Predictive Maintenance Report
for
Gros-ite
June 1, 2009
Advanced Monitoring Service
55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947
Confidentia
Enclosed is a current report of the data collected during our visit on May 27, 2009. This report
will give you an overview of all data collected, the recommended action , and their priority
levels. Please feel free to contact our office with any questions or concerns you may have
regarding this report or the services you received.
June 1, 2009
Gros-ite Industries
360 New Britain Rd.
Bohemia, Conn. 11716
Attn: Jim Pelletier
Subject : Vibration Readings
Dear Jim,
Sincerely,
Edward A. Bartnikowski
Reliability Consultant
Advanced Monitoring Service
55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947
Confidentia
June 1, 2009
Gros-ite Industries
1790 New Britain Rd.
Farmington, Conn. 06032
Subject : Vibration Readings at Federal Mogul
Enclosed is a current trip report of the data collected during our visit on May 27, 2009.
1) First set of reading on spindle #3 ser # 50111-80, 60729-81 rebuilt by Gros-ite. Position S2
shows a bearing misalignment, imbalance and non synchronous noise.
2) Second set of reading on spindle #2 ser # 60380-80-02 position S2 indicated a imbalance
problem. Spindle was rough balanced at Gros-ite, but had no tools to trim balance unit to meet
the .003 Mils spec. Spindle can be run with tools to make parts.
3) Third set of reading’s on spindle # 1 ser # 60380-80-01 could not be run due to a missing piece
in the dove tail rail.
Recommend a Balance ring is added to shaft to help with trim balancing.
Advanced Monitoring Service
55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947
Confidentia
Alarm Priority Codes
Critical
High
Low
Emergency Situation, Immediate Action Needed
Repair within the Month or Next Scheduled Shutdown
Monitor more Frequently
Confidentia
Alarm Report Summary
MACHINE ALARM PAGE PROBLEM
#2 Spindle HIGH 1 Imbalance
Ser # 60380-80-02
#3 Spindle HIGH 2 Imbalance / Alignment
Ser# 50111-80
#1 Spindle NONE 3 None
Ser # 60380-80-01
Confidentia
S1A
S1R
S1V
DATE :
June 1, 2009
COMPANY :
Gros-ite Spindle
AREA : PRIORITY :
HIGH
PROBLEM STATEMENT :
INSPECT SPINDLE FOR PROPER BALANCE
MACHINE NAME :
Spindle #2
Ser # 60380-80-02
DSO NUMBER :
MACHINE DRAWING :
FINDINGS :
The spectrum on position S2 on the
spindle indicates an 1xfr in the radial plane
with no synchronous peaks, which is a
indication of a Imbalance problem.
RECOMMENDATIONS :
Recommend trim balancing spindle
with a set of tools.
Note : Spindle was rough balanced at Gros-
ite without a set of tools.
PAGE : 1
S2A
S2R
S2V
S1A
S1R
S1V
Confidentia
Confidentia
Confidentia
S1A
S1R
S1V
DATE :
June 1, 2009
COMPANY :
Gros-ite Spindle
AREA : PRIORITY :
HIGH
PROBLEM STATEMENT :
INSPECT SPINDLE FOR PROPER BALANCE AND BEARING ALIGNMENT
MACHINE NAME : Spindle #3
Ser # 50111-80
# 60729-81
DSO NUMBER :
MACHINE DRAWING :
FINDINGS :
The spectrum on position S2 on the
spindle indicates an high 1xfr and 2xfr in the
radial plane with non synchronous peaks,
which is a indication of a Imbalance and
bearing alignment problem.
RECOMMENDATIONS :
Recommend realigning position S2
bearing and rebalancing unit.
Note: Fed’s spindle in machine.
PAGE : 2
S2A
S2R
S2V
S1A
S1R
S1V
Confidentia
Confidentia
Confidentia
S1A
S1R
S1V
DATE :
June 1, 2009
COMPANY :
Gros-ite Spindle
AREA : PRIORITY :
NONE
PROBLEM STATEMENT :
INSPECT SPINDLE FOR PROPER BALANCE
MACHINE NAME :
Spindle #1
Ser # 60380-80-01
DSO NUMBER :
MACHINE DRAWING :
FINDINGS :
The spectrum’s on all positions
meet .003 Mils spec.
RECOMMENDATIONS :
Repair broken dove tail.
Note : Spindle has a broken dove tail and
was not able to run in machine. Do to
setting position.
PAGE : 2
S2A
S2R
S2V
S1A
S1R
S1V
Confidentia

Fedmodul Va

  • 1.
    Predictive Maintenance Report for Gros-ite June1, 2009 Advanced Monitoring Service 55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947 Confidentia
  • 2.
    Enclosed is acurrent report of the data collected during our visit on May 27, 2009. This report will give you an overview of all data collected, the recommended action , and their priority levels. Please feel free to contact our office with any questions or concerns you may have regarding this report or the services you received. June 1, 2009 Gros-ite Industries 360 New Britain Rd. Bohemia, Conn. 11716 Attn: Jim Pelletier Subject : Vibration Readings Dear Jim, Sincerely, Edward A. Bartnikowski Reliability Consultant Advanced Monitoring Service 55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947 Confidentia
  • 3.
    June 1, 2009 Gros-iteIndustries 1790 New Britain Rd. Farmington, Conn. 06032 Subject : Vibration Readings at Federal Mogul Enclosed is a current trip report of the data collected during our visit on May 27, 2009. 1) First set of reading on spindle #3 ser # 50111-80, 60729-81 rebuilt by Gros-ite. Position S2 shows a bearing misalignment, imbalance and non synchronous noise. 2) Second set of reading on spindle #2 ser # 60380-80-02 position S2 indicated a imbalance problem. Spindle was rough balanced at Gros-ite, but had no tools to trim balance unit to meet the .003 Mils spec. Spindle can be run with tools to make parts. 3) Third set of reading’s on spindle # 1 ser # 60380-80-01 could not be run due to a missing piece in the dove tail rail. Recommend a Balance ring is added to shaft to help with trim balancing. Advanced Monitoring Service 55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947 Confidentia
  • 4.
    Alarm Priority Codes Critical High Low EmergencySituation, Immediate Action Needed Repair within the Month or Next Scheduled Shutdown Monitor more Frequently Confidentia
  • 5.
    Alarm Report Summary MACHINEALARM PAGE PROBLEM #2 Spindle HIGH 1 Imbalance Ser # 60380-80-02 #3 Spindle HIGH 2 Imbalance / Alignment Ser# 50111-80 #1 Spindle NONE 3 None Ser # 60380-80-01 Confidentia
  • 6.
    S1A S1R S1V DATE : June 1,2009 COMPANY : Gros-ite Spindle AREA : PRIORITY : HIGH PROBLEM STATEMENT : INSPECT SPINDLE FOR PROPER BALANCE MACHINE NAME : Spindle #2 Ser # 60380-80-02 DSO NUMBER : MACHINE DRAWING : FINDINGS : The spectrum on position S2 on the spindle indicates an 1xfr in the radial plane with no synchronous peaks, which is a indication of a Imbalance problem. RECOMMENDATIONS : Recommend trim balancing spindle with a set of tools. Note : Spindle was rough balanced at Gros- ite without a set of tools. PAGE : 1 S2A S2R S2V S1A S1R S1V Confidentia
  • 7.
  • 8.
  • 9.
    S1A S1R S1V DATE : June 1,2009 COMPANY : Gros-ite Spindle AREA : PRIORITY : HIGH PROBLEM STATEMENT : INSPECT SPINDLE FOR PROPER BALANCE AND BEARING ALIGNMENT MACHINE NAME : Spindle #3 Ser # 50111-80 # 60729-81 DSO NUMBER : MACHINE DRAWING : FINDINGS : The spectrum on position S2 on the spindle indicates an high 1xfr and 2xfr in the radial plane with non synchronous peaks, which is a indication of a Imbalance and bearing alignment problem. RECOMMENDATIONS : Recommend realigning position S2 bearing and rebalancing unit. Note: Fed’s spindle in machine. PAGE : 2 S2A S2R S2V S1A S1R S1V Confidentia
  • 10.
  • 11.
  • 12.
    S1A S1R S1V DATE : June 1,2009 COMPANY : Gros-ite Spindle AREA : PRIORITY : NONE PROBLEM STATEMENT : INSPECT SPINDLE FOR PROPER BALANCE MACHINE NAME : Spindle #1 Ser # 60380-80-01 DSO NUMBER : MACHINE DRAWING : FINDINGS : The spectrum’s on all positions meet .003 Mils spec. RECOMMENDATIONS : Repair broken dove tail. Note : Spindle has a broken dove tail and was not able to run in machine. Do to setting position. PAGE : 2 S2A S2R S2V S1A S1R S1V Confidentia