Notts Sport offers a design and advisory service for synthetic sports pitch projects. They provide full project development, design, specification, supply, construction, and post-construction services at no upfront cost. Their Fast Track Funding option allows customers to fund projects through operating leases over 5-7 years, with payments potentially offset by pitch rental income. Examples show funding covering 100% of resurfacing or new pitch costs. The holistic service aims to deliver high-quality facilities and overcome common obstacles like planning, funding, and technical issues.
The document discusses the IYRE project which provides support to businesses to improve environmental performance through increased efficiency. It provides an agenda and overview of the project as well as case studies of businesses that received funding. Performance metrics are presented showing that in the last financial year, 87 projects were supported with £403,164 in the Southwest region, exceeding initial targets.
This document summarizes a sponsored research project on human somatic cells funded by the National Institutes of Health. The project has a total budget of $1,757,826.66 and is led by Principal Investigator Eric Hendrickson at the University of Minnesota. As of November 10, 2009, the project has spent $1,794,311.49, exceeding its total budget by $47,085.49. It also shows a cost share budget of $79,393.66 that has not been met.
Sport & Events Management in Ukraine - ALBATROSDima Tantsiura
Albatros Sport provides travel and event management services for sports teams in Ukraine, Belarus, and other countries. They arrange accommodation in recommended hotels that provide rooms on the same floor, a private restaurant, and meeting space. Albatros also coordinates transportation using rental vehicles and drivers experienced working with football teams. They arrange airport transfers and support, and can provide services at stadiums in Kiev, Dnipropetrovsk, Lviv, Borisov, and Zhodino that meet UEFA and FIFA requirements.
This document discusses Red Bull's pioneering spirit and obsession with defying boundaries and pushing limits through ambitious campaigns and ideas conceived from pure imagination. It describes how Red Bull was born from the human soul's drive to overcome physical hurdles and live beyond reason through the realm of imagination and ambition. In under 3 sentences.
A ready to use Template for pitching your Business for funding! See updated v...Alok Rodinhood Kejriwal
This document provides a template and sample pitch for entrepreneurs seeking funding for their business. The template includes sections for key elements of a funding pitch such as stating the problem being addressed, the solution or business proposition, market opportunity, competition, financial projections, and founding team. The sample pitch uses this template to present a hypothetical mobile gaming startup. The document emphasizes keeping the pitch concise while demonstrating traction, market size, revenue modeling, and risks to investors. It aims to help first-time entrepreneurs structure and practice their funding pitches.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise boosts blood flow and levels of neurotransmitters and endorphins which elevate and stabilize mood.
The Aurora Community Tennis Club is proposing to install a translucent fabric roof over the tennis courts at Fleury Park to allow for year-round tennis and other recreational activities. This would increase playable days from the current 4 months to 12 months. ACTC envisions partnering with local organizations like the school board and seniors' center to utilize the space. The roof would be financed by an entrepreneur who would recoup costs over 20 years through membership fees and court rentals. ACTC believes this multi-use facility would benefit the community by promoting health, arts, and civic engagement.
Liberate Your Library Costing And Support ModelJonathan Field
The document discusses costing and support models for library consortia using the open source library system Evergreen. It provides sample pricing for individual libraries and discounted pricing models for consortia. For a three member consortium, the annual cost per library is $8,000-$16,430, lower than individual pricing. Consortia benefits include shared expertise, lower software and hosting costs, and mutual support between members.
The document discusses the IYRE project which provides support to businesses to improve environmental performance through increased efficiency. It provides an agenda and overview of the project as well as case studies of businesses that received funding. Performance metrics are presented showing that in the last financial year, 87 projects were supported with £403,164 in the Southwest region, exceeding initial targets.
This document summarizes a sponsored research project on human somatic cells funded by the National Institutes of Health. The project has a total budget of $1,757,826.66 and is led by Principal Investigator Eric Hendrickson at the University of Minnesota. As of November 10, 2009, the project has spent $1,794,311.49, exceeding its total budget by $47,085.49. It also shows a cost share budget of $79,393.66 that has not been met.
Sport & Events Management in Ukraine - ALBATROSDima Tantsiura
Albatros Sport provides travel and event management services for sports teams in Ukraine, Belarus, and other countries. They arrange accommodation in recommended hotels that provide rooms on the same floor, a private restaurant, and meeting space. Albatros also coordinates transportation using rental vehicles and drivers experienced working with football teams. They arrange airport transfers and support, and can provide services at stadiums in Kiev, Dnipropetrovsk, Lviv, Borisov, and Zhodino that meet UEFA and FIFA requirements.
This document discusses Red Bull's pioneering spirit and obsession with defying boundaries and pushing limits through ambitious campaigns and ideas conceived from pure imagination. It describes how Red Bull was born from the human soul's drive to overcome physical hurdles and live beyond reason through the realm of imagination and ambition. In under 3 sentences.
