Planning laws were reviewed and simplified in a recent legislation which came into force on 1st October 2007.
Anyone thinking of buying a property or piece of land they wish to renovate or extend or build on must be aware of the planning laws as
ignorance is no defence.
There are various stages in the planning application process which must be followed and these can be summarised as follows:
STEP 1 - initial research at the local Mairie or at the DDE ( Direction
Departementale d’Equipement). If you are looking to buy a property or
piece of land or already own a property and now wish to make some
alterations, it is highly advisable to seek information on the local plan
( Plan Local d’Urbanisme) so as to establish if the property falls within
a particular area such as housing, agricultural or industrial areas as
certain restrictions may apply. Further research into the local risk
prevention plan would also reveal if the property falls within an area
susceptible to natural risks such as flooding, avalanche or forest fires.
Although the vendor is under the obligation to disclose a copy of
such a plan at the time of the contract, it is advisable to carry out
these searches in order to save time, cost and any aggravation if
you have to take the vendor to court for failing to have complied with
his obligation.
STEP 2 – for certain types of renovation /building works, you may
have to apply for planning permission.
As you can only apply for planning permission if you are the owner
of the property, if you are not the owner, an initial outline planning
permission can be applied for at the contract stage of a purchase for
a Certificat d’urbanisme preoperationel.
This document is similar to a local search and will reveal any
restrictions imposed by the local authorities and DEE relating to the
proposed works to be carried out to the property. This application
needs to make reference to plans of the property with an indication
of new windows/ entrances/ extensions and a description of the
proposed works but does not need to involve an architect. The
local authorities usually take 2 months to return their response and
so the purchase cannot proceed until the certificate is issued. The
document may contain specific conditions for the proposed work
such as having a septic tank installed which is compliant and of the
right capacity, or for the land to be connected to the mains water
system at the owner’s costs etc.
This document is a useful indication of the issues you will need to
address in order to do carry out the proposed works.
Once the Certificate of Urbanisme is issued, it remains valid for
18 months. This means that you have to apply for a planning
permission within this time frame otherwise, the certificate will lapse
and you will be required to apply for a new one. It is possible to
apply for a new certificate of urbanisme but one has to comply with
strict deadlines.
STEP 3 - Apply for planning permission
Depending on the type of project you have, there are three different
types of planning permissions:
»» Planning permission ( permis de Construire) which is
	 relevant for any new constructions; if the proposed
	 building is larger than 170 m2. You are required to instruct
	 an architect who will draw up proper plans and usually
	 will apply for the relevant permissions on your behalf. The
	 architect will need to take out adequate insurance and
	 make relevant declarations. The permission is valid for
	 3 years and so you will need to commence works within
	 this period otherwise, you will have to apply for a new
	 planning permission and run the risk of it not being
	 granted or new restrictions being imposed. The project
	 manager ( and this could be you or the architect ) will
	 need to make a declaration of commencement of works
	 with the local authority so that it is clear when the works
	 have started but also for the benefit of the 10 year builder
	 warranty to commence.
»» Planning to develop ( permis d’amenager) which is
	 relevant for major extensions or works to existing building;
»» Planning to demolish ( permis de demolir) when you have
	 to demolish an existing building in order to build a new
	 one or to reduce health and safety hazards due to a
	 derelict building.
Some works may not need planning permission but a declaration
de travaux which is a declaration of intended works. These works
would include new building or extension of less than 20 m2; some
loft conversions; new windows or doors to be created, new fences or
boundary walls, changes to the external structure of the property.
If you are unsure which permission to apply for, the local Mairie is usually
very helpful in guiding you through which type of permission is required.
Do remember than ignorance is no defence even if you are English!
If you need help with any of the above steps, please do not hesitate to contact me as I will be pleased to carry these preliminary checks
for you and complete the relevant applications on your behalf.
Mrs Lauren Annicchiarico – Solicitor – Principal – French Law Matters

More Related Content

Similar to French Law Matters - Information Guide On Planning Laws In France

Construction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 aConstruction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 a
Colin Tomlinson
 
Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015
Colin Tomlinson
 
Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2
Colin Tomlinson
 
Section 21 - How and Why?
Section 21 - How and Why?Section 21 - How and Why?
Section 21 - How and Why?
alison13
 
