www.sertechexchange.com
High-grade Organic
Phosphate for
Agricultural and
Medical Cannabis
Industry
Certified Organic
by OMRI, WSDA,
and CDFA
www.sertechexchange.com
Project Highlights
2
1. The highest grade (total and available P) phosphate deposits in USA โ€“ premium product
5. Fully permitted, and in full operations to mine 70,000t exposed outcropping
2. Achieved organic fertilizer certification by (OMRI, WSDA, CDFA) โ€“ High margin market growing at 10-15% p.a.
3. Excellent logistical position in Central Utah to serve the entire US (West Coast and Mid West, the key organic
fertilizer markets)
4. Low cost operation and very simple processing required (only fine grinding, drying and bagging)
6. Fully operational with orders processing and shipping started in May 2020
www.sertechexchange.com
We develop and process the highest quality organic
phosphate fertilizer in the US, helping to meet the worlds
rising demand in organic fertilizer, high-welfare animal feed
and hydroponic organic nutrients
3
www.sertechexchange.com 4
Organic Phosphate Market Key Notes
The US organic food market is growing
at double digit rates annually (10% to
15%) with increase demand for organic
dry and liquid fertilizers required to
help meet this growth.
Organic agriculture/food
animal feed and hydroponic
markets markets provide a
significant sales premium.
Phosphate is one of three
primary crop nutrients
required for all plant
growth. There are no
substitutes for phosphate.
Falcon Isleโ€™s high quality
organically certified phosphate is
an essential ingredient for the
Organic Agriculture Fertilizer
Market.
1
2 3
www.sertechexchange.com
Sector Problems
USDA requires all
organic food to be
grown with organically
certified fertilizers.
Legalized cannabis will
require tighter quality
controls and greater
demand for organically
certified product.
A shortage of organic soil
inputs prevent farmers
from satisfying the rising
demand for organic food
and medical cannabis.
Existing US rock phosphate
suppliers only offer low grade
material- Available 3% P205.
Existing US rock phosphate
have heavy metal issues,
restricting their organic
certification.
High cost per P-value
(amount of Available
Phosphate per ton)
Higher demand for Micronized
Fertilizers required for
hydroponic farming.
5
www.sertechexchange.com
Solution
Falcon Isle
PhosAgri Organic
Fertilizer
Total P205 percentage
averaging
28%
An Available
guaranteed P205
percentage of
14%
3x higher than any
other organic rock
phosphate in the
United States
6
www.sertechexchange.com
Solution
Fine grinding and micronization of PhosAgri will allow
us to capitalize on both the regular organic markets and
the major growth in hydroponics.
PhosAgri, is the lowest price rock phosphate in North
America, per โ€œPโ€.
Based in Utah, Falcon Isle is centrally located to distribute to
key organic markets in both the west coast and mid-west.
7
www.sertechexchange.com
Solution
PhosAgri has very low heavy metal impurities, which has allowed it to be
organically certified by all three key certification agencies
8
www.sertechexchange.com
Organic fertilizer manufactures create
custom fertilizer blends specific for
various crop and soil conditions. These
complex blends provide broad
utilization, allowing for a pricing
premium and attractive margins.
ORGANIC FERTILIZER
MANUFACTURERS
Target Markets and Customers
The high-grade, low impurities and
organic certification of the Falcon Isle
phosphate fertilizer allow for its use as
a direct to soil organic application in
bulk or 50 lb bags for smaller farmers
and retailers.