A ready to use Template for pitching your Business for funding! See updated v...Alok Rodinhood Kejriwal
This document provides a template and sample pitch for entrepreneurs seeking funding for their business. The template includes sections for key elements of a funding pitch such as stating the problem being addressed, the solution or business proposition, market opportunity, competition, financial projections, and founding team. The sample pitch uses this template to present a hypothetical mobile gaming startup. The document emphasizes keeping the pitch concise while demonstrating traction, market size, revenue modeling, and risks to investors. It aims to help first-time entrepreneurs structure and practice their funding pitches.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise boosts blood flow and levels of neurotransmitters and endorphins which elevate and stabilize mood.
The Aurora Community Tennis Club is proposing to install a translucent fabric roof over the tennis courts at Fleury Park to allow for year-round tennis and other recreational activities. This would increase playable days from the current 4 months to 12 months. ACTC envisions partnering with local organizations like the school board and seniors' center to utilize the space. The roof would be financed by an entrepreneur who would recoup costs over 20 years through membership fees and court rentals. ACTC believes this multi-use facility would benefit the community by promoting health, arts, and civic engagement.
Liberate Your Library Costing And Support ModelJonathan Field
The document discusses costing and support models for library consortia using the open source library system Evergreen. It provides sample pricing for individual libraries and discounted pricing models for consortia. For a three member consortium, the annual cost per library is $8,000-$16,430, lower than individual pricing. Consortia benefits include shared expertise, lower software and hosting costs, and mutual support between members.
The document provides guidance on design considerations for badminton facilities. It discusses dimensions for badminton courts and required run-off spaces around courts. Minimum spacing is specified between courts, walls, and dividing curtains based on the level of play. Specific requirements are outlined for flooring, walls, ceilings, lighting, heating/ventilation, and other facility elements. The guidance aims to promote best practices for designing facilities that meet the needs of the sport and create an enjoyable playing environment.
This document summarizes the current status and upcoming timeline for BDUK's Phase 3 broadband procurement process. To date, £44.37 million in public funding has been awarded for projects covering 40,540 premises. Several local bodies have awarded contracts or are in the evaluation process. The timeline shows indicative timetables for additional local bodies proceeding through open market reviews, public consultations, invitation to tender stages and evaluations between now and mid-2018. Standard procurement structures, documents, award criteria and contract terms are defined to promote consistency across local body procurements. Suppliers are encouraged to engage with BDUK for support and to participate in upcoming local tenders.
Burness NHS Procurement Seminar - 30 March 2010Elaine Creamer
How does the NHS ensure that it obtains best value when procuring its construction needs? No doubt this will be a question that will increasingly concern the NHS should they be called upon to bear a share of the widely anticipated cuts in public spending.
Over the last 18 months, the NHS has sought to achieve best value through the application of Frameworks Scotland. HFS Frameworks Scotland operates on a design and build basis along with a target cost payment mechanism. Will HFS Frameworks Scotland always be the most appropriate way to procure the construction needs of the
NHS? Can local frameworks be used to procure projects for which Frameworks Scotland is not suitable? Burness, with the assistance of procurement specialists within the NHS and the private sector, will be offering answers to these questions.
Frameworks are no longer the only option for the NHS and a new era of the hub is now dawning. How will hub operate and how will it interact with national and local frameworks? Burness, as legal advisors to the hub South East Territory, is ideally placed to offer views of these important issues.
- Forest Green Rovers Football Club wants to move to a new Eco Park stadium and sports complex to address restrictions at their current stadium, match their ambition of promotion in the football leagues, and bring all their teams together at one sustainable location.
- An outline planning application has been submitted to Stroud District Council and is under consultation for a decision in November/December 2016. It is a £100 million project located on a site near Stonehouse.
- In addition to the sporting facilities, the Eco Park will include a green business area to create about 4,000 jobs and have economic benefits for the region. It will also facilitate a canal restoration project.
Property Redevelopment Proposal (Final Yr Project)Mothusi Lekgowe
The document proposes redeveloping the Dolphin Square site in Weston Super Mare. It provides background on the town, describes the site and ownership structure. The proposal includes luxury and affordable housing, retail, parking, and leisure facilities. Financial analysis shows the redevelopment would have a profit of over 20% of net development value. Due to economic uncertainty, a phased or joint venture approach is recommended.
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...KTN
Network Rail, through Innovate UK, are to invest £2.88 million in two SBRI competitions to improve the safety and efficiency of our railways. The competitions launch on Monday 2nd December and this briefing event is aimed at providing you with more information on the competitions and how to apply. It is also an opportunity to meet others, network and form collaborative partnerships.
Up to £1.08m (+VAT) is available to support the key challenges faced by Network Rail: trespass at platform ends and edges (e.g. fare evasion, shortcuts) and incursion over platform ends and edges to commit crime (e.g. cable theft, vandalism). Network Rail is seeking to demonstrate the capability of physical and/or technological solutions to combat these challenges. The solution must be scalable to suit a variety of station environments and will be tested through trials at multiple live station environments.
Find out more: https://ktn-uk.co.uk/news/live-now-webcast-network-rail-innovate-uk-railways-sbri-competition-briefing
PKF Francis Clark is delighted to present our 13th annual Finance in Cornwall event on Tuesday 25th June 2019.
Delegates will hear from more than a dozen sources of funding and business support via short presentations and panel discussions, with the opportunity to ask questions and network with other local business owners and directors and professional advisers.
This year we have also teamed up with Cornwall Lenders Forum (a Cornwall Chamber of Commerce initiative), Acceleration Through Innovation and Cornwall Trade and Investment.
We have welcomed over 150 people to the event each year and we recommend that you reserve a place if you are thinking about expanding or investing further in your business in Cornwall.
What is a PQQ - Pre Qualfication Questionaire
A (PQQ) is normally issued by the contracting authority when they require contractors to supply goods / products or services - It is one of the main documents that must be completed correctly and must be returned to the contracting authority by the specified
date if the contractor wishes to be included in the tendering process and hope to win the contract.
This document represents a standard PQQ and our objective to assist small firms in completing the document correctly - We will provide (1 hour) of free advice to all firms
on request.
In addition to this document, we provide a training programme for firms who wish to fully understand and successfully take part in tendering and procurement both in the private and public sector.
PQQ Evaluation
We provide an assessment of how the PQQ may be evaluated and the qeighting factors attached to each section as part of the (1 hour) support
END
The document summarizes a seminar for Gloucestershire cricket clubs that covered various topics to help clubs such as facilities development, fundraising, volunteer recruitment and retention, and developing projects from concept to completion. Speakers included representatives from the ECB and Gloucestershire Cricket Board who provided information on grants, loans, the NatWest CricketForce initiative and support available to clubs.
The City of Hutto, Texas is holding a bond election on November 3, 2009 to fund various city improvement projects. The bond committee reviewed long-range plans and survey results to develop four bond propositions totaling $22.5 million for street improvements, parks/recreation facilities, a sports complex, and a joint city/YMCA recreation center. If approved, the bonds would require an estimated $0.19 increase to the interest and sinking tax rate over 5 years for debt repayment.
Proposal For Commercial Outdoor Space Maintenance Powerpoint Presentation SlidesSlideTeam
A magnificent lawn adds aesthetic appeal to a hotel or an office building. Lush green patios with some eye-appealing flowers create a delightful and pleasing atmosphere for visitors and employees. The commercial landscape needs periodic care and maintenance to remain clean, safe, healthy, and attractive. Organizations seek commercial lawn services from outside, so now is the time to create an impression. Opt for our customized Proposal For Commercial Outdoor Space Maintenance PowerPoint Presentation Slides and promote your professional services. Utilize our professionally-designed patio preservation PowerPoint template to address your clients’ concerns and then provide expert suggestions to overcome the issue. With the help of this striking cover letter, mention the techniques and activities for upkeeping your garden area. A systematically-created table of contents contains the sections of this lawn care PowerPoint template. Take the advantage of this courtyard upkeep PPT layout to define the goals and objectives of the project. Mowing mulching, ornamental care, trimming, and leaf removal are some of the key requirements for maintaining the property. Ensure installation of an eco-friendly irrigation system to water lawns consistently and regularly by incorporating this invigorating PowerPoint slideshow. Understand your client’s requirements and construct a plan of action including kick-off meeting, planning, ground preparation, and walkthrough. Highlight the scope of services like lawn maintenance, weed, and insect control, ground aeration, bush pruning, irrigation system installation, and debris removal, and make sure you mentioned all the services. A detailed timeline slide exhibits the completion time of each activity. Inform your customers about your wide array of services distinctively like landscape design, hardscaping, tree removal, and festive lighting by employing our topic-specific landscaping PowerPoint graphic. Depict financial structure and talk about multiple package services so the clients can choose the appropriate and suitable one. Present your achievements and awards in a visually appealing template to persuade your audience. https://bit.ly/2Oj3FfE
The document proposes building a commercial sport complex in Semenyih. It would provide sports facilities and promote healthy lifestyles. The complex would include a sports hall, swimming pool, gym, dance studio, changing rooms, and lockers. It would benefit the community by increasing activity levels, economic opportunities, and sense of well-being. The complex would be designed to be accessible, include green spaces, and integrate with the surrounding residential areas.
The document summarizes a proposed bond election for the City of Hutto, Texas on November 3, 2009. It includes four propositions totaling $22.5 million for street improvements, parks/recreation facilities, a sports complex, and a joint city/YMCA recreation center. It provides details on the bond committee process, general obligation bonds and certificates of obligation, recommended projects for each proposition, and how the bonds may impact the city's tax rate based on projected population and property value growth.
INVESTMENT ANALYSIS WITH DEMOS TO COMPLEMENT DECISIONSJibril Ali Zangina
This document provides an overview of investment appraisal, which is a means of assessing whether an investment project is worthwhile. It discusses various types of investment appraisal techniques used to evaluate projects, including payback period, accounting rate of return, internal rate of return, profitability index, and net present value. These techniques allow firms to analyze the costs and potential returns of investments over time to inform decision making. The document also provides examples to illustrate how different appraisal methods are applied.
This document provides an overview of public-private partnership (PPP) models and financing. It discusses the general principles of PPPs, including definitions and typical structures. It also examines PPPs from the perspective of public authorities and private partners. In addition, the document explores various methods of financing PPP projects, including typical risk allocation and lending parameters. It provides two case studies of large PPP projects to illustrate financing structures and risk mitigation tools used by lenders.
This document discusses capital budgeting decisions and methods for evaluating investment projects. It covers typical capital budgeting decisions companies face and introduces the net present value and internal rate of return methods. The net present value method calculates the present value of a project's cash inflows and outflows to determine if it has a positive net present value. The internal rate of return is the discount rate that results in a project having a net present value of zero. The document provides examples of applying these methods to evaluate potential investment projects.
The document discusses public-private partnerships (PPPs) and procurement. It provides examples of PPP arrangements for infrastructure projects like prisons, roads, and water services. PPPs involve a private entity financing, building, and operating a project according to a long-term concession agreement from the public sector. The benefits to the government are accessing infrastructure without public funds and transferring construction and operational risks to the private sector.
Air Quality & Odour Business Development PresentationMark Chapman
The document discusses the performance of an Air Quality team against chargeability targets from August 2008 to July 2009. It shows that the team exceeded its monthly and cumulative fee targets each month. It then performs a SWOT analysis of the team, identifying strengths, weaknesses, opportunities, and threats. Finally, it outlines actions to maximize opportunities and mitigate threats, such as increasing awareness of capabilities, pursuing framework opportunities, and routinely reviewing performance feedback.
Capita Symonds is one of the largest consultancies in the UK, with over 4,000 staff providing design, engineering, management, and infrastructure services. It is a wholly owned division of Capita Group and has worked on major projects in the UK such as Wembley Stadium and the 2012 Olympics. Capita Symonds offers a full range of in-house services throughout the entire project lifecycle from a single point of responsibility.
The document provides guidance on design considerations for badminton facilities. It discusses dimensions for badminton courts and required run-off spaces around courts. Minimum spacing is specified between courts, walls, and dividing curtains based on the level of play. Specific requirements are outlined for flooring, walls, ceilings, lighting, heating/ventilation, and other facility elements. The guidance aims to promote best practices for designing facilities that meet the needs of the sport and create an enjoyable playing environment.
This document summarizes the current status and upcoming timeline for BDUK's Phase 3 broadband procurement process. To date, £44.37 million in public funding has been awarded for projects covering 40,540 premises. Several local bodies have awarded contracts or are in the evaluation process. The timeline shows indicative timetables for additional local bodies proceeding through open market reviews, public consultations, invitation to tender stages and evaluations between now and mid-2018. Standard procurement structures, documents, award criteria and contract terms are defined to promote consistency across local body procurements. Suppliers are encouraged to engage with BDUK for support and to participate in upcoming local tenders.
Burness NHS Procurement Seminar - 30 March 2010Elaine Creamer
How does the NHS ensure that it obtains best value when procuring its construction needs? No doubt this will be a question that will increasingly concern the NHS should they be called upon to bear a share of the widely anticipated cuts in public spending.
Over the last 18 months, the NHS has sought to achieve best value through the application of Frameworks Scotland. HFS Frameworks Scotland operates on a design and build basis along with a target cost payment mechanism. Will HFS Frameworks Scotland always be the most appropriate way to procure the construction needs of the
NHS? Can local frameworks be used to procure projects for which Frameworks Scotland is not suitable? Burness, with the assistance of procurement specialists within the NHS and the private sector, will be offering answers to these questions.
Frameworks are no longer the only option for the NHS and a new era of the hub is now dawning. How will hub operate and how will it interact with national and local frameworks? Burness, as legal advisors to the hub South East Territory, is ideally placed to offer views of these important issues.
- Forest Green Rovers Football Club wants to move to a new Eco Park stadium and sports complex to address restrictions at their current stadium, match their ambition of promotion in the football leagues, and bring all their teams together at one sustainable location.
- An outline planning application has been submitted to Stroud District Council and is under consultation for a decision in November/December 2016. It is a £100 million project located on a site near Stonehouse.
- In addition to the sporting facilities, the Eco Park will include a green business area to create about 4,000 jobs and have economic benefits for the region. It will also facilitate a canal restoration project.
Property Redevelopment Proposal (Final Yr Project)Mothusi Lekgowe
The document proposes redeveloping the Dolphin Square site in Weston Super Mare. It provides background on the town, describes the site and ownership structure. The proposal includes luxury and affordable housing, retail, parking, and leisure facilities. Financial analysis shows the redevelopment would have a profit of over 20% of net development value. Due to economic uncertainty, a phased or joint venture approach is recommended.
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...KTN
Network Rail, through Innovate UK, are to invest £2.88 million in two SBRI competitions to improve the safety and efficiency of our railways. The competitions launch on Monday 2nd December and this briefing event is aimed at providing you with more information on the competitions and how to apply. It is also an opportunity to meet others, network and form collaborative partnerships.
Up to £1.08m (+VAT) is available to support the key challenges faced by Network Rail: trespass at platform ends and edges (e.g. fare evasion, shortcuts) and incursion over platform ends and edges to commit crime (e.g. cable theft, vandalism). Network Rail is seeking to demonstrate the capability of physical and/or technological solutions to combat these challenges. The solution must be scalable to suit a variety of station environments and will be tested through trials at multiple live station environments.
Find out more: https://ktn-uk.co.uk/news/live-now-webcast-network-rail-innovate-uk-railways-sbri-competition-briefing
PKF Francis Clark is delighted to present our 13th annual Finance in Cornwall event on Tuesday 25th June 2019.
Delegates will hear from more than a dozen sources of funding and business support via short presentations and panel discussions, with the opportunity to ask questions and network with other local business owners and directors and professional advisers.
This year we have also teamed up with Cornwall Lenders Forum (a Cornwall Chamber of Commerce initiative), Acceleration Through Innovation and Cornwall Trade and Investment.
We have welcomed over 150 people to the event each year and we recommend that you reserve a place if you are thinking about expanding or investing further in your business in Cornwall.
What is a PQQ - Pre Qualfication Questionaire
A (PQQ) is normally issued by the contracting authority when they require contractors to supply goods / products or services - It is one of the main documents that must be completed correctly and must be returned to the contracting authority by the specified
date if the contractor wishes to be included in the tendering process and hope to win the contract.
This document represents a standard PQQ and our objective to assist small firms in completing the document correctly - We will provide (1 hour) of free advice to all firms
on request.
In addition to this document, we provide a training programme for firms who wish to fully understand and successfully take part in tendering and procurement both in the private and public sector.
PQQ Evaluation
We provide an assessment of how the PQQ may be evaluated and the qeighting factors attached to each section as part of the (1 hour) support
END
The document summarizes a seminar for Gloucestershire cricket clubs that covered various topics to help clubs such as facilities development, fundraising, volunteer recruitment and retention, and developing projects from concept to completion. Speakers included representatives from the ECB and Gloucestershire Cricket Board who provided information on grants, loans, the NatWest CricketForce initiative and support available to clubs.
The City of Hutto, Texas is holding a bond election on November 3, 2009 to fund various city improvement projects. The bond committee reviewed long-range plans and survey results to develop four bond propositions totaling $22.5 million for street improvements, parks/recreation facilities, a sports complex, and a joint city/YMCA recreation center. If approved, the bonds would require an estimated $0.19 increase to the interest and sinking tax rate over 5 years for debt repayment.
Proposal For Commercial Outdoor Space Maintenance Powerpoint Presentation SlidesSlideTeam
A magnificent lawn adds aesthetic appeal to a hotel or an office building. Lush green patios with some eye-appealing flowers create a delightful and pleasing atmosphere for visitors and employees. The commercial landscape needs periodic care and maintenance to remain clean, safe, healthy, and attractive. Organizations seek commercial lawn services from outside, so now is the time to create an impression. Opt for our customized Proposal For Commercial Outdoor Space Maintenance PowerPoint Presentation Slides and promote your professional services. Utilize our professionally-designed patio preservation PowerPoint template to address your clients’ concerns and then provide expert suggestions to overcome the issue. With the help of this striking cover letter, mention the techniques and activities for upkeeping your garden area. A systematically-created table of contents contains the sections of this lawn care PowerPoint template. Take the advantage of this courtyard upkeep PPT layout to define the goals and objectives of the project. Mowing mulching, ornamental care, trimming, and leaf removal are some of the key requirements for maintaining the property. Ensure installation of an eco-friendly irrigation system to water lawns consistently and regularly by incorporating this invigorating PowerPoint slideshow. Understand your client’s requirements and construct a plan of action including kick-off meeting, planning, ground preparation, and walkthrough. Highlight the scope of services like lawn maintenance, weed, and insect control, ground aeration, bush pruning, irrigation system installation, and debris removal, and make sure you mentioned all the services. A detailed timeline slide exhibits the completion time of each activity. Inform your customers about your wide array of services distinctively like landscape design, hardscaping, tree removal, and festive lighting by employing our topic-specific landscaping PowerPoint graphic. Depict financial structure and talk about multiple package services so the clients can choose the appropriate and suitable one. Present your achievements and awards in a visually appealing template to persuade your audience. https://bit.ly/2Oj3FfE
The document proposes building a commercial sport complex in Semenyih. It would provide sports facilities and promote healthy lifestyles. The complex would include a sports hall, swimming pool, gym, dance studio, changing rooms, and lockers. It would benefit the community by increasing activity levels, economic opportunities, and sense of well-being. The complex would be designed to be accessible, include green spaces, and integrate with the surrounding residential areas.
The document summarizes a proposed bond election for the City of Hutto, Texas on November 3, 2009. It includes four propositions totaling $22.5 million for street improvements, parks/recreation facilities, a sports complex, and a joint city/YMCA recreation center. It provides details on the bond committee process, general obligation bonds and certificates of obligation, recommended projects for each proposition, and how the bonds may impact the city's tax rate based on projected population and property value growth.
INVESTMENT ANALYSIS WITH DEMOS TO COMPLEMENT DECISIONSJibril Ali Zangina
This document provides an overview of investment appraisal, which is a means of assessing whether an investment project is worthwhile. It discusses various types of investment appraisal techniques used to evaluate projects, including payback period, accounting rate of return, internal rate of return, profitability index, and net present value. These techniques allow firms to analyze the costs and potential returns of investments over time to inform decision making. The document also provides examples to illustrate how different appraisal methods are applied.
This document provides an overview of public-private partnership (PPP) models and financing. It discusses the general principles of PPPs, including definitions and typical structures. It also examines PPPs from the perspective of public authorities and private partners. In addition, the document explores various methods of financing PPP projects, including typical risk allocation and lending parameters. It provides two case studies of large PPP projects to illustrate financing structures and risk mitigation tools used by lenders.
This document discusses capital budgeting decisions and methods for evaluating investment projects. It covers typical capital budgeting decisions companies face and introduces the net present value and internal rate of return methods. The net present value method calculates the present value of a project's cash inflows and outflows to determine if it has a positive net present value. The internal rate of return is the discount rate that results in a project having a net present value of zero. The document provides examples of applying these methods to evaluate potential investment projects.
The document discusses public-private partnerships (PPPs) and procurement. It provides examples of PPP arrangements for infrastructure projects like prisons, roads, and water services. PPPs involve a private entity financing, building, and operating a project according to a long-term concession agreement from the public sector. The benefits to the government are accessing infrastructure without public funds and transferring construction and operational risks to the private sector.
Air Quality & Odour Business Development PresentationMark Chapman
The document discusses the performance of an Air Quality team against chargeability targets from August 2008 to July 2009. It shows that the team exceeded its monthly and cumulative fee targets each month. It then performs a SWOT analysis of the team, identifying strengths, weaknesses, opportunities, and threats. Finally, it outlines actions to maximize opportunities and mitigate threats, such as increasing awareness of capabilities, pursuing framework opportunities, and routinely reviewing performance feedback.
Capita Symonds is one of the largest consultancies in the UK, with over 4,000 staff providing design, engineering, management, and infrastructure services. It is a wholly owned division of Capita Group and has worked on major projects in the UK such as Wembley Stadium and the 2012 Olympics. Capita Symonds offers a full range of in-house services throughout the entire project lifecycle from a single point of responsibility.
2. NOTTS SPORT®, CHILDSPLAY®, VHAF® and NOTTSSWARD® are registered trademarks
Notts Sport was formed in 1984 by Mr. Bert Patrick
Bert’s son, Shaun Patrick, is now the Chairman of the company
Business premise was based on supplying synthetic components
for sport and play facilities around the UK
Original portfolio of solutions consisted of solely Notts Sport
patented systems
We offer 3 product areas –
Cricket - Non Turf Cricket surfacing
Childs Play - Impact absorbing playground surfacing
Multi Sports - Synthetic MUGAs and Pitches
Fast Track Funding was launched in 2011
Notts Sport Ltd
3. Notts Sport offer customers their
unique Design & Advisory Service
on multi sport & synthetic pitch
projects
The service is at no additional cost
to our traditional business premise
& income route of supplying
specialist synthetic components
The only Approved Supplier to
England Hockey for synthetic
pitches
We can offer all types of synthetic
grass for your needs and
requirements
About Multi-Sports
Multi Sport
4. Service Breakdown
Project Development
üProject Appraisal
üBudgeting
üPlanning Consultancy
üDesign Consultancy
Design & Specification
üSite Investigation/Survey
üDesign Evaluation
üTechnical Specification
üTender Package Preview
üTender Evaluation
Supply & Pitch Construction
üContractor Appointment
üContract Management
üCDM Co-Ordination
üQuality Control – Materials & Build
üMaintenance Advice/instruction
üHandover
Post Construction
üMonitoring & Evaluation
üOngoing Maintenance Advice
üOngoing Condition Reports & Surveys
5. We offer a holistic design & enabling
service to customers at no up front fee or
cost, consistently delivering high quality
bespoke facilities
Customers have a company with 29 years
of expertise on their project team
Provides customers reassurance that there
is a specialist company providing complete
design, development & delivery assistance
Customers have a project manager on site
who can act as a intermediary between the
client and contractor, so we can offer
unbiased non-contractor led advice
By working with experienced and proven
contractors, customers have further
reassurance that their facility will be
delivered to the highest qualities and
standards
Service Benefits
6. Planning Objections
Project team commitment
Availability of resources
Demand
Technical Objections
Spatial Constraints
Funding
Common Obstacles
7. To date via the Design & Advisory Service
to overcome the design & development
obstacles
Via Notts Sport Fast Track Funding to solve
any funding issues
How can Notts Sport Help?
8.
9. Unique offer provided by Notts Sport to
customers in the UK
A method of putting in place funding for
synthetic sports facilities such as synthetic
pitches and Multi Use Games Areas
(MUGAs)
Originally developed to offer solutions for
customers with existing facilities in need of
refurbishment
Notts Sport are able to arrange the funding
of the project against which the customer
pays the funding amount over a 5 or 7
year period
Can be used to cover entire project cost or
to top up existing funding or budgets
What is Fast Track
Funding?
10. Designed specifically for State Schools,
Local Authority customers and
Independent Schools
Also available, subject to approval, for
private, commercial and other customer
sectors subject to stringent checks
We are working with established funding
partners, Unilink Ltd, experienced in local
authority and education sectors
Arranged via an operating lease format
which has been passed by the EFA and
auditors as a true operating lease
The first project at Whitefields Academy
(London) has been completed whilst others
are in construction and tender stages.
What is Fast Track
Funding?
11. Fixed rates for entire funding period via
operating lease agreement rather than
financing or loans
Independent customers have greater
flexibility and can use finance leases or
loans
Customers can take up an option to own
facility at the end of the funding period
Flexible terms including topping up
existing funding pots and monies
Can be paid to suit individual
requirements
Funding can be repaid over either a
standard 5 or 7 year funding period
What is Fast Track
Funding?
12. The completed synthetic sports pitch can
generate an income via external lettings
Contributes or even offsets the cost of
the funding
Approval process is extremely fast for the
local authority and education sectors so
there are no lengthy application processes
to third parties
Agreement paperwork has now been used
& approved by EFA
Notts Sport work at risk to secure all
necessary consents AND put in place the
funding
Notts Sport can design the facility to your
specific needs
What is Fast Track
Funding?
16. Notts Sport work at risk throughout the
design, development and all pre-
construction stages
We will include any other elements of the
project within our design & the contract
Funding can help customers plan for the
future refurbishment scheme
May include car parking, access
arrangements and other separate sports
facilities such as macadam courts, jump
pits etc.
Spreads the cost over 5 or 7 years to help
fund other projects
Fast Track Funding
Customer Benefits
17. Improves the sports provision of your site
Likely to improve the availability of your
sports facilities either by maximising the
usage of existing facilities
Frees up usage within other areas (e.g.
sports halls)
Improves the teaching provision for your
pupils
Attracts new customers to the site
Raises the profile of the school or leisure
centre
Fast Track Funding
Customer Benefits
18. Meets government requirements for active
& healthy lifestyles for youngsters and
communities
Meets the government advice for schools
and councils to provide community hubs
that offer services and support throughout
the day and evenings
You can deliver a new synthetic sports
facility without any up front costs
Income from external lettings will
contribute or even cover the funding
payments
Simply a way of spreading the cost
over 5 or 7 years
Fast Track Funding
Customer Benefits
20. Resurface of existing full size Synthetic Pitch
cost £160,000 + VAT.
Working on an existing facility replacing synthetic
grass with shockpad remediation
Maintenance package anticipated to cost £350 per
visit, 6 visits per year for a sand filled/dressed facility
Yearly performance testing/condition checks
included free of charge by Notts Sport.
Fast Track Funding
Example 1 – Resurface of Existing Pitch
21. Fast Track Funding
Example 1 – SYNTHETIC PITCH RESURFACE
PROJECTED COST OVER A 5 YEAR PERIOD =
PROJECTED COST OVER A 7 YEAR PERIOD =
PAYMENT
TYPE
£0 DEPOSIT £50,000 DEPOSIT £100,000 DEPOSIT
YEARLY £ 31,744.00 £ 21,824.00 £ 11,904.00
FINAL
PAYMENT
£ 30,272.00 £ 20,812.00 £ 11,352.00
PAYMENT
TYPE
£0 DEPOSIT £50,000 DEPOSIT £100,000 DEPOSIT
YEARLY £ 24,696.00 £ 16,979.00 £ 9,261.00
FINAL
PAYMENT
£ 28,512.00 £ 19,602.00 £ 10,692.00
22. Construction of a new full size Synthetic Pitch costs
estimated at £415,000 + VAT*
Working on an greenfield site with no major site constraints
or underlying issues
Maintenance package anticipated to cost £350 per
visit, 6 visits per year for a sand filled/dressed facility
Yearly performance testing/condition checks
included free of charge by Notts Sport.
*Based on a recent feasibility report in South England
Fast Track Funding
Example 2 – New Build Synthetic Pitch
23. Fast Track Funding
Example 2 – NEW BUILD PITCH
PROJECTED COST OVER A 5 YEAR PERIOD =
PROJECTED COST OVER A 7 YEAR PERIOD =
PAYMENT
TYPE
£0 DEPOSIT £100,000 DEPOSIT £150,000 DEPOSIT £200,000 DEPOSIT
YEARLY £ 82,118.00 £ 62,278.00 £ 52,358.00 £ 42,438.00
FINAL
PAYMENT
£ 78,310.00 £ 59,390.00 £ 49,930.00 £ 40,470.00
PAYMENT
TYPE
£0 DEPOSIT £100,000 DEPOSIT £150,000 DEPOSIT £200,000 DEPOSIT
YEARLY £ 63,885.00 £ 48,450.00 £ 40,733.00 £ 33,015.00
FINAL
PAYMENT
£ 73,757.00 £ 55,937.00 £ 47,027.00 £ 38,117.00
25. The levels that can be charged varies
across the UK with metropolitan/urban
areas charging as much as £90 per hour
In other areas of the UK then costs can be
as little as £30 per hour for a full size pitch
Cross pitches are most commonly let and
due to the range of hire rates this also
varies across the UK
Typically £30-£40 per hour but as
little as £15 per hour in parts of the
UK
It is important to maximise bookings
throughout the year
Summer Camps
Non Traditional Sports
Example Synthetic
Pitch Income
26. Determining the demand for the local area is
critical and customers are advised to speak to
other facility operators and NGB’s to ascertain
rates and clubs looking for pitches
EXAMPLE HOCKEY PITCH LETTINGS:
Monday – Thursday
£30 per cross field pitch (3no.)
2 hours per night (average)
£720 per week
£70 per full pitch (1no.)
3 times per week (Tues-Thurs)
£210 per week
Weekends
£90 per match
4 matches per weekend
£360 per weekend
TOTAL INCOME = £1,290 per week (44 wks)
TOTAL INCOME = £56,760 per annum
Example Synthetic
Pitch Income
27. Fast Track Funding
Example 2 – NEW BUILD PITCH
PROJECTED COST OVER A 5 YEAR PERIOD =
PROJECTED COST OVER A 7 YEAR PERIOD =
PAYMENT
TYPE
£0 DEPOSIT £100,000 DEPOSIT £150,000 DEPOSIT £200,000 DEPOSIT
YEARLY £ 82,118.00 £ 62,278.00 £ 52,358.00 £ 42,438.00
FINAL
PAYMENT
£ 78,310.00 £ 59,390.00 £ 49,930.00 £ 40,470.00
PAYMENT
TYPE
£0 DEPOSIT £100,000 DEPOSIT £150,000 DEPOSIT £200,000 DEPOSIT
YEARLY £ 63,885.00 £ 48,450.00 £ 40,733.00 £ 33,015.00
FINAL
PAYMENT
£ 73,757.00 £ 55,937.00 £ 47,027.00 £ 38,117.00
28. Notts Sport will offer initial appraisals of
anticipated income generation, usually
based on 44 weeks of lettings per year
Different surfaces can generate greater
income with 3G (football) pitches usually
being the biggest income generator
followed by high quality sand dressed
hockey grasses
It is critical to establish what
teams/demand there is in the local area
before choosing your surface if income
generation is key to the feasibility of the
scheme
Good practice is to host open days to
establish demand within the local area and
have Clubs fill out booking sheets based on
anticipated requirements
Example Synthetic
Pitch Income
30. Service Breakdown
Project Development
üProject Appraisal
üBudgeting
üPlanning Consultancy
üDesign Consultancy
Design & Specification
üSite Investigation/Survey
üDesign Evaluation
üTechnical Specification
üTender Package Preview
üTender Evaluation
Supply & Pitch Construction
üContractor Appointment
üContract Management
üCDM Co-Ordination
üQuality Control – Materials & Build
üMaintenance Advice/instruction
üHandover
Post Construction
üMonitoring & Evaluation
üOngoing Maintenance Advice
üOngoing Condition Reports & Surveys
31.
32. Working with the Approved Suppliers to
England Hockey to assist in determining
strategic importance of the project & for
future funding plans
Fully transparent Design & Advisory
Service with specialist expertise available
for Fast Tracking Funding via Unilink
Our service takes you from earliest stages
to completion and beyond working at risk
to give you the best chance possible of
achieving your goals.
Deliver a synthetic pitch without any
capital contribution
Benefits to You
33. As a company we strive to offer
customers the best possible solutions
for their budgets
Delivery on time, on budget and to
the specified standards
By offering funding solutions we can
provide your facility for you
Please do not hesitate to contact us
to discuss your scheme
Notts Sport