PRAVADA - La Mesa, CA
Phase One of two phases - 527 total unit mixed use, LEED Silver project with 100kw solar and 45k sf retail
$141M total construction cost
338 units – 895 sf average
325,000 rentable sf – 933 parking stalls
3 and 4 story wood structures over 2 level concrete parking garage/podium
Responsible for:
Extensive value engineering
Construction Document Management/Coordination
Full coordination of all disciplines
Construction administration and quality control
Specification and product selection
LEED Retrofit Supervision and Coordination
PRAVADA - La Mesa, CA
Phase One of two phases - 527 total unit mixed use, LEED Silver project with 100kw solar and 45k sf retail
$141M total construction cost
338 units – 895 sf average
325,000 rentable sf – 933 parking stalls
3 and 4 story wood structures over 2 level concrete parking garage/podium
Responsible for:
Extensive value engineering
Construction Document Management/Coordination
Full coordination of all disciplines
Construction administration and quality control
Specification and product selection
LEED Retrofit Supervision and Coordination
Service Design Workshop for Banche del Tempo Milan. Co-creation of goals and action plan to raise visibility and increase participation in Milan's Time Banks
Lifestyle Brands - Success and Profits Despite CrisisKristina Tool
What is a lifestyle brand and how have they cultivated a loyal following not only to sustain business but have some of their most profitable results ever, even during a crisis? Can your brand reap the rewards of being a lifestyle brand?
Service Design Workshop for Banche del Tempo Milan. Co-creation of goals and action plan to raise visibility and increase participation in Milan's Time Banks
Lifestyle Brands - Success and Profits Despite CrisisKristina Tool
What is a lifestyle brand and how have they cultivated a loyal following not only to sustain business but have some of their most profitable results ever, even during a crisis? Can your brand reap the rewards of being a lifestyle brand?