DIRECT APPLICATION
ORGANIC DISTRIBUTION
Amazon, Home Depot Garden
Supply and Lowes Garden Supply
LARGE RETAIL
9
www.sertechexchange.com
PRICE
PER โ€œPโ€ LEVEL $.95 $2.55 $3.33 $1.55 $5.83
LOCATION/
PROXIMITY Utah Canada Tennessee Idaho Florida
QUALITY
AVAILABLE
P205%
14% 7% 3% 3% 3%
Competition
9
www.sertechexchange.com
Logistical Position
9
Top 10 states
by farm sales
Sales
($bn)
CA 2.4
WA 0.6
PA 0.3
OR 0.3
WI 0.2
NY 0.2
TX 0.2
MI 0.2
CO 0.1
AZ 0.1
53% of
organic farm
sales
www.sertechexchange.com
The Importance of Phosphate in Cannabis
Phosphate is a vital nutrient required by cannabis plants that fulfills many
important biological functions that results in:
Reduced growth cycle given the
explosive growth produced by a fast root
development. The grower can start the bloom
stage of plants much earlier, thus reducing the
total time required to harvest the cannabis crop
Improved yields and
quality of buds and
seeds
An essential nutrient for
cannabis plants to perform the
different metabolic processes โ€“
such as photosynthesis
Improves Bloom for
better flower
development.
12
www.sertechexchange.com
Historic Phosphate Resource Estimates:
Southern Section
11.0 million tons of indicated resources (1983)
๏‚ท 60,000 tons previously stripped /exposed
๏‚ท 3,887,500 tons surface mineable (1979)
๏‚ท 3,044,000 tons underground mineable (1953)
Northern Section
12.0 million tons of inferred resources (1983)
4.0 million tons surface mineable (1983)
13
www.sertechexchange.com 14
Proposed Production
Falcon Isle began
production on the
Falcon Isle Phosphate
Project in the third
quarter of 2019 priced
at $260 p/t FOB
Initial production is
focused on the
exposed phosphate
material where there
is approximately
70,000 tons of
exposed organically
certified phosphate
rock.
Following the removal
of material from this
area, additional
production will focus
on near surface
estimated historic
resource of
approximately
7.0 million tons.
www.sertechexchange.com 15
Process
Surface Mining
Extraction
Rough
Crushing
Fine Micro-
Grinding
Packaging in 1
Ton Tote Gags
www.sertechexchange.com
Project Development and Production
Falcon Isleโ€™s business plan involves the use
of third-party consultants, third party
mining contractors and third-party
processing facilities.
The use of outside contractors allows Falcon
Isle to move more quickly into operations
and minimize up front capital required to
expedite production and sales.
Falcon Isleโ€™s contractors will provide and
maintain all the necessary equipment for the
operations including all of the heavy machinery
for the extraction, crushing, grinding and
transportation throughout the entire extraction,
processing and transportation operation.
16
www.sertechexchange.com
Strengths and
Competitive Advantages Strong and experienced management,
and consultant team including Stantec
Engineering.
Near term cash flow from sales to top tier
organic fertilizer manufacturers and distributors,
including Scotts Miracle-Gro, Foster Farmers
Organic Fertilizer, Growers Secret, and more
Location โ€“ market and infrastructure
close, centrally located in Utah
Product well positioned for growth in rapidly
expanding organic agriculture/food and
medical cannabis market
14
www.sertechexchange.com
Strengths and
Competitive Advantages Existing 70,000 tons of surface
exposed high-grade organic rock
phosphate material remaining from
prior operations
Strong double-digit growth in the
organic food and cannabis market,
10% to 15% annually
OMRI, WSDA and CDFA organic
certification for organic fertilizer.
Low capital and operating costs with
the use of third-party contractors and
consultants
70,000
tons
15
www.sertechexchange.com 17
CEO - R. Shawn Hilda
is an experienced and seasoned executive who has launched and operated companies with
international expansion in the fields of Natural Resource Assets, Construction, Manufacturing,
Real Estate Development, Financial Management and Investment.
Serving as President and CEO of Falcon Isle Resources, Inc., Carlton Tate Group, LLC and
Caymus Capital International, LLC, Shawn Heldasโ€™ diversified expertise has allowed these
companies to successfully expand into projects nationally and internationally.
Shawn is a licensed general contractor in 5 states plus Guam.