Energy Act 2011 - more grey than green
Energy Act 2011 - more grey than greenEnergy Act 2011 - more grey than green
Energy Act 2011 - more grey than green
OTBEveling
 
Vietnam _Land and Real Estate in Vietnam
Vietnam _Land and Real Estate in VietnamVietnam _Land and Real Estate in Vietnam
Vietnam _Land and Real Estate in Vietnam
Dr. Oliver Massmann
 
Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019 Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019
Pat Coyle
 
Real Estate (Regulation & Development) Act, 2016
Real Estate (Regulation & Development) Act, 2016Real Estate (Regulation & Development) Act, 2016
Real Estate (Regulation & Development) Act, 2016
Dhruv Seth
 
Maharashtra Real Estate and Regulatory Act 2016
Maharashtra Real Estate and Regulatory Act 2016Maharashtra Real Estate and Regulatory Act 2016
Maharashtra Real Estate and Regulatory Act 2016
sameer313
 
Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016
sandesh mundra
 
Sunday Times condo article
Sunday Times condo articleSunday Times condo article
Sunday Times condo article
Ajithaa Edirimane
 
Rera nirc ca-201220
Rera nirc ca-201220Rera nirc ca-201220
Rera nirc ca-201220
CMA .Pankaj Jain
 
MRERA by VRK2019.pptx
MRERA by VRK2019.pptxMRERA by VRK2019.pptx
MRERA by VRK2019.pptx
VivekKasar5
 
english-Portugal.pdfgrandede mais o nome de
english-Portugal.pdfgrandede mais o nome deenglish-Portugal.pdfgrandede mais o nome de
english-Portugal.pdfgrandede mais o nome de
francisconunes
 
Renting out private properties - in England
Renting out private properties - in EnglandRenting out private properties - in England
Renting out private properties - in England
Michael Scutt
 
Leasehold and freehold property - a buyers guide
Leasehold and freehold property - a buyers guideLeasehold and freehold property - a buyers guide
Leasehold and freehold property - a buyers guide
Bolt Burdon
 
RERA
RERARERA
Primavera.
Primavera.Primavera.
Primavera.
rajlaxmipardeshi
 
English prestige - presentation on real estate (regulation and development)
English prestige -  presentation on real estate (regulation and development)English prestige -  presentation on real estate (regulation and development)
English prestige - presentation on real estate (regulation and development)
English Prestige
 
Scottish Letting Day 2019 - Showdome afternoon sessions
Scottish Letting Day 2019 - Showdome afternoon sessionsScottish Letting Day 2019 - Showdome afternoon sessions
Scottish Letting Day 2019 - Showdome afternoon sessions
Scottish Association of Landlords
 

Similar to French Law Matters - Information Guide On Planning Laws In France (20)

Construction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 aConstruction law update august 2015 quarter 2 a
Construction law update august 2015 quarter 2 a
 
Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015Commercial and Construction Law Update Q2 2015
Commercial and Construction Law Update Q2 2015
 
Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2Commericial Management and Construction law update 2015 Q2
Commericial Management and Construction law update 2015 Q2
 
Section 21 - How and Why?
Section 21 - How and Why?Section 21 - How and Why?
Section 21 - How and Why?
 
Energy Act 2011 - more grey than green
Energy Act 2011 - more grey than greenEnergy Act 2011 - more grey than green
Energy Act 2011 - more grey than green
 
Vietnam _Land and Real Estate in Vietnam
Vietnam _Land and Real Estate in VietnamVietnam _Land and Real Estate in Vietnam
Vietnam _Land and Real Estate in Vietnam
 
Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019 Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019
 
Real Estate (Regulation & Development) Act, 2016
Real Estate (Regulation & Development) Act, 2016Real Estate (Regulation & Development) Act, 2016
Real Estate (Regulation & Development) Act, 2016
 
Maharashtra Real Estate and Regulatory Act 2016
Maharashtra Real Estate and Regulatory Act 2016Maharashtra Real Estate and Regulatory Act 2016
Maharashtra Real Estate and Regulatory Act 2016
 
Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016
 
Sunday Times condo article
Sunday Times condo articleSunday Times condo article
Sunday Times condo article
 
Rera nirc ca-201220
Rera nirc ca-201220Rera nirc ca-201220
Rera nirc ca-201220
 
MRERA by VRK2019.pptx
MRERA by VRK2019.pptxMRERA by VRK2019.pptx
MRERA by VRK2019.pptx
 
english-Portugal.pdfgrandede mais o nome de
english-Portugal.pdfgrandede mais o nome deenglish-Portugal.pdfgrandede mais o nome de
english-Portugal.pdfgrandede mais o nome de
 
Renting out private properties - in England
Renting out private properties - in EnglandRenting out private properties - in England
Renting out private properties - in England
 
Leasehold and freehold property - a buyers guide
Leasehold and freehold property - a buyers guideLeasehold and freehold property - a buyers guide
Leasehold and freehold property - a buyers guide
 
RERA
RERARERA
RERA
 
Primavera.
Primavera.Primavera.
Primavera.
 
English prestige - presentation on real estate (regulation and development)
English prestige -  presentation on real estate (regulation and development)English prestige -  presentation on real estate (regulation and development)
English prestige - presentation on real estate (regulation and development)
 
Scottish Letting Day 2019 - Showdome afternoon sessions
Scottish Letting Day 2019 - Showdome afternoon sessionsScottish Letting Day 2019 - Showdome afternoon sessions
Scottish Letting Day 2019 - Showdome afternoon sessions
 

Recently uploaded

一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
hedonxu
 
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptxTHE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
Namrata Chakraborty
 
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
mecyyn
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
Justin Ordoyo
 
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
15e6o6u
 
The Work Permit for Self-Employed Persons in Italy
The Work Permit for Self-Employed Persons in ItalyThe Work Permit for Self-Employed Persons in Italy
The Work Permit for Self-Employed Persons in Italy
BridgeWest.eu
 
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
qevye
 
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
ooqzo
 
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
gedsuu
 
Business Laws Sunita saha
Business Laws Sunita sahaBusiness Laws Sunita saha
Business Laws Sunita saha
sunitasaha5
 
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
meboh
 
Should AI hold Intellectual Property Rights?
Should AI hold Intellectual Property Rights?Should AI hold Intellectual Property Rights?
Should AI hold Intellectual Property Rights?
RoseZubler1
 
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
cadyzeo
 
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
Sangyun Lee
 
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
pdeehy
 
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
fexbqa
 
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
woywevt
 
Capital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptxCapital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptx
OmGod1
 
From Promise to Practice. Implementing AI in Legal Environments
From Promise to Practice. Implementing AI in Legal EnvironmentsFrom Promise to Practice. Implementing AI in Legal Environments
From Promise to Practice. Implementing AI in Legal Environments
ssusera97a2f
 
PPT-Money Laundering - lecture 5.pptx ll
PPT-Money Laundering - lecture 5.pptx llPPT-Money Laundering - lecture 5.pptx ll
PPT-Money Laundering - lecture 5.pptx ll
MohammadZubair874462
 

Recently uploaded (20)

一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
 
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptxTHE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
 
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
一比一原版(trent毕业证书)加拿大特伦特大学毕业证如何办理
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
 
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
 
The Work Permit for Self-Employed Persons in Italy
The Work Permit for Self-Employed Persons in ItalyThe Work Permit for Self-Employed Persons in Italy
The Work Permit for Self-Employed Persons in Italy
 
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
 
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
 
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
 
Business Laws Sunita saha
Business Laws Sunita sahaBusiness Laws Sunita saha
Business Laws Sunita saha
 
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
 
Should AI hold Intellectual Property Rights?
Should AI hold Intellectual Property Rights?Should AI hold Intellectual Property Rights?
Should AI hold Intellectual Property Rights?
 
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
 
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
Sangyun Lee, 'Why Korea's Merger Control Occasionally Fails: A Public Choice ...
 
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
一比一原版(uwgb毕业证书)美国威斯康星大学绿湾分校毕业证如何办理
 
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
 
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
 
Capital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptxCapital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptx
 
From Promise to Practice. Implementing AI in Legal Environments
From Promise to Practice. Implementing AI in Legal EnvironmentsFrom Promise to Practice. Implementing AI in Legal Environments
From Promise to Practice. Implementing AI in Legal Environments
 
PPT-Money Laundering - lecture 5.pptx ll
PPT-Money Laundering - lecture 5.pptx llPPT-Money Laundering - lecture 5.pptx ll
PPT-Money Laundering - lecture 5.pptx ll
 

French Law Matters - Information Guide On Planning Laws In France

  • 1. Regulated by the Solicitors Regulation Authority, registration number 296484 French Law Matters Suite 1, First Floor, Richmond House, Richmond Hill, Bournemouth, BH2 6EZ Tel: 01202 355480 Fax: 01202 355479 Email: Lauren@frenchlawmatters.co.uk www.frenchlawmatters.co.uk Information guide on planning laws in France Planning laws were reviewed and simplified in a recent legislation which came into force on 1st October 2007. Anyone thinking of buying a property or piece of land they wish to renovate or extend or build on must be aware of the planning laws as ignorance is no defence. There are various stages in the planning application process which must be followed and these can be summarised as follows: STEP 1 - initial research at the local Mairie or at the DDE ( Direction Departementale d’Equipement). If you are looking to buy a property or piece of land or already own a property and now wish to make some alterations, it is highly advisable to seek information on the local plan ( Plan Local d’Urbanisme) so as to establish if the property falls within a particular area such as housing, agricultural or industrial areas as certain restrictions may apply. Further research into the local risk prevention plan would also reveal if the property falls within an area susceptible to natural risks such as flooding, avalanche or forest fires. Although the vendor is under the obligation to disclose a copy of such a plan at the time of the contract, it is advisable to carry out these searches in order to save time, cost and any aggravation if you have to take the vendor to court for failing to have complied with his obligation. STEP 2 – for certain types of renovation /building works, you may have to apply for planning permission. As you can only apply for planning permission if you are the owner of the property, if you are not the owner, an initial outline planning permission can be applied for at the contract stage of a purchase for a Certificat d’urbanisme preoperationel. This document is similar to a local search and will reveal any restrictions imposed by the local authorities and DEE relating to the proposed works to be carried out to the property. This application needs to make reference to plans of the property with an indication of new windows/ entrances/ extensions and a description of the proposed works but does not need to involve an architect. The local authorities usually take 2 months to return their response and so the purchase cannot proceed until the certificate is issued. The document may contain specific conditions for the proposed work such as having a septic tank installed which is compliant and of the right capacity, or for the land to be connected to the mains water system at the owner’s costs etc. This document is a useful indication of the issues you will need to address in order to do carry out the proposed works. Once the Certificate of Urbanisme is issued, it remains valid for 18 months. This means that you have to apply for a planning permission within this time frame otherwise, the certificate will lapse and you will be required to apply for a new one. It is possible to apply for a new certificate of urbanisme but one has to comply with strict deadlines. STEP 3 - Apply for planning permission Depending on the type of project you have, there are three different types of planning permissions: »» Planning permission ( permis de Construire) which is relevant for any new constructions; if the proposed building is larger than 170 m2. You are required to instruct an architect who will draw up proper plans and usually will apply for the relevant permissions on your behalf. The architect will need to take out adequate insurance and make relevant declarations. The permission is valid for 3 years and so you will need to commence works within this period otherwise, you will have to apply for a new planning permission and run the risk of it not being granted or new restrictions being imposed. The project manager ( and this could be you or the architect ) will need to make a declaration of commencement of works with the local authority so that it is clear when the works have started but also for the benefit of the 10 year builder warranty to commence. »» Planning to develop ( permis d’amenager) which is relevant for major extensions or works to existing building; »» Planning to demolish ( permis de demolir) when you have to demolish an existing building in order to build a new one or to reduce health and safety hazards due to a derelict building. Some works may not need planning permission but a declaration de travaux which is a declaration of intended works. These works would include new building or extension of less than 20 m2; some loft conversions; new windows or doors to be created, new fences or boundary walls, changes to the external structure of the property. If you are unsure which permission to apply for, the local Mairie is usually very helpful in guiding you through which type of permission is required. Do remember than ignorance is no defence even if you are English! If you need help with any of the above steps, please do not hesitate to contact me as I will be pleased to carry these preliminary checks for you and complete the relevant applications on your behalf. Mrs Lauren Annicchiarico – Solicitor – Principal – French Law Matters