration.
O/S-HP-UX
Architecture- 64 bit
Database -11.2.0.3
Database Size- 22 TB
Clusterware- 11.2.0.3
Storage – ASM
7. Project DWH: Exadata DBMA Tasks:
Working as Oracle Database Machine Administrator for Oracle Exadata X2-2 (Full and
Quarter Racks) running Oracle version 11.2.0.3.
Accustomed to using Exadata KVM.
Administration of Oracle Exadata Cell Nodes.
o Analyzing Cell Alerts for the detection potential issues and H/W failures.
Compressing table partitions to conserve space as per business / user requirement.
Reclaiming fragmented space by reorganizing tablespaces.
Monitoring Exadata compute and cell node ILOM interfaces for component failures
and coordinating with Oracle Service / Field Engineer towards a feasible resolution.
Checking Golden gate sync status and troubleshooting incase of issues.
Project DWH: Exadata
Clusterware upgrade from 11.2.0.3 to 11.2.0.4
Full Rack X2-2
Project Knowledge Management:
Clusterware upgrade from 11.2.0.1 to 11.2.0.4
O/S-Windows 2008
Architecture- 64 bit
Database -11.2.0.1
Database Size- 500 Gb
Clusterware- 11.2.0.4
Storage – ASM
Project DWH: Golden Gate
Monitoring real time environment data extraction from Live Production Systems and replication of the same into the DWH
database.
Monitoring goldengate components or criticalprocesses such as Manager, Extractor, Pump, Replicator and troubleshooting them
for any issues and ensuring that replication is working fine from Production to DWH database.
Configured column level replication for only specific columns of table.
Handled GG during flashback database revert and brought in sync.
Handled GG during N/w issues.
Monitoring GG through Oracle GG Director Link & adding new Source/Target in Data Source of GG Director Administrator Tools.
Knowledge of Bi-directional replication with CDR, Upgradation of GG, logdump utility.