Shawn graduated with a Bachelor of Science Degree from the
Architecture School of Design at Arizona State University with
a minor in Marketing.
R. Shawn Helda
www.sertechexchange.com 20
Stantec Engineering
Greg has over 20 years in the mining and process industry and has lived or worked
in Canada, Mongolia, Mexico, Germany, and India as well as the United States. He
has served in a variety of technical and operating positions during his industry
experience, including production engineering, project management, and field-level
project coordination, as well as working in coal, aggregate, and hard rock
processing facilities.
Greg Gillian
EDUCATION
โ€ข B.S., Mining Engineering,
Minerals Processing Option,
Pennsylvania State
University, University Park,
Pennsylvania, 1999
CERTIFICATIONS & TRAINING
CERTIFICATIONS
& TRAINING
โ€ข Qualified Professional,
Mining & Metallurgical
Society of America, Boulder,
Colorado, 2018 Engineer in
Training, 1999
โ€ข Certified Surface Foreman,
Virginia, 2004
MEMBERSHIPS
โ€ข Board of Directors,
National Mining
Association Board of
Directors, Utah Mining
Association
โ€ข Member, Society for
Mining, Metallurgy, and
Exploration
Certified Mining Engineer
www.sertechexchange.com 21
Stantec Engineering
Larry Henchel brings 40 years of exploration, mine geology, mineral
property evaluation and project management expertise to his project
teams. He has worked in numerous positions throughout his career,
including field geologist, mine geologist, regional exploration manager,
project manager and consultant. His prior employment with mine
operators gives him the hands-on experience that provides an
understanding of geological considerations critical to successful mining
ventures. Larryโ€™s significant international experience includes Canada,
India, Mongolia, Colombia, the Middle East and southern Africa, which
has brought insight into mine development environments throughout the
world. His multi-commodity base covers much of the mining industryโ€™s
resources, including coal, oil shale, bituminous sand, phosphate, potash,
mineral brine, uranium and iron ore deposits. Larry has authored and co-
authored numerous Technical Reports on mineral properties for clients,
submitted to major international securities markets including the
Toronto, New York, Australian and Hong Kong exchanges.
Larry Henchel
EDUCATION
โ€ข B.Sc. Geology, Saint
Lawrence University,
Canton, New York, 1978
Certified Geologist
REGISTRATIONS
โ€ข Professional Geologist,
Association of Professional
Engineers and Geoscientists
of Alberta
โ€ข Professional Geologist,
State of Utah
MEMBERSHIPS
โ€ข Registered Member, Society
for Mining, Metallurgy, and
Exploration
www.sertechexchange.com 22
Logan Simpson
Jim is a lawyer, certified environmental planner and public
administrator who has worked in state and local government,
as well as for private entities and clients. He has advised local
government clients on planning and land use matters,
managed federal environmental assessment and natural
resource planning projects, and provided staff support to a
non-profit, multi-interest corporation that conducts
performance reviews of state oil and gas regulatory programs.
Jim directed the Utah Division of Oil, Gas, and Mining and has
chaired and served on state and interstate natural resource
and regulatory boards and commissions. He was the City
Attorney of Park City, Utah for six years; has privately
practiced public lands, natural resources, and water law; and
has worked as a BLM land law examiner, minerals permitting
specialist, and exploration and engineering geologist.
James Carter
Boards and
Commissions:
โ€ข Past Chair of the Westminster
College Alumni Board, Chair of
the Henry's Fork Foundation
Board, Chair of the Holladay
Planning Commission, Member
of the Friends of Great Salt
Lake Advisory Board
โ€ข Past City Attorney of Park City,
minerals permitting specialist,
National Environmental Policy
Act (NEPA) planning and
documentation. Past Chair of
the Westminster College
Alumni Board, Chair of the
Henry's Fork Foundation Board.
Certified Environmental Planning Firm
www.sertechexchange.com 23
Prepared for Falcon Isle Resources, Inc.
50 West Broadway Suite 150
Salt Lake City, UT 84101
801-337-1644
shawn.helda@falconisleresources.com
www.falconisleresources.com

Falcon isle resources deck-team v6-final 5-4-20 (2nd round)

  • 1.
    www.sertechexchange.com High-grade Organic Phosphate for Agriculturaland Medical Cannabis Industry Certified Organic by OMRI, WSDA, and CDFA
  • 2.
    www.sertechexchange.com Project Highlights 2 1. Thehighest grade (total and available P) phosphate deposits in USA โ€“ premium product 5. Fully permitted, and in full operations to mine 70,000t exposed outcropping 2. Achieved organic fertilizer certification by (OMRI, WSDA, CDFA) โ€“ High margin market growing at 10-15% p.a. 3. Excellent logistical position in Central Utah to serve the entire US (West Coast and Mid West, the key organic fertilizer markets) 4. Low cost operation and very simple processing required (only fine grinding, drying and bagging) 6. Fully operational with orders processing and shipping started in May 2020
  • 3.
    www.sertechexchange.com We develop andprocess the highest quality organic phosphate fertilizer in the US, helping to meet the worlds rising demand in organic fertilizer, high-welfare animal feed and hydroponic organic nutrients 3
  • 4.
    www.sertechexchange.com 4 Organic PhosphateMarket Key Notes The US organic food market is growing at double digit rates annually (10% to 15%) with increase demand for organic dry and liquid fertilizers required to help meet this growth. Organic agriculture/food animal feed and hydroponic markets markets provide a significant sales premium. Phosphate is one of three primary crop nutrients required for all plant growth. There are no substitutes for phosphate. Falcon Isleโ€™s high quality organically certified phosphate is an essential ingredient for the Organic Agriculture Fertilizer Market. 1 2 3
  • 5.
    www.sertechexchange.com Sector Problems USDA requiresall organic food to be grown with organically certified fertilizers. Legalized cannabis will require tighter quality controls and greater demand for organically certified product. A shortage of organic soil inputs prevent farmers from satisfying the rising demand for organic food and medical cannabis. Existing US rock phosphate suppliers only offer low grade material- Available 3% P205. Existing US rock phosphate have heavy metal issues, restricting their organic certification. High cost per P-value (amount of Available Phosphate per ton) Higher demand for Micronized Fertilizers required for hydroponic farming. 5
  • 6.
    www.sertechexchange.com Solution Falcon Isle PhosAgri Organic Fertilizer TotalP205 percentage averaging 28% An Available guaranteed P205 percentage of 14% 3x higher than any other organic rock phosphate in the United States 6
  • 7.
    www.sertechexchange.com Solution Fine grinding andmicronization of PhosAgri will allow us to capitalize on both the regular organic markets and the major growth in hydroponics. PhosAgri, is the lowest price rock phosphate in North America, per โ€œPโ€. Based in Utah, Falcon Isle is centrally located to distribute to key organic markets in both the west coast and mid-west. 7
  • 8.
    www.sertechexchange.com Solution PhosAgri has verylow heavy metal impurities, which has allowed it to be organically certified by all three key certification agencies 8
  • 9.
    www.sertechexchange.com Organic fertilizer manufacturescreate custom fertilizer blends specific for various crop and soil conditions. These complex blends provide broad utilization, allowing for a pricing premium and attractive margins. ORGANIC FERTILIZER MANUFACTURERS Target Markets and Customers The high-grade, low impurities and organic certification of the Falcon Isle phosphate fertilizer allow for its use as a direct to soil organic application in bulk or 50 lb bags for smaller farmers and retailers. DIRECT APPLICATION ORGANIC DISTRIBUTION Amazon, Home Depot Garden Supply and Lowes Garden Supply LARGE RETAIL 9
  • 10.
    www.sertechexchange.com PRICE PER โ€œPโ€ LEVEL$.95 $2.55 $3.33 $1.55 $5.83 LOCATION/ PROXIMITY Utah Canada Tennessee Idaho Florida QUALITY AVAILABLE P205% 14% 7% 3% 3% 3% Competition 9
  • 11.
    www.sertechexchange.com Logistical Position 9 Top 10states by farm sales Sales ($bn) CA 2.4 WA 0.6 PA 0.3 OR 0.3 WI 0.2 NY 0.2 TX 0.2 MI 0.2 CO 0.1 AZ 0.1 53% of organic farm sales
  • 12.
    www.sertechexchange.com The Importance ofPhosphate in Cannabis Phosphate is a vital nutrient required by cannabis plants that fulfills many important biological functions that results in: Reduced growth cycle given the explosive growth produced by a fast root development. The grower can start the bloom stage of plants much earlier, thus reducing the total time required to harvest the cannabis crop Improved yields and quality of buds and seeds An essential nutrient for cannabis plants to perform the different metabolic processes โ€“ such as photosynthesis Improves Bloom for better flower development. 12
  • 13.
    www.sertechexchange.com Historic Phosphate ResourceEstimates: Southern Section 11.0 million tons of indicated resources (1983) ๏‚ท 60,000 tons previously stripped /exposed ๏‚ท 3,887,500 tons surface mineable (1979) ๏‚ท 3,044,000 tons underground mineable (1953) Northern Section 12.0 million tons of inferred resources (1983) 4.0 million tons surface mineable (1983) 13
  • 14.
    www.sertechexchange.com 14 Proposed Production FalconIsle began production on the Falcon Isle Phosphate Project in the third quarter of 2019 priced at $260 p/t FOB Initial production is focused on the exposed phosphate material where there is approximately 70,000 tons of exposed organically certified phosphate rock. Following the removal of material from this area, additional production will focus on near surface estimated historic resource of approximately 7.0 million tons.
  • 15.
  • 16.
    www.sertechexchange.com Project Development andProduction Falcon Isleโ€™s business plan involves the use of third-party consultants, third party mining contractors and third-party processing facilities. The use of outside contractors allows Falcon Isle to move more quickly into operations and minimize up front capital required to expedite production and sales. Falcon Isleโ€™s contractors will provide and maintain all the necessary equipment for the operations including all of the heavy machinery for the extraction, crushing, grinding and transportation throughout the entire extraction, processing and transportation operation. 16
  • 17.
    www.sertechexchange.com Strengths and Competitive AdvantagesStrong and experienced management, and consultant team including Stantec Engineering. Near term cash flow from sales to top tier organic fertilizer manufacturers and distributors, including Scotts Miracle-Gro, Foster Farmers Organic Fertilizer, Growers Secret, and more Location โ€“ market and infrastructure close, centrally located in Utah Product well positioned for growth in rapidly expanding organic agriculture/food and medical cannabis market 14
  • 18.
    www.sertechexchange.com Strengths and Competitive AdvantagesExisting 70,000 tons of surface exposed high-grade organic rock phosphate material remaining from prior operations Strong double-digit growth in the organic food and cannabis market, 10% to 15% annually OMRI, WSDA and CDFA organic certification for organic fertilizer. Low capital and operating costs with the use of third-party contractors and consultants 70,000 tons 15
  • 19.
    www.sertechexchange.com 17 CEO -R. Shawn Hilda is an experienced and seasoned executive who has launched and operated companies with international expansion in the fields of Natural Resource Assets, Construction, Manufacturing, Real Estate Development, Financial Management and Investment. Serving as President and CEO of Falcon Isle Resources, Inc., Carlton Tate Group, LLC and Caymus Capital International, LLC, Shawn Heldasโ€™ diversified expertise has allowed these companies to successfully expand into projects nationally and internationally. Shawn is a licensed general contractor in 5 states plus Guam. Shawn graduated with a Bachelor of Science Degree from the Architecture School of Design at Arizona State University with a minor in Marketing. R. Shawn Helda
  • 20.
    www.sertechexchange.com 20 Stantec Engineering Greghas over 20 years in the mining and process industry and has lived or worked in Canada, Mongolia, Mexico, Germany, and India as well as the United States. He has served in a variety of technical and operating positions during his industry experience, including production engineering, project management, and field-level project coordination, as well as working in coal, aggregate, and hard rock processing facilities. Greg Gillian EDUCATION โ€ข B.S., Mining Engineering, Minerals Processing Option, Pennsylvania State University, University Park, Pennsylvania, 1999 CERTIFICATIONS & TRAINING CERTIFICATIONS & TRAINING โ€ข Qualified Professional, Mining & Metallurgical Society of America, Boulder, Colorado, 2018 Engineer in Training, 1999 โ€ข Certified Surface Foreman, Virginia, 2004 MEMBERSHIPS โ€ข Board of Directors, National Mining Association Board of Directors, Utah Mining Association โ€ข Member, Society for Mining, Metallurgy, and Exploration Certified Mining Engineer
  • 21.
    www.sertechexchange.com 21 Stantec Engineering LarryHenchel brings 40 years of exploration, mine geology, mineral property evaluation and project management expertise to his project teams. He has worked in numerous positions throughout his career, including field geologist, mine geologist, regional exploration manager, project manager and consultant. His prior employment with mine operators gives him the hands-on experience that provides an understanding of geological considerations critical to successful mining ventures. Larryโ€™s significant international experience includes Canada, India, Mongolia, Colombia, the Middle East and southern Africa, which has brought insight into mine development environments throughout the world. His multi-commodity base covers much of the mining industryโ€™s resources, including coal, oil shale, bituminous sand, phosphate, potash, mineral brine, uranium and iron ore deposits. Larry has authored and co- authored numerous Technical Reports on mineral properties for clients, submitted to major international securities markets including the Toronto, New York, Australian and Hong Kong exchanges. Larry Henchel EDUCATION โ€ข B.Sc. Geology, Saint Lawrence University, Canton, New York, 1978 Certified Geologist REGISTRATIONS โ€ข Professional Geologist, Association of Professional Engineers and Geoscientists of Alberta โ€ข Professional Geologist, State of Utah MEMBERSHIPS โ€ข Registered Member, Society for Mining, Metallurgy, and Exploration
  • 22.
    www.sertechexchange.com 22 Logan Simpson Jimis a lawyer, certified environmental planner and public administrator who has worked in state and local government, as well as for private entities and clients. He has advised local government clients on planning and land use matters, managed federal environmental assessment and natural resource planning projects, and provided staff support to a non-profit, multi-interest corporation that conducts performance reviews of state oil and gas regulatory programs. Jim directed the Utah Division of Oil, Gas, and Mining and has chaired and served on state and interstate natural resource and regulatory boards and commissions. He was the City Attorney of Park City, Utah for six years; has privately practiced public lands, natural resources, and water law; and has worked as a BLM land law examiner, minerals permitting specialist, and exploration and engineering geologist. James Carter Boards and Commissions: โ€ข Past Chair of the Westminster College Alumni Board, Chair of the Henry's Fork Foundation Board, Chair of the Holladay Planning Commission, Member of the Friends of Great Salt Lake Advisory Board โ€ข Past City Attorney of Park City, minerals permitting specialist, National Environmental Policy Act (NEPA) planning and documentation. Past Chair of the Westminster College Alumni Board, Chair of the Henry's Fork Foundation Board. Certified Environmental Planning Firm
  • 23.
    www.sertechexchange.com 23 Prepared forFalcon Isle Resources, Inc. 50 West Broadway Suite 150 Salt Lake City, UT 84101 801-337-1644 shawn.helda@falconisleresources.com www.falconisleresources